2016-2021
Name
Safiyyah Mousa Khaseeb Date of Birth
01-Oct-1998 Adderess
Aroura-Ramallah Contact (Tel)
0568516444 Contact (Email)
safiyyah.khaseip110@gmail.com
Objective I seek to gain experience in the work sector where i could apply my understanding and appreciation for design, urban morphology, interior design, history, innovation and how they affect people's life. In the future, i aim to pursue further knowledge in architecture and urban planning by pursuing a Masters and PHD in the related feilds. My career goals are to gain and understand as much of the two Objective realm as possible and be exellence in them both and able to teach Ithem. seek to gain experience in the work sector where i could apply my understanding and appreciation for design, urban morphology, interior design, history, innovation and how they affect people's life. Education InExperience the future, i aim to pursue further knowledge in architecture and urban planning byatpursuing Masters PHD in theBZU. related 2020 Training Arte Vision Office. andEngineering/ 2016 -2021 Bachelor degree inaArchitectural GPAfeilds. 78.6 My goals are to gain andand understand as much of the two 2021career Some Individual Interior Exterior work. 2015 -2016 Aroura Secondary School Scientific Stream. GPA 95.0 realm as possible and be exellence in them both and able to teach 2012 -2014 Amid-East Certifi¬cations in English Language them. Participation 2018 3D Max- Autocad- Premovera- Photoshop cources with Experience World Techniacl Elite center with certificates certified by the MinistryLanguages of Education. 2020 Training at Arte Vision Office. 2021 Some Individual Interior and Exterior work. Art exhibition design competition for the Al-Qattan Founda•2019 English Language: Excellent in reading, writing, and speaking 2021 Working at Saba Engineering Office ( 01/09/2021- 31/12/2021). •tion. Arabic Language: Mother tongue 2022 Working at Pal-Designer Engineering Office ( 01/01/2022- now). 2019 Student Council Design Competition at Birzeit University.
SkillsAand abilitiesfor designing and planning the yard of the 2020 competition Church of the Nativity, in cooperation with the Bethlehem municipal•ity. Software skills: very good at Revit and AutoCAD
• good at Lumion render • Workflow very good Photoshop, illustrator • Free hand sketching skills Outcome •Sketching Communication and social Proccess skills •FreeAbility create a positive and motivational hand tosketchAutocadRevit- atmosphere Adobe (Photoshop•ing. Work both independently andSketchup. in teams RhinoIllustrator- Inde-
sign)- Lumion.
Introducers Workflow
Skills and abilities • • •• •• • • •
Languages Software skills:
very good at Revit and AutoCAD good at Lumion render English Language: very Excellent reading, writing, and speaking good in Photoshop, illustrator Arabic Language: Mother Free hand sketching skills tongue Communication and social skills Ability to create a positive and motivational atmosphere Skills Workand bothabilities independently and in teams
