National Geographic HQ

Page 1

SAMAHER H ALAMOUDI National Geographic HQ

1



NATIONAL GEOGRAPHIC HQ

3


DESIGN PROCESS APPLYING CONCEPT

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner

4

Scanned by CamScanner

Scanned by CamScanner


DESIGN PROCESS

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

Scanned by CamScanner

5


6

Scanned by CamScanner


Scanned by CamSc 7


GROUND FLOOR PUBLICE AREA scale 1/8’’=1’0’’

OPEN TO BELOW

8


GROUND FLOOR PUBLICE AREA PROCESS

UP

MULTIPURPOSE ROOM

LOADING DOCK

UP

Scanned by CamScanner CAFE

SERVICE

EXIBITION

ORDER

INTERACTIVE AREA

EXIBITION / LOBBY

JANITOR

DN

UP RETAIL

PER ICC 1022.1 EXEPTION 1

OPEN TO ABOVE

9


GROUND FLOOR ENTRANCE 2

3

Roof 25' - 0 1/2"

GYP . BOARD AIR RETURN LIGHT

Level 2 14' - 2"

LAMINATED WHITE ACID ETCHEDGLASS TREAD

5’0’’

5’X12’ GLASS SHEET

Cedar WOOD

2’X3’ MARBLE LED STRIP LIGHT

10

1/2’’ BLACK METAL STRIPS

2’6’’ 6’’

Level 1 0' - 0"


GROUND FLOOR ENTRANCE

Hidden LED Strips

11


GROUND FLOOR ATRIUM /MULTIPURPOSE AREA

2’0’’

5’0’’

STEP LIGHT FIXTURE

MATERIAL AT TREAD AND RISER TO MATCH UPPER FLOOR

Cedar WOOD

BLACK RUBBER 1/2’’

CONTINUOS PRE-CAST HANDRAIL 3’0’’

FINISHED BLACK CON.

7’’1

12

Scanned by CamScanner

4’’

Level 1 0' - 0"


13


GROUND FLOOR EXIBITION

3’0’’

5’0’’

3’0’’

5’0’’

14


GROUND FLOOR EXIBITION

SUSPENDED WIRE

GLASS SHELVES

DIGITAL DISPLAY SCREEN

0' - 10"

3' - 8"

0' - 10" 0' - 2"

0' - 8"

0' - 8"

10' - 0"

Level 2 14' - 2"

1' - 1"

1' - 0"

10' - 0"

1' - 0"

3' - 0"

EQ

EQ

1' - 5"

EQ

EQ

EQ

EQ

2' - 3"

0' - 6"

2' - 2"

0' - 2"

0' - 6"

0' - 6"

1' - 8"

5' - 0"

1' - 3"

2' - 3"

1' - 5"

15


DN

DN

SENIORS

SECONF FLOOR OFFICES scale 1/8’’=1’0’’

OFFICE SUPPLIES

REGIONAL MANAGER

MEMBERSHIP

MARKETING DIRECTOR

EDITORAL STALL

MARKETING ASSISTANT CONFERENCE ROOM

HIDDEN JINATOR CLOSET

COAT CLOSET

TELEPHONE CLOSET

DESIGN PRODUCTION ASSISTANT

CONTROLLER

ART DIRECTOR

ACCOUNTING

DN

HR OFFICE

OFFICE ENTRANCE

OFFICE MANAGER

PANTRY

16

OPEN TO BELOW

CONFERENCE ROOM


SECOND FLOOR OFFICE AREA NOT TO SCALE

Midterm Basemen Floor plan

Scanned by CamScanner

Scanned by CamScanner

17


18


SECONF FLOOR DESIGN DETAIL

FSC® Certified Tropical Hardwood Ipe Flooring Oak Aspen 720 Reclaimed Wood

FSC® Certified Stone Source Olympian Black Dany Fleury. Honed Made Black Marble. MR 3: Material Reuse MR4 : Recycled Content MR5 ; Regional Content

FSC® Certified Metropolitan Gypsum Board

Recycled Content 10% Recycled Content 20% Low Emitting Materials Adhesives and Sealants Low Emitting Materials Paints and Coatings Low Emitting Materials Composite Wood and Agrifiber Products Regional Materials 10% (500 mile rule) Regional Materials 20% (500 mile rule)

Epoxy pure white flooring Stonhard

FSC® Certified Guardian Glass Company Oak Aspen 720 Reclaimed Wood

FSC® Certified HPAC Painting Low Emitting Materials Adhesives and Sealants Low Emitting Materials Paints and Coatings Low Emitting Materials Composite Wood and Agrifiber Products Regional Materials 10% (500 mile rule) Regional Materials 20% (500 mile rule)

Interface Carpet Tufted Sheared

100% Recycled Content Type 6 Nylon 127960AK00

19


OFFICE MEETING ROOM

DN

DN

SENIORS

OFFICE SUPPLIES

REGIONAL MANAGER

MEMBERSHIP

MARKETING DIRECTOR

EDITORAL STALL

MARKETING ASSISTANT CONFERENCE ROOM

HIDDEN JINATOR CLOSET

COAT CLOSET

TELEPHONE CLOSET

DESIGN PRODUCTION ASSISTANT

CONTROLLER

ART DIRECTOR

ACCOUNTING

DN

HR OFFICE

OFFICE ENTRANCE

20

OFFICE MANAGER

PANTRY

OPEN TO BELOW

CONFERENCE ROOM


21


11' -

METAL LIGHT TRACK

1' - 0"

SA

F

F

OPEN TO BELOW @ 22'0'' A.F.F SA

2' - 7"

B

C

EQ

EQ

E

EQ

EQ

EQ

EQ

1' - 6"

EQ

EQ

HIDDEN CONTINU OUS LED STRIPS IN NATURAL WHITE

LEGEND:

3' - 5"

F

EQ

SUPPLY EXIT SIGN

3

11' - 7" EQ EQ

Drawn By

12' - 3"

ACOUS TICAL TILE CEILIN G SYST EM 1'X2'

22 April, 2016 Samaher Alamoudi

ID #

03590467

Meeting Area

REFLECTED CEILING PLAN LEVEL 2

5

EQ

21' - 10"

4

2' - 3"

