Shift Apartments [460 16th Street AKA 15th & Island] Location: East Village, Downtown San Diego, CA Year: 2015 - 2018 (projected May '18) Residential Units: 368 Land Area: 60,078 sq ft (5,581 sq m) Parking Stalls: 498 Built Up Area: 630,340 sq ft (129,500 sq m) Floor Area Ratio: 7.0 Construction Cost: $123 million Construction: Type 1A over VA Owner: Lennar - LMC East Village Architect: Carrier Johnson Security/Structured Cabling: Redrock Landscape Architect: Urban Arena Geotechnical: Leighton Group, Inc. Interior Designer: Style Interiors Civil: Kettler Leweck Engineering Structural: DCI Engineers Shoring: Earth Support Systems, Inc. Electrical: ELEN Consulting Dry Utilities: Utility Specialists, Inc. Mechanical/Plumbing: McParlane Waterproofing: Brandon Associates Exterior Building Enclosure: J.A. Weir Archaeo/Paleontologist: BFSA-CA Façade Access: Olympique Waste Management: Terra Pacific Exterior Lighting: Lighting Design Alliance Elevator: EWCG Acoustics: ABC Acoustics Fire Protection Life Safety: Jensen Hughes ADA/FHA: theACCESSpartnership Low Voltage: ABBACOM LEED and Energy: VCA-Green General Contractor: Swinerton Builders Environmental: Advantage Environmental Professionals Program: 22 Story Residential Tower, 5 Story Wood Residential Low-rise over Concrete Retail Podium – Shared Office – Amenities – Public Landscape and Art-walk Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
Concept Design of folding iconic massing 3D geometries in Rhino3D, and building programming. Hands on schematic design involvement, design development and construction documents oversight. Set up project master schedule and milestones and met every deadline. Management of 7~10 in-house project team members of consisting Project Designer, Project Architects, Job Captain, BIM Manager, Interior Designers & Production Staff, preserving Sr. Design Principal’s vision. Structured 11 sub-consultants teams under Architect’s contract negotiating scope, fees and agreements. Management and coordination of 20 project consultants contracted under both Architect and Owner. Prepared all executed agreements scope and fee exhibits and finalized Owner-Architect contract. Managed and prepared public authorities submittals including Civic San Diego, City of San Diego and FAA. Presentation of project in public hearings and to Civic San Diego Board; obtaining unanimous motion vote. Wrote presentation narratives for community groups and devised speaking rolls with Landscape Architect. Internal project setup, WBS staffing plan, billing forecast & project account management. Monthly evaluation & approval of consultants work progress and invoices. Chairing client & consultants weekly meetings, set agendas, tracked action items minutes for all parties. Overseeing deliverables of all engineering disciplines inclusive of Architect’s sub-consultants and Client’s direct consultants and working with in-house QA/QC to ensure standard of care. Resolved complex problems that require synchronized engagement of multiple disciplines and expertise; including Fire Smoke management, alarm and sprinklers, electrical, mechanical, elevator and structural design, city inspector and general contractor sub-trades feedback; assisting the client in obtaining direction. Made UT San Diego newspaper’s Business & Development front page.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL & RETAIL - MIXED USE
Point Loma Nazarene University Science Building - Sator and Latter Halls Electrical Engineer: Mike Wall Eng. Year: 2013 - 2015 Civil Engineer: Michael Baker Built Up Area: 42,000 sq ft (3,900 sq m) Audio Visual, Acoustics, Construction Cost: $22 million IT Consultant: WaveGuide Client: Point Loma Nazarene University Cost Estimator: Cumming Design Architect: Carrier Johnson LEED Consultant: IES, Inc. Landscape Architect: Spurlock Poirier Fire Life Safety: Jensen Hughes Structural Engineer: Hope Amundson Signage Consultant: Miriello Mechanical Plumbing Engineer: MA Eng. Project Manager: Project Contractor: Rudolph & Sletten, Inc. Management Advisors, Inc. Location: San Diego, California
Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
Determined the project scope and fees, wrote and prepared all of the projects contracts. Negotiated all of the consultants fees. Modified contract language for Owner-Architect AIA B101, ConsultantArchitect AIA-C401 and Owner-Contractor agreements AIA-A102 and General Conditions AIA-A201, in coordination with the firm’s corporate legal counsel, the university’s legal counsel and insurance company. Created cash flow forecasts for the client, the firm and the consultants. Participated in the programming meetings with the users. Primary point of contact for client, consultants, and contractor. Oversaw the project from schematic design through construction documentation, construction addministration and project closeout. Met with the city, and challenged municipal codes interpretations to comply with all regulations. Assisted the project team in Revit implementation, and incorporated civil and landscape 3d models with the architectural modles. Hands on involvement with schematic design and design development when needed. DEPARTMENT LEGEND BIOLOGY
UP
CLASSROOMS/ GENERAL NON-ASSIGNED
INC. OFOI
INC. OFOI
CADAVER STORAGE
CADAVER STORAGE
INC. OFOI
INC. OFOI
CENTRIFUGE OFOI
ENVIRO CHAMBER OFOI
EQUPMENT SPACE OFOI
RESEARCH LAB B1.07a 118 930 SF
CELL / DEVELOPMENTAL BIO / IMMUNOLOGY B1.05 120 1245 SF
CELL CULTURE ROOM B2.03 119 FLOW CYTOMETER OFOI
CART OFOI
