Current situation

Dyke relocation at Voorsterklei

New situation

Dyke relocation work is being carried out in Voorsterklei to protect the hinterland during high water of the river IJssel.

dyke

dyke

high water

IJssel

IJssel

A new dyke is being constructed a kilometre inland. Lowering sections of the old dyke on the north and south sides will create inflow and outlet openings.

N

E

W

S

(farming) ground

high water

Sections of the surface level are being lowered by between 1 and c. 3 metres and several houses and farming companies are being moved. Where possible, the ground will remain in use for farming purposes.

IJssel Lowering the dyke will create inflow and outlet openings during high water.

Key to map: planning area ‘text’

modified / new situation

IJssel

new dyke lowering dyke outlet opening

excavation/lowering

existing dyke

current dyke

Lowering the surface level will encourage flow during high water.

(provincial) road railway track oxbows inflow opening Voorsterklei

dyke ZUTPHEN

Planning 1 2 3 4

Effect

Project decision Preparation phase Start of work Delivering water safety

29 cm drop in water level during high water at Voorsterklei.

VOORST

Scale: 1 2012

www.roomfortheriver.nl

2

4

3 2013

2014

0

1 km

2015 Jan 2015 / 33