Experience the Progress. The new crawler excavator R 924 meets new phase IIIB engine emissions standards. A brand new maintenance concept which improves productivity A modern and spacious cab which allows the operator to work in unrivalled comfort A versatile tool holder for quick and efficient work under all circumstances
Liebherr-Great Britain Ltd. Normandy Lane, Stratton Business Park Biggleswade, SG18 8QB Phone: 01767 60 2100 E-mail: info.lgb@liebherr.com www.facebook.com/LiebherrConstruction www.liebherr.co.uk
The Group
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
kelston s
South West based muckshifters Kelston Sparkes hav on big earthmoving and quarrying contracts but wh slightly different from the norm.
Using the company’s largest excavator an 85 tonne excavation of a massive silage pit on one of the larg West of England famed for its large aggregate qua lay solid rock.
Once the top soils were stripped and stockpiled for the rock. Ably assisted by a Caterpillar D8R rip tract Caterpillar 740 articulated dump trucks for the long cope with the majority of the material on site, the D ripper the D8R was attacking pockets of stubborn r Ripping downhill ensured the best penetration of th the tractor gave just a little more assistance in pullin
At the tip area another Hitachi from the excavator fl elsewhere ion the job while another Caterpillar doze tipped material.
DCM
sparkes
ve a long history of operating large equipment hen DCM caught up with them the contract was
Hitachi Zaxis 870 work was commencing on the gest farms in the area. With this area of the South arries, it was no surprise that just below the surface
r later re-use the big Hitachi was used to excavate tor, the Hitachi was loading a small fleet of g haul to the tipping area. Whilst the Hitachi could D8R made the job easier. Using its single shank rock before the Hitachi could attempt to load it. he ripper shank and with the added 35 tonne of ng the rock out.
fleet, a Zaxis 255LC was loading topsoils to be used er, this time a D6M, was being used to level any
Just a few reasons why using an NFDC member means you are getting the best of the best...
Competent•Trusted Audited• Experienced But don’t just take our word for it... “Using NFDC members means CDM2007 Appendix 4
DRIDS Demolition and Refurbishment Information Data Sheets
Discover how the award-winning DRIDS have been developed to provide the demolition and refurbishment industry with relevant
knowledge and practicable information on materials and products that they currently
manage, or required to manage in the future.
is fully covered and my clients have discharged their duties and employed competent contractors, which makes all of our jobs a lot easier.”
Found out more todaY: www.nfdc-drids.co.uk
- John Woodward, C&D Consultancy For more information on the National Federation of Demolition Contractors please visit our website.
NFDC, Resurgam House, Paradise, Hemel Hempstead, Herts, HP2 4TF
T:01442 217144 F:01442 218268 W: www.demolition-nfdc.com
WHY ARE DIFFERENT TO THE REST? • CDM-C Services for all demolition projects from £10000 to £10million • 5 Full IDE members in the team • Specialists in tower block demolitions (we currently have 23 tower blocks under way) • NDTG approved trainers delivering over 130 different training courses throughout Europe • Approved “Zero Harm” trainers • Approved as World Wide trainers for Rammer • NFDC ISP member
www.demolishdismantle.co.uk - www.demolitiontraining.com margaret@demolishdismantle.co.uk - Call John Woodward on 07870 404906
ROTAR ENGINEERED TO GRAB ATTENTION AND EVERYTHING ELSE
THE PLANT MACHINERY SOLUTION SEPARATION/CRUSHING/MIXING/WASHING/SCREENING/RECYCLING/DEMOLITION
01606 83 55 44
www.worsleyplant.co.uk
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
komatsu
The first two of the five machine order placed by M the Ffos y Fran land reclamation scheme in Merthyr
One each of the PC3000 backhoe and face shovel w the derelict site overlooking the South Wales valley excavators are loading a large fleet of Caterpillar 77
Taking between three and four buckets to fill the 77 100 million tonnes of overburden to expose the hig Coal, all 11 million tonnes of it.
