PORTFOLIO VOL.1 (2015-2018)

Page 1




1

CONTENT


CONTENT

CONTENT CURRICULUM VITAE

PROFESSIONAL WORK

CONTACT DETAIL | EDUCATION | EXPERIENCE HONOUR | LANGUAGE | SKILL

SIME DARBY SDN. BHD.

DENAI ALAM

SURAU IBNU SINAR

ACADEMIC WORK

HOSPITAL PUTRAJAYA

RETREAT ECO-HOUSE

BUNGALOW MELAWATI

SEMESTER 2

ESQUISSE (POST OFFICE)

DATUK SHAHRUL

SEMESTER 4

BIT ENNOVA

POST OFFICE

SPA & MASSAGE

TOURISM INFORMATION CENTER SEMESTER 5

OTHER WORK

LEMBAGA KEMAJUAN IKAN MALAYSIA (LKIM)

RENDERING

SEMESTER 4

SEMESTER 6

MEASURED DRAWING SHORT SEMESTER

KEY & STETCH

PHOTOGRAPHY SKETCHING MODELLING GRAPHIC

2


CV

CV

3


4 CV


5

ARCHITECTURE


ARCHITECTURE

ARCHITECTURE

6


SEMESTER 2

RETREAT ECO-HOUSE Diploma semester 2 TYPE : House CLIENT : Eyo Hock Seng SIZE : 100msq PROJECT : Final

Individual / group

7

:

Mohd Salehien Bin ABdul Rahmantt

Site :

Teluk Chempedak, Kuantan Pahang.

Brief :

The proposed design will also be amphasized on the selection/positioning on the site based on the analysis and synthesis done. The building approaches (vehicular and pedestrian access) and entrances are highly important in the design. Thus beside the usual external and internal functional spaces, the basic element of passive design and eco-sustainability shall also be considered.

Project Introduction :

In this project, student has to design of a compact living space for four person inside a retreat Eco-House. This single storey home shall consist of several activity space such as for working studio, resting, sleeping, meal preparation, eating and cleaning. Student are required to study and research on anthropometric in relation to domestic space and equipment in which related to their final design. The study also cover circulation, movement and spatial relationship between various spaces involve in the design.


SEMESTER 2 night view from Laut China Selatan

8


CLIENT SEMESTER 2

EYO HOCK SENG Student has given client in many of professional background. One of them is Eyo Hock Seng, who the most popular shadow-play in Kelantan. In pass, shadow-play was traditional entertainning for malay community. Hock seng was ‘Tok Dalang’ for shadowplay and he has his own team,Kumpulan Seri Campuran. His experience in shadowplay is more than 40 years.Hock seng start his career when he 14 years old, when he turn to 17, he has given trust as ‘Dalang Tua’ because of his skill and experience, and he never stop in shadow-play until present.

SITE ANALYSIS KIJAL

Kijal is a mukim in Kemaman District, Terengganu, Malaysia. The town is well known for the Awana Kijal Golf and Beach Resort, a luxury resort which is owned by the Genting Group. Kijal is also known for its lemang and durian. The Kijal Beach stretches for 8 kilometers with rocky outcrops in the north at “Awana Kijal” and south at “Bukit Penunjuk”. The famous “sleeping giant” rock formation in the sea is located at Penunjuk beach, where a tidal estuary is often used for anchoring of traditional fishing boats. Also known as Mirul Kijal’s Hometown.

STRENGHT

-COOL AIR AROUND THE TREES SURROUNDING. -AREA COVERED BY TALL, LEAFY TREES. -THE SERENITY OF THE AREA.

WEAKNESSES

-SANDY SOIL ON THE BEACH. -LACK OF VEGETATION. -ONLY A FEW TYPE OF TREE EXISTS.

OPPORTUNITY

-NATURAL VENTILATION AND SHADING. -THERAPEUTIC ENVIRONMENT.

THREATS

-WEAK BASE TO SUPPORT FOUNDATION. -CHANCE OF FLOOD DURING MONSOON SEASON.