STOCKROOM / STORAGE B2.01 112
ENTRY 114
PREPARATION ROOM B2.02 111 1184 SF
AUTOCLAVE PREHEATER CART OFOI
ANATOMY + PHYSIOLOGY B1.02 117 1216 SF
CUST. CLOSET
CART OFOI
FACULTY CONFERENCE B3.01
ULTRA CENTRIFUGE OFOI
MECH. SHAFT
ULTRA CENTRIFUGE OFOI
DATA (IDF)
REF. OFOI
ICE MACHINE OFOI
WATER PURIFIER
EQUIPMENT SPACE
MEN'S RESTROOM
MICROBIOLOGY B1.03
BSL-2 RESEARCH LAB 1.07b 106 951 SF
MOLECULAR BIOLOGY / GENETICS / DEVEL. BIOL. B1.04 108 1269 SF
MICROSCOPY / DARKROOM B2.04 107 152 SF MIC OFOI MIC OFOI
WOMEN`S RESTROOM
INC. OFOI
PCR
EQUIP'T
INSTRUMENT LAB B2.05 REF. OFOI 109 127 SF
INC. OFOI
STAIR #1A
MIC OFOI
CRYOSTAT
INC. OFOI
INC. OFOI
INC. OFOI
FUTURE
INC. OFOI
CLASSROOM (55+3HC)G1.02a 102 1303 SF
QPCR
ELEVATOR
UP
1
UP
A6.1
UP
CLASSROOM (75+5HC) G1.03a 101
POINT LOMA NAZARENE UNIVERSITY SCIENCE BUILDING
P-A1 FIRST FLOOR
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
Project Status
5368.00
EDUCATIONAL - LABORATORIES
7/5/2014
Point Loma Nazarene University Lyle and Grace Prescott Prayer Chapel General Contractor: BYCOR Year: 2015 - 2018 Building Concrete Sub: Civil Works Corp. Built Up Area: 730 sq ft (3,900 sq m) Site Concrete Sub: Construction Cost: $1.8 million Steel Sub: Minshew Steel Client: Point Loma Nazarene University Glazing Sub: Vision Systems Architect: Carrier Johnson + Culture Specialty Sheet Metal Structural Engineer: KPFF Engineers and Woodwork Sub: Tecture Electrical Engineer: ELEN Consultants Sheet Metal Sub: Buxcon Mechanical Engineer: MA Eng. Landscape Design Build Sub: Civil Engineer: Michael Baker Int. Modern Zen Gardens Location: San Diego, California
Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
Managed the project from inception, concept and schematic design. Attended meetings with PLNU administration and spiritual student body, documented all meetings and helped formulate the narrative. Took over the project at end of schematic design from sketches and impressionist renderings. Developed all ideas into feasible construction. Developed the organic wood lattice ceiling “the Crown of Thorns�. Detailed tight areas of concrete, steel, glass, and wood junctions, floating roof, complicated steel embeds, massive cantilevered slab and walls. Solely created construction documents and secured the building permit. Created highest LOD Rhino3D/Revit 3D model and used it for every aspect of the construction process substituting the need for shop drawings of complex elements. Used the 3D model for a creating a fly-through (Link) that was used for raising the donations for funding the construction. Performed construction administration on the behalf of Carrier Johnson and construction management on the behalf of PLNU. Assessed construction progress, validated and singed pay applications and change orders.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RELIGIOUS
(2) LAPTOPS / PC STATION AND 2 SCREENS (1) SMALL REFRIGERATOR (1) COFFEE MAKER / ELECTRIC KETTLE UNDER-CABINET LIGHTING DESK LAMP HEATER / FAN EXTERNAL DRIVES ADDITIONAL OUTLETS TO CHARGE SEVERAL DEVICES SUCH AS PHONE, CAMERA ETC. ADDITIONAL OUTLETS AT BOOKCASE
Point Loma Nazarene University Science Building Renovation - Rohr Hall • •
TOASTER OVEN (5) MONITORS
OFFICE 206, SAME AS STANDARD ABOVE BUT IN ADDITION: • •
NEEDS FROM (20 TO 10 PC STATIONS 500 WATT NETWORK ROUTER
OFFICES 209, 210, 211, 212,
FURNITURE & EQUIPMENT BASEMENT FLOOR PLAN
A3
A4
A6
A5
A7
A6
A8
A7
A9
A8
A10
A9
A10
THEY NEED (1) PHYSICS EQUIPMENT EQUIVALENT TO MICROWAVE.
GENERAL NOTES
STUDENTS AT COMMON AREAS SHOULD HAVE SUFFICIENT OUTLETS TO CHARGE LAPTOPS AND PHONES.
A11 A12
Electrical Engineer: ELEN Consultants Year: 2016 - 2019 (Projected) Mechanical Plumbing Engineer: MA Eng. Built Up Area: 42,000 sq ft (3,900 sq m) Structural Engineer: Coffman Construction Cost: $10 million Civil Engineer: Stevens Cresto Client: Point Loma Nazarene University Audio Visual, Acoustics and Architect: Carrier Johnson + Culture IT Consultant: WaveGuide Program Manager: B&G Consultants Contractor: BYCOR Location: San Diego, California TYPICAL OFFICES AT 3RD FLOOR:
A11
(2) LAPTOPS / PCGENERAL STATION NOTES: AND 2 SCREENS (1) COFFEE MAKER / ELECTRIC KETTLE CONTRACTOR SHALL SUBMIT SAMPLES OF ALL FINISHES FOR ARCHITECT'S APPROVAL PRIOR TO ORDERING MATERIALS AND UNDER-CABINET1.LIGHTING COMMENCEMENT OF WORK. DESK LAMP HEATER / FAN 2. REFER ELEVATIONS, DETAILS, FINISH AND SPECIFICATION ADDITIONAL OUTLETS TO TO CHARGE SEVERAL DEVICES SUCHPLAN AS PHONE, CAMERA ETC.FOR FURTHER CLARIFICATION AND INFORMATION. ADDITIONAL OUTLETS AT BOOKCASE 3. MANUFACTURER NAME AND PRODUCT NUMBER SHOWN FOR BASIS OF DESIGN. SEE WRITTEN SPECIFICATIONS FOR ALTERNATES. STUDENTS AT COMMON AREAS SHOULD HAVE SUFFICIENT OUTLETS TO CHARGE LAPTOPS AND PHONES. • • • • • • •
DN
4. FLOORING, WALL, AND CEILING FINISHES IN CLOSETS SHALL BE THE SAME AS THAT OF THE SPACE INTO WHICH THE CLOSET DOORS OPEN INTO.
B0 B1
FLOORING NOTES:
PEG DRYING RACK
LCD SCREEN
8. CARPETS OR CARPET TILES SHALL BE SECURELY ATTACHED; HAVE A FIRM CUSHION, PAD OR BACKING OR NO CUSHION OR PAD; AND HAVE A LEVEL LOOP, TEXTURED LOOP, LEVEL-CUT PILE OR LEVEL-CUT/UNCUT PILE WITH PILE NOT EXCEEDING 1/2" IN HEIGHT. CBC SEC. 1124B.3
CR
OFFICE 211
113 SF OFFICE 112 RB CPT 1 01
1. SURFACES TO RECEIVE PAINT SHALL RECEIVE A LEVEL 4 FINISH AND BE PROPERLY SEALED, SANDED, ETC. PRIOR TO APPLICATION. 80% CD SET
RB113CPT 01 1
3. REFER TO REFLECTED CEILING PLAN FOR ALL GYP. BOARD CEILING/SOFFIT PAINT COLORS. REFER TO DOOR SCHEDULE FOR ALL DOOR AND FRAME PAINT COLORS.
