The Lawrence Group Documentation

Page 1

University of Kans s aARCH m a n t h803 a auer health + wellness internship saint louis, missouri 2012 Health and Wellne


Contents 04 INTO + OVERVIEW 06 TIME LINE 06 PROJECTS SD

DD

NAZARETH SEMO ST. PIUS STARBUCKS

20

REFLECTION

CA

CONSTRUCTION


LG


introduction + overview

Helping Our Clients Realize Their Dreams Our mission has remained consistent over the past quarter century

ST. LOUIS NEW YORK PHILADELPHIA CAROLINAS TEXAS


THE LAWRENCE GROUPS MULTI-DISCIPLINARY architecture CORPORTATE EDUCATION HEALTHCARE HOSPITALITY MEDIA MIXED USE RESIDENTIAL RETAIL SENIOR LIVING SUSTAINABLE DESIGN interiors COLORS NICHE LANDSCAPE LANDSCAPE PLANNING URBAN DESIGN PLANNING BLOCK CODE REGION NEIGHBORHOOD DEVELOPMENT CONSTRUCTION

GRAPHICS

04


INTERN HAPPY HOUR

LG SOFTBALL TEAM


EXPERIENCE: COLLABORATION VARIOUS BUILDING TYPES SITE VISITS SOCIAL ACTIVITIES PROJECT ARCHITECT OFFICE MANAGEMENT MATERIAL REVIEW CONSULANT COORDINATION SHOP DRAWINGS SCHEMATIC DESIGNS DESIGN DEVELOPMENT CONSTRUCTION ADMIN.

06


may

jun

jul

aug

DRURY

DANCE STL

NAZARETH

SEMO


sept

oct

nov

dec

N. GRAND APTS.

ST PIUS

STARBUCKS

08


NAZARETH LIVING CENTER

INDENDENDENT SENIOR LIVING Client: nazareth living center Location: 2 nazareth lane

saint louis, missouri 63129

context:

residential neighborhood senior living complex: assited living, skilled nursing

renderings by andrey Mishev


program:

50 living units parking garage library, card room, meditation room, fitness, exercise, doctors office, kitchen, dining, family party room

brief:

I have been involved with this project since may 2011. in august 2012, I was given project architect responsibilities as a result of an associate’s maternity leave during the construction administration phase. i attended meetings with the owner and other members of the design team.

10


construction

observation


marketing plans

12


℄ 3'-2"

4'-7 5/8" 4'-7 3/4"

TRASH/ RECYCL'G 105

CORRIDOR 104 9'-0 7/8"

D2s SIM.

UP

6'-6"

18'-10 1/2"

NORTH STAIR S1-1

D1

W2s

1 A7.04

DN

28'-5 3/8" TYP.

S1-1A

UNIT A105

UNIT A103

D1s

2 A7.01

15'-6 3/4"

2 A7.02

shop drawing review + solutions

3'-2 1/8"

D2 6'-0" TYP.

D4s

D2s

UNIT A101

"

'-0

R64

10145.002 11/16/12

8'-3 1/4" 1'-1 5/8"

MECH. 117A

STAFF RESTRM. 116

OFFICE 113

LINENS 115

9a

D4s

D4s

D1

1'-8 3/8"

℄ 5'-0 5/8"

CARD ROOM 138

15'-10 3/8"

48"

ASI 9-A6.11

℄ 3'-7 1/2"

117A

HALL 117 +0"

DRY STORAGE 112

113

A5.01

CORRIDOR 102

D2s

D2s

6'-4"

138

Project No.: Issue Date:

18'-11 7/8"

12'-7 3/8"

114 JANITOR 114

28'-5 3/8" TYP.

DISH ROOM 110

D2s

D2

D2s SIM.

ELEC 137 W4

9'-2 1/2"

W3

Cross Reference: ASI No.9

°

2.82

11

1'-3"

PREP 111

COOLER 118 -7-1/2"

FREEZER 119

COOK 109

BEVERAGE 108

22

BAR 106 48"

ELEV E-1

D2

Project:

1 A5.03

6'-6"

5'-0" TYP.

5'-0"

4'-6" HIGH WALL

44 seats

DINING ROOM 107

21

19

A5.02

TYP.

ELEV LOBBY 101

S1-1B

CORRIDOR 136 19'-8 1/2"

UNIT A123

2 Nazareth Lane, St. Louis Missouri 63102

1 A5.02

107A

20

104 UNIT A121

BOND BEAM, RE: STRUCT.

107B

CENTER OF RADIUS AT PATIO

LOUNGE 121

CORRIDOR 122

12 0° 6'-0" TYP.

1" DRIP

33'-0 1/4"

PATIO

FAMILY PARTY/ CONFERENCE 120

PUBLIC RESTRM. 124 124 JANITOR 125

13'-5 3/4"

R-19 BATT INSULATION

116

20' 10'

14'-0 1/8" 11'-1 7/8" 15'-0 7/8"

ROOF BELOW

RE: A0.05

8'-11 1/2" 12'-11 1/4" 15'-0 7/8" 15'-0 7/8" 13'-1 7/8" 13'-1 7/8"

7'-1 5/8" 3'-3 5/8"

105B 105A

5' 0

Design Development

25'-9 1/4"

128

GENERAL STORE 127

1'-5 3/4"

126

PUBLIC RESTRM. 126

TYP. 15'-0 7/8"

ROOF BELOW

1st Floor Phase 1

Northstar Nazareth Living Center

9 7/8"

ALIGN

9A 12

13'-5 7/8"

Nazareth Living Center

20'-10 3/4"

8'-2"

STORAGE 128

" '-3 12

3'-0 5/8"

consultant coordination

3'-2"

150°

D2 TYP.

MEDIA ROOM 129

D2

D2s

12'-2 1/2" 6'-6"

D1s

6'-6"

first floor October 18, 2012 10145.002

31'-10 3/4"

150°

CORRIDOR 123

ADA UNIT A111

28'-5 3/8" TYP.

UNIT C113

D1

BASE BID: VINYL SIDING ADD ALTERNATE: BRICK VENEER

D2

D1

D1 D2

UNIT C115

D1s

13 A8.03

137

109

6'-0" 7'-7 3/4" 4'-0" 11'-0 3/8" 4'-0" 5'-7 5/8" 7'-0 7/8" 2'-1 7/8"

102 6'-0"

24'-0" 3'-5 1/8" D1

6 MIL MOISTURE BARRIER BELOW SLAB

6'-4"

D1

D1

D2 D2

6'-0" TYP. D2s D2s

D2

D2

UNIT A117

PAINTED 8" CMU (NOM.), RE: STRUCT.

82'-2 1/2" UNIT A119

2X4 VINYL CLAD LAY-IN CEILING SUSPENDED FROM METAL DECK

120B 125

14'-2 5/8" 16'-1 3/4" 27'-10 1/4"

127 3 A5.02 SIM.

PROVIDE PECORA WATERPROOFING AT CONC. PATIO SLABS ABOVE GARAGE

8'-1 1/8" 4'-3 5/8"

21'-5 1/4"

21'-3 3/8"

D2 SIM.

ADA UNIT A112

28'-5 3/8" TYP.

UNIT C114

D2 D2

D4

W4

℄ 6'-0" TYP.

131

TYP. S1

CORRIDOR 130

TYP. S1

10'-8"

MECH/ ELEC 131

D2

D4s D2s D2s

D2 D2

D2

TECH CLOSET 133

133

JANITOR 132

6'-5 1/4"

120A 6'-0 3/4"

4'-9"

9'-0 3/4" 123

D1

D1s

UNIT C116

132

ROOF BELOW

4"

3'-0 3/4"

72"

2'-4"

D1

UNIT A118

TRASH/ RECYCL'G 135

11'-0" CORRIDOR 134

130

42'-5 1/8" 5'-0" DN

1/2"=1'-0"

STEEL POUR STOP- (PT), RE: STRUCT.

THRESHOLD SET IN MASTIC

SLOPE 2% MAX

SLOPE 2% MAX

GARAGE FLOOR 88'-2 1/2"

7'-0"

4"

117 14'-10 7/8" 13'-1 7/8" 35'-2"

122 4"

12

2'-11 5/8" S2-1

CONC. SLAB ON GRANULAR FILL, RE: STRUCT.