• Software skills: very good at Revit and AutoCAD Introducers • good at Lumion render • very good Photoshop, illustrator Eng. Dinna Qazzaz Eng. Hadeel Dweib • Free hand sketching skills • Communication 0592990942 and social skills 0595567174 • Ability to create a positive and motivational atmosphere • Work both independently and in teams
Introducers *** In the following pages, I will present some of my university and individual works Eng. Dinna Qazzaz 0592990942
*** In the following pages, I will present some of my university and individual works
#1
Graduation Project Post-pandemic school Surda-Ramallah
N IO AC RC MA DE DE S EA LIN
12.00
6.00 3.00 9.00 0.00
Site
Plan
AS LINE
DE
DEM
ARC
ACIO
N
Scale 1:500
Ground Floor Plan
First Floor Plan
Second Floor Plan
Third
Scale 1:500
Scale 1:500
Scale 1:500
Floor
Scale 1:500
Plan
#2
Residential Project Abwein _ Ramallah Indevidual Work
*URXQG )ORRU 3ODQ 3 2 1 0.28
0.33
(DVW (OHYDWLRQ
0.38 1.00
0.40
2.80
2.05 0.55
2.83
1.03 0.35
6RXWK (OHYDWLRQ
0.63
A
4.35
B
4
C
2.53
D
5
F
1.70
E
6
G
0.58
0.40
I
8 7
1.08
H
9 1.13
J
0.33
K
11 10
)LUVW )ORRU 3ODQ J
K
I
H
G
F
E
D
C
B
A
1 2 3
0.38
0.40 0.63
2.83
1.03 0.35
2.05
2.80 0.55
1.00
0.28
4.35
4
2.53
5
1.70
6
7 8
0.58
1.08
0.40
0.33
:HVW (OHYDWLRQ
1RUWK (OHYDWLRQ
9
10 11 1.13
0.33
03
04
#3 1
SHOT 1:1
Revit Project Birzeit University _ Birzeit Indevidual Work
3ODQV 1
2
3
4
5
6
7
8
9
10
1
11
2
3
4
5
6
7
8
9
10
11
3881 2971 224
75 52 75
221
75
201
75 54 75
274
910
75 48 75
1372
276
75
559
17
186
296
133
550
550
550
550
155
402
474
17
W2
B
A
20
A
B
298
W2
W2
W2
W2
W2
W2
D2
W2
D3 298
A 298
298
A
D3
10
736
10
551
10
Description
0 179 54 50
21
22 m²
D2
D4 D2
443
D4 D4
C
D5 226
D5
13 34 m²
OFFICE 12 D2 15 m² D2
4 m²
D2
D
OFFICE
OFFICE
CORIDOR
10
9
22
33 m²
11 m²
D2
16
15
14
4 m²
4 m²
44 m²
W2
W2
W2
4 m²
W2
W2
W2
E
D2
F D5
31
G
OFFICE D2 11 D2 14 m²
STORAGE STORAGESTORAGE STORAGE
W2
W2
W2
W2
G
-
-
0
17
330
187
20 28 m²
Date
---
187
7 m² D4
CORIDOR
8
D5
18
F
F
G
D1 24
OFFICE
7 19 m²
42 m² D6 OFFICE
17
G
OFFICE D2
257
1895
840
No.
194
6 19 m²
17
169
355
10
D1 CORIDOR D7
19
OFFICE D1
25 m²
5 m²
281
179
OFFICE D1 5 9 m²
15
10
OFFICE D1 4 9 m²
D5
280
201
D1 3 9 m²
D6 CORIDOR
E
E
OFFICE D1
CORIDOR D7
7 m²
257 556
603
603 10
2
23
w1
D
10 190
217
217
10
636
636
580
F
840
376
376 10
603
270
OFFICE 19 m²
STORAGE D2
226
178 85
1895
E
443
C
C D
86 9 120 9 83
D
OFFICE D1 1 12 m²
961
C
775
775
---
115
613
376
281
553
B
39 BATHROOM
212
405 474
228
460
467
83
235
415
225
415
223
415
468
415
415
568
282
415
---
415
144
B
174
75 60 75
304
75 58 75
198
75 62 75
330
160
75 58 75
170
75 60 75
612
26
140
2930
2890
---
186
296
133
550
550
550
550
155
402
474
17
474 474
3881
1
2
3
4
5
6
7
8
9
10
1
11
2
3
4
5
6
7
8
9
10
11
Birzeit University
Administiration Building 1
Ground Floor Dimenssion
1
Ground Floor Furniture
1 : 100 Groun Floor Dimension Plan
1 : 100
(OHYDWLRQV
0001 2 February,2020 Safiyyah Khaseeb Jihad Kmail
Project Number Date Drawn By Checked By
A1-1 Area Schedule (Rentable)
Level 10
9
8
Area
7
5
499 m² 493 m² 501 m² 21 m² 31 m²
3
2
North 1 : 100
W1 W2 W3 W4 W5
7DEOHV
Second floor 780
Level
40 3 2 54 5
Ground Floor First Floor Second Floor Third Floor Third Floor
Area
First floor 390
2
Grand total: 111
50 60 70 80 90 100 120 140 160
No.