Participated in the programming meetings with the users, and addressed all needed details of conference rooms, faculty offices, department chair office special requirements covering the Departments of Chemistry, Biology, Kinesiology, Physics Mathematics and Computer Science. FURNITURE/EQUIPMENT GENERAL NOTES Investigated special labs needs for Anatomy, Physiology and Kinesiology . Determined the project scope and fees, wrote and prepared all of the projects POWER-SIGNAL GENERAL NOTES A4.0 contracts. Negotiated all of the consultants fees. Modified contract language for Owner-Architect AIA B101, ConsultantWALL FINISH KEYNOTES Architect AIA-C401. Created cash flow forecasts for the client, the firm and the consultants. Primary point of contact for client, consultants, and contractor. Assisted the project team in Revit implementation. Hands on involvement with schematic design and oversight of design EQUIPMENT NOTES development and construction FINISH PLAN LEGENDdocuments.. Resolved the Strobic Exhaust mechanical ventilation systems location while complying with Coastal Commission height restrictions. Managed Architecture and Interior staff along with consultants. Short-listed, interviewed and assisted the university in contractor selection. 4. PAINT ALL AIR DIFFUSERS, CLG/WALL ACCESS PANELS, SPEAKERS, ETC. TO MATCH SURFACE THEY OCCUR ON.
OFFICE 114
B7
MANUAL SHADES TYP.
MANUAL SHADES TYP.
6. PAINT PLYWOOD BACKBOARD AT ALL TEL/DATA ROOMS TO MATCH ADJACENT SURAFCES.
7. ALL EXPOSED STRUCTURAL COLUMN/BRACE FRAMES TO BE PAINTED TO MATCH ADJACENT WALL FINISH.
MANUAL SHADES TYP.
1
2. SUBMIT SAMPLES OF ALL MILLWORK HARDWARE FOR APPROVAL BY ARCHITECT BEFORE INSTALLATION. 3. REFER TO INTERIOR ELEVATIONS AND/OR MILLWORK DETAILS FOR MILLWORK FINISHES.
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
MANUAL SHADES TYP.
EN
T
REF
T
R
R
T
T
R
R
CHALK BOARD
REF
1
TYP.
CHALK BOARD
CONF. OFFICE306 207234 SF
CPT 1
REF
REF
OFFICE 208
RBT 01R
T
BOOKCASE
OFFICE 6 307 115 SF RB CPT 01 1
OFFICE 209
STORAGE 312 110 SF VCT 1
R
T R
MANUAL SHADES TYP.
T
T
R
R
GATE LEG TABLE
OFFICE CONFERENCE REF 310 212
REF
175 SF RB 01
CPT 1
WHITEBOARDS
MOVABLE LAB TABLE
UP
MANUAL SHADES TYP.
DN DN
80% CD SET
SINK W/EYEWASH
TYPICAL OFFICES AT FLOORS 1 &2 :
PHYSICS FACULTY RESEARCH PHYSICS 213 RESEARCH LAB 311 237 SF
CHALK BOARD
GATE LEG TABLE
OFFICE OFFICE OFFICE 8 210 211 309 115 SF RB CPT 01 1
TABLE
8'-10"
ADJ. OFFICE 214 PHYSICS CHEM.
CHALK BOARD
CHALK BOARD GATE LEG TABLE
OFFICE 7 REF 308 115 SF RB CPT 01 1
REF
317' - 8" L.P.
PH
EQUIPMENT
TV.
RB CPT 01 1
PAINTED WITH P-1. REFER TO FINISH
SCHEDULES, SYSTEMS FURNITURE:THIS PLANS REPRESENT ACCENT COLOR WALLS ONLY PROVIDE FINAL ELECTRICAL HOOK-UP TO SYSTEMS FURNITURE FOR POWER/TELE/DATA CONNECTIONS. SYSTEMS FURNITURE MANUFACTURER TO SUPPLY WHIPS FOR FINAL CONNECTION OF SYSTEMS FURNITURE. COORDINATE W/ SYSTEMS FURNITURE MANUF. / INSTALLER FOR ALL CIRCUIT/AMP REQUIREMENTS. ALL J-BOXES/CORE LOCATIONS SHALL BE MARKED AT THE FLOOR/WALL AND FIELD VERIFIED BY THE FURNITURE VENDOR PRIOR TO INSTALLATION.
COORDINATION: COORDINATE ELECTRICAL INSTALLATION W/ ALL OTHER SUBCONTRACTORS & SHALL BEAR ANY COSTS ASSOCIATED W/ THE RELOCATION OF ANY EQUIPMENT INSTALLED WHICH CONFLICTS W/ OTHER EQUIPMENT.
328' - 4" L.P. CR
CHALK BOARD BOOKCASE
CHALK BOARD
CHALK BOARD GATE LEG TABLE
GATE LEG TABLE GATE LEG TABLE
25'-4 3/4"
CART
30" DEEP SHELVING
30" DEEP SHELVING
24" DEEP SHELVING
CHALK BOARD
CHEMISTRY SHARED STORAGE STUDENT COMMONS 313 215 80 SF VCT 1
COLOR: ALL OUTLETS AND INTERIOR COVERPLATES TO BE WHITE, U.O.N.BE U.N.O. ALL WALLS SHOULD
HVAC CONTROL WIRING: PROVIDE WIRING FOR ONE THERMOSTAT FOR EVERY HVAC ZONE, REFER TO MECHANICAL DRAWINGS FOR LOCATIONS. CONTRACTOR SHALL NOT PROCEED WITH INSTALLATION UNTIL LOCATIONS HAVE BEEN REVIEWED AND APPROVED BY ARCHITECT IN THE FIELD.
• SYMBOL • • • • • • • •
TABLE
GATE LEG TABLE
OFFICE OFFICE 5 206305 115 SF RB CPT 01 1
PH
CHALK BOARD
TESTING ROOM 314 116 SF CPT RB 1 01
TYP.