3 A8.03

COLUMN BEYOND

GARAGE

VINYL RAILING WITH SQUARE BALLUSTERS

BALCONY

DWELLING UNIT

2'-0 3/8" SOUTH STAIR S2-1

UP

2 WALL SECTION BALCONY @ GARAGE

A6.11

SLOPE = 1/4: 12

FIRST FLOOR 100'-0"

7'-5 7/8"

12'-8 1/4" 12'-4 5/8" 10'-9 1/8" 13'-1 7/8" 15'-0 7/8" 15'-0 7/8" 13'-6 1/4"

8'-11 1/4" 7'-5 7/8" 10 1/2" TYP. 13'-10 1/8"

129B 2 A7.03

135

8'-7 5/8" 6 3/4"

21'-10 3/4" 3'-3 1/4" 18'-8 5/8" 13'-1 7/8" 35'-2" 12'-8 1/4" 23'-1 3/4" 13'-1 7/8" 15'-6" 18'-1 1/4" 10'-0 3/4"

7 1/2"

east elevation


MATCH ADJ KITCHEN CABINETRY, TYP.

1'-8"

3

Project: 105B

Nazareth Living Center

8"

3'-0" MATCH ADJ

EQ.

KITCHEN CTRTOP HT

2'-10 1/2"

1'-4"

EQ.

4 1/2"

BASE CABINET WITH DRAWERS - (PROVIDE MODIFIED FULL OVERLAY CABINET DRAWERS PER SPEC)

7"

7"

OPTIONAL DRAWER LOCK CABINET HARDWARE SHALL MATCH ADJ KITCHEN HARDWARE

FULL HEIGHT, TRAY BASE CABINET

LOCKABLE CASTERS LOCATE WHEEL FLUSH WITH F.O. CABINET AS TO NOT CREATE A TRIP HAZARD

1'-8"

KITCHEN ISLAND ELEVATION

3/4"=1'-0"

Cross Reference: Kitchen Island Elevations

Project No.: Issue Date:

product design

material selection

STONE COUNTERTOP WITHOUT BACKSPLASH (PROVIDE 1" RADIUS AT CORNERS, TYP.) - COLOR SHALL MATCH ADJ. KITCHEN COUNTERTOP

4'-0"

NOTE: CABINET DRAWER AND DOOR PROFILE/STYLE/ COLOR/SIZE SHALL MATCH ADJ KITCHEN CABINETRY

10145 11/15/2012

ASI-A4.01-3

2 Nazareth Lane, St. Louis, MO 63129

-3"

architect’s supplemental instructions

1/4":12" Slope Max. 1/8":12" Slope Min.

FUSED DISCONNECT SWITCH BOX 2 CU. YARD COMPACTION CONTAINER

REMOTE POWER UNIT

EXHAUST SHAFT ABOVE

TRASH/ RECYCL'G 105

PROVIDE (2) ADDITIONAL LAYERS OF 5/8" GYP. BOARD THIS SIDE OF WALL

U1 7 1/4"

S1-1B

12'-5 3/4"

TRASH COMPACTOR

TRASH CHUTE ABOVE 7 A7.04 104

1'-6 1/2"

105A

3" 7 1/4"

+0" 1'-6 1/2"

W3

1 Trash Chute Plan - First Floor

A7.04

W5

1/2"=1'-0" Project:

Nazareth Living Center 2 Nazareth Lane, St. Louis, MO 63129

Cross Reference: ASI No. 4-1/A7.04

Project No.: Issue Date:

10145.002 09/25/2012

ASI No. 4

mock up panel

NOTE: COORDINATE COMPACTOR/ CONTAINER LOCATION WITH TRASH CHUTE.

14


pioneer network conference presentation

Household Renovation

Household Renovation

St. Joseph ’s Home 429 SF/Bed

The Sarah Community Anna House Story

Brooking Park Memory Care 460 SF/Bed

Neighborhood – New Construction The Sarah Community Anna House Story brief: a study on creating effiecient resident-oriented programmatic floor plans in senior living establishments, creating a welcoming sense of community. These are described as neighborhoods and allow for an enhanced focus on health and experience of the residents.

Meadowlands Memory Care 559 SF/Bed

Neighborhood – New Construction


Household Renovation The Sarah Community Anna House Story

Brooking Park Memory Care

Neighborhood – New Construction 460 SF/Bed

The Sarah Community Anna House Story

Meadowlands Memory Care 559 SF/Bed

Neighborhood – New Construction The Sarah Community Anna House Story

Clarity Pointe 565 SF/Bed

Dining Experience

The Sarah Community Anna House Story

16


south east missouri state UNIVERSITYRIVER CAMPUS MIXED USE

Client: south east missouri state university Location: 518 S Fountain St

program:

Cape Girardeau, MO 63702

student housing academic program- art studios

context:

river campus


space allocation diagrams ceramics

art/gen. ed. CERAMICS

ATION

SPACE ALLOCATION DIAGRAMS

painting

PAINTING

SPACE ALLOCATION DIAGRAMS

K02

CLASSROOM

B02 CLAY MATERIAL STORAGE

A01

A03

A05

120 SF OFFICE

RCVG

A02

A04

GRAMS

OUTDOOR SCULPTURE EXHIBIT

1,800 SF

C01

OFFICE

120 SF

100 SF

C05

OFFICE 120 SF

B13

2000 SF

PROJECT STORAGE

SPRAY BOOTH

150 SF

TBD

2000 SF

music

SPACE ALLOCATION DIAGRAMS

9/24/2012

9/24/2012

D04

INDEPENDENT WORK AREA

C04

C02

FRAME MAKING

400 SF

1250 SF

MUSIC

D05

INDEPENDENT STUDIOS

MODEL

HAND BUILDING AND METAPHOR

120 SF EA. OFFICES

C06

C03

PAINTING

1600 SF

B01

B12 B11

sculpture WOODS MAJORS STUDIO

600 SF

D01

WOOD SHOP

1200 SF

D02

D07 E07 F07

STORAGE

E04

2200 SF

STORAGE

E01

SPRAY BOOTH

STORAGE

SECTIONAL CLASSROOM-03

CHAMBER

500 SF

H04

H10

300 SF

SECTIONAL CLASSROOM-02

INSTRUMENT STORAGE

F05

500 SF

900 SF

SPRAY BOOTH

200 SF

875 SF

H05

H02

400 SF

CHORAL REHEARSAL

SPRAY BOOTH

E05

3D STUDIO

H01

E06

CLASSROOM

F01

CHORAL LIBRARY

100 SF

250 SF

2600 SF

H09

D06

250 SF

D03 E03 F03

METALS SHOP

TBD

TBD

TBD

MEN’S LOCK. ROOMS

320 SF

INDEPENDENT STUDIOS

700 SF

1,000 SF

D07

B05

750 SF

KILN ROOM

120 SF OFFICE

TEACHING GALLERY

J04

WOMEN'S LOCKER ROOM

B09

A07

2,100 SF

SHOWER

J02 750 SF

INDEPENDENT STUDIOS

J05

SHOWER

B10

OUTDOOR STORAGE

OUTDOOR CERAMICS YARD

J03

1,100 SF

1,000 SF

B08 200 SF

GLAZE

B14 CLASSROOM-01

WHEEL THROWING

CLAYMIXING

150 SF RECEIVING

400 SF

3300 SF

B03

ADV. CLASSROOM

B06

B07

500 SF

E02 METALS STORAGE

120 SF

120 SF 120 SF 120 SF OFFICE OFFICE OFFICE

120 SF

3125 SF

400 SF

250 SF

H06

H11 H12 H13

H07

H03 SECTIONAL CLASSROOM-01

500 SF

H08

F04

120 SF

250 SF

PRACTICE ROOMS

STORAGE

F02

1800 SF

STORAGE

F06

300 SF

OFFICE

120 SF

ANCE

SHARED SPACES

DIAGRAMS

SPACE ALLOCATION DIAGRAMS

theater & Dance WOMEN'S LOCKER ROOM

K05

CLASSROOM

DIRECTING

SHOWER

9/24/2012

shared spaces K02

J06

J02 J03

J01

DANCE STUDIO

9/24/2012

COMMON GALLERY

750 SF

K03

J12

J04 J05

MEN'S LOCK. ROOMS

SHOWER

320 SF

J09

J10

120 SF 120 SF OFFICE OFFICE

J11 120 SF OFFICE

RESTROOM

300 SF

TRAINING ROOM

4200 SF

K07

STUDENT BREAK ROOM

3300 SF

2160 SF

K03 STAFF

250 SF

1000 SF

TBD

A03

brief: 9/24/2012

schematic design design development space allocation diagrams context studies precedent studies 3-d modeling siting options