Unlike quarrying operation where the aggregate is remove it, the overburden is blasted differently with the precious coal beneath. Once the blasts have be remove the material which will be stored in large ov in the restoration stages. Raw power is needed to r abundance. Power to the PC3000 comes from a Kom
With an estimated 17 year lifespan of the project th team of specialist engineers complete with their ow
DCM
u mining
Miller Argent with Komatsu Mining went to work at r Tydfil in late 2007.
were placed to work moving overburden from y town. Both equipped with 15m3 buckets, the 77F trucks with a 91 tonne capacity.
77 skips, the PC3000s are expected to move almost ghest quality coal found in the UK, Welsh Steam
blasted from the ground to allow machinery to h the material being “lifted� so as not to disturb een undertaken the Komatsus will move in and verburden dumps until it is used to fill the voids remove the overburden and the Komatsu has it in matsu V12 diesel engine developing 1260hp
he Komatsus are looked after on site by a dedicated wn purpose built workshops.
DCM
DCM
DCM
DCM
DCM
DCM
DCM
DCM
h c wilso
Well respected abnormal load specialists H C Wilson f for the European manufacturers of mining machines w products into the UK. Over the last three decades Wil mining shovels which have operated on these shores f
In 2007 the company won the contract to transport fiv shovels to the newly opened Miller Argent Ffos y Fran Wales. Each machine, when broken down into their co to transport from the manufacturing plant in Germany to plan routes, organise escort vehicles and arrange th to move across Europe enabling the loads to be delive to build up the machines in the correct order.
The loads need to be delivered in a chronological ord being the first to arrive on site along with the crated c fixings and ancillary items required to put each machin the build two cranes are used to unload and commenc undercarriage and 40t track frames are mated up, the bolted into place. Carried from Germany on one of W superstructure measures almost 6m in width and is the the site. Within five days the machine is built and testi
DCM
on
from Elmswell in Suffolk are usually the first choice when it comes to transporting their lsons have transported the majority of the large from Demag, O&K, Komatsu mining and O&K Terex.
ve 250 tonne Komatsu PC3000 excavator and face n land reclamation project in Merthyr Tydfil, South omponent parts makes up nine loads for the company y. The experienced staff in the Suffolk office are able he necessary permits to allowing the abnormal loads ered in time for the engineers from Komatsu Mining
der with the machine’s undercarriage and track frames components which include the bolts, ne together. For the majority of day one of ce the machines assembly. Once the 22t e 68t superstructure is craned into position and Wilson’s Nooteboom 2 bed 4 low loaders, the e heaviest of all the components delivered to ing commenced in readiness for it to start operating.
MONITOR
-
DETECT
-
PROTECT
Remote Boundary Monitoring of Dust, Noise and Meteorological Parameters
Key Features
- Fully integratable with Emicontrols dust control turbine range - Fully Automatic Monitor, Detect, Protect control package - Email and text alarms for exceeded dust and noise levels - Dedicated web hosted data with secure private login - Maintenance free wind speed and direction sensor - Real time dust (PM10, PM2.5 TSP) and noise levels - IEC61672-1 Compliant Sound Level Meter - Proven dust measurement technology - Heated Inlet to remove moisture
Applications
- Demolition Phase Monitoring - Monitoring entertainment noise - Petrochem and VOC monitoring - General Compliance monitor - Site monitoring strategies - Waste Transfer Stations - Section 61 compliance - PPG24 compliance - Construction Sites
European Attachments Group Ltd
Saxon Works, South Street, Openshaw, Manchester, M11 2FY Tel: 0845 4745670 Sales: 0845 4745670 Email: sales@siteshield360.com Web: www.siteshield360.com
Austin Wilkinson Demolition are experienced in all aspects of demolition, remediation, asbestos removal, excavation and plant hire. Working nationwide to complete contracts efficiently and safely. All staff are NVQ qualified and take part in the latest demolition training.
Factories
DEMOLITION EXCAVATION REMEDIATION PLANT HIRE
www.awdemolition.co.uk - awdemolition@gmail.com AW Demolition, Bowden House, Macdonald Road, Irlam, Manchester, M44 5LH
www.rpadesignandmedia.co.uk
DCM
DEMOLITION CONSTRUCTION MOVING