FILE CABINET
CHALK BOARD
OFFICE OFFICE 4 205 304 115 SF CPT RB 1 01
TYP.
CR
BOOKSHELF
REF
FILES CONFERENCE / STORAGE & STUDY AREA 315 80 SF 216 CPT RB 1 01
15 A8.1
LVT 1
RB 01
OPEN TO TO OPEN BELOW BELOW
TABLE
R
WD 1
OPEN OPENTO TO BELOW BELOW
CR
C 1
BOOKSHELF
1
OFFICE3 OFFICE 204 303 115 SF CPT RB 1 01
1. ALL WALL MOUNTED POWER/DATA/VOICE OUTLETS TO HAVE WHITE COLORED FACE PLATES WHEN MOUNTED ON PAINTED WALL MOUNTING HEIGHTS: SURFACE.A. OUTLETS: LOCATE BOTTOM AT +15"A.F.F. MIN., VERTICAL AND LEVEL U.O.N. B. SWITCHES/T-STATS: LOCATE TOP BETWEEN +40" A.F.F. AND +48"A.F.F., VERTICAL AND LEVEL U.O.N. 2. ALL WALL MOUNTED POWER/DATA/VOICE OUTLETS HAVE BRUSHED S.S.AND FACE PLATES MOUNTED ON ANY METAL WALL C. ABOVE-COUNTER (AC): LOCATE ABOVE TOPTOBETWEEN +40" A.F.F. +44" A.F.F.,WHEN VERTICAL AND LEVEL U.O.N. SURFACE. HORIZONTAL SPACING: 3. COORDINATE HEIGHTS AND LOCATIONS OF ALL OUTLETS AND CONTROLS WITH ARCHITECT. VERIFY ALL HEIGHTS OF A. PLANMOUNTING DIMENSIONS: ARE TO CENTERLINE U.O.N. OUTLETSB.WHERE MILLWORK OCCURS. TOGETHER W/ A MAXIMUM SEPARATION OF 6" TO 8" o.c., OUTLETS: TO BE GROUPED OUTLETS SHOWN BACK-TO-BACK IN FIRE-RATED OR ACOUSTICAL PARTITIONS SHALL BE OFFSET 24" MINIMUM. C. LIGHT SWITCHES: GROUP UNDER A SINGLE COVERPLATE WHERE APPLICABLE. D. BACK-TO-BACK OUTLETS SHALL BE SPACED A MINIMUM OF 12" APART.
TELE/DATA OUTLETS: PROVIDE EMPTY CONDUIT STUB-UP TO ABOVE CEILING, RING & PULL-STRINGS, AND BACK BOXES w/ BLANK COVERPLATES FOR ALL TELE/DATA OUTLETS.
PH
RB 01
32'
ELECTRICAL / DATA NOTES:
MOVABLE TEACHING STATION
PH
MTL 1 CR
DEPT. WORK AREA SHARED 316 STUDENTCPT RB COMMONS 1 01 153 SF 217
TYP.
RB 01
LVT 1
BOOKSHELF
249 SF
GATE LEG TABLE
GATE LEG TABLE
OFFICE OFFICE 2 203 302 115 SF CPT RB 1 01
TYP.
CUBBIES
STANDING HEIGT COUNTER
CHEMISTRY. ADMIN. AREATEST ROOM 220 317
CHALK BOARD
CHALK BOARD
GATE LEG TABLE
CART
CORRIDOR C3 855 SF
STOCK RM. 222
(3) CHALKBOARDS
CPT RB 1 01
18" DEEP BOOKCASE
STANDING COUNTER
COUNTER
R
62" X 32" PRINTER -
T
TYP.
T
R
DESK
CART
PH
ADJUNT OFFICE 318 RECEPT. 96 SF 219 CPT RB 1 01
CHALK BOARD
OFFICE 1 301 OFFICE 114 202SF
CPT RB 1 01
T
DESK
BOOKSHELF
WHITEBOARD
BOOKSHELF
R
CPT 1 WD 1
FACULTY LOUNGE 320 FACULTY CHALK BOARD OFFICE318 SF BOOKCASE 201 LVT RB 1 01
OPEN TO BELOW
B7
RB 01
BOOKSHELF
MAC MINIDESK
B6
T
ADJUNT OFFICE 319 96 SF
BOOKSHELF
M/W TABLE
15 A8.1 TYP.
BOOKSHELF
REF -
STOCK ROOM 218
TYP.
1
BOOKSHELF
ELEVATOR ELEVATOR
UP
B4 B5
PH CR
CORRIDOR 317' - 8" L.P. 328' - 4" L.P. C2
TYP.
TYP.
BOOKSHELF
MTL 1
CR
328' - 4" L.P. DN
CR
RB 01
LATERAL FILE CABINETS
B3
C 1
7'-8"
PH
CR
INTRO PHYSICS 223
15 A8.1
PH
TYP.
317' - 8" L.P.
16'
(2) LAPTOPS / PC STATION AND 2 SCREENS DESCRIPTION (1) SMALL REFRIGERATOR (1) COFFEE MAKER / ELECTRIC KETTLE UNDER-CABINET LIGHTING DESK LAMP VINYL TRANSITION STRIP, COLOR TO MATCH WALL BASE HEATER / FAN EXTERNAL DRIVES ADDITIONAL OUTLETS TO CHARGE SEVERAL DEVICES SUCH AS PHONE, CAMERA ETC. ADDITIONAL OUTLETS AT BOOKCASE CARPET
OFFICE 202, SAME AS STANDARD ABOVE BUT IN ADDITION:
T
• •
R
TOASTER OVENCONCRETE (5) MONITORS
OFFICE 206, SAME AS STANDARD ABOVE BUT IN ADDITION:
10'-7 1/8"
1
9'-5 5/8"
14'-7 1/16"
9'-7 1/8"
9'-7 1/8"
9'-7 1/8"
9'-7 1/8"
14'-7 1/8"
9'-7 1/8"
9'-7 1/8"
9'-5 9/16"
9'-5 9/16"
•
9'-7 1/8"
SINK
9'-2"
• •
2
VCT
•
FINISH PLAN THIRD | LEVEL
CG
0
RE EN
5'-0"
COMPUTER LAB 321
5'-0"
REF. M3.09
CR
CHEMISTRY. ADMIN. AREA 317
FILES / STORAGE 315
CHEMISTRY STORAGE 313
TESTING ROOM 314
MARKER BOARD
5'-3 3/8" CHEM. PHYSICS STORAGE 312
4'-0"
REF.