9/24/2012

efficient floor plan options

18


SEMO RIVER CAMPUS MIXED USE

UNIT TYPES STUDY 13'-0"

UNIT A

DWELLING

4 BEDROOM/ 4 BATH 14'-3"

1'-4"

2'-8"

BATH

BATH R

14'-3" 0

6'-6"

32'-0"

BEDROOM

8'-6"

14'-3"

BEDROOM

KITCHENETTE

6'-6"

DINING BATH

BATH

8'-6"

8'-6"

BEDROOM

5'-4"

W/D BEDROOM

8'-6"

Scale: 3/16" = 1'-0"

14'-3"

Southeast Missouri State River Campus Residence Hall & Academic Program

Unit A 07.05.12

612.127 13'-0"

Sketch/Page No.

A01 refer to sheet A3.0

DWELLING

UNIT HYBRID 4 BEDROOM/ 4 BATH

14'-3"

DINING 32'-0"

8'-6"

2'-8"

14'-3"

BEDROOM BATH

R

BEDROOM

14'-3"

5'-4"

BEDROOM

3'-6"

1'-4"

8'-6"

W/D

8'-6" 0

6'-6"

BATH

KITCHENETTE

BATH

BATH

14'-3"

8'-6"

BEDROOM

Scale: 3/16" = 1'-0"

Southeast Missouri State River Campus Residence Hall & Academic Program

Unit C (Hybrid) 07.05.12

13'-0"

612.127

Sketch/Page No.

A01 refer to sheet A3.0

DWELLING

UNIT B

4 BEDROOM/ 4 BATH

DINING

2'-8"

5'-4"

32'-0" 3'-6"

1'-4"

8'-6" 14'-3"

BEDROOM

BEDROOM BATH

R

3'-6"

14'-3"

BATH W/D

0

6'-6"

BATH

KITCHENETTE

14'-3"

BEDROOM

BEDROOM

8'-6"

14'-3"

8'-6" 6'-6"

BATH 8'-6"

Scale: 3/16" = 1'-0"

Southeast Missouri State River Campus Residence Hall & Academic Program 612.127

Unit B 07.05.12

Sketch/Page No.

A01

EFFICIENT FLOOR PLANS

refer to sheet A3.0

gross area = net leaseable area net area


PROGRAM SITING OPTIONS

STUDENT HOUSING ACADEMIC PROGRAMS EXISTING BUILDINGS

CONCEPT:

programmatically, establish a relationship between the academic program spaces and the residential housing

20


ST. PIUS V ADAPTIVE REUSE`

Client: archdiocese of st. louis Location: 3310 S Grand Blvd

program:

Saint Louis, Missouri 63116

catholic charities offices: catholic family servies refugee center southside center lamp housing resource childcare center shared multi-purpose spaces

context:

st. louis city

brief:

abandoned school building Programming Adjacencies field verifying existing conditions consultant coordination Adaptive Reuse Historic Preservation integrating new systems multiple clients & programs


shared refugee center heatlth + assistance 11

11

12

8

6

6

9

9

DN

6 4

1

1

6 4

1

1 1

ALIGN

INTAKE

1

DN ALIGN

REVERSE DR. SWING

4

1

REVERSE DR. SWING

CLOSET

3

VCT FLR'G

CLOSET

VCT FLR'G

4

1

10'-5"

5 FAMILY CONF. 1 5'-10" 4'-5" 10'-5" COPY

1

TYP.

TYP.

6

9

9

7

17

7

CLASSROOM

CLASSROOM

12x12 VCT FLR'G 6 PLAS. CLG @ 12'-4 1/2" A.F.F.

12x12 VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

9

17

8

7

8 12 10

10

CLASSROOM

CLASSROOM

12x12 VCT FLR'G 12 PLAS. CLG @ 12'-4 1/2" A.F.F.

12x12 VCT FLR'G 6 PLAS. CLG @ 12'-4 1/2" A.F.F.

15

15

7

TYP.

TYP.

23 6

23

16'-2 1/2"

16'-2 1/2"

9

10

TYP. DS

1 5'-10" COPY

8'-6"

WS8

WS8 1

WS7

WS7

WS2

WS6

WS6

WS3

RECEPTION

12

CLOSET

3

12x12 VCTSFLR'G

S

TERRAZZO FLR'G

TERRAZZO FLR'G

5

5

CLOSET

12x12 VCT FLR'G

12x12 VCT

3

12x12 VCT CLOSET VCT FLR'G

18 22

22

REMOVE AC UNIT AND WOOD SHELVING

REMOVE AC UNIT AND WOOD SHELVING

21

OFFICE

221

CARPET PLAS. CLG @ 13'-2" A.F.F.

6

21 OFFICE

TYP.

1 TERRAZZO FLR'G 7

4

25

14

4

WS5

CLOSET 3 VCT FLR'G

OFFICE

OFFICE CARPET 2x2 APC @ 7'-11 1/2" 3 A.F.F.

TERRAZZO FLR'G

67

7

CLOSET 14

WOOD FLR'G PLAS. CLG @ 13'-2" A.F.F.

CLOSET

15 WOOD FLR'G PLAS. CLG @ 13'-2" TYP. A.F.F.

1

1

22

22

3 6 CLOSET

WOOD FLR'G PLAS. CLG @ 13'-2" A.F.F.

24 15

3 4 5 6 7 8

PLAN NORTH

REMOVE WALL MOUNTED AND BASE CABINET, AND OR CABINET, DRINKINGAND OR DRINKING REMOVESINK, WALLSINK MOUNTED SINK, SINK AND BASE 10 FOUNTAIN, REFERFOUNTAIN, TO M.E.P. DRAWINGS FOR MORE INFORMATION. REFER TO M.E.P. DRAWINGS FOR MORE INFORMATION.

14 15 16 17

14

19 DIRECTOR TYP.

1'-6" DIRECTOR 15 101 TYP.

11'-3"

10'-6" 11'-3"

MECH. RM.

DN (11)R UP (13)R @ 7 7/16"-

WS3

ELEC./ DATA 15'-4 5'-3 1/2"1/2"

MECH. RM.

STAFF OFFICE

1 15'-4 1/2"

18 10'-6"

WS2

DS

STAFF OFFICE

10 UP

16

STAFF16 RR

LANDING ELEV. @ 120'-2 3/4" A.F.F.

T

WS1

DS

PLAS. CLG @ 13'-2" A.F.F.

19

UP

PLAS. C 12'-4 1/2"

1 WS2

WS1

15 1

TYP.

2'-3 1/2"

1'-6"

18

PLAN NORTH

WS3

2

LANDING ELEV. @ 120'-2 3/4" A.F.F.

TYP.

STAFF RR17

19 10

1

TYP.

PLAN NORTH

PLAN NORTH

2nd FLOOR - NEW WORK 2ndPLAN FLOOR PLAN - NEW WORK 2 floor 2 3rd plan-new

PL NO

3

SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"

X X CONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY) CONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY)

TYP.