9


SEMESTER 2 Front perspective sketch

CONTEXT & STRATEGY

key plan VEHICULAR CIRCULATION 13%

location plan

PLANTATION

SUN PATH

WIND ORIENTATION

PROPOSE SITE

50%

25% 12%

VISTA PREFERENCE

10


SEMESTER 2

BUBBLE DIAGRAM

11


The concept approach was related on profession of Eyo Hock Seng .The Space planing was created as a apportunity by Eyo Hock Seng to play his shadow play. By using polycarbonate as facade, shadow effect will appeared when the sun hit the wall. When night, light inside the house will create shadow-play. Structure of the house is base on Kelantan house was made, the wall structure, the beam and the column.

SEMESTER 2

CONCEPT

DESIGN STRATEGY

free AIR VENTILATION house

making ICONIC house

ASSEMBLY place for villagers

RECYCLE MATERIAL is use to make this house.

GREEN ASPECT building

TRANSPARENT WALL to create a shadow

12


SEMESTER 2

3

2

1

1. ANJUNG 2.DINNING AREA 3.LIVING AREA

13

SECTIONAL PERSPECTIVE


DETAIL

FORM DESIGN SEMESTER 2

APA BUILD A BETTER HOME WALL DETAIL: RAIN-SCREEN WALL DETAILS

Vapor retarder (if appropriate)

PRIVATE

PUBLIC

Roof gutter

SEMIPUBLIC

Insulation baffle

IDENTIFY SPACE ZONING

EXPANDED SPACE

Soffit vent Trim Screen

Drywall Wind

Furring strips/airspace

Wood structural panel sheathing

Water-resistive barrier Wood studs

Siding

Vapor retarder (if appropriate)

Siding

SAPERATE BY ZONE

SPACE ORIENTATION

Drywall Wood studs

Furring strip/airspace

Water-resistive barrier Wood structural panel sheathing Wind

Rim board Treated lumber

Wind Pest screen Flashing Wind

Seal bottom plate to concrete cross ventilation through the house

Seal water-resistive barrier per manufacturer’s recommendations

14


SEMESTER 2

DETAIL PLAN

15


16 SEMESTER 2


17

SEMESTER 2


SEMESTER 2

REAR ELEVATION

RIGHT ELEVATION 18


SEMESTER 2

FRONT ELEVATION

LEFT ELEVATION 19


SEMESTER 2

INTERIOR 20


SEMESTER 4

ESQUISSE (POST OFFICE) Diploma semester 4 TYPE : Services CLIENT : Post Malaysia. SIZE : 167.86sqft PROJECT : Task 2

Individual / group

21

:

Mohd Salehien Bin ABdul Rahman

Site :

University Collage Shahputra, Kuantan Pahang.

Brief :

In this project student will be designig a mobile esquisse for post office. This small project is for student to get ready and familiar with the purpose of the main project for this semester which designing a Post Office at Kuala Lumpur.

Project Introduction :

The site is located at University Collage Shahputra. The main focuses in this project was to create movable post office kiosk for Pos Malaysia Berhad. At the same time, we keep the ecofriendly energy to give the welcoming design to all around people to access and used the servicess.


SEMESTER 4

CONCEPT

TRANSFORMER Sustainable design seeks to reducenegative impact on the environment and the health. Thus, with the design can transform to a simply box to a counter for services use. It was a advantages for user to reduce time and make all the bisness fast.

22


SEMESTER 4

PRECEDENT STUDY

DETAIL DRAWING

DESIGN STRATEGY

ESQUISSE ORIENTATION

TECHNOLOGY NATURAL VENTILATION

NATURAL LIGHTING

23


SEMESTER 4 PERSPECTIVE VIEW

24


SEMESTER 4

POS OFFICE

Diploma semester 4 TYPE : Services CLIENT : Pos Malaysia Bhd. SIZE : 5761.33 sqft PROJECT : Final

Individual / group

25

:

Mohd Salehien Bin ABdul Rahman

Site :

Jalan Tungku Abdul Rahman, Kuala Lumpur

Brief :

The student are required designing proposal design of a post office in an empty shop house lot at the corner of Jalan Tuanku Abdul Rahman in Kuala Lumpur. The new post office should portray the image of the POS MALAYSIA that has the potential to serve the public with a good shape planning and three different facade design.

