I
O
ut
U
PROFESSOR: IVÁN CAPDEVILA
own
FEATURING: LAURA SOLA TARÍ Mª SALOMÉ PAGÁN ARACIL
D
13th JANUARY 2017 UNIVERSITY ALICANTE
p
N
^FOMBERA’!S!TECHNOLOGIC!CENTER,2007,!LA!RIOJA,!SPAIN*
“You will never know where you are living in.” ^IN!* ^UP!*
This architecture would be a sensorial experience where the body not only is keeped in touch but also dominated by the nature. A different way to learn from the environment that involves people.
^USES!LABORAORIES!OF!NATURE,!KNOWLEDGE!BUSSINES!AND!INTERNET!CENTER*
ÌINDEXÍ
PHASE 5......................................................1-6 PHASE 1......................................................7-8 PHASE 2....................................................9-10 ^ARCHITECT¨ALEJANDRO!ZAERA!POLO*
^OUT* ^DOWN*
COMPARISONS 3,4,5 S!AND!XL -MODEL........................................11-14 -PLANS........................................15-18 -ELEVATIONS............................19-22 -SECTIONS................................23-26 -AXONOMETRIES.....................27-30
_ELEVATION & SECTION XL_ MESURES 50 x 5 x 5 m
1
(Phase!5!Hybridation)
2 FOMBERA TECHNOLOGIC CENTER UA 2016
_ELEVATION & SECTION S_ MESURES 10x10x5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
_AXONOMETRIA XL_ MESURES 50 x 5 x 5 m
3
(Phase!5!Hybridation)
4 FOMBERA TECHNOLOGIC CENTER UA 2016
_AXONOMETRIA S_ MESURES 10x10x5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
_PLANTA XL_ MESURES 50 x 5 x 5 m
5
(Phase!5!Hybridation)
6 FOMBERA TECHNOLOGIC CENTER UA 2016
Mountain is present from the basis of the project. It is a way to be. It is not a way to look at. The construction of the building comes from the ground to the top. The growing comes in a vertical way, looking at the sun. It is involved by another natural element: vegetation. That element is to the mountain such as the mountain is to the vegetation. Both all grow together and there will be not live one without the other. The structure offers support to the vegetation and that offers protection and natural climate to the building. What happens inside is also a consequence of about what is going on at the outside. Growing of the vegetation and light changes because of the sun movement organizes the space inside the building. By one hand, due to the vertical and randomatic growing, the staircase has to take place in different places. That fact limits the disposition of the living space. Also, light that comes from the sun permits or allows the use of the space, depending on the situation and time. Vegetation dominates from the outside and tries to come to the inside. As a consequence of all these conditions and elements, there are no limits on the building but neither limits on the use of the space. Living is a game. Staying in some place it is something that perhaps it is no possible to know if that belongs to the inside or to the outside.
“Because the inside is determined by the outside. And without outside elements, there will no live inside the building�
_PLANTA S_ MESURES 10x10x5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
7
Technologic Center-La Fombera (Phase!1!Findings) _Zaera-Polo
Represents Innovation Lightness High-tech Continuity Nature Pre-existence Strictly Circulation Division Local Id.
Ramps Pavement-Wood Hight (Undergraund) Vegetation Mesh Glass Decorative Layer Structure Pillars Trusses Wall Stairs Doors Floors Joins Corridors
Technologic Center-La Fombera
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE. _Zaera-Polo
Represents Innovation Lightness High-tech Continuity Nature Pre-existence Division
8 FOMBERA TECHNOLOGIC CENTER UA 2016
Ramps Pavement-Wood Hight (Undergraund) Vegetation Mesh Glass Color Layer Structure Pillars Trusses Wall Stairs Doors Floors Joins Corridors
9
(Phase!2!Reductions
10 P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_MODEL S_4 DISPLACEMENTS_ MESURES 10 x 10 x 3 m
_MODEL S_3 HOMOGENENIZATIONS_ MESURES 10 x 10 x 10 m
11
(Phase!3|4|5!model!S
12
_MODEL S_5 HYBRIDATIONS_ MESURES 10 x 10 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_MODEL XL_4 DISPLACEMENTS_ MESURES 50 x 50 x 5 m
_MODEL XL_3 HOMOGENENIZATIONS_ MESURES 50 x 50 x 50 m
13
(Phase!3|4|5!model!XL
14
_MODEL XL_5 HYBRIDATIONS_ MESURES 50 x 5 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_PLAN S_4 DISPLACEMENTS_ MESURES 10 x 10 x 3 m
_PLAN S_3 HOMOGENENIZATIONS_ MESURES 10 x 10 x 10 m
15
(Phase!3|4|5!plan!s
16
_PLAN S_5 HYBRIDATIONS_ MESURES 10 x 10 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_PLAN XL_4 DISPLACEMENTS_ MESURES 50 x 50 x 5 m
_PLAN XL_3 HOMOGENENIZATIONS_ MESURES 50 x 50 x 50 m
17
(Phase!3|4|5!plan!xl
18
_PLAN XL_5 HYBRIDATIONS_ MESURES 50 x 5 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_ELEVATION S_4 DISPLACEMENTS_ MESURES 10 x 10 x 3 m
_ELEVATION S_3 HOMOGENENIZATIONS_ MESURES 10 x 10 x 10 m
19
(Phase!3|4|5!ELEVATION!S
20
_ELEVATION S_5 HYBRIDATIONS_ MESURES 10 x 10 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_ELEVATION XL_4 DISPLACEMENTS_ MESURES 50 x 50 x 5 m
_ELEVATION XL_3 HOMOGENENIZATIONS_ MESURES 50 x 50 x 50 m
21
(Phase!3|4|5!ELEVATION!xl
22
_ELEVATION XL_5 HYBRIDATIONS_ MESURES 50 x 5 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_SECTION S_4 DISPLACEMENTS_ MESURES 10 x 10 x 3 m
_SECTION S_3 HOMOGENENIZATIONS_ MESURES 10 x 10 x 10 m
23
(Phase!3|4|5!SECTION!S
24
_SECTION S_5 HYBRIDATIONS_ MESURES 10 x 10 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_SECTION XL_4 DISPLACEMENTS_ MESURES 50 x 50 x 5 m
_SECTION XL_3 HOMOGENENIZATIONS_ MESURES 50 x 50 x 50 m
25
(Phase!3|4|5!SECTION!XL
26
_SECTION XL_5 HYBRIDATIONS_ MESURES 50 x 5 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_AXONOMETRIES S_4 DISPLACEMENTS_ MESURES 10 x 10 x 3 m
_AXONOMETRIES S_3 HOMOGENENIZATIONS_ MESURES 10 x 10 x 10 m
27
(Phase!3|4|5!AXONOMETRIES!S
28
_AXONOMETRIES S_5 HYBRIDATIONS_ MESURES 10 x 10 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
_AXONOMETRIES XL_4 DISPLACEMENTS_ MESURES 50 x 50 x 5 m
_AXONOMETRIES XL_3 HOMOGENENIZATIONS_ MESURES 50 x 50 x 50 m
29
(Phase!3|4|5!AXONOMETRIES!XL
30
_AXONOMETRIES XL_5 HYBRIDATIONS_ MESURES 50 x 5 x 5 m
P.R.E. COURSE: PLAYING, REMAKING and EXAGERATING ARCHITECTURE.
FOMBERA TECHNOLOGIC CENTER UA 2016
!!IN,!OUT,!UP,!DOWN!!