B7
80% CD SET
REF. P1.05
MANUAL SHADES TYP.
MANUAL SHADES TYP.
02.09.18
PRELIMINARY NOT FOR CONSTRUCTION
CONFERENCE 310
MANUAL SHADES TYP.
WHITEBOARD
SCREEN
WHITEBOARD
OFFICE 8 309
BOOKSHELF
WHITEBOARD
OFFICE 7 308
WHITEBOARD
BOOKSHELF
OFFICE 6 307
BOOKSHELF
WHITEBOARD
CONF. 306
WHITEBOARD
WHITEBOARD
OFFICE 5 305
SCREEN
WHITEBOARD
WHITEBOARD
OFFICE 4 304
BOOKSHELF
OFFICE 3 303
BOOKSHELF
WHITEBOARD
WHITEBOARD
OFFICE 2 302
BOOKSHELF
BOOKSHELF
BOOKSHELF
OFFICE 1 301
TOASTER
MANUAL SHADES TYP.
DN
PHYSICS RESEARCH LAB 311
LAB SINK
WHITEBOARD
STOVE W / OVEN
FACULTY LOUNGE 320
KETTLE
328' - 4" L.P.
LASER PRINTER
GAS CABINET
-
DEPT. WORK AREA 316
CAB
ADJUNT OFFICE 318
(2) MICRO
ADJUNT OFFICE 319
CR
PH
UPPER CAB.
ELEVATOR
PH
CR
CAB
BLENDER
OPEN TO BELOW
PH CR
CORRIDOR C3 13" DEEP UPPER CABINETS
TV
GB
A5.2
MOVABLE TEACHING STATION
PH CR
328' - 4" L.P.
PH
OPEN TO BELOW
FINISH PLAN SECOND & THIRD LEVEL DRAWING NO:
LASER PRINTER
EXISTING SHAFT
B3
B6
STUDENTS AT COMMON AREAS SHOULD HAVE SUFFICIENT OUTLETS TO CHARGE LAPTOPS AND PHONES.
A11
FUME HOOD
7'-3"
CR
B4 B5
CORNER GUARD
TYPICAL OFFICES AT 3RD FLOOR: 00-0 FINISH CALLOUT • (2) LAPTOPS / PC STATION AND 2 SCREENS • (1) COFFEE MAKER / ELECTRIC KETTLE • UNDER-CABINET LIGHTING • DESK LAMP • HEATER / FAN • ADDITIONAL OUTLETS TO CHARGE SEVERAL DEVICES SUCH AS PHONE, CAMERA ETC. • ADDITIONAL OUTLETS AT BOOKCASE
32'
TITLE:
4'-0"
2'-6"
CR
DN
16'
CHECKED BY: Checker
PLOT DATE: 2/12/2018 1:31:18 PM
-
REF.
A10
8'
DRAWN BY: Author
MANUAL SHADES TYP.
4'-0"
ADVANCE PHYS LAB/CLASSROOM 322
MOVABLE LAB TABLES
KITCHEN 324
PH
CR
A9
TABLES
OPEN TO BELOW
5'-10 1/16"
328' - 4" L.P.
A8
MANUAL SHADES TYP.
EQUIPMENT
STUDENT COMMON AREA 326
WOMEN 327
A7
4'
PROJECT NO: 5671.00
EN
OPEN TO BELOW
B2
TILE
02.09.18
PRELIMINARY NOT FOR CONSTRUCTION
RE SC
LOWER BOOKCASES
MANUAL SHADES TYP.
A6
40 CUBBIES
B1
A5
CHALKBOARDS
A4
SC
A3
EQUIPMENT
A2
MEN 328
THEY NEED (1) PHYSICS EQUIPMENT EQUIVALENT TO MICROWAVE.
STUDENTS AT COMMON AREAS SHOULD HAVE SUFFICIENT OUTLETS TO CHARGE LAPTOPS AND PHONES.
SCALE: 1/8" = 1'-0"
A1
LUXURY VINYL TILE
NEEDS FROM (20 TO 10 PC STATIONS 500 WATT NETWORK ROUTER
OFFICES 209, 210, 211, 212,
FURNITURE & EQUIPMENT 2ND FLOOR PLAN SCALE: 1/8" = 1'-0"
FURNITURE EQUIPMENT PLAN BASEMENT & FIRST LEVEL
4. PLAM CABINETRY SHALL BE FLUSH OVERLAY CONSTRUCTION U.N.O. CONSTRUCT IN ACCORDANCE WITH WIC MANUAL OF MILLWORK "PREMIUM GRADE". CONSTRUCT W/ 3/4" HIGH PRESSURE PARTICLE BOARD. ALL EXPOSED SURFACES SHALL BE PLASTICSCOPE: LAMINATE U.N.O. FURNITURE AND EQUIPMENT ARE INDICATED FOR SYSTEMS COORDINATION ONLY. FURNITURE AND EQUIPMENT SHALL BE PROVIDED AND INSTALLED UNDER SEPARATE CONTRACT U.O.N. 5. HINGES SHALL BE SELF-CLOSING, FULLY CONCEALED, DESIGNED TO OPEN AT LEAST 170 DEGREES. HINGES SHALL HAVE INDEPENDANT VERTICAL, HORIZONTAL AND DEPTH ADJUSTMENT. HINGES SHALL BE STEEL WITH NICKEL PLATED FINISH. COORDINATION: COORDINATE POWER AND SIGNAL REQUIREMENTS WITH FURNITURE AND EQUIPMENT VENDORS AS REQUIRED.DRAWING REFER TO NO: 6. PROVIDE HEAVY-DUTY FULL EXTENSION DRAWER SLIDES, MANUFACTURER: HAFFEL OR APPROVED EQUAL. ELECTRICAL DRAWINGS.
1
PHYSICS LAB CLASSROOM 221
TYP.