FIRE ALAM

SPOT LIGHT

Date S A

Headquarter

Dropped down ceiling

EQ

3' - 4" 12' - 3"

2' - 8"

12' - 3"

6 0' - 0" EQ

30' - 8"

EQ

S A

WHITE GYP BOARD +9' A.F.F

EQ

10' - 11" S A

S A

E X

EQ

9

10

S A

EQ

S 6' - 5" A

EQ

2' - 7"

EQ

5' - 8"

E X

E X

EQ

3' - 3"

6'0'' EQ SPACE 6'2''

WHITE GYP E BOARD + 9' X A.F.F

E X

11

F

EQ

2' - 5"

CONTINU OUS LED STRIPS IN NATURAL WHITE

F

2' - 0"

EQ

ACOUS TICAL TILE CEILIN G SYST EM 1'X2'

2' - 0"

F

EQ

6' - 2"

8 CONTINU OUS LED STRIPS IN NATURAL WHITE

S A

4' - 0"

S A

EQ

S A

7

12' - 3"

EQ EQ

12' - 3"

All GY board ceiling are8’0’’ AFF

3'' WO OD PA NE L + 9' A.F. F

11' - 6"

EQ

2' - 4"

S A

EQ

6' - 2"

12' - 3"

F

Dropped down ceiling

0'

EQ

2' - 0"

CONTINUOUS LED STRIPS IN NATURAL WHITE

3' - 2"

ALL GYP BOARD ARE+9' A.F.F'

All GY board ceiling are 9’0’’ AFF

12

R

Dropped down ceiling

EQ

EQ

EQ

EQ

11' - 3"

24' - 10" S A

1' - 0"

15

3' - 2"

SA

EQ

METAL LIGHT TRACK

14

2' - 5"

ACOUSTICAL TILE CEILING SYSTEM 1'X2'

F

F

SA

2' - 7"

3' - 0"

SA

16 EQ

6'0'' EQ SPACE 6'2''

EQ

OPEN TO BELOW @ 22'0'' A.F.F

17

LEGEND:

22

SA

NOTE: SMOKE ALARM

Lumination™ Recessed LED Troffer from GE Lighting Solutions

CAMERA

RETURN

1. U.O.N. IN ROOM WITHOUT SUSPENDED CEILING, THR GYP. BOARD OR PLAYWOOD WALL FINISH SHALL TERMINATE AT 8’0’’ A.F.F. EXCEPT AS FOLLOWS. 2. LIGHTING PATTERN CENTERED IN SPACE U.O.N

F

SPRINKLES

SPOT LIGHT SUPPLY EXIT SIGN

Date

22 April, 2016

FIRE ALAM

3. NOT ALL CEILING ACCESS PANELS ARE INDICATED PLANS. REFER TO THE MECHANICAL DRAWING AND SPECIFICATION FOR ACCESS PANEL SIZE QUANTITIES, AND APPROXIMATE OCATIONS. DUCTWORD SHOP DRAWING SHALL INDICATE THE APPROXIMATE A.P. LOCATION WHICH WILL BE ADJUSTED IF REQUIRED BY THE REVIEWING ARCHIECT. 4. SPRINKLER HEADS W.O. IN 2X2 GRID CLGS. SHALL BE CENTERED IN GRID

Main Cooridor

Exposed Ceiling LED ligh strips daylight

13 4' - 8"

3' - 5"

Private office

2' - 0"

-3

"

F

34 Graham St, San F

Wood panels 2x4 9’0’’ AFF

9' - 2"

F

EQ

4' - 6"

CAMERA

RETURN

4' - 10"

2' - 0"

S A

Lumination™ Recessed LED Troffer from GE Lighting Solutions

SMOKE ALARM

SPRINKLES

S A

3' - 4" 4' - 10"

6'0'' EQ SPACE 6'2''

3' - 5"

SUSTAINABLE LOUVER SKYLIGHT

1'0'' THIC K BLA CK PAIN TED GYP BOAR D WI TH WOO D CO VERI NG + 9' A.F.F

SA

2

8' - 5"

EQ 1' - 0"

EQ

7' - 7"

4' - 10"

2' - 0"

17' - 2"

EQ 1' - 0"

3' - 4"

S A

3' - 4"

2' - 8"

13' - 7" 1' - 0"

2' - 4"

S A

WHITE GYP BOARD +9' A.F.F

F

5' - 0"

CUS TOM SUR FAC EM OUN TED LIGH TS + 9' A.F.F

F

3' - 0"

EQ

SA

M

S A

4' - 10"

skylight 1' - 0"

EQ

K

EQ

3' - 1"

4' - 10"

Work station area

J

5'0'' EQ SPACE 5'2''

S A

4' - 10"

I

1

4' - 6"

1' - 0"

H

5'0'' EQ SPACE 5'2''

2' - 6"

1' - 0"

G

F

4' - 10" S A

F

EQ

5'0'' EQ SPACE 5'2''

scale 1/16’’=1’0’’

Atrium

D

3' - 0"

A

12' - 3"

SECOND FLOOR OFFICE RCP AREA


FINISHES P1

FSC® Certified Tropical Hardwood Ipe Flooring

P1

Oak Aspen 720 Reclaimed Wood

P1 210 203

204 DN

P1

DN

SENIORS 208

P1

WB

OFFICE SUPPLIES

202

P1

212

P1

FSC® Certified Stone Source Olympian Black Dany Fleury. Honed Made Black Marble. MR 3: Material Reuse

211

REGIONAL MANAGER

MR4 : Recycled Content MR5 ; Regional Content

207

MEMBERSHIP

WB

213 P1

FSC® Certified Metropolitan Gypsum Board

MARKETING DIRECTOR

CONFERENCE ROOM P1

206 P1

EDITORAL STALL 209

214 211

210

Recycled Content 10% Recycled Content 20% Low Emitting Materials Adhesives and Sealants Low Emitting Materials Paints and Coatings Low Emitting Materials Composite Wood and Agrifiber Products Regional Materials 10% (500 mile rule) Regional Materials 20% (500 mile rule)