17

2n

SCA

CEILING PLAN KEYP CEILING

REMOVE ALUM. SINGLE HUNG WINDOW, INSTALLATION REMOVE ALUM. SINGLERETAIN HUNG FOR WINDOW, RETAIN FOR INSTALLATION ANDDOOR TRANSOM TOAND BE PRESERVED; DOOR HISTORIC FRAME TRANSOM TOREPAIR BE PRESERVED; REPAIR DOOR 25 7 HISTORIC DOOR 7 FRAME AT NEW LOCATIONTO CONSTRUCTION ATREFER NEW LOCATIONREFER TOPLAN. CONSTRUCTION PLAN. FRAME AND TRANSOM IF REQUIRED. FILLIF HINGE POCKETS, HOLES, FRAME AND TRANSOM REQUIRED. FILL LATCH HINGE POCKETS, LATCH HOLES,

REMOVE WALL MOUNTED BOARDS, BOARDS,MARKER ETC. REMOVETRIM, WALLCHALK MOUNTED TRIM,MARKER CHALK BOARDS, BOARDS, ETC. 25 9 (RETAIN HISTORIC(RETAIN CHALK BOARD WHERE NOTED) HISTORIC CHALK BOARD WHERE NOTED)

13

WS4

13

WS5

6 TYP. @WS4 ELEVATOR

2 ELEC./ TYP. DATA 3 1 FEC

DS

PATCH AND REPAIR ALL EXISTING PATCH AND REP HISTORIC CLOCK TO REMAIN, REPLACE MISSINGREPLACE GLASS LENS ON SOUTH HISTORIC CLOCK TO REMAIN, MISSING GLASS LENS ON SOUTH IN NEW PARTITIONS MECHANICAL PROVIDE SOUND BATTS IN AT NEW PARTITIONSROOM AT MECHANICAL 15 PROVIDE SOUND 15 BATTS 1 ROOM 1 1 1 REQUIRED TO MATCH EXISTING REQUIRED TO FM SIDE. PROTECT DURING DEMOLITION AND DEMOLITION CONSTRUCTION SIDE. PROTECT DURING ANDPROCESS CONSTRUCTION PROCESS BRICK VENEER INFILL TOVENEER MATCH EXIST'G OVER 5/8"EXIST'G DENSGLAS 3-5/8" BRICK INFILL TO MATCH OVER 5/8" DENSGLAS 3-5/8" SAW CUT AND2REMOVE EXISTING CMU AS EXISTING REQUIRED FORAS NEW DOOR OPENING SAW CUT AND REMOVE CMU REQUIRED FOR NEW DOOR 19 OPENING 16 REMOVED WOOD DOOR OPENINGS AT WALL TO REMAIN REMOVED WOOD CASED DOOR OPENINGS AT WALL TO REMAIN HISTORIC TERRAZZO FLOORING AND BASE, RESTORE DAMAGED AREAS HISTORIC TERRAZZO FLOORING ANDANY BASE, RESTORE ANY DAMAGED 16 AREAS 19 CASED PATCH IN AND REPAIR EXISTING PATCH IN AND H R METAL STUDS W/ INSULATION AND GYP. BD. AND AT INTERIOR 2 2 METAL STUDS W/ 5/8" INSULATION 5/8" GYP.SIDE. BD. AT INTERIOR 2 SIDE. 2 IF ANY, SCRUB CLEAN, POLISH AND SEALPOLISH AS REQUIRED FORAS LIKE NEW IF ANY, SCRUB CLEAN, AND SEAL REQUIRED FOR LIKE NEW AT EXTERIOR WALLS AND AT HIST AT EXTERIOR W REMOVE MISCELLANEOUS COAT RACKS ETC.COAT AT EXISTING REMOVE SHELVING, MISCELLANEOUS SHELVING, RACKS ETC. AT EXISTING PROVIDE SILL FLASHING AND WEEPS AS REQUIRED. PROVIDE SILL FLASHING AND WEEPS AS REQUIRED. REMOVED WOOD DOORS, FRAMES SIDELITES ATAND FRONT ENTRY, AT FRONT ENTRY, REMOVED WOOD AND DOORS, FRAMES SIDELITES 3 APPEARANCE. APPEARANCE. 20 20 DEMOLISHED PARTITIONS OR ASP DEMOLISHED CLOSETS AS REQUIRED FIELD CONDITION. CLOSETS ASVERIFY REQUIRED FIELD VERIFY CONDITION. WOOD VERTICAL HISTORIC MULLIONS TO REMAINSEE DETAIL 3/A3.2SEE DETAIL 3/A3.2 WOOD VERTICAL HISTORIC MULLIONS TO REMAINPROVIDE & INSTALL NEW CLEAR INSULATED GLASSINSULATED IN EXISTING PROVIDE & INSTALL NEW CLEAR GLASS IN EXISTING CLEAN AND PAINT.CLEAN AND PAI HISTORIC CORRIDOR TO BE CORRIDOR PRESERVED; ANY DAMAGED PLASTER HISTORIC TOREPAIR BE PRESERVED; REPAIR ANY DAMAGED PLASTER 17 17 REMOVE BUILT-IN WOOD STORAGE OR SHELVING UNIT.. BUILT-IN CABINET WOOD STORAGE CABINET OR SHELVING UNIT.. 3 REMOVE EXIST'G INFILL CONSTRUCTION PREVIOUSLY AT PREVIOUSLY 3 4 REMOVE REMOVE EXIST'G INFILLAT CONSTRUCTION ALUMINUM WINDOW SASH ASWINDOW REQ'D TOSASH MATCH ALUMINUM AS EXISTING REQ'D TO GLAZING. MATCH EXISTING GLAZING. WALLS AND CEILINGS TO AND MATCH ADJACENT FINISHES. WALLS CEILINGS TO MATCH ADJACENT FINISHES. 21 21 NEW SUSPENDEDNEW ACOUSTICAL SUSPENDP DEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR. DEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR. FIELD VERIFY SIZES AND EXIST'G CONDITIONS. FIELD VERIFY SIZES AND EXIST'G CONDITIONS. 3 3 REMOVE EXISTINGREMOVE POWER EXISTING PANEL- REFER TOPANELM.E.P. DRAWINGS FOR MORE POWER REFER TO M.E.P. DRAWINGS FOR MORE DETAILS A, B, & C/A8.1 DETAILS A, B, & TO BE PRESERVED; ANY DAMAGED PLASTER WALLS PLASTER WALLS HISTORIC STAIRS TOREPAIR BE PRESERVED; REPAIR ANY DAMAGED 5 REMOVE EXIST'G INFILL CONSTRUCTION PREVIOUSLY AT PREVIOUSLY 4 HISTORIC STAIRS REMOVE EXIST'G INFILLAT CONSTRUCTION 4 INFORMATION. INFORMATION. 22 22 NEW MECHANICALNEW LOUVER IN EXISTING WOOD MECHANICAL LOUVER INWINDOW EXISTINGFRAME. WOOD WINDOW FRAME. MATCH ADJACENT FINISHES. CLEAN REPAINT CEILINGS TO MATCH ADJACENT FINISHES.WINDOW CLEAN REPAINT WINDOW REPAIR COVED PLASTER REPAIRCEILING COVED DEMOLISHED WINDOW AS REQ'DWINDOW FOR NEW DEMOLISHED ASALUM. REQ'DWINDOW. FOR NEW ALUM. WINDOW. AND CEILINGS TO AND 18 18 REMOVE C.I. RADIATOR ANDC.I. ASSOCIATED PIPING COMPLETELYREFER TO REMOVE RADIATOR AND ASSOCIATED PIPING COMPLETELYREFER TO INSTALL WEATHERINSTALL TIGHT . WEATHER TIGHT . 4 4 FRAMES AT NORTH ELEVATION FRAMES AT NORTH ELEVATION AS REQUIRED AT DEMOLISHED 6 AS REQUIREDPA ORIGINAL WOOD WINDOW TO REMAIN. ORIGINALFRAME WOODISWINDOW FRAME IS TO REMAIN. M.E.P. DRAWINGS M.E.P. FOR MORE INFORMATION. DRAWINGS FOR MORE INFORMATION. RELOCATED ALUM. SINGLE HUNG WINDOW INHUNG EXISTING WOOD RELOCATED ALUM. SINGLE WINDOW IN EXISTING WOOD EXISTING WINDOWS HISTORIC CHALK BOARD TOCHALK BE PRESERVED, SAND WOOD FRAME AS WOOD FRAME HISTORIC BOARD TOCLEAN/ BE PRESERVED, CLEAN/ SAND AC. UNITWINDOW AND METAL PANEL SET IN REMOVE AC. COMPOSITE UNIT AND METAL COMPOSITE PANEL THIS AREA T EXISTING WIND REMOVE EXISTINGREMOVE FINISH FLOOR MATERIAL AND UNDERLAYMENT EXISTING FINISH FLOOR MATERIAL ANDAS UNDERLAYMENT AS 23 REMOVE WINDOW 19 AS 19 5 SET IN 5 23 5 5 7 CLADDING AT EXTERIOR OF AT EXTERIOR WINDOW BREAK FRAME.METAL PROVIDE BREAK METAL CLADDING OF CURTAIN REQUIRED AND REPAINT. USEAND ELEMENTS FROM DEMO BOARDS IF DEMO REQ'D.BOARDS IF REQ'D. WINDOW FRAME. PROVIDE REQUIRED REPAINT. USE ELEMENTS FROM EXIST'G ALUM. WINDOW SASH FRAME, FRAME TOFRAME, REMAIN. EXIST'G ALUM. WINDOW SASH FRAME TO REMAIN. WATER TO ACHIEVE (1) WATER CURTA INDICATED (HARDWOOD FLOORING TO REMAIN). SEE GENERAL NOTE INDICATED (HARDWOOD FLOORING TO REMAIN). SEE3 GENERAL NOTE 3 WOOD FRAME TO WOOD MATCHFRAME EXIST'GTO INSTALLED CONDITIONS, INSTALL MATCH EXIST'G INSTALLED CONDITIONS, INSTALL AC. UNITWINDOW AND METAL PANEL SET IN REMOVE AC. COMPOSITE UNIT AND METAL COMPOSITE PANEL SET IN DOOR CORRIDOR TO BE PRESERVED; DOOR ANDREPAIR FRAMEDOOR AS AND FRAMEWEATHER EXISTING TERRAZZO FLOORING TO REMAIN, PROTECT DURINGPROTECT THE EXISTING TERRAZZO FLOORING TO REMAIN, DURING THE 24 REMOVE WINDOW DOOR TOREPAIR BE PRESERVED; AS TIGHT . WEATHER TIGHT . 6 6 TRANSOM WOOD WORK STRIPPE TRANSOM WOO 6 HISTORIC CORRIDOR 6 HISTORIC 24 8 EXIST'G ALUM. WINDOW SASH FRAME, FRAME TOFRAME, REMAIN. EXIST'G ALUM. WINDOW SASH FRAME TO REMAIN. REQUIRED. REFERREQUIRED. TO DOOR SCHEDULE FOR MORE INFORMATION. DEMOLITION AND DEMOLITION CONSTRUCTION ANDPROCESS. CONSTRUCTION PROCESS. REFER TO DOOR SCHEDULE FOR MORE INFORMATION.