COMPUTER LAB 321 996 SF
LASER PRINTER
30" DEEP SHELVING
WHITEBOARD
MOVABLE TEACHING STATION
WHITEBOARD
BOOKSHELF
EXISTING SHAFT
1
LASER PRINTER
LVT RB 1 01
LVT RB 1 01
STUDENT RESEARCH COMPUTER "VIRUS LAB." KITCHEN 225 324
LASER PRINTER
203 SF
15 7'-3" A8.1
MECH. ROOM OPEN TO BELOW 226
8'
MANUAL SHADES TYP.
TYP.
ADVANCE PHYS LAB/CLASSROOM 322 877 SF
BOOKSHELF
B2
WHITEBOARD
WOMEN WOMEN 228 327
7'-1 1/16"
MEN MEN 229 328 207 SF
5'-7 5/8"
CT 1
1 WHITEBOARDS EQUIPMENT
1'-2" 2'-6" 5'-4 7/8"
TB 01
2'-6"
TB 01
4'
EN
CT 1
TYP.
SC RE
COFFEE MAKER
1
STUDENT COMMON AREA 326 358 SF CPT RB 1 01
TV
OPEN TO BELOW
EQUIPMENT
MANUAL SHADES TYP.
1'-0"
0
RE SC
ALL IDEAS, DESIGN, ARRANGEMENTS AND PLANS INDICATED OR REPRESENTED BY THIS DRAWING ARE OWNED BY, AND THE PROPERTY OF CARRIER JOHNSON AND WERE CREATED, EVOLVED AND DEVELOPED FOR USE ON, AND IN CONNECTION WITH THIS PROJECT. NONE OF SUCH IDEAS, DESIGN, ARRANGEMENTS, OR PLANS SHALL BE USED BY, OR DISCLOSED TO ANY PERSON, FIRM, OR CORPORATION FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN PERMISSION OF CARRIER JOHNSON. FILING THESE DRAWINGS OR SPECIFICATIONS WITH ANY PUBLIC AGENCY IS NOT A PUBLICATION OF SAME. NO COPYING, REPRODUCTION OR USE THEREOF IS PERMISSIBLE WITHOUT THE CONSENT OF CARRIER JOHNSON.
FINISH PLAN SECOND | LEVEL SCALE: 1/8" = 1'-0"
FURNITURE & EQUIPMENT 1ST FLOOR PLAN SCALE: 1/8" = 1'-0"
B1
PROJECT NO: 5671.00
9. ALL AREAS OF EXPOSED STRUCTURE AND MECHANICAL SYSTEMS ABOVE CEILINGS TO BE PAINTED BLACK. EXCEPT IN MECHANICAL, ELECTRICAL, JANITOR & DATA ROOMS. DRAWN BY: CHECKED BY: Author Checker MILLWORK NOTES: PLOT DATE: 1. MILLWORK CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND SUBMIT SHOP DRAWINGS FOR ALL MILLWORK BEFORE 2/12/2018 1:30:53 PM MANUFACTURING OR INSTALLATION FOR APPROVAL BY ARCHITECT. TITLE:
B8
2
PRELIMINARY NOT FOR CONSTRUCTION
5. ALL WALLS TO BE PAINTED PT- 01 U.O.N. REFER TO FINISH PLANS FOR EXTENT OF ACCENT WALL PAINT AND WALLCOVERING LOCATIONS.
OPEN TO BELOW
8. ALL EXIT STAIR RAILINGS, STRINGERS, AND EXPOSED UNDERSIDE OF STAIRS TO CONCRETE & STAINLESS STEEL.
MANUAL SHADES TYP.
MANUAL SHADES TYP.
02.09.18
2. PAINT SHALL BE APPLIED AS RECOMMENDED BY MANUFACTURER FOR GIVEN SURFACE. PARTITIONS TO BE PAINTED SHALL RECEIVE ONE COAT OF PRIMER (TINTED SIMILAR TO PAINT COLOR) PLUS MINIMUM OF TWO COATS OF PAINT TO COMPLETELY COVER.
LVT RB 01 1
OFFICE 212 115 SF OFFICE
11'-9"
OFFICE 210 113 SF OFFICE
RB 111 CPT 01 1
PAINT / WALLCOVERING NOTES:
UP
OFFICE PHYSICS FACULTY 115 RESEARCH 213 236 SF
BOOKSHELF
OFFICE 209 115 SF OFFICE 110 RB CPT 1 01
Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
DN
WHITEBOARD
RB CPT 01 1 TYP.
WHITEBOARD
SHARED STUDENT WHITEBOARD COMMONS 215 TV 189 SF OFFICE 1 TYP. 116 WD
WHITEBOARD
109 RB CPT 1 01
307' - 0" L.P.
PH
UP
BOOKSHELF
RB CPT 01 1
WHITEBOARD
OFFICE 208 115 SF OFFICE
1
9. SEAL EXISTING CONCRETE SLAB THROUGHOUT ENTIRE 1ST FLOOR PRIOR TO INSTALLATION OF NEW FLOORING MATERIALS. COORDINATE SEALANT SPECIFICATION W/ FLOORING MANUFACTURER'S TO ENSURE SLAB PREPARATION MEETS THEIR INSTALLATION AND WARRANTY GUIDELINES.
317' - 8" L.P. AED
OFFICE 214 92 SF
WHITEBOARD
(2) WHITEBOARD
BOOKSHELF
01
7. USE SANITARY CERAMIC TILE COVE BASE (3/8" MIN. RADIUS) @ RESTROOM FLOORS, AND BULLNOSE CERAMIC TILE @ TOP EDGES AND @ ALL CORNERS AND EDGES. INSTALLER TO CUSTOM CUT EDGES AS NEEDED.
CRADJ.
WHITEBOARD
OFFICE 207 OFFICE 145 SF 108 RB CPT
6. PROVIDE GREY MARBLE THRESHOLD @ ALL RESTROOM ENTRANCES. SEE DETAIL 8/A8.70.
TYP.
CR
CONFERENCECR& STUDY AREA 216 (1) WHITEBOARD CPT RB 129 SF 1 01 STUDENT AREA 117
1
OFFICE 107
RB CPT 01 1
5. PROVIDE A VINYL TRANSITION STRIP BETWEEN FLOORING MATERIAL CHANGES. SEE DETAIL 9/A8.70.
TALL CAB.
15 A8.1
TYP.
307' - 0" L.P.