Project Introduction :

Our new identity embodies the spirit of what the new Pos Malaysia brand signifies; for today and tomorrow. Our focus on transformation is expressed through the lighting treatment within the ‘O’ in Pos. It illustrates how we are always moving forward. The ‘Fast Forward’ arrow reinforces the brand’s progressive, innovative and forward thinking. It also denotes a strong digital association.


SEMESTER 4

SITE PLAN

key plan

LOCATION PLAN

26


27

SEMESTER 4


POS MALAYSIA

SEMESTER 4

The history of Pos Malaysia Berhad can be traced back to the early 1800s with the establishment of postal services first in the Straits Settlements (Penang, Malacca, and Singapore) and gradually, it covered the entire Malaya by early 20th century. Letters were delivered through dispatch riders or special messengers then. Instead of postage stamps, fees were collected when letters were handed in at the Pos office and letters posted were given a receipt. Over the years, the evolution of technology saw the emergence of digital media/internet and changing customer behaviours. Despite the personal touch and sentimental value attached to traditional mails, this market is shrinking, replaced by the more popular social media and SMS. Pos Malaysia Berhad is also going through the same evolution. No longer are we the traditional postal corner, as we embark into the 21st century, we have and are evolving to meet the demands and needs of our customers’ changing behaviours and marketplace. Together with the role of the national postal provider, Pos Malaysia Berhad has morphed into a conglomerate, offering supply chain solutions and financial services, competing directly and indirectly with many companies in both domestic and international areas

PRECEDENT STUDY

PERSPECTIVE VIEW

28


SEMESTER 4

CONCEPT

The concept of this building is ‘URBAN PLAYGROUND’. Plublic space is created to the society to them to create an event and create a place for urban life. The inherited forecourts that were of different levels in front were relevelled and planters introduced to create a plaza that invites the pedestrian public into the development and bring back the pleasure of a high-street experience along the frontage of the shophouses. A series of canopies and balconies along the length of The Row protects the visitor from the tropical elements, thus bringing back the function of the old five- foot-way, albeit in a contemporary manner.

monday

tuesday

Taking the cue of the traditional use of bricks and load-bearing construction method used in the original shophouses, we continued the use of local bricks throughout. The back lane was re-activated by introducing both visual and physical connectivity from within.

wednesday

thursday

friday

saturday

sunday

29


30 SEMESTER 4


SEMESTER 4

DESIGN PROCESS

1. The program projected on the plot.

2. A new public space by empty the ground floor

3. Connected a ‘urban playground’ to the street.

DESIGN STRATEGIES 10%

50%

Site given in 535.44 squaremeter

31

Created green area to public.

40%

Vista Preference


32 SEMESTER 4


SEMESTER 5

THE ARK

Diploma semester 5 TYPE : Tourism Information Centre CLIENT : Tourism Malaysia PROJECT : Final

Individual / group

:

Mohd Salehien Bin ABdul Rahman

Site :

Bukit Melawati, Kuala Selangor.

Brief :

In this project student will be designig a mobile esquisse for post office. This small project is for student to get ready and familiar with the purpose of the main project for this semester which wdesigning a Post Office at Kuala Lumpur.

Project Introduction :

I center stand for information center , a place where the visitor can know thier destination in Taman Melawati, kuala selangor . The Ark information center located at Taman Bukit Melawati, Kuala selangor. The site is surrounded by a historical place and has it own story.

33


SEMESTER 5

SITE PLAN

key plan

LOCATION PLAN

34


SEMESTER 5

CONCEPT THE ARK

… The idea from the concept of the ship. This is related to the historical story on the site which is the past the site was an attack to the Dutch Colonists. It was a harbour to them staging and trading. The site also known as the punishment place for the traitors. Tangga 100, busut Kuala Selangor ‘Perigi Beracun’and Light House was a deviden to prove that Bukit Melawati was a place full of history story…

35


36 SEMESTER 5


37

SEMESTER 5


SEMESTER 5

MOCK UP MODEL

38


SEMESTER 6

LKIM

Diploma semester 6 TYPE : Office & Public space CLIENT : Lembaga Kemajuan Ikan Malaysia PROJECT : Final

Individual / group

:

Mohd Salehien Bin ABdul Rahman

Site :

Temerloh, Pahang Darul Makmor.