9

11

WS4

14'-1 1/8" 1

ELEVATOR 6 TYP. @WS4 ELEVATOR

5'-3 1/2" 2'-3 1/2" HISTORICAL CORR.

T

1 REMOVE REMOVE PARTITION AND ASSOCIATED DOORS IN IT'S ENTIRETY PARTITION AND ASSOCIATED DOORSAS IN INDICATED. IT'S ENTIRETY AS INDICATED. AND FRAMEDOOR AND FRAME REMOVE EXIST'G 18 REMOVE EXIST'G 18 DOOR

10

12

WS5

14

TYP.

X X (THIS PLAN ONLY) DEMOLITION KEYED NOTES DEMOLITION KEYED NOTES (THIS PLAN ONLY)

2

DS

10

CLOSET

24

SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"

1

19

WOOD FLR'G PLAS. CLG @ 13'-2" A.F.F.

2nd FLOOR - DEMOLITION 2ndPLAN FLOOR PLAN - DEMOLITION 3rd floor plan-demo 1 1 PLAN NORTH

13

3 DS

CARPET 2x2 1 APC @ 7'-11 1/2" A.F.F.

FEC

WS3 HISTORICAL CORR.

18

21

CARPET PLAS. CLG @ 13'-2" A.F.F.

67

25

2

UP (13)R @ 7 7/16"DN (8)R. @ 7 5/8"

RECEPTION

1

WS6

14'-1 1/8" 7'-4" INSIDE SHAFT 1 WS5 2

ELEVATOR

WS2

1

10 DS TYP.

WS6

LOBBY

6

UP (13)R. @ 7 3/4"

12

10

4 1

WS7

9

7'-4" 3 SHAFT INSIDE TYP. 2

8'-6" 1

3'-4"

10

4 6

1

1

1 WS8

TYP. 1

1

CLOCK LOBBY

9

10 3TYP.

TYP.

3'-4"

6 1

1

9'-8"

HEALTH & ASSISTANCE CENTER 10

1

6

2

13

B

211

TYP.

18

TYP. 1 WS8

WS7

CLOCK

3 13

18

2

DN

15 MECH.

1

9'-8" 11'-0"

4'-5"

REFUGEE 10 CENTERREFUGEE CENTER TYP. TYP. 6 6 6

35'-8"

15

DS

35'-8"

15

6

11

1

10

HEALTH & ASSISTANCE 6 CENTER

6

6

6

1 11

11'-0"

10 HISTORICAL TYP. HALLWAY

5

1

3 10

4 6

6

6

1

15 1 EXAM MECH.

OVEN/ COOK TOP & HOOD

TYP.

DN

FEC 1

HISTORICAL HALLWAY

DN (13)R. @ 7.5"+

VCT FLR'G

CLOSET

3

VCT FLR'G

DN (11)R

DN (11)R

6

1 CLOSET

3

TYP. ALIGN

EXAM

4'-5"

TYP.

INTAKE

ALIGN

FAMILY CONF.

4

1

4'-5" 16'-3"

DS

CLASSROOM 12x12 VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

TERRAZZO FLR'G PLAS. CLG @ PLAS. CLG. @ 12'-4 1/2" A.F.F. 12'-5" A.F.F.

2

TYP. ALIGN FEC

1

ALIGN

DS

7

GRANT RECIPIENT

16'-3"

MICRO

OVEN/ COOK BREAK RM TOP & HOOD 10

B 11

14'-11 3/4"

10

HISTORICAL CLASSROOM HALLWAY 12x12 VCT FLR'G

GRANT RECIPIENT

25

PLAS. CLG @ 12'-4 1/2" A.F.F.

9'-9 1/2"

25

JAN.

BREAK RM

T

5

6'-3 1/4" INSIDE SHAFT

PRESERVE HISTORIC CHALK BD.

2

S

7

TERRAZZO FLR'G PLAS. CLG. @ 12'-5" A.F.F.

7

14'-11 3/4"

PRESERVE HISTORIC CHALK BD. 6

6

5

DW MICRO

9'-9 1/2"

D.F.

10 12

7 HISTORICAL HALLWAY

3284

JAN.

111'-10" 7 F.F.

REF

6'-3 1/4" INSIDE SHAFT

VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

3284

F.S. DW

11'-1 3/8"

CLOSET 36

9 CLASSROOM

VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

6

CLOSET

1

19'-5"

7

3

8

S

12 9

CLASSROOM

9 F.F. 111'-10"

7

REF

10

17 D.F.

6 DS

9

7

F.S.

2

11'-1 3/8"

8

4

7

4

UP (13)R. @ 7 3/4"

6

7

2

12

17

DS

4

16

4

5'-9 1/2"

3

DN (11)R

4

PASSAGE STAFF MENS RR STAFF MENS RR

1'-8" 2'-3 1/2"

18

12

4

4

TYP.

DN (13)R. @ 7.5"+

6

4

TYP.

12'-3 1/4"

CLOSET 3 6

10

TERRAZZO FLR'G

18

19

12'-3 1/4"

CLOSET

19

10

9'-3 1/8"

REVERSE DR. SWING

16 19

PASSAGE

15 TYP.

8

TERRAZZO FLR'G

REVERSE DR. SWING

19

15 6 TYP.

VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

9'-5 1/4"

15 TYP.

7 CLASSROOM 6

STAFF WOMENS RR STAFF WOMENS RR

109'-9" F.F.

UP (13)R @ 7 7/16"-

VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

109'-9" F.F.

TYP.

DN (8)R. @ 7 5/8"

CLASSROOM

VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

10

TYP.

STAIR

MULTIPURPOSE MULTIPURPOSE ROOM ROOM

9'-3 1/8"

15

10

9

7

7 CLASSROOM

8 TYP.

6

9

9'-5 1/4"

VCT FLR'G PLAS. CLG @ 12'-4 1/2" A.F.F.