Epoxy pure white flooring

MARKETING ASSISTANT

Stonhard

205

224

HIDDEN JINATOR CLOSET

209

208 P1 224

COAT CLOSET

P1

WB

Oak Aspen 720 Reclaimed Wood

201

206

DESIGN PRODUCTION

FSC® Certified Guardian Glass Company

P1 P2

204 222

207

205

223

TELEPHONE CLOSET

P3

CONTROLLER

P1

215

ART DIRECTOR

221

FSC® Certified HPAC Painting

P2

203 P2

Low Emitting Materials Adhesives and Sealants Low Emitting Materials Paints and Coatings Low Emitting Materials Composite Wood and Agrifiber Products Regional Materials 10% (500 mile rule) Regional Materials 20% (500 mile rule)

ACCOUNTING 216 P1 DN

220

218

OFFICE ENTRANCE 203

Interface Carpet

HR OFFICE 217 P1

P1

PANTRY 202

201

206

P1

219

201

OPEN TO BELOW

WB

P1

FINISH & FLOOR PATTERN LEGEND:

Drawn By ID #

FINISH & FLOOR PATTERN NOTES:

CP 1 = CARPET

EP = WHITE EPOXY

P1

P1 = BLACK WALLPAINT

WD = BRICH WOOD

TE = TILE FLOOR

P2

P2 = WHITE WALLPAINT

P3

P3 = YELLOW WALLPAINT

CONC = BLACK CONCERTERE-

1. CONTRACTTOR TO SUBMIT SAMPLES OF ALL FINISHES TO DESIGNER FOR WRITTEN APPROVAL PRIOR TO ORDERING MATERIAL 2. CONTRACTOR TO VERIFY ALL SURFACES ARE CLEAN AND READY AND TO RECEIVE NEW FINISHES 3. CONTRACTOR TO INSTALL ALL FINISHES PER MANUFACTURES SPECIFICATION 4.CONTRACTOR CLEAN ALL WINDOWS AND WINDOW SILLS. 5. ALL CEILING GWB SOFFTIS TO BE PAINTED WITH P-2,UNO. 6. ALL WOOD PAINTED SURFACES ARE TO BE PRIMEDWITH LATEX PRIMER AND FINISHED WITH LATEX SEMI-GLOSS PAINT. SEMI GLOSS LATEX

23

22 April, 2016

Date

Samaher Alamoudi 03590467

FINISH PLAN LEVEL 2

100% Recycled Content Type 6 Nylon 127960AK00

CONFERENCE ROOM

OFFICE MANAGER WB P1

P1

Tufted Sheared

Headquarter

34 Graham St, San Francisco, CA 94129

A102 Scale

1/4’’= 1’0’’


PROJECT USERS ANALYSIS Regional Manager

Senior Editor

Senior Web Editior

Art Director

Marketing Director

Office Manager Senior Senior

Director

Director Regional Manager

HR Amount of space is the most important factor in how much we enjoy our offices

24

The worst part, according to the data, is that these office workers can’t control what they hear — or who hears them.


25


UPUP

BASEMENT FLOOR

STORAGE

SECURITY

STORAGE

scale 1/8’’=1’0’’

KITCHEN

RECREATION AREA

ELECTRICAL

MECHANICAL

OPEN TO

EXIBITION

ARCHIVE

JANITOR WALK N CLOSET

UP

PERFORMANCE AREA

26

UP


BASEMENT MULTI PUROPSE AREA

27


EGRASS DIAGRAM

NOT TO SCALE

BASMENT

GROUND FLOOR

SECOND FLOOR

UP UP P

DN -

UP

DN

UP

---

-

DN

UP

-

28

-

UP

DN

-


ACCESSIBLE RESTROOM LAYOUT scale 1/2’’=1’0’’

FIXTURES: DURAVIT 1' - 1"

9' - 11"

Urinals

Model-No. 255109

Model-No. 081835

Model-No. 032050

3' - 2"

2' - 6"

3' - 1"

3' - 2"

1' - 6"

3' - 1"

1' - 6"

5' - 2"

5' - 7"

Plenum Space

Cove Lighting

3' - 2"

1' - 6"

4’0’

6' - 2"

5' - 6" 4' - 5"

CLEAR SPACE

5’0’

1' - 0"

3’0’

EQ

EQ

5' - 0"

6' - 0"

1' - 9"

4’0’ 2’6’

10’’ CLEAR SPACE

11' - 9"

2’10’’ 0' - 0"

1' - 0"

5' - 4"

1’6’

36’’

Marble tile

Under cabinet hidden light

29


BUILDING SECTION scale 1/8’’=1’0’’

30


BUILDING SECTION scale 1/8’’=1’0’’

31


A

B

C

K

Roof 25' - 0 1/2"

Level 2 14' - 2"

Level 1 0' - 0"

K

C

B

A

Roof 25' - 0 1/2"

Level 2 14' - 2"

Level 1 0' - 0"

32


33


Roof 25' - 0 1/2"

Level 2 14' - 2"

34

Level 1 0' - 0"


Roof 25' - 0 1/2"

Level 2 14' - 2"

Level 1 0' - 0"

35



CONSTRUCTION SET


BUILDING SECTION REFERANCE DRAWING NUMBER WALLSECTION OR ELEVATION REFERANCE DRAWING NUMBER DETAIL REFERANCE DRAWING NUMBER

6. SUBSTITUTIONS, REVISIONS, OR CHANGES SHALL BE SUNMITTED TO ARCHITECT AND OWNER (IN

CONFORMANCE WITH SPECIFIED PROCEDURES) PROIOR TO PURCHASE, FABRICATION, OR INSTALLATION. 7. ALL M ANUFACTURED ARTICLES, M ATERIALS, A ND E QUIPMENT SHALL B E APPLIED, CONNECTED, TIONS ERECTED, CLEANNED AND CONDITIONED DIFFERENCES BETWEEN THE MANUFACTURER’S INSTRUC AND THE CONTRACT DOCUMENTS, THE GC SHALL NOTIFY THE ARCHITECT AND OWNER BEFORE PROCEED.

PROJECT NAME/ ADDRESS NATIONAL GEOGRAPHIC HEADQUATER 1ST GRAHAM ST. SAN FRANCISCO, CALIFORNIA

8. GC IS TO ASSUME THE SOLE RESPONSIBILITY FOR JOB SITE CONDITIONS, INCLUDING, SAFETY OF PERSONS AND PROPERTY DURING THE DURATION OF THE PROJECT.

