LIGHTING ANALYSIS CHEN ROU ANN 1001G76463
THE SITE IS LOCATED IN CHOW KIT, KUALA LUMPUR. CHOW KIT IS AS A TROPICAL COUNTRY, THE BUILDING IS BEING EXPOSED TO SUN ALL YEAR ROUND. BASED ON THE READINGS OF THE LIGHTING DURING SITE ANALYSIS, IT IS CONCLUDED THAT THE SITE HAS A GOOD LIGHTING CONDITION,
AN
RIS
GA
WHILE MEETING THE REQUIREMENTS FOR MAXIMUM EFFICIENCY. THE
AN
AD
MP
SE
FRONT AND BACK ALLEY ARE WELL LIT, WITH ENOUGH SUN LIGHT TO SUFFICIENTLY BRIGHTEN UP THE BUILDING.
B SITE 82 sqm 2. 5 8 REA
A
THE INTENTION OF THE DESIGN IS TO ALLOW AS MUCH SUN INTO THE
KAN
mm
3050
ISAN
GAR
ANJA
UNAN
BANG
BUILDING AS POSSIBLE, MINIMIZING MECHANICAL HELP, HENCE REDUCING ELECTRICITY CONSUMPTION.
DAYLIGHTING GROUND FLOOR
CAFE
FOOD AREA
REST AREA
THE AREAS BEING HIGHLIGHTED ARE THE AREAS THAT REQUIRE NO ARTIFICIAL LIGHTING. MOST OF THE AREAS OF THE SELECTED ARE EXPOSED TO SUNLIGHT, GIVING A PLEASANT FEEL.
ARTIFICIAL LIGHTING KITCHEN AREA
ARTIFICIAL LIGHTING
FIRST FLOOR
OFFICE AREA
DISCUSSION ROOM
NATURAL LIGHTING CONTOUR
DAY LIGHTING
REFLECTED CEILING PLAN
ARTIFICIAL LIGHTING CONTOUR
SECOND FLOOR AREAS IN THE KITCHEN ARE DARKER, AS ITS SURROUNDED BY WALLS, AND IT NEEDS BRIGHT LIGHTS FOR USERS TO BE ABLE TO SEE PROPERLY TO COOK, HENCE LIGHTING IS INTRODUCED.
THE DISCUSSION ROOM IS SITUATED IN THE BUILDING, FAR FROM THE SUNLIGHT, THEREFORE, LIGHTING IS INTRODUCED.
THE OFFICE AREA IS SITUATED AT THE FRONT OF THE BUILDING, THOUGH EXPOSED TO THE SUN, IT IS NOT BRIGHT ENOUGH TO BE SUFFICIENT FOR AN OFFICE BAREA, THEREFORE ARTIFICIAL LIGHTING IS NEEDED.
LIGHTING FITTINGS