Brief :

Student are required to design building of medium complexity demonstrating technical, exvironmental issues and urban issues with a maximun of 4 storeys high. Student Should have sufficient knowledge to juxapose all these issues in a comprehensive working dawing exercise.

Project Introduction :

LKIM is a one of fishery under goverment that also relate about the agriculture. It also one of part pulse of fishery in this country . student are required to design building on medium complexity demonstrating technical. environmental isssues and urban issues with a maximum of 4 storeys high. student should have sufficient knowledge to juxtapose all these issue in a comprehensive design. This site at the temerloh that is center of PAHANG. one of the attraction in this site is GULAI TEMPOYAK. The landmark of this site is masjid Abu Bakar. This fishery complex is created to LEMBAGA KEMAJUAN IKAN MALAYSIA.and student have to relate all the existing building blend with the fishery complex

39


SEMESTER 6

SITE PLAN

key plan

LOCATION PLAN

40


41

SEMESTER 6


42 SEMESTER 6


SEMESTER 6

CONCEPT

Care is stand for reincarnation for the surrounding that is died environment on. CARE also use in the of RIVER OF LIFE agenda which is they wan to use the waterfront as a good looking for the feature. nowadays, many of people look the river as one of the “BIGGER DRAINAGE� for them .and many of the building use the riverfront as their services road and postpone the river . but in themes of CARE we can use the water front as one of good impression such asC - CONNECT Connect all the people in the Temerloh use the riverfront as their activity like lately, all people use a river to do one of their life ,such washing, shower and also use to hunter fish. A - ACTIVETES in this site we can use the esplanade, as one of the attraction to people come and see the riverfront as a good impression. R - REGENERATES regenerates the riverfront to make sure people use is as one of attraction, and make more fun activity such a KAYAK and fishying. E - ENLIVENS this mean to give a new life water front in this Semantan river.

43


SEMESTER 6

TEMERLOH is a town in Central Pahang , in Malaysia in Temerloh district. Located about 130 kilometeres from Kuala Lumpur along the Kuantan-Kuala Lumpur trunkroad temerloh is the second largest town in pahang after kuantan. it is situated at the junction of the pahang river and semantan River. The district consist of two area, the 1442-square- kilometers municipal council area and the 808-square kilometers outer municipal council area todays, temerloh usuallly refers to territory under the administration of temerloh municipal council or majlis Perbandaran Temerloh,which include the smaller town adjacent to the city suchas Mentakab,lanchang,kuala krau, and kerdau.

44


MEA. DRAWING

MEASURED DRAWING Diploma TYPE Individual / group

:

: Measured Drawing

Mohd Salehien Bin ABdul Rahman, Amir abdillah, Alia Azlan, Azihairi Awaluddin, Abdul Fattah.

Site :

Sungai Lembing, Kuantan Pahang.

Brief :

Sungai Lembing is a tin mining town in Kuantan District, Pahang, Malaysia. Lembing is Malay for spear, and “sungai� means river. Per local legend, the local ruler saw a vision of a spear in the nearby river and thus named his town after this vision. Until the 1860s, Sungai Lembing was a major producer of underground tin. Sungai Lembing town developed in the 1880s when the British set up the tin mining industry, although the history of mining in this area extends much further back. From 1891, the Pahang Consolidated Company Limited, (PCCL), which was under British control, had a 120 -year lease to mine the area. PCCL managed the mine from 1906 until its liquidation in 1986 when world tin prices collapsed.

45


46 MEA. DRAWING


47

PRO. WORK


PRO. WORK

PROFESSIOANAL WORK

48


WORK 1

DENAI ALAM

Razin Architects. Sdn. Bhd. TYPE : Residential CLIENT : Sime Darby Berhad. SIZE : 40’ x 80’

Site :

Denai Alam, Elmina

Project Introduction :

Phase H1a is one of the final phases of Semi Detached house comprises of 48 units two storey of built up size 40’ x 80’ to be developed in the coveted township of Denai Alam. Strategically located at the heart of City of Elmina and surrounded by matured neighbourhoods, Phase H1a is within walking distance to commercial amenities and a short drive to the future Elmina City Centre.