CPT RB 1 01
OFFICE 206 115 SF
OFFICE 106
CPT 1
MTL 1
WHITEBOARD
OFFICE 205 115 SF
OFFICE 105
CPT RB 1 01
WHITEBOARD
OFFICE 204 115 SF
OFFICE 104
4. ALL CARPET FLOORING TRANSITIONS SHALL BE COMPLETELY FLUSH. ALL OTHER FLOORING TRANSITIONS MAY HAVE A MAXIMUM OF 1/2" LEVEL CHANGE OF FINISHED FLOOR TO FINISHED FLOOR.
EXERCISE PHYSIOLOGY AND BIOMECHANICS LAB. 122
FOLDABLE DESKS ON CASTERS
TESTING OFFICE 118
WHITEBOARD
OFFICE 203 115 SF OFFICE 103 CPT RB 1 01
B7
3. PROVIDE SHOP DRAWINGS FOR ALL CARPET SEAMING JOINTS FOR ARCHITECTS APPROVAL PRIOR TO FLOORING INSTALLATION.
OPEN TO BELOW
UPPER CABINETS ABOVE DESKS
TYP.
BOOKSHELF
WD 1
CART
CART
RB 01
2 FULL HEIGHT SKELETON CABS W/GLASS DOORS
REF
C 1
2. TYPICAL FLOOR COVERING TRANSITION IS AT THE CENTERLINE OF THE DOOR OR AT THE CENTERLINE OF THE OPENING WHERE NO DOOR IS PRESENT, U.O.N. PROVIDE A VINYL TRANSITION STRIP BETWEEN FLOORING MATERIAL CHANGES.
MANUAL SHADES TYP.
TYP.
OUTLETS 220 AND DATA AT EACH WALL
FOLDING TABLE
BOOKSHELF
BIOLOGY RECEPTION 119
TEACHER'S AREA
KINESIOLOGY STORAGE 121
BOOKSHELF
DISPLAY
RB 01
DESK CAB
BOOKSHELF
-
TEST ROOM CPT RB 220 1 01 103 SF
BOOKSHELF
REF
OFFICE
CPT 1
TV TYP.
1
TYP.
202 OFFICE145 SF 102 CPT RB 1 01
CPT RB 1 01
VENT
C1
WHITEBOARD
BOOKSHELF
B6
ADJUNCT. OFFICE FACULTY OFFICE 101 201 131 SF
VENT
1
PHYSICS LAB CLASSROOM OVERHEAD TRACK W/ CAMERAS 221 BIOMECHANIC PLATFORM 996 SF SLAB RECESSED PIT AT CONCRETE LVT RB 01 1
GROSS ANATOMY LAB. 123
CORRIDOR UPPER CABINETS C2 857 SF CORRIDOR
317' - 8" L.P.
RECEPT. 219 846 SF
WORK AREA 120
15 A8.1
TYP.
OUTLETS 220 AND DATA AT EACH WALL SINK W/ LOWER CABINETS
PEG DRYING BOARD
RB 01
TEACHER'S AREA
METAL WELL
VENT
CR
BOOKSHELF
RB 01
XEROX MACHINE
VCT 1
WHITEBOARD
CADAVER BOXES
TYP.
REFRIGERATOR /FREEZER LARGE MICROWAVE MOUNTED TOASTER OVEN SINK W/GARBAGE DISPOSAL
WHITEBOARD
UP DN
15 A8.1
CR
STOCK ROOM MICRO 218 113 SF GD STOR. BREAK 129
BOOKSHELF
B4 B5 B4 B5 B6
TYP.
• • • •
PH CR
UP
MTL 1
METAL RB LVT 1WELL 01
DOC CAMERA
VENT
SINKS REF. P2.01
LVT 1
WHITEBOARD
EXISTING SHAFT
307' - 0" L.P.
DN
CADAVER BOXES
AV DUCTING
STOCK RM. 222 237 SF SCULLERY
INTRO PHYSICS 223 1005 SF
CADAVER BOXES
IDF 125
1. PATCH ALL AREAS WHERE FLOOR IS NOT LEVEL OR IS CRACKED PRIOR TO FLOORING INSTALLATION.
TYP.
METAL WELL
DOC CAMERA
VENT
C PH RB 1 01
RB 01
JANITOR 126
WOMEN 127
1
B3
CT 1
LVT 1
CR
9'-1 1/8"
TB 01
MEN 128
317' - 8" L.P.
B2 B3
TB 01
SINK
WHITEBOARD
B2
WOMEN 228 203 SF
1
CADAVER BOXES
MECH. ROOM 226 221 SF
WHITEBOARD
CT 1
PHYS TV STUDENT RESEARCH RESEARCH LAB COMPUTER "VIRUS LAB." 124 225 467 SF
BOOKSHELF
OPEN TO BELOW
MAIN ENTRY
TYP.
BOOKSHELF
1 MEN 229 207 SF
MANUAL SHADES (DARK ROOM)
MANUAL SHADES (DARK ROOM)
EQUIPMENT
BOOKSHELF
B1
1301 third avenue san diego ca 92101 phone 619.239.2353 | fax 619.239.6227
A2
A5
A4
3900 LOMALAND DR, SAN DIEGO, CA 92106
A1
A3
1301 third avenue san diego ca 92101 phone 619.239.2353 | fax 619.239.6227
A2
3900 LOMALAND DR, SAN DIEGO, CA 92106
A0 A1
•
POINT LOMA NAZARENE UNIVERSITY SCIENCE BUILDING ROHR HALL TENANT IMPROVEMENT
SCALE: 1/8" = 1'-0"
7'-1 1/16"
1
3900 LOMALAND DR, SAN DIEGO, CA 92106
• • • • • • • • •
AV CLOSET
POINT LOMA NAZARENE UNIVERSITY SCIENCE B ROHR HALL TENANT IMPROVEMENT
TYPICAL OFFICES AT FLOORS 1 &2 :
LARGE REFRIGERATOR
LASER PRINTER
CR
POINT LOMA NAZARENE UNIVERSITY SCIENCE BUILDING ROHR HALL TENANT IMPROVEMENT
DISH WASHER
3'-8"
24 CUBBIES
LAB. CART
60" ABOVE UPPER SH
STOR. RM B107
LAB. CART
CHEMISTRY STORAGE B110
OFFICE 202, SAME AS STANDARD ABOVE BUT IN ADDITION:
ALL IDEAS, DESIGN, ARRANGEMENTS AND PLANS INDICATED OR REPRESENTED BY THIS DRAWING ARE OWNED BY, AND THE PROPERTY OF CARRIER JOHNSON AND WERE CREATED, EVOLVED AND DEVELOPED FOR USE ON, AND IN CONNECTION WITH THIS PROJECT. NONE OF SUCH IDEAS, DESIGN, ARRANGEMENTS, OR PLANS SHALL BE USED BY, OR DISCLOSED TO ANY PERSON, FIRM, OR CORPORATION FOR ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN PERMISSION OF CARRIER JOHNSON. FILING THESE DRAWINGS OR SPECIFICATIONS WITH ANY PUBLIC AGENCY IS NOT A PUBLICATION OF SAME. NO COPYING, REPRODUCTION OR USE THEREOF IS PERMISSIBLE WITHOUT THE CONSENT OF CARRIER JOHNSON.