PROJECT DIRECTORY CLIENT/ OWNER: NATIONAL GEOGRAPHIC

9. GC SHALL HAVE A FULL-TIME REPRESENTATIVE PRESENT IN THE BUILDING AT ALL TIMES WHILE CONSTRUCTION ACTIVITIES ARE UNDERWAY ON-SITE. 10. GC TO VERIFY THAT EXISTING CONCRETE FLOORS ARE LEVEL, SMOOTH, AND FREE FROM SCALING. GC TO REPORT ANY VERIATIONS IN FLOOR LEVEL GREATER THEN 1/4” IN 10’-0”

38ST GRAHAM ST. SAN FRANCISCO. CALIFORNIA, 94129 CEL: 415- 104- 7878 OFFICE: 415- 299- 2000

1/4’’ Scale

A00 SHEET INDEX SHEET A000 SHEET A001 SHEET A101 SHEET A102 SHEET A103 SHEET A104 SHEET A201 SHEET A202 SHEET A203 SHEET A302

COVER SHEET EGRESS PLAN GROUND FLOOR PLAN SECOND FLOOR PLAN THIRD FLOOR PLAN BASEMENT FLOOR PLAN EXTERIOR ELEVATION BUILDING SECTION EAST SECTION SECOND FLOOR R.C.P

SHEET A401 SECOND FINISHING PLAN SHEET A501 SECOND FURNITURE PLAN/ ELECTRICAL PLAN SHEET A601 TOILET ENLARGE PLAN SHEET A701 INTERIOR ELEVATIONS SHEET A702 INTERIOR ELEVATIONS SHEET A703 INTERIOR ELEVATIONS SHEET A801 DETALS SHEET A802 DETAILS

COVER SHEET

5. WORK AREAS ARE TO REMAIN SECURE AND LOCABLE DURING CONSTRUCTION GC SHALL COORDI NATE WITH OWNER TO ENSURITY. FINAL CLEANING INCLUDING BUT IS NOT LIMITED TO CLEANING OF ALL GLASS. GLOSSYT SURFACES, FLOORS, DOORS, FRAMS, AND WALL BASE,

PROJECT NORTH

34 Graham St, San Francisco, CA 94129

4. IN CASE OF CONFLICT BETWEEN ARCHITECTS AND ENGINEER’S DRAWING IN LOCATION MATERIAL/ EQUIPMENT THE ARCHITECT AND OWNER SHALL BE NOTIFIED IMMEDIATELY FOR CLARIFCATION.

Headquarter

N

03590467

GRAPHIC SYMBOL LEGEND

CONTRACTOR: JOE SMITH MATAROZZI/ PELSINGER BUILDING, INC. 355 11TH STREET, SUITE 200 SAN FRANCISCO, CA 94103 TEL: 415- 666- 6666 FAX: 415- 888- 8888 EMAIL: JOESMITH@GMAIL.COM

ID #

3. ALL DIMENSIONS TO BE TAKEN FROM NUMBERIC DESIGNATIONS ONLY DIMENSIONS ARE NOT TO BE SCALE OFF OF DRAWINGS.

Drawn By

RECTION OF ALL WORK. AS DIRECTED BY ARCHITECT. FOR WHICH THE ARCHITECT WAS NOT NOTIFIED IN ADVANCE

ARCHITECT” samaher alamoudi 2432 15TH AVENUE SAN FRANCISCO, CA, 94110 CELL: 415- 217- 9999 OFFICE: 415- 555- 5555 EMAIL: YCHANG13@GMAIL.COM

22 April, 2016

2. THE GENERAL CONTRACTOR (GC) SHALL REVIEW ALL DOCUMENTS AND VERIFY ALL DIMENSION AND FIELD CONDITIONS AND SHALL CONFIRM THAT WORK IS BUILDABLE AS SHOWN, ANY CONFLICTS, OR OMISSION, ETC. PERFORMANCE OF ANY WORK IN QUESTION. THE GC SHALL BE RESPONSIBLE FOR COR

Samaher Alamoudi

A. INTERNATIONAL BUILDING CODE,2012 (CALIFORNIA BUILDING CODE AMENDMENTS 2012, AND SAN FRANCISCO BUILDING CODE AMENDMENTS 2012) B. UNIFORM MECHANICAL CODE (U.M.C.), 2012 C. NATIONAL ELECTRICAL CODE (N.E.C.), 2011 D. UNIFORM PLUMBING CODE (U.P.C.), 2009 E. INTERNATIONAL FIRE CODE (I.F.C.), 2009 F. AMERICANS WITH DISABILIIES ACT (A.D.A.) G. STATE AND LOCAL MOICIPAL ORDINANCES AND AMENDMENTS TO THE CODES.

ABBREVIATIONS LIST EQ EQUAL TYP. TYPICAL AFF. ABOVE FINISHED FLOOR T TREAD R RISER CAB CABINET DWR DRAWER WD. WOOD CPT. CARPET CONC. CONCRETE SLT SLATE TILE WLC WOOL CARPET PT PAINT GLA GLASS W SF SQUARE FEET CLG-MTD CEILING MOUNTED DW DISHWASHER REF REFRIGERATOR (E) EXISTING D DOWN, DEPTH Y UP WITH U.0.N UNLESS OTHERWISE NOTED

Date

GENERAL NOTES 1. ALL WORK SHALL COMPLY WITH THE APPLICABLE CODES. AMENDMENTS. ORDINANCES, LAWS. OR DERS, APPROVALS, ETC. THAT ARE REQUIRED BY PUBLIC AUTHORITIES IN THE EVENT OF CONFLICT. WORK SHALL COMPLY WITH THE MOST STREGENT REQUIREMENT. REQUIRMENTS INCLUDE. BUT ARE NOT LIMITED TO THE CURRENT APPLICABLE EDITIONS OR PUBLICATIONS OF THE FOLLOWING:


-

-

-

34 Graham St, San Francisco, CA 94129

-

UP

EGRASS DIAGRAM

Headquarter

---

03590467

UP

ID #

DN

22 April, 2016

DN

Samaher Alamoudi

-

DN

Drawn By

-

Date

DN -

UP UP P

UP

UP

-

-

Scale

1/4’’= 1’0 ’’