49


50 WORK 1


51

WORK 1


52 WORK 1


53

WORK 1


54 WORK 1


WORK 2

SURAU IBNU SINAR

Razin Architects Sdn. Bhd. TYPE : Institution CLIENT : Hospital Putrajaya SIZE : 15,555.76 sqft

Site :

Hospital Putrajaya, Wilayah Persekutuan Putrajaya

Project Introduction :

Hospital Putrajaya wanted to build a prayer space that almost 1000 capacity on this new surau. This because, existing prayers room for the staff and the visitor in Hospital Putrajaya was too small when it time pick hours. Then, our team has to give a new Proposal to Hospital institution to create and build new surau and temporary accommodation to the visitor who came from far. The facade and the languange of the building was inspired from Hospital Putrajaya itself.

55


56 WORK 2


57

WORK 2


58 WORK 2


59

WORK 2


WORK 2

GROUND FLOOR PLAN

1ST FLOOR PLAN

60


WORK 3

BUNGALOW MELAWATI Razin Architects. Sdn. Bhd. TYPE : Residential CLIENT : Datuk Shahrul

Site :

Melawati Ulu Klang, Selangor

Project Introduction :

Design for the house that located at the fill site is one of the challenging work. The couple wanted to design a house accordingly to meet thier sibling or relatives. The open layout plan was created to give them feel the circulation and the view from the site. The design is inspired by the ‘Bali style’ or tropical style which is a familiar form and feeling to the weather of Malaysia. With use a few material and finishes into this house make the house feel neutral and comfortable to the visitor.

61


62 WORK 3


63

WORK 3


64 WORK 3


WORK 4

BIT ENNOVA

Razin Architects. Sdn. Bhd. TYPE : Institution

Site :

Selangor

Project Introduction :

Site is located nearest from Klang river as we can take advantages to bring the nature to our building. Client wanted to making temporary building for TNB collage student with a facilities such as class room, hostel , and workshop for the student by using ship containers as Industrial contruction is the main theme. Ship container is use as main material as green building. This will reduce cost for contruction and make faster time to contruct. The ship container is place in the grid system and created courtyard in the midle of space for natural ventilation.

65


WORK 4

Modular shape of characteristics, ship container give us more understanding about the contruction futher. Base on the study, ship container can be use to build different design but still have to keep the modular shape of the container. The container have a different type of dimension such as 20ft and 40ft lenght.

66


WORK 4

PRECEDENT STUDY

67


WORK 4

“TO CREATE A GREEN MULTIPULPOSE FACILITY THAT EVOKE AND PERSONIFY AN INDUSTRIALIZED STRUCTURE”

68


WORK 5

SPA & MASSAGE Key And Sketch Sdn. Bhd. TYPE : Spa

Site :

Selangor

Project Introduction :

Located along the Ara Damansara highway, spa and massage is the perfect blend for those who want to relax and release depression. Luxury design concept bring the spa & massage feel calm with the lighthing setting and the material used. The challenge in this project was making furniture useable function with numerous form. At the same time, this project emphasize composition and anthopometry of human scale.

69


70 WORK 5


71

WORK 5


72 WORK 5


73

WORK 5


74 WORK 5


75

POST PRODUCTION


RENDERING

76 POST PRODUCTION


POST PRODUCTION

INTERIOR PERSPECTIVE

77


78 POST PRODUCTION


POST PRODUCTION

EXTERIOR PERPSECTIVE

79


80 POST PRODUCTION


81

PHOTOGRAPHY


PHOTOGRAPHY

PHOTOGRAPHY

82


83

PHOTOGRAPHY


84 PHOTOGRAPHY


85

PHOTOGRAPHY


86 PHOTOGRAPHY


87

SKETCH


SKETCH

SKETCHING

88


89

SKETCH


90 SKETCH


91

MODEL


MODEL

MODELLING

92


93

MODEL


94 MODEL


95

GRAPHIC


GRAPHIC

GRAPHIC

96


97

GRAPHIC


98 GRAPHIC




Thank You For Your Consideration salehin.ks@gmail.com https://www.instagram.com/salehien_ar/ 012-3986487


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.