66

4

7 CLASSROOM 6

6

6 6 QUARRY TILE FLR'G QUARRY TILE FLR'G

6

9

UP (13)R @ 7 7/16"-

6 4

9

X XX

8 STAIR

6

X XX

12

20

19'-5"

20

1'-8" 2'-3 1/2"

15 TYP.

5'-9 1/2"

15 TYP.

ETC. AND REFINISH FRAME MATCHFRAME EXISTING DOORFINISH. SCHED. ETC. AND TO REFINISH TO FINISH. MATCH SEE EXISTING SEE DOOR SCHED.

EXISTING ENTRY AND STEPS, RESTORE HISTORIC CONDITIONEXISTING ENTRY AND TO STEPS, RESTORE TO HISTORIC CONDITION8 8 SEE DETAILS 1 THRU SHEET A3.2. SEE4DETAILS 1 THRU 4 SHEET A3.2. SAW CUT AND REMOVE AREA OFREMOVE CONCRETE SLAB NEW ELEVATOR, SAW CUT AND AREA OF FOR CONCRETE SLAB FOR NEW ELEVATOR, 11 REFER TO STRUCTURAL FOR MORE INFORMATION. REFERDRAWINGS TO STRUCTURAL DRAWINGS FOR MORE INFORMATION. HISTORIC DOOR WITH SWING REVERSED AS SHOWN, PREP AS EXISTING FRAME HISTORIC DOOR WITH SWING REVERSED SHOWN, PREP EXISTING FRAME 9 9 REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. DRAWINGS FOR DRAWINGS FOR REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. FOR NEW SWING/ FOR HARDWARE. REFER TO DOOR SCHEDULE. NEW SWING/ HARDWARE. REFER TO DOOR SCHEDULE. 12 MORE INFORMATION. MORE INFORMATION. HISTORIC WOOD BASE MOLDINGS RAIL TRIM BE PRESERVED, HISTORIC WOOD AND BASEWALL MOLDINGS ANDTO WALL RAIL TRIM TO BE PRESERVED, 10 10 1. REFER TO GENERAL NOTES CUTTING ANDAND PATCHING NOTES 1. REFER TO AND GENERAL NOTES CUTTING AND PATCHING NOTES REMOVE STEEL FLUE PIPE AND METAL PATCHBRACKETS, EXISTING PATCH EXISTING REMOVE STEEL FLUESUPPORT PIPE AND BRACKETS, METAL SUPPORT TYPICAL AT EXTERIOR WALL CLASSROOM SIDECLASSROOM OF HISTORICSIDE CORRIDOR. TYPICAL ATAND EXTERIOR WALL AND OF HISTORIC CORRIDOR. 13 1. ALL EXISTING1.INTERIOR AND EXTERIOR PLASTER WALLS EXPOSED ALL EXISTING INTERIOR AND EXTERIOR PLASTER WALLS EXPOSED SHEET A2.1 FOR MORE INFORMATION. SHEET A2.1 FOR MORE INFORMATION. MASONRY AS REQUIRED AT REMOVED BRACKETS. MASONRY AS REQUIRED AT REMOVED BRACKETS. NEW STEEL PIPE HANDRAILS, DRILL POSTCORE INTO STONE STEPS OR STONE STEPS OR TO VIEW IN NEW CONSTRUCTION NEW STEEL CORE PIPE HANDRAILS, DRILL POST INTO TO BE PATCHED, TO VIEW IN NEWARE CONSTRUCTION ARE REPAIRED TO BE PATCHED, REPAIRED 11 11 CONCRETE, SET IN NONE SHRINK CONCRETE, SETGROUT. IN NONE SHRINK GROUT. AND RESTORED TO ORIGINAL WALL FINISH AND WALL TEXTURE AS AND TEXTURE AS AND RESTORED TO ORIGINAL FINISH 2. ALL PLASTER 2. WALLS CEILINGS TO AND REMAIN EXPOSED TO VIEWEXPOSED IN ALLAND PLASTER WALLS CEILINGS TO REMAIN TO VIEW IN REMOVE EXISTING WINDOWEXISTING AND WOOD TRIM. AND WOOD TRIM. WINDOW 14 REMOVE REQUIRED, FIELD REQUIRED, VERIFY EXTENT OFVERIFY WORK.EXTENT OF WORK. FIELD NEW CONSTRUCTION TO BE VISUALLY REMOVE NEWARE CONSTRUCTION AREINSPECTED, TO BE VISUALLY INSPECTED, REMOVE EXISTING STONE STEPS, MUD-JACK AND SEAL JOINTS AND AS REQ'DEXISTING STONE STEPS, MUD-JACK SEAL JOINTS AS REQ'DREMOVE LOOSE DELAMINATING ORDELAMINATING DAMAGED PLASTER AT EXTERIOR WALLS REMOVE LOOSE OR DAMAGED PLASTER AT EXTERIOR WALLS 12 SPALLED OR LOOSE PLASTER AND REMOVE ANYAND PEELING SPALLED ORFINISHES LOOSE PLASTER FINISHES REMOVE ANY 12 PEELING SEE DETAIL 4/A3.2SEE DETAIL 4/A3.2 15 AND PREP AS REQUIRED FORAS NEW PLASTER FINISH VERIFY CONDITIONS). AND PREP REQUIRED FOR NEW(FEILD PLASTER FINISH (FEILD VERIFY CONDITIONS). 2. PROTECT ALL2.HISTORIC BUILDING ELEMENTS TO REMAIN DURING PROTECT ALL HISTORIC BUILDING ELEMENTS TO REMAIN DURING PAINT AND PREP WALLS AND PREP CEILINGS ASAND REQUIRED FORAS PLASTER PAINT AND WALLS CEILINGS REQUIRED FOR PLASTER PROVIDE NEW 8" CMU FILL NEW WITH PLASTER FINISH MATCHFINISH ADJACENT PROVIDE 8" CMU FILL WITHTO PLASTER TO MATCH ADJACENT REMOVE WOOD DOOR ANDWOOD RETAINDOOR DOORAND FORRETAIN POSSIBLE INSTALLATION AT INSTALLATION NEW REMOVE DOOR FOR POSSIBLE AT NEW WORK. 13 13 THE DEMOLITION AND CONSTRUCTION TYP. PROCESS, TYP. THE DEMOLITION ANDPROCESS, CONSTRUCTION REPAIR REPAIR WORK. WALLS AT EXISTING WINDOW OPENINGS 16 WALLS AT EXISTING WINDOW OPENINGS LOCATION. EXISTING DOOR FRAME ANDDOOR TRANSOM TOAND REMAIN. LOCATION. EXISTING FRAME TRANSOM TO REMAIN.

PLAN LEGEND PLAN LEG

3. HARDWOOD FLOORS; ANY AREAS FOUND TOAREAS BE UN-SOUND ORBE UN-SOUND OR PROVIDE NEW STEEL 3. HARDWOOD FLOORS; ANY FOUND TO LINTELS ASSTEEL REQUIRED AT NEW DOOR OPENING PROVIDE NEW LINTELS AS REQUIRED AT NEW DOOR OPENING3. HISTORIC CORR; REMOVE SURFACE MOUNTED ELECTRICAL CONDUITS, HISTORICALL CORR; REMOVE ALL SURFACE MOUNTED ELECTRICAL CONDUITS, 14 14 17 DAMAGED ARE TODAMAGED BE PATCHED TO RECEIVE NEW TO RECEIVE NEW REFER TO STRUCTURAL AREAS TOREQUIRE BE PATCHED AS REQUIRE FOR MORE DWGS INFORMATION. REFERDWGS TO STRUCTURAL FOR MORE INFORMATION. J-BOXES, LIGHT FIXTURES, TO M.E.P. MORE DWGS INFORMATION. J-BOXES, ETC. LIGHTREFER FIXTURES, ETC. DWGS REFERFOR TO M.E.P. FOR MORE INFORMATION. UNDERLAYMENT / UNDERLAYMENT FINISHES FLOOR/ MATERIAL AS SCHEDULE. FINISHES FLOOR MATERIAL AS SCHEDULE. PLASTER WALLS AND CEILINGS, TRIM, DOORSTRIM, ARE TO BEDOORS PRESERVED U.N.O. PLASTER WALLS ANDAND CEILINGS, AND ARE TO BE PRESERVED U.N.O.