A01


PERFORMANCE AREA

RECREATION AREA

UP

JANITOR WALK N CLOSET

UP

3

34 Graham St, San Francisco, CA 94129

15' - 9"

4' - 2"

EXIBITION

5

1/4’’= 1’0 ’’

1

Scale

A101

10' 10'- -1"8"

UP UP

FLOORPLAN BASEMENT 1

23' - 6" 35' - 1"

9' - 39' 7" - 3"

SECURITY

Headquarter

13' - 6"

STORAGE 14' - 2"

03590467

24' - 1"

10' - 1"

ID #

ARCHIVE

MECHANICAL

5' - 5"

22 April, 2016

22' - 3"

6' - 1"

Samaher Alamoudi

7' - 8"

STORAGE

C

Drawn By

1' - 3"

ELECTRICAL

22' - 0"

Date

48' - 9"

8' - 2"

25' - 10"

46' - 4"

8' - 4"

23' - 7"

B

5' - 5"

25' - 1"

A

19' - 4"

24' - 4"

22' - 0" ---

-

22' - 3"

K 10' - 11"

45' - 10"

KITCHEN

2

22' - 6"

4


A

C

B

K

---

DN

209

OFFICE SUPPLIES 213

205

REGIONAL MANAGER

Scale

204

DN

203

SENIORS

A102

1

202

MEMBERSHIP

-

208

214

210

-

2

34 Graham St, San Francisco, CA 94129

212

MARKETING DIRECTOR 207

---

EDITORAL STALL 215 206

CONFERENCE ROOM

MARKETING ASSISTANT

216

205

211

210

HIDDEN JINATOR CLOSET -

217

-

209

208

COAT CLOSET DESIGN PRODUCTION ASSISTANT

Headquarter

3

217

206

204

201

227

205

TELEPHONE CLOSET

207

CONTROLLER 218

ART DIRECTOR IRECTOR 203 225

226

---

224

4

223

ACCOUNTING

DN

219

220

-

CONFERENCE ROOM 222

5

ID #

-

201

Date

OPEN TO BELOW

PANTRY

FLOOR PLAN L EVEL 2 OFFICE

206

Drawn By

OFFICE MANAGER 201

03590467

220

203

202

22 April, 2016

HR OFFICE

OFFICE ENTRANCE

Samaher Alamoudi

221


PERFORMANCE AREA JANITOR WALK N CLOSET

UP

RECREATION AREA

2

UP

34 Graham St, San Francisco, CA 94129

15' - 9"

4' - 2"

UP UP

1

3

5

Scale

1/4’’= 1’0 ’’

A103

10' 10'- -1"8"

10' - 11"

FLOORPLAN BASEMENT 1

23' - 6" 35' - 1"

9' - 39' 7" - 3"

SECURITY

Headquarter

13' - 6"

STORAGE 14' - 2"

03590467

24' - 1"

10' - 1"

ID #

ARCHIVE

MECHANICAL

5' - 5"

22 April, 2016

22' - 3"

6' - 1"

Samaher Alamoudi

7' - 8"

STORAGE

C

Drawn By

1' - 3"

ELECTRICAL

22' - 0"

Date

48' - 9"

8' - 2"

25' - 10"

46' - 4"

8' - 4"

23' - 7"

B

5' - 5"

25' - 1"

A

19' - 4"

24' - 4"

22' - 0" ---

-

22' - 3"

K

45' - 10"

KITCHEN

EXIBITION

22' - 6"

4


A

B

C

K

Roof 25' - 0 1/2"

Level 1 0' - 0"

Scale

A201

1/8’’

Level 2 14' - 2"

SOUTH 1/8’’=1’0’’

K

C

B

A

34 Graham St, San Francisco, CA 94129

Roof 25' - 0 1/2"

Level 2 14' - 2"

Level 1 0' - 0"

NORTH 1/8’’=1’0’’

2

3

4

5

Headquarter

1

Roof 25' - 0 1/2"

Level 2 14' - 2"

Level 1 0' - 0"

WEST 1/8’’=1’0’’

03590467

Level 2 14' - 2"

Level 1 0' - 0"

EXTERIOR ELEVATION

Roof 25' - 0 1/2"

Samaher Alamoudi

1

ID #

2

Drawn By

3

22 April, 2016

4

Date

5


44 22 April, 2016

BB

1/4’’

REFLECTED CEILING PLAN LEVEL 2

03590467

Samaher Alamoudi

Headquarter

1/4’’

ID #

Drawn By

Date

34 Graham St, San Francisco, CA 94129

AA Scale

A202 1/4’’


C

K

203

DN

204

SENIORS

FINISH & FLOOR PATTERN LEGEND:

CP 1 = CARPET

EP = WHITE EPOXY

P1

P1 = BLACK WALLPAINT

WD = BRICH WOOD

TE = TILE FLOOR

P2

P2 = WHITE WALLPAINT

DN

P3

P3 = YELLOW WALLPAINT

209

P2

OFFICE SUPPLIES P2

CONC = BLACK CONCERTEREPAINT

1/4’’= 1’0 ’’

1 P1

Scale

B

A302

A

213

205

P2

MEMBERSHIP

202

208

214

210

FINISH & FL OOR PATTERN NO TES:

P2

2 P1 212

209

MARKETING DIRECTOR

EDITORAL STALL

206

215

MARKETING ASSISTANT CONFERENCE ROOM

205

210

1. CONTRA CT TOR TO SUBMIT SAMPLES OF ALL FINISHES TO DESIGNER FOR WRIT TEN APPROV AL PRIOR TO ORDERING MATERIAL 2. CONTRA CTOR TO VERIFY ALL SURF ACES ARE CLEAN AND READY AND TO RECEIVE NEW FINISHES 3. CONTRA CTOR TO INSTALL ALL FINISHES PER MANU FACTURES SPECIFIC ATION 4.CONTRACTOR CLEAN ALL WINDOWS AND WINDOW SILLS . 5. ALL CEILING GWB SOFFTIS TO BE PAINTED WITH P-2,UN O. 6. ALL WOOD PAINTED SUR FACES ARE TO BE PRIMEDWITH LATEX PRIMER AND FINISHED WITH LATEX SEMI- GLOSS PAINT. SEMI GL OSS LATEX