Description
Date
499 m² 493 m² West 501 m² 1 21 m² 31 m²
Grounf floor 0
1 : 100
Grand total: 5
Door Schedule
D1 D2 D3 SHOT2 D4 1:1 D5 D6 D7 D8 D9
G
Area Schedule (Rentable)
No.
Width
F
90 115
Count
Grand total: 104
Type Mark
E
147 147 131
200 120 200 150 120
D
1100
159
Height
45 50 60 75 85
C
Third floor
104
147 131
Window Schedule
Width
B
1424
Grand total: 5
Type Mark
A
1
131
243
4
Stair case
200
147
108
Ground Floor First Floor Second Floor Third Floor Third Floor
6
111
11
Description
Date
Window Schedule
Height 210 220 210 210 210 210 210 210 210
Count 2 9 26 24 33 3 4 8 2
Type Mark W1 W2 W3 W4 W5
Width
Height
45 50 60 75 85
Count
200 120 200 150 120
40 3 2 54 5
Grand total: 104
D6 D7 D8 Type Mark D9
Grand total: 5
W1 W2
Grand total: 111
100 120 140 160
45 50
North Elevation Project Number
Drawn By
Area
Birzeit University Door Schedule
Type Mark Ground Floor Width D1 First Floor 50 D2 60 Second Floor D3 70 Third Floor D4 80 D5 Third Floor 90
Administiration Building
Date
Area Schedule (Rentable)
Level
Birzeit University
Checked By
Administiration
Building Height 499 m² Count
210 220 210 210 210 210 210 210 Width 210
Drawn By
Checked By
Window Schedule
A3-3
2 Scheduals 493 m² 9 501 m² 26 21 m²24 A4-1 31 m²33
0001 2 February,2020 Safiyyah Khaseeb Jihad Kmail
Project Number
Date
0001 2 February,2020 Safiyyah Khaseeb Jihad Kmail
3 4 8 Height 2
200 120
ADAP
N
Count
40 3
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
5
6
7
8
9
10
11
3881 2970 224
75 52 75 54 75
368
75 54 75
274
910
75 48 75
584
75 46 75
226
75 50 75
165
276
75
559
W2
A
A W2
W2
W2
W2
W2
W2
W2
W2
W2
D1
475
W2
B
B 396
OFFICE
376
-
227
454
415
607
405
226 303
74
133
130
78
D
40 D3 4 m²
75
C
D
1895
W4
E
E
F
F No.
G
G
35
42 D1
281
OFFICE
30 D1 24 m²
19 m²
31
B
STORAGE D3 46
OFFICE
3 m² D8 D8 D3 STORAGE
32
39
16 m²
28 m²
D1 STORAGE
44
D1 STORAGE
45
3 m²
43
D8
WAITTING HALL
WAITTING HALL
38
37
91 m²
C STORAGE
D1
Description
W2
D1
48
W3 W3
D
2 m² OFFICE
D1 OFFICE
1 m²
8D3 m²
WAITTING HALL
D1
D1
STORAGE
36 19 m²
2 m²
D3
D2 OFFICE
D2
D2
34
33
6 m²
16 m²
E
66 m²
W2 W2 D1
F
Date W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5 W5
G
-
-
---
17
186
OFFICE
29 12 m²
W5 W5 W5 W5 W5
G
186
OFFICE D1
47 D3
2 m²
16 m²
D1
D3
107
480
11 m²
41 D3 1 m²STORAGE
OFFICE
W4
383 822
359
188
Date
637
637
Description
10
1278
1053
No. F
C
75 46 75
230
194
28
D1