ALL EXISTING3. WINDOWS AND WOOD WORKAND AREWOOD TO BE WORK INSPECTED ALL EXISTING WINDOWS ARE TO BE INSPECTED AND REPAIRED ASAND REQ'D. WOOD FRAMES, AND TRIMSTOOLS ARE REPAIRED AS REQ'D.STOOLS WOOD FRAMES, AND TRIM ARE TO BE PAINTED AS TYP. DETAIL 2/A8.1 TOSCHEDULED. BE PAINTEDSEE AS SCHEDULED. SEE TYP. DETAIL 2/A8.1

22

DEMOLISHED PAR

EXISTING PARTITI NEW PARTITION

NEW OR EXISTING

NEW OR EXISTING

PARTITION WITH A 2x4 ACOUSTICAL


STARBUCKS PROTOTYPE

Client: starbucks Location: Multiple site adaptations

program:

drive-thru starbucks primary structure= shipping containers office kitchen restroom storage service areas

brief:

dd + cd drawing sets material research consultant coordination 3-d modeling The prototype for this project utilized shipping containers as the primary structure and adapted scales, orientations and materials to become site specific .


C

E

Exterior Elevation Notes

FOAM CORNICE TYP.

D C

E

T.O. CORNICE 19' - 8"

D

A. General Contractor to coordinate and schedule signage installation with the Signage Contractor providing a minimum scheduling notice of 4 weeks and 1 week prior to scheduled T.O. date of installation. Starbucks Construction Manager to provide General Contractor with Signage Contractor contact information.

FOAM CORNICE TYP.

T.O. DRIVE THRU 18' - 5 7/32" CL OF SIGN 17' - 1 9/16"

\\stls-fs02\lgdata\LGProjects\2012\12177 SG Starbucks Container Drive Thru Stores\12177_BIM\12177_Local_Roseville\12711 SBX Roseville [sauer3].rvt

36" ILLUM LOGO DISC (SIGNAGE BY OTHERS)

C. General Contractor to provide fire treated wood stud blocking, or equivalent to support Signage. 36" ILLUM LOGO DISC 6" HIGH (SIGNAGE BY OTHERS)

TRIM 15' - 6"

CANOPY SUPPORT

CANOPY SUPPORT

F. Signage Contractor to supply shop drawings to Starbucks Construction Manager and to the General Contractor as needed. General Contractor to notify Starbucks Construction Manager immediately if shop drawings or installation is in discrepancy with Starbucks architectural drawings.

STUCCO PANEL (MATCH COLOR AND TEXTURE ON ADJ. Level 2 SHOPPING CENTER STUCCO)

A-501 SURFACE MOUNTED LIGHT FIXTURE

Contractor to furnish and install ele all conduit, wire, connections, and b necessary to serve Signage.

C. General Contractor to provide fir blocking, or equivalent to support S

D. Signage Contractor shall verify s and all allowable monument or pole and provide shop drawing(s) prior t Designer for approval.

E. Signage Contractor to install sign local codes ad obtain permit and la

F. Signage Contractor to supply sh Construction Manager and to the G needed. General Contractor to not Manager immediately if shop drawi discrepancy with Starbucks architec

9' - 6" Level 2 9' - 6"

STUCCO PANEL (MATCH COLOR AND TEXTURE ON ADJ. SHOPPING CENTER STUCCO)

Project Team:

SURFACE MOUNTED LIGHT FIXTURE SURFACE MOUNTED LIGHT FIXTURE

Sheet Notes B.O.W 5' - 0"

11/16/2012 3:09:59 PM

STEEL PLATE SURROUND - PAINT BLACK (MATCH PMSFC TYP. ALL WINDOWS)

STONE BASE 2' - 0"

6" Typ.

/4" X 2" FRY REGLET ETWEEN STUCCO PANEL AND STONE AINT BLACK)

3/4" X 2" FRY REGLET (PAINT BLACK)

2' - 0"

STONE VENEER; MATCH EXISTING BUILDINGS

A A

2

Exterior Elevation

1. Electrical / CT panels; Refer to Electrical. Level Mech, 1 Elec, Plum, Michael Peterson, P.E. 2. Reclaimed Wood Rain Screen Fire Protection PO Box 159311 3. Expanded metal / steel art panel. Final design to be determined.0' - 7 1/4" Nashville, TN /37215 Engineer: 1. Electrical CT panels; Refer to Ele 4. 1" x 6" Steel angle (Paint Black) 615.417.8779 2. Reclaimed Wood Rain Screen 5. Pass Off shelf. 3. Expanded metal / steel art panel. F 6. Steel plate surround(at all horizontal windows); Paint black. T.O. SLAB 4. 1" x 6" Steel angle (Paint Black) 7. Steel channel (Paint black) 0' - Professional 0" 5. Pass Off shelf. 8. Exterior Signage by Others. Seal: 6. Steel plate surround(at all horizont 9. Conduit Head 7. Steel channel (Paint black) 10. 3" Down Spout 8. Exterior Signage by Others. 11. Metal Mesh Panels and Graphics by others. 9. Conduit Head 12. Air Curtain. Ref. to Mechanical 10. 3" Down Spout 11. Metal Mesh Panels and Graphics 12. Air Curtain. Ref. to Mechanical

TONE VENEER; ATCH EXISTING BUILDINGS

E EAST

1. Provide 3" (75mm) high black acry glazing. Sturctural Affiliates Intl. 95 Whtie Bridge Rd., Sutie 222 Nashville, TN 37205 615.269.0069

Exterior Elevation Keyed Notes STONE BASE

T.O. SLAB 0' - 0"

3/4" X 2" FRY REGLET BETWEEN STUCCO PANEL AND STONE (PAINT BLACK)

B.O.W 5' - 0"

Structural Engineer:

Level 1 0' - 7 1/4"

6" Typ.

Sheet Notes

1. Provide 3" (75mm) high black acrylic store address on glazing.

SIGNAGE BY OTHERS

east elevation

EXTERIOR ELEVATION ROSEVILLE EAST 3/8" = 1'-0"

MATERIALS LEGEND A. STONE VENEER,VERSETTA STONE, #2022 PLUM CREEK

MATERIALS LEGEND

Project Title:

B. PAINTED STUCCO, BENJAMIN MOORE. #OC-88, INDIAN WHITE.

12" H. ILLUM. LETTERS, STACKED (TEST FIT) EXTERIOR SIGNAGE BY OTHERS

D

C

T.O. CORNICE D 19' - 8"

E

A. STONE VENEER,VERSETTA

B. PAINTED STUCCO, BENJAMIN MOORE. #OC-88, I

C. PAINTED STUCCO, BRUNING PAINT CO. #8552, SWISS CREAM. 12" H. ILLUM. LETTERS, STACKED (TEST FIT) EXTERIOR SIGNAGE BY OTHERS D. CORNICES, TRIM 1 BENJAMIN MOORE. #OC-45, SWISS COFFEE.

T.O. CORNICE 19' - 8"

E. PAINTED WOOD OR PAINTED FAUX CORBELS, STUCCO ACCENTS TRIM 2. BRUNING PAINT CO. #8765, SHADY SIDE.

STUCCO PANEL ( MATCH TAN COLOR ON ADJ. SHOPPING CENTER STUCCO)

NOTE: COLOR & MATERIALS PER ROSEVILLE DRP 03-03 CONDITIONS OF APPROVAL. NOT ALL COLORS & MATERIALS USED ON THIS PROJECT. STUCCO PANEL ( MATCH

6" HIGH TRIM 15' - 6"

TAN COLOR ON ADJ. SIGNAGECENTER IS FOR REFERENCE SHOPPING STUCCO) ONLY, AND IS BY OTHERS UNDER SEPERATE PERMIT.