34 Graham St, San Francisco, CA 94129

REGIONAL MANAGER

211

216

207 217

HIDDEN JINATOR CLOSET

P3

209

217

208

Headquarter

3

P2

P3

P2

COAT CLOSET P2

DESIGN PRODUCTION ASSISTANT

P2

P2

201 206

204

P3 P3

205

TELEPHONE CLOSET

207

P3

P2

CONTROLLER

227

ART DIRECTOR

218

203 225

226

224

4

221

HR OFFICE

OFFICE ENTRANCE

220

203

201

206

OFFICE MANAGER 201

OPEN TO BELOW

P2

P2

CONFERENCE ROOM

Date

5

FINISH & FLOOR PATTERN NOTES:

FINISH & FLOOR PATTERN LEGEND:

CP 1 = CARPET

EP = WHITE EPOXY

P1

P1 = BLACK WALLPAINT

P3

P3 = YELLOW WALLPAINT

1. CONTRACTTOR TO SUBMIT SAMPLES OF ALL FINISHES TO DESIGNER FOR WRITTEN APPROVAL PRIOR TO ORDERING MATERIAL 2. CONTRACTOR TO VERIFY ALL SURFACES ARE CLEAN AND READY AND TO RECEIVE NEW FINISHES 3. CONTRACTOR TO INSTALL ALL FINISHES PER MANUFAC-

ID #

222

202

Drawn By

PANTRY

FINISH PLAN LEVEL 2

219

220

03590467

DN

ACCOUNTING

22 April, 2016

P1

Samaher Alamoudi

223


---

C

EQ

D

EQ

E

EQ

EQ

EQ

EQ

M

EQ

EQ

5'0'' EQ SPACE 5'2''

LEGEND:

8' - 5" 21' - 10"

7' - 7"

SA

3

EXIT SIGN

11' - 7"

S A

RETURN

SECURITY CAMERA

4

ACOUSTICAL TILE CEILING SYSTEM 1'X2'

EQ

SPOT LIGHT

SPRINKLES

12' - 3"

EQ 1' - 0"

EQ

1' - 0"

1'0'' THICK BLACK PAINTED GYP BOARD WITH WOOD COVERING +9' A.F.F

3' - 5"

12' - 3"

SUPPLY

1' - 0"

5

F

FIRE ALAM

EQ

4' - 6"

9' - 2" 3' - 4"

3' - 4"

F

EQ

12' - 3"

8

WHITE GYP BOARD +9' A.F.F 2' - 0"

2' - 7"

S A

10

EQ EQ

11

F

CONTINUOUS LED STRIPS IN NATURAL WHITE

9

S A

E X

2' - 2"

10' - 11"

SA

E X

E X6' - 5" S A

6'0'' EQ SPACE 6'2''

EQ

E X

4' - 0"

3' - 3"

E X

3. NOT ALL CEILINGACCESS PANELS ARE INDI CATED PLANS. REFERTO THE MECHANI CAL DRAWING AND SPECIFCATION I FORACCESS PANEL SIZE Q UANTITIES, AND APROXIMA P TE OCATIONS. DUCTWORD SHOP DRAWING SHALL INDI CATE THE APPROXIMATE A.P. LOCATION WHICHWILL BE ADJUSTED IF REQUIRED BY THE REVIEWING ARCHIECT. 4. SPRINKLER HEADSW.O. IN 2X2 GRID CLGS. SHALL BE CENTERED IN GRID

F

EQ

WHITE GYP BOARD +9' A.F.F

5' - 8"

CONTINUOUS LED STRIPS IN NATURAL WHITE

SA

EQ

SA

1. U.O.N. IN ROOM WITHOUT SUSPENDED CEILING, THR GYP. BOARD OR PLAYWOOD WALL FINISH SHALLTERMINATE AT 8’0’’ A.F.F. EXCEPT AS FOLLOWS. 2. LIGHTINGPATTERN CENTERED INPACE S U.O.N

EQ

S A

7

12' - 3"

3'' WOOD PANEL +9' A.F.F

EQ

30' - 8" 2' - 4"

F

12' - 3"

NOTE:

SA 11' - 6"

6' - 2"

ACOUSTICAL TILE CEILING SYSTEM 1'X2'

6 0' - 0"

Headquarter

2' - 8"

12' - 3" EQ

2' - 0"

SA

6' - 2"

12' - 3"

4' - 10"

S A

EQ

3' - 4" 2' - 0"

Ligh ting Sol utions

34 Graham St, San Francisco, CA 94129

2' - 8"

13' - 7"

5' - 0" 2' - 4"

SUSTAINABL E LOUVER SKYLIGHT

F

3' - 4"

3' - 5"

2' - 3"

4' - 10"

Lumina tion™ Rece ss ed

SMOKE ALARM

2

F

S A

4' - 10"

HIDDEN CONTINUOUS LED STRIPS IN NATURAL WHITE 17' - 2"

EQ

WHITE GYP BOARD +9' A.F.F

SA

A402

S A

1' - 6"

CUSTOM SURFACE MOUNTED LIGHTS +9' A.F.F

S A

1' - 0"

K

6'0'' EQ SPACE 6'2''

2' - 6"

1' - 0"

EQ

J

1 3' - 1"

S A 3' - 0"

EQ

I

5'0'' EQ SPACE 5'2''

4' - 6"

1' - 0"

H

F

S A

G

EQ

5'0'' EQ SPACE 5'2''

4' - 10"

F

1/4’’

B

Scale

A

3"

2' - 0"

F

0' -

12

2' - 0"

CONTINUOUS LED STRIPS IN NATURAL WHITE

3' - 2"

R

2' - 0"

ALL GYP BOARD ARE+9' A.F.F'

SA

1' - 0"

F

SA

2' - 5"

14

15

17

ID #

16

Drawn By

SA

Date

3' - 0"

F

6'0'' EQ SPACE 6'2''

OPEN TO BELOW @ 22'0'' A.F.F

2' - 7"

S A

MET AL LIGH T TR ACK

3' - 2"