25 m² STORAGE STORAGE
298
826
E
272
341
172
860
411
201
501
112
150 399
1895
85 50 85
D
95
960
C
OFFICE
D1
27
---
169
291
389
270
389
389
351
411
415
568
386
---
B
775
147
A
D3
298
298
A
---
298
200
45 48 45 48 45 48 45 51 45 82 45 44 45 50 45 46 45 52 45 50 45 54 45 47 45 46 45 50 45 44 453845 40 45 49 45 48 45 48 45 47 45 50 45
330
575
140
60
2890
109
60 105
457
3864
1
2
3
Birzeit University
Administiration
5
6
7
8
9
10
11
1
1:1
Ground Floor Furniture Plan 0001 2 February,2020 Safiyyah Khaseeb Jihad Kmail
Drawn By Checked By
4
5
6
7
8
10
11
First Floor Dimension Plan
furniture First Floor
1
0001 2 February,2020 Safiyyah Khaseeb Jihad Kmail
Project Number
1 : 100
Date Drawn By
A1-2
Checked By
A1-3
G 1
9
Administiration Building
1 : 100
Project Number
3
Birzeit University
First Floor Dimenssion Building
Date
2
2
3
4
5
6
7
8
9
10
F
E
D
C
B
Stair case
Staircase 1424
1424
105
135
1264 Third Floor
Second Floor 780
Date
Description 390
164
No.
Date
122
201
Description
First Floor 390
156
390
No.
196
First floor
197
196
122
101
780
233
Second floor
131
201
147
117
85
1174
147
1100
250
Parapet Third floor
A
11
390
1
SECTION SHOT 1
4
3
10:00 AM
10:00 AM
Grounf floor
Ground Floor
0
E
September 22 5:32 AM
N
South
0
E
September 22 5:32 AM
N
1 : 100
East
1
E
1 : 100
10:00 AM
6WLPXODWLRQV
S
S
5:41 PM
December 21
7:11 AM
5:41 PM
W
1
N
W
S
AUTUMN 3 PM
2
4:12 PM
W
AUTUMN 10 AM
10:00 AM
10:00 AM
Birzeit University
10:00 AM
E
E
March 20
March 20
5:49 AM
5:49 AM
N
N
WINTER 3 PM Birzeit University 7
Administiration Building
S
10:00 AM
Administiration Building
E
E
September 22
September 22
5:32 AM
5:32 AM
N
N
S
5:54 PM
S
5:54 PM
W
No.
5:41 PM
W
Description
W
5:41 PM
South Elevation S
Date
W
N
West Elevation 0001 2 February,2020 Safiyyah Khaseeb Jihad Kmail
Project Number
3
SPRING 3 PM
No.
4
Description
SPRING 10 AM
1
Date
Date Drawn By Checked By
10:00 AM
June 21 4:09 AM
A3-1
10:00 AM
June 21
E
4:09 AM
N
AUTUMN 3 PM
2
E
0001 N 2 February,2020 Safiyyah Khaseeb Jihad Kmail
Project Number
10:00 AM
7:11 AM
Checked By
A3-4
10:00 AM
10:00 AM
S
4:12 PM
W
E
E
March 20
March 20
5:49 AM
5:49 AM
N
E
Administiration Building
S 5:54 PM
W
7
N
W
8
W
Solar Study
WINTER 10 AM
0001 2 February,2020
Date
3 SUMMER 3 PM
6
SPRING 3 PM
SPRING 10 AMSafiyyah Khaseeb
Drawn By
4
Checked By
SUMMER 10 AM
Birzeit University
Description
S
5:54 PM
W
S
