Record of Site Condition Process
Jim Phimister
The Process Phase I ESA
Phase II ESA
Record of Site Condition Remediation
Phase I ESA
Phase II ESA
Record of Site Condition Remediation
Objective of a Phase I ESA To identify potential sources of environmental impairment both on & off-site
Site History
Toronto Reference Library
Air Photo
Toronto City Archives
Fire Insurance Map Ecolog ERIS Report
Site Inspection
Interviews Site personnel Neighbours Former employees Government officials etc.
SAMPLING
Phase I ESA
Phase II ESA
Record of Site Condition Remediation
Objective of a Phase II ESA To verify potential sources of environmental impairment identified during the Phase I ESA
Soil Test Drilling
Ground Water Sampling & Monitoring
Laboratory Analysis LABORATORY USE ONLY Arrival C ondition:
Good
Poor (complete "Notes")
Arrival Temperature: 5623 M cA dam Ro ad; M ississauga, Ontario ; L4Z 1N9 P ho ne: 905-501-9998 o r 800-856-6261 Fax: 905-501-0589
Client Information
Report Information
C ompany:
1. Name:
C ontact:
Email:
Address:
2. Name:
AGAT Job Number: Notes:
(P lease " x" tho se that apply) Single sample per page
Email: Fax:
Email:
C lient Project #:
Email:
Ind/Co m
PWQO
Region
Reg 558
(indicate one)
C C ME Other (indicate)
Res/P ark
Sanitary
Ag
Storm
Sample Ident ification
(Please " x" those that apply)
Sewer Use
Date / Time Sampled
Sample M atrix
5 to 7 working days Rush TAT:
3 to 5 days 48 to 72 hours 24 to 48 hours Date Required:
Is this a drinking water sample (po table water intended fo r human co nsumptio n)? Yes No
If "Yes" please use the Drinking Water Chain of Custody Record
# of Containers
Comments - Site/Sample Inf o, Sample Containment
PCBs
Reg 153 Table
Regular TAT:
PAHs
Regulatory Guideline Required: (indicate one)
Excel Fo rmat Included
3. Name:
AGAT Quotation #:
(Please " x" t he applicable box below)
M ultiple samples per page
3. Name:
PO#:
Turnaround Time (TAT) Required
VOCs
Phone:
Report Format
TCLP
CHAIN OF CUSTODY RECORD
For specif ic requirement s (I.e. TCLP parameters or sewer use region) please complete " Special Instructions" below.
Sample Relinquished By (print name & sign)
Date/Time
Samples Received By (print name and sign)
Date/Time
Sample Relinquished By (print name & sign)
Date/Time
Samples Received By (print name and sign)
Date/Time
Special Instructions
Page
of
Appropriate Standards Background – Table 1 Generic – Table 2 to Table 5 Risk Assessment – Site specific criteria
Phase I ESA
Phase II ESA
Record of Site Condition Remediation
Soil Remediation
Ground Water Remediation
Phase I ESA
Phase II ESA
Record of Site Condition Remediation
The Process Phase I ESA
Phase II ESA
Record of Site Condition Remediation