F

ACOUSTICAL TILE CEILING SYSTEM 1'X2'

REFLECTED CEILING PLAN LEVEL 2

11' - 3"

24' - 10"

03590467

EQ

22 April, 2016

EQ

Samaher Alamoudi

EQ

3' - 5"

13 4' - 8"


3

2

11

A

POWER AND DATA LEGEND: RECEPTACLE-20 AMP, 125V OLT NEMA 5-20R DUPLEX RECEPTACLE- DUPLEX FLOOR BOX TYPE

DN

TELEPHONE OUTL ET

204

203

SENIORS

DATA OUTLET

RECEPTACLE DOUBLE DUPLEX ( Q UADRUPLEX )

COMBINATIONTELEPHONE ANDDATA OUTLET

MANUAL PULL FIRE

A502

209

OFFICE SUPPLIES 213

205

MEMBERSHIP

202

POWER AND DATA NOTES:

214

210

208

7' - 6"

5' - 8"

1' - 0"

7' - 0"

(UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARETO CENTERLINE O THE F BOX )

B 212

207

MARKETING DIRECTOR

4 ’’ 8A.F.F 6 0’’ A.F.F 1 8’’ A.F.F 1 8’’ A.F.F 8 0’’ A.F.F OR B.F.C 4 ’’8A.F.F ABOVE DOORS MAX.9’’ A.F.F)

209

206

MARKETING ASSISTANT

SWITCHES TELEPHONE-WALLTYPE TELEPHONEDATA OUTLET RECEPTACLE/ DATA OUT LET FIRE ALARM HORN/ST ROBE FIRE ALARM PULL TA S TION EXIT LIGHT WALL MOUNTED

34 Graham St, San Francisco, CA 94129

REGIONAL MANAGER

EDITORAL STALL 215

205

216

211

210

217

HIDDEN JINATOR CLOSET

Headquarter

5' - 0"

C 217

5' - 0"

209

Scale

4

208

COAT CLOSET 206 201 205

TELEPHONE CLOSET

207

227

DESIGN PRODUCTION ASSISTANT

CONTROLLER 218

204

ART DIRECTOR

225

226

203 224

D

223

ACCOUNTING 219

220

206

CONFERENCE ROOM 222

47

Date

E

ID #

201

Drawn By

OPEN TO BELOW

PANTRY

POWER ANDDATA PLAN LEVEL 2

201

03590467

220

203

202

22 April, 2016

HR OFFICE

OFFICE ENTRANCE

Samaher Alamoudi

221


36’’ 5' - 4" CLEAR SPACE

22 April, 2016

Headquarter

5' - 6"

11' - 9"

03590467

2’6’

RESTROOM

2’10’’ CLEAR SPACE

Samaher Alamoudi

Cove Lighting

ID #

Under cabinet hidden light EQ 3' - 2"

1' - 6"

1' - 6"

34 Graham St, San Francisco, CA 94129

3' - 2"

3' - 1"

5' - 2"

1/2’’

9' - 11"

Scale

A602

5' - 7"

Drawn By

Marble tile 3' - 2"

4’0’

Date

1’6’ EQ

1' - 9"

3’0’

6' - 0"

1' - 6"

2' - 6"

3' - 1"

0' - 0"

5’0’

1' - 0"

Plenum Space

5' - 0"

6' - 2"

1' - 1"

4' - 5"

1' - 0"

4’0’

10’’


Scale

A701 2’0’’

5’0’’ MATERIAL AT TREAD AND RISER TO STEP LIGHT FIXTURE MATCH UPPER FLOOR

BLACK RUBBER 1/2’’

34 Graham St, San Francisco, CA 94129

Cedar WOOD

CONTINUOS PRE-CAST HANDRAIL 3’0’’

FINISHED BLACK CON.

7’’1

4’’

Level 1 0' - 0"

MULTIPURPOSE STADIUM STAIR

Headquarter

1/4’’=1’0’’

1/4’’=1’0’’

49 ID #

CAFE

1/4’’=1’0’’

Drawn By

CAFE

Date

5’0’’

INTERIOR EL EVATION

03590467

22 April, 2016

Samaher Alamoudi

29’’

3’0’’

5’0’’

3’0’’

5’0’’


2

SUSPENDED WIRE

3

Roof 25' - 0 1/2"

GYP . BOARD

GLASS SHELVES

AIR RETURN LIGHT

3' - 8"

0' - 10" 0' - 2"

0' - 8"

0' - 8"

10' - 0"

Level 2 14' - 2"

Scale

0' - 10"

2' - 2"

0' - 2"

A701

DIGITAL DISPLAY SCREEN

1' - 1"

1' - 0"

EQ EQ

1' - 5"

3' - 0"

2’6’’

LED STRIP LIGHT

6’’

0' - 6"

0' - 6"

1/2’’ BLACK METAL STRIPS

2’X3’ MARBLE

1' - 8"

5' - 0"

1' - 3"

2' - 3"

1' - 5"

Cedar WOOD

34 Graham St, San Francisco, CA 94129

EQ

5’X12’ GLASS SHEET

10' - 0"

5’0’’

LAMINATED WHITE ACID ETCHEDGLASS TREAD

1' - 0"

EQ

EQ

EQ

2' - 3"

0' - 6"

Level 2 14' - 2"

Level 1 0' - 0"

MAIN LOBBY AND RECEPTION

RETAIL CHECK OUT AND DISPLAY SHELVES CASE

1/4’’=1’0’’

1/4’’=1’0’’

1/4’’=1’0’’

Date

03590467

27’’

50

INTERIOR EL EVATION

CAFE

ID #

CAFE

22 April, 2016

Hidden LED Strips

Samaher Alamoudi

Hidden LED Strips

Drawn By

6’’

1’0’’

16’’

3’0’’

1’0’’

2’0’’

12’0’’

Headquarter

1/4’’=1’0’’


LAMINATED WHITE ACID - ETCHEDGLASS TREAD CLEAR SILICON

S.STEEL CHANNEL

VERTICAL FURRING: 3 5/8’’ ST. STUDS @12’’ O.C., ADJACENT FRAMING

COORDINATE FRAMING WITH SUPPLY OR RETURN DUCT W/O S.M.D

GLASS TREAD: TOP ONE LAYER 1.3CM LOW IRON ANNEALED GLASS LAMINATED TO INNER: 3 LAYERS 1.3 CM LOW IRON TEMPERED GLASS WITH ONE LAYER OF TRANSLUCENT LAMINATE. WERTICAL FACE: 1 CM LOW IRON ANNEALED GLASS

1/2’’

5/8’’ GYP.BD.

