Dyke relocation in westenholte

Page 1

Dyke relocation in Westenholte

Current situation houses

The dyke next to the Westenholte district of Zwolle is being relocated 300 metres inland. Two channels are also being excavated. These interventions will ensure that the river IJssel can discharge more water and that the city Zwolle and the hinterland are protected.

dyke

houses

houses

high water

channel

dyke

houses

IJssel

V E E C AT E N ZWOLLE

E S

viewpoint

IJssel

Key to map:

country estate

bridge N331

planning area ‘text’

channel

high water IJssel

N W

New situation

modified / new situation

dyke channel

bridge

existing objects new, modified or replaced objects

nature reserve channel

new bridge excavated dyke

ZALK

farm

new bridge new channel

IJssel

bird hide

dyke

W E S T E N H O LT E

motorway

country estate

Vreugderijkerwaard (flood plain)

(provincial) road

A28 houses

railway track

Spoolde

houses on a dyke

ZWOLLE

water purification plant

Planning Effect

SPOOLDE

1 2 3 4

Project decision Preparation phase Start of project Delivering water safety

14 cm drop in water level during high water.

N50

Scale: 1 2008

www.roomfortheriver.nl

2 2009

2010

3 2011

2012

4 2013

2014

2015

0

400 m

2016 Jan 2015 / 38


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.