CANOPY SUPPORT

6" HIGH TRIM 15' - 6"

CANOPY SUPPORT PICK-UP WINDOW CANOPY

C WOOD TRELLIS WOOD TRELLIS

Level 2 9' - 6"

METAL AWNING

Level 2 9' - 6"

WIRE MESH PANEL METAL AWNING WIRE MESH PANEL

C. PAINTED STUCCO, BRUNING PAINT CO. #8552, S

D. CORNICES, TRIM 1 BENJAMIN MOORE. #OC-45, S

E. PAINTED WOOD OR PAINTED STUCCO ACCENTS TRIM 2. BRUNING PAINT CO. #8765, S

NOTE: COLOR & MATERIALS PER ROS CONDITIONS OF APPROVAL. N MATERIALS USED ON THIS PRO

SIGNAGE IS FOR REFERENCE IS BY OTHERS UNDER SEPERA

The Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal.

PICK-UP WINDOW CANOPY

C

Starbucks - Roseville

E

PROJECT DESCRIPTION

C

November 15, 2012 - 100% Construction Documents

TEEL PLATE SURROUND PAINT BLACK (MATCH PMSFC YP. ALL WINDOWS)

This drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect.

STUCCO PANEL (RUST - TO MATCH EXISTING) No. 0

STUCCO PANEL (RUST - TO MATCH EXISTING)

Description

Date

CONSTRUCTION

11-15-12

STAINLESS STEEL SHELF

STUCCO PANEL (RUST TO MATCH EXISTING)

B.O. WDW 3' - 4 1/4"

STUCCO PANEL (RUST TO MATCH EXISTING)

6"

STAINLESS STEEL SHELF

B.O. WDW 3' - 4 1/4"

6" Typ.

STONE BASE 2' - 0"

6" 6" Typ.

STONE BASE 2' - 0"

Level 1 0' - 7 1/4"

3/4" X 2" FRY REGLET (PAINT BLACK)

west elevation

T.O. SLAB 0' - 0"

VERSETTA VENEER; MATCH EXISTING BUILDINGS

EXTERIOR ELEVATIONS Project Number:

A

VERSETTA VENEER; MATCH EXISTING BUILDINGS

EXTERIOR ELEVATION ROSEVILLE SOUTH 3/8" = 1'-0"

Sheet Number:

12177.02

A-201

Drawn By:

SF, MP, SA Issue Date:

11.15.12

LG v1.3

3

Level 1 Sheet Title: 0' - 7 1/4"

T.O. SLAB 0' - 0"

3/4" X 2" FRY REGLET (PAINT BLACK)

A

EXTERIOR ELEVATION ROSEVILLE SOUTH 3 3/8" = 1'-0"

� Office:

DECK: (FACTORY INSTALL) EPDM ON 1/2" RECOVERY BOARD ON 3/4" PLYWOOD ON 5" STEEL CHANNELS SADDLE: (FIELD INSTALL) EPDM ON 1/2" RECOVERY BOARD ON 3/4" PLYWOOD FRAMING

R-38 SPRAY FOAM INSULATION 5 (CONTINUOUS) I-501

319 North 4th Street Suite 1000 St. Louis, Missouri 63102 p 314.231.5700 f 314.231.0816

5 I-501

MEMBRANE ROOFING TAPERED INSULATION

METAL FLASHING

12

12 1

RECOVERY BOARD SEAL

1

METAL FLASHING

2" METAL DECK STEEL ANGLE 6" HSS TUBE

SUSPENDED CEILING GRID

CANTILEVERED 5" STEEL CHANNELS

MYLAR COATED CEILING TILES

INFILL SPRAY FOAM INSUL IN FIELD AROUND BOLTED CONNECTION

Project Team:

STUCCO PANEL CEMENT BOARD

HSS 6X2X1/4

"Z" CLIP FASTENERS TYVEK ON 1/2" PLYWOOD 4 " METAL STUDS W/ SPRAY FOAM INSUL. (R-22 MIN.) FRP ON 1/2" PLYWOOD

Sturctural Affiliates Intl. 95 Whtie Bridge Rd., Sutie 222 Nashville, TN 37205 615.269.0069

Structural Engineer:

Mech, Elec, Plum, Michael Peterson, P.E. PO Box 159311 Fire Protection Nashville, TN 37215 Engineer: 615.417.8779

Professional Seal:

ALUMINUM THRESHOLD (CONTINUOUS)

6"

6"

6" SPRAY FOAM INSULATION (CONTINUOUS)

6" RIGID INSULATION (BETWEEN BOTTOM OF PURLINS TO GRADE)

2" METAL DECK 6" HSS TUBE

STEEL ANGLE GRADE

CONCRETE FOOTING

RIGID INSULATION

section thru shipping container structure 1

Section at Connection 1" = 1'-0"

The Professional Architect's seal affixed to this sheet applies only to the material and items shown on this sheet. All drawings, instruments or other documents not exhibiting this seal shall not be considered prepared by this architect, and this architect expressly disclaims any and all responsibility for such plans, drawings or documents not exhibiting this seal.

This drawing and details on it are the sole property of the architect and may be used for this specific project only. It shall not be loaned, copied or reproduced, in whole or part, or for any other purpose or project without the written consent of the architect.

No.

0' - 0 1/4" max.

New Door Frame

0' - 0 1/2"

Aluminum Threshold Resilient Flooring

Slope

Floor Butt Detail 3 1 1/2" = 1'-0"

Concrete per Civil Drawings

Exterior Door Threshold Detail 2 1 1/2" = 1'-0"

0

Description CONSTRUCTION

Date 11-15-12

Resilient Flooring

2 1 max.

(E) Floor & Structure

(E) Floors & Structure per Structural

November 15, 2012 - 100% Construction Documents

Project Title:

3/4" PLYWOOD RESILIENT FLOORING

Starbucks - Roseville

4" X 2" FRY REGLET AINT BLACK)

STUCCO PANEL (MATCH COLOR AND TEXTURE ON ADJ. SHOPPING CENTER STUCCO)

C

3

STEEL CHANNEL - PAINT BLACK (MATCH PMSFC)

TUCCO PANEL MATCH COLOR AND EXTURE ON ADJ. HOPPING CENTER STUCCO)

E. Signage Contractor to install signage in compliance with local codes ad obtain permit and landlord approval.

PROJECT DESCRIPTION

URFACE OUNTED LIGHT XTURE

62" SIGNAGE BY OTHERS

C

A-501

p 314.231.5700 f 314.231.0816

CL OF SIGN 17' - 1 9/16" TRIM 15' - 6"

N MOUNTED SIGNAGE BY OTHERS PIN MOUNTED SIGNAGE BY OTHERS 3

A. General Contractor to coordinate installation with the Signage Contra scheduling notice of 4 weeks and 1 date of installation. Starbucks Con

319 North 4thprovide Street General Contractor with Sig information. Suite 1000 St. Louis, Missouri 63102 B. General Contractor shall coordin

D. Signage Contractor shall verify size and location of any and all allowable monument or pole signage with landlord and provide shop drawing(s) prior to fabrication to Starbucks 6" HIGH Designer for approval.

62" SIGNAGE BY OTHERS

TEEL CHANNEL - PAINT BLACK (MATCH PMSFC)

Exterior Elevation CORNICE 19' - 8"

B. General Contractor shall coordinate with Electrical Office: Contractor to furnish and install electrical circuits including T.O. DRIVE THRU all conduit, wire, connections, and breaker at panel board 18' - 5 7/32" necessary to serve Signage.

Fibrous Break

24A-402

Sheet Title:

BUILDING SECTIONS Project Number:

12177.02 Drawn By:

SF, MP, SA Issue Date:

11.15.12

Sheet Number:


reflection

fig. 01

fig. 02

fig. 03

fig. 04

maintain healthy relationships [figure 01]

its critical to maintain a healthy relationship with other consultants and co-workers. utilize these relationships as resources when needing assistance on unfamiliar subjects. critical networks can be established with design team members.

dont be afraid to ask questions [figure 02]

An internship is a combination of an educational experience and real world applications. There is always a unique situation to every project. discovering answers is a self-motivated exploration, and asking questions should enhance this search. asking questions is critical to solving problems and enhances comprehension.

take initative + learn [figure 03]

search for opportunities to make an impression, provide input and ask tough questions. exhibit unique talents and take on new responsibilities.

have fun [figure 04]

involve yourself in the work community and the surrounding area. indulge in social work groups and be yourself.


thanks to the lawrence group for the wonderful experience and opportunities. - sam


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.