34 Graham St, San Francisco, CA 94129

WHERE NOTED ON MESH. FOR RETURN AIR PROVIDE CONTINUOUS 3’’ OPENING ALONG THIS WALL

3/4’’ PLHARD CAP CEILING FRAMING 6’’ C - BOXED HDR AT CLG. OOPEN.YWOOD 1’0’’

8’’ GYP.BD.

1’’X1’’EGGCRATE 1/4’’ CER.T, OR 1/4’’ MIRROR 9’’ 3/4’’ PLYWOOD

LAMINATED WHITE ACID ETCHEDGLASS TREAD

Headquarter

S.E.D

WHITE ALUM. 3/4’’ ANGLE 6’’

3X3 STEEL ANGLE 1/4’’ THICK

DETAIL

22 April, 2016

03590467 ID #

Drawn By

GLASS WALL

Date

COVE LIGHTING

Samaher Alamoudi

MET STUD

Scale

A702

EDGE OF GLASS BEYOND


Scale

A802 1/2’’SCHEDULED GLAZING

34 Graham St, San Francisco, CA 94129

EPOXY.

SCHEDULED FLOOR FINISH, VARIES

VCT.

1/2’’ X 1/2’’ 1/8’’ ALUM. CHANNEL

VINYLE TRANSITION STRIPS LOCATE UNDER DOOR W.O.

CARPET

1/4’’ GLAZING SEALANT

NOTE: USE AS IS FOR CONC, CUT TO 1/8’’ VERT. FACE V.C.T.

SHIM AND LEVEL

CARPET

Headquarter

1 1/2’’

EXP. BLOT TO CONC. 1 1/2’’

GLUE DOWN CARPET SEE JOHNSON CRS-XXX-A FOR PROFILE

BLOCK OUT FOR GLAZING CHANNEL

52 ID #

Drawn By

52

Date

DETAIL

03590467

FLOOR TRANSITION

22 April, 2016

GLASS WALL

CONC, SLAB

Samaher Alamoudi

3 1/2’’


214 215 216 217 218 219 220 221 222 223 224 225

CP 1 = CARPET

Inte rfac e Carpet Tufted She ared

P2

CPI CPI CPI EP CPI CPI CPI EP CPI CONC. EP EP

WOOD LOUVER WOOD LOUVER

W

GLS GLS

P3 P3 P1

P2

P1 P1

P2 P2

P2

GLS GLS GLS

GLS P2

ACCO,T

P3

ACCO,T

P2 GLS GLS GLS GLS

ACCO,T ACCO,T GYP. GYP. EXPOSED ACCO,T EXPOSED GYP. ACCO,T ACCO,T

P2

P2

P2

GLS

GLS

P2 P2 GLS GLS

GENERAL NOTE

CEILING MATERIAL

1/4’’

CPI TILE CPI EP CPI CPI CPI CPI CPI WD CONC. CPI EP TILE

SE

P2

GLS EXPOSED

P3 GLS GLS

P3

WOOD LOUVER

GLS

GLS

GLS

P1

P1

TE = TILE FLOOR

WD EXPOSED ACCO,T EXPOSED WD GYP. EXPOSED GYP.

FSC® Certi ed Tropical Hardw oo d Ipe Floo ring

P1

P3

P1 = BLACKWALLPAINT

Painting Black MAT

Oak Aspe n 720 Reclaimed Woo d

100% Rec ycled Content Type 6 Nylon 127960AK00

Low Emitting Materials Adhesi ve s

and Sea lants

P3 = YELLOW WALLPAINT

Painting YELLOW SEMI GLOSSY Low Emitting Materials Adh es ives

and Seal ants Low Emitting Materials Paints and

Low Emitting Materials Paints and

Low Emitting Materials Compo site

Low Emitting Materials Compo site

Regi onal Materials 10% (500 mile rule ) Regi onal Materials 20% (500 mile rule )

Regi onal Materials 10% (500 mile rule ) Regi onal Materials 20% (500 mile rule )

EP = WHITE EPOXY

Epoxy pu re white oo ring

Scale

N

A900

208 209 210 211 212 213

GENERAL MANAGER OFFICE PANTRY OFFICE ENTRANCE ART DIRECTOR DESIGN PRODUCTION MARKETING ASSISTANT MRKETING DIRECTOR REGIONAL MANAGER SENIOR ATRUIM 2 OFFICE SUPPLY COORIDOR RESTROOM MEMBERSHIP EDITORAL STALL CONFERANCE ROOM 1 COORIDOR CONTROLLER ACCOUNTING HR COORIDOR CONFERANCE ROOM 2 ATRUIM 2 COORIDOR OFFICE ENTRANCE 2

WALL

LOOR MATERIAL

34 Graham St, San Francisco, CA 94129

201 202 203 204 205 206 207

OOM NAMEF

Headquarter

ROOM NUMBERR

CONC = BLACK CONCERTEREPAINT

Stonha rd

FSC® Certi ed Stone S ource Olympian Black Dany Fleu ry. Honed Made Black Marble. MR 3: Material Reuse MR4 : Recycled Content MR5 ; Regional Content

P2

P2 = WHITEWALLPAINT

Painting WHITE MAT Low Emitting Materials Adhesi ve s

and Sea lants

Low Emitting Materials Compo site Regi onal Materials 10% (500 mile rule )

SCHEDULED

03590467

Regi onal Materials 20% (500 mile rule )

ID #

Oak Aspe n 720 Reclaimed Woo d

Low Emitting Materials Paints and

22 April, 2016

FSC® Certi ed Gua rdian Glass Company

Samaher Alamoudi

Oak Aspe n 720 Reclaimed Woo d

GLS

Drawn By

FSC® Certi ed Tropical Hardwood Ipe Flooring

Date

WD = BRICH WOOD


THANK YOU

54


55


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.