BUILDING SERVICES (ARC 2423)
PROJECT 2 - APPLICATION OF BUILDING SERVICES CHEN ROU ANN 1001G76463
SCHOOL OF ARCHITECTURE
MS SATEERAH
COLD WATER AND HOT WATER SUPPLY SYSTEM
Washroom 1:50
HT
WATER SUPPLY SYSTEM BY-LAW UBBL 1984 UNDER UNDER UBBL BY-LAW 48 Suitable measures should be taken to prevent penetration of dampness and moisture into the building.
From roof
19MMØ COPPER PIPE AS HOT WATER
UNDER UBBL BY-LAW 123 Allowing adequate accommodation of the pipes, stop cocks to enable repairs and access openings to ducts or enclosure
LEGEND
GROUND FLOOR
WATER METER F
FILTER
GV
Incoming water from SYABAS
WATER TANK
SC
HOT WATER
GATE VALVE
Kitchen sink
Water meter Measure volume of water used
STOP COCK SHOWER WATER TANK SHOWER HEAD KITCHEN SINK TOILET BASIN WATER CLOSET COLD WATER
FIRST FLOOR
Shower head
HOT WATER
Gate valve Allow or prevent flow of liquids
ROOF LEVEL
SC HT
SCHEMATIC DIAGRAM OF WATER SUPLY SYSTEM
25MMØ DROPPER UPVC CLASS D DISTRIBUTION PIPE
19MMØ COPPER PIPE AS HOT WATER
20MMØ CW PI PE
SC
Stop cock Restrict or isolate flow of liquid through a pipe
ROOF LEVEL
SERVICE PIPE
20MMØ CW PIPE
SC
SC
SC
GV
SC 20MMØ CW PI PE
F
32MMØ UPVC CLASS D PIPE
GV GROUND LEVEL
GROUND LEVEL
GT
DRAINAGE SYSTEM
TO INDAH WATER KONSORTIUM
A drainage system is one that is used to drain foul water and surface water so that there will be no overloading problems in periods of heavy rain.
DRAIN SUMP
MH
MH
LEGEND GUTTER
GT
GUTTER
GT
DRAINAGE PIPE
GT
WATER FLOW DIRECTION
MH
MAN HOLE DRAINAGE SUMP
DRAIN SUMP