w e e k s a m
2
j o u r n a l
h o r w o o d
6 3 7 5 3 3
frame
c on str u c tion
p r oc c e ss
Knee Bracing
K Bracing
We
wer e
c u t
in to
We
th en
was
as
on we
wan ted
A
basic
.
is
n ot
it
wil l
c h ose
is
b a sl a
wood
a n d
a s k ed
to
a
s e l f
c ou l d
sta n d in g
m a k e
s tr u c tu r e
th at
it
Cross Bracing
s tu r c tu r e
c h oose
two
wh at
ty p e
u n iv e r sa l
of
fr a m e
c ol l u m s
we
h ol d in g
u p
b e a m
it
we
m a k e
to
u se
of
p ie c e s
we
fr a m e
ar e
p ie c e
fr a m e
th en th er e
to a s
h ad
to
u n iver sal
If
a
a
l on g
h ad
tal l
Based First
give n
40
b r a c e d
th r e e to
or
top p l e
u se
m a in th e
r igid
ov e r
join ts
d u e
ty p e s c r os s
to
of
h av e
l ate r a l
b e e n
b r a c in g
b r a c in g
m a d e
for c e s
s y s te m
a
c on str u c tion
We
d ec id ed
sh ape
This th an
to
way
12
to
save we if
on
u se d
we
tr ian gu l ar
b a s e
s tu r c tu r e
m ate r ia l s on ly
we r e
fr a m e
ou r
9
u sin g
a l s o
p r oc c e ss
a
tr ia n gu l a r
Triangular Base
u se d
p ie c e s a
of
p e r
s te p
r ath e r
s qu a r e
r es is ts
l ate r a l
for c e s
v e ry
wel l
As
time
was
fabr ic atin g
a a
c on s tr a in t l ot
of
th e
we
s ave d
fr a m e
it
b y
p r e
wor k
Pre
fabr ic atin g
c on str u c tion
As We
Masking
th e
str u c tu r e
fou n d
u sin g
We
p r oc c e ss
th at
mask in g
al so
su r fac e
u se d ar e a
b e c a m e
th e
j oin ts
ta l l e r
it
s ta rte d
to
s way
c ou l d
b e
s tr en gth e n ed
tape
join ts
b y
ta p e p l a s tic of
th e
b in d e r towe r
s p ir a l s
th at
wa s
to
e x pa n d
tou c h in g
th e
th e
gr aou n d
This
mad e
with ou t
th e
wh ic h
s tr u c tu r e it
m ay
s ign ific a n tly
h av e
s tr on ge r
fail e d
Plastic ‘legs’
c on str u c tion
p r oc c e ss
th e
tower
pr e
in c r easin g
As
th e
keep
As
towe r
it
you
c an
r eson ably
A
spir e
h eigh t
,
s c a l ed
stu r d y s e e ta l l
was th is
d u e we
it
to
b e c a me
th e
we r e
h ar d er
l igh twe igh t
a b l e
to
a n d
h ar d er
to
m ate r ia l
c on s tr u c t
a
s tr u c tu r e
p l a c ed p r ov ed
on to
top b e
to
a d d
v e ry
s ta b il ity
a n d
h el p fu l
th e
fin al
ou tc ome
fabr ic atin g
b ib liogr a ph y ChIng, F. (2008) Building Construction Illustrated, 4th Edition. John Wiley & Sons, Inc., Hoboken, New Jersey