Project Number
5
WINTER 3 PM
Birzeit University
7:22 PM
S
Drawn By
December 21
N
7:22 PM
Date
AUTUMN 10 AM
Date
A5-1
Jihad Kmail N
10:00 AM
10:00 AM
Administiration Building June 21 4:09 AM
Scheduals Project Number Date Drawn By
0001 2 February,2020 Safiyyah Khaseeb
June 21
E
4:09 AM
N
E
N
7:22 PM
S
W
7:22 PM
S
W
8
WINTER 10 AM
4
4 3
4
3 3
3
6
3 6
3
3
3
3
3
4
1
#4
SHOT 1:1
Construction Project Al-Hisba _ Ramallah Group Work of 3
A A
C
B
D E F
G
H
I
J
K
M
L
N
66.4816 8.9865
3.8418
12.4777
0.5168
4.9311
3.6241
4.4822
2.7362
9.3978
2.6037
1.3234
10.4320
1.1283
1
1 4.1825
4.1825
2.8158
2.8158
2
2
3
3
6.7871
6.7871
4
4
B 17.8778
17.8778
5
5
B 68.7065
68.7065
11.7985
11.7985
2.1894
2.1894
6
6
7 8
0.7981
7 8
0.7981
2.5223
2.5223
D1
9
9
1.9262
1.9262
10
10 3.5637
11 12
3.5637
0.2071
11
0.2071
14.0380
12
14.0380
A 13
13 8.9865
12.4777
3.8418
0.5168 1.1283
4.9311
3.6241
4.4822
2.7362
9.3978
2.6037
1.3234
10.4320
66.4816
A
B
D E F
C
*URXQG 3ODQ
H
G
I
K
J
L
M
N
A B
A
C
D E F
G
H
I
J
K
L
M
N
66.4816 8.9865
3.8418
12.4777
0.5168
4.9311
3.6241
4.4822
2.7362
9.3978
2.6037
1.3234
10.4320
1.1283
1
1 4.1825
4.1825
2.8158
2.8158
6.7871
6.7871
2
2 3
3
D5 4
4
B 17.8778
17.8778
5
5
B 68.7065
68.7065
11.7985
11.7985
2.1894
2.1894
6
6 7 8
0.7981
0.7981
2.5223
2.5223
1.9262
1.9262
9
9
10
10 3.5637
11 12
7 8
3.5637
0.2071
0.2071
14.0380
11 12
14.0380
A 13
13 8.9865
12.4777
3.8418
0.5168 1.1283
4.9311
3.6241
4.4822
2.7362
9.3978
2.6037
1.3234
10.4320
66.4816
A
B
6WUXFWXUH 3ODQ
C
D E F
G
H
I
J
K
L
M
N
A
B
4.8420
C
D
1.4664
F
E
2.7085
9.3279
G
2.8165
H
4.4628
I
4.5712
J
1.0943
3.9060
L
K
0.6447
3.6132
8.00 D2
4.00
6.00
D1
0.00
0.00 D4
1RUWK (OHYDWLRQ C
B
A
13.2011
0.6088
D
3.7528
F
E
1.8560
2.5266
H
G
I
0.8905 2.0628
K
J
11.9300
17.8714
5.5804
L
1.0389
9.60
9.30
6.00
D2
D1 D3
0.00
0.00 D4
(DVW (OHYDWLRQ B
A
C
8.8286
16.4947
D
E
G
F
0.5975 1.1417
3.8560
4.5644
I
H
4.4696
J
9.3419
2.8059
L
K
2.7073
M
1.3441
10.2530
9.30
9.30
8.00 D2
6.00
6.00 D1
0.00
0.00 D4
6RXWK (OHYDWLRQ A
B
D
C 44.8695
17.4080
17.9252
9.5364
9.30
9.30
8.00 6.00
6.00 D2
0.00
0.00
6HFWLRQ $ $ A
9.30
C
B
D
9.60
30.3699 1.1106
12.9399
16.3193
6.00
D4
0.00
0.00 D1
6HFWLRQ % % 2.40
Cumbrera Aluzinc Caliber 26 Sheet
C-SECTION 2''x6'' STEEL SHEET 1.2000
0.70
63,'(5 -2,176 */$66 '(7$,/6
75866 &/$'',1* '(7$,/
&2/801 75866 &211(&7,21
) 2 8 1 ' $7 , 2 1 '(7$,/6
:$7(5 '5$,1,1* '(7$,/6