ALL IDEAS, DESIGN, ARRANGEMENTS AND PLANS INDICATED OR REPRESENTED BY THIS DRAWING ARE OWNED BY, AND THE PROPERTY OF CARRIER JOHNSON AND WERE CREATED, EVOLVED AND DEVELOPED FOR USE ON, AND IN CONNECTION WITH THIS PROJECT. NONE OF SUCH IDEAS, D ANY PURPOSE WHATSOEVER WITHOUT THE WRITTEN PERMISSION OF CARRIER JOHNSON. FILING THESE DRAWINGS OR SPECIFICATIONS WITH ANY PUBLIC AGENCY IS NOT A PUBLICATION OF SAME. NO COPYING, REPRODUCTION OR USE THEREOF IS PERMISSIBLE WITHOUT THE CONSENT O
(E) EL. EQUIP. B108 PROVIDE VENT FOR HAZARDOUS MATERIALS
B7
OPEN TO BELOW
SNORKEL EXHAUST
DESK
PROJECT NO: 5671.00
DRAWN BY: Author
CHECKED BY: Checker
PLOT DATE: 2/12/2018 1:31:07 PM
2
TITLE:
FURNITURE & EQUIPMENT 3RD FLOOR PLAN
FURNITURE EQUIPMENT PLAN SECOND & THIRD LEVEL
SCALE: 1/8" = 1'-0"
0
4'
8'
16'
32'
DRAWING NO:
A4.1
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
EDUCATIONAL - RENOVATION
Airborne San Diego Mechanical Engineer: MA Engineers Year: 2014 - 2017 Electrical Engineer: MPE Consulting Built Up Area: 18,780 sq ft (1,745 sq m) Landscape Architect: Ivy Land Area: 10,006 sq ft (930 sq m) Civil Engineer: Kettler Leweck Construction Cost: $27 million Fire Life Safety Consultant: Rolf Jensen Client: Airborne San Diego, Inc. Sheet Metal Sub: California Sheet Metal Architect: Carrier Johnson + Culture Curved Studs Sub: Radiustrack Structural Engineer: Hope Amundson General Contractor: Swinerton Location: San Diego, California
Role: Design and Construction Administration of Curvilinear Organic
Geometry (at Carrier Johnson + CULTURE)
Created the landmark speed forms for interior dry walls and exterior sheet metal walls at entrance. Utilized Rhino 3D, Grasshopper Scripting, Revit 3D, AutoCAD and Excel to schedule all information for construction. Worked closely with contractor, sheet metal subcontractor and drywall curved studs subcontractor to construct the forms.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
SPORTS
Morris Cerullo World Evangelism Legacy International Center Foundation Civil Engineer: Project Design Consultants Year: 2015 - 2019 Acoustical Engineer: Eilar & Associates Built Up Area: 391,347 sq ft (36,357 sq m) Dry Utility: Butsko Land Area: 18 acres (7.3 ha) Traffic Engineering: Linscott, Law Construction Cost: $160 million & Greenspan Client: MCWE - MCLCF Food Service: Orness Design Group Architect: Carrier Johnson + Culture Geotechnical: Kleinfelder Landscape Architect: Land-Lab Environmental Engineer: RECON Structural Engineer: KPFF Consulting Eng. LEED & Cx: Healthy Buildings Mechanical Engineer: McParlane Experience: Visioneering Studios Electrical Engineer: FBA Engineering Water Feature: Aquatic Design Fire Life Safety: Jensen Hughes Waterproofing: Xpera Group Parking Consultant: Walker Low Voltage: Tekworks Theater Consultant: the Sextant Group Contractor: Clark Construction Location: San Diego, California
Job title: Senior Project Manager (at Carrier Johnson + CULTURE)
Managed the project team of all staff and consultants during Design Development and Construction Documents to meet pre-established deadlines that were agreed upon with the Owner and the DesignBuild general contractor. Monitored financial performance of project operations. Represented the design team in the Owner-Architect-Contractor meetings, and during the Consultants Coordination meetings. Contract management of all connected parties along with change order review and validation. Proposed Value Engineering solutions to Jerusalem stone design. Participated in design solutions for building systems and structural systems coordination. Prepared presentations for City of San Diego public hearings. Organic 3D design of the Main Theater’s acoustical ceiling clouds in coordinating with theater designer.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RELIGIOUS RETREAT - HOSPITALITY
Pacifica Bayside Community Location: Chula Vista, California
Structural Engineer: DCI Engineering Year: 2013 - 2014 Civil Engineer: Rick Engineering Land Area: 5 acres (20,200 sq m) Built Up Area: 425,000 sq ft (129,500 sq m) MEP Engineer: Design West Dry Utilities Engineer: Butsko Budget: Confidential Fire Life Safety Consultant: Jensen Hughes Owner: Pacifica Retail Consultant: Cushman & Wakefield Hotel Operator: Marriot Design Architect: Carrier Johnson Geotechnical Engineer: Geocon, Inc. Pre-Construction/Contractor: Turner Landscape Architect: KTU+A Program: Residential Towers, Low-rise and Rowhouses – Retail – Office – Hospitality Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
Structured consultants teams and negotiated consultants fees and agreements upon joining the firm. Setup all Consultant-Architect contracts, finalized negotiation of contract language of Owner-Architect contract, and prepared all executed agreements. Created project setup, workforce staffing plan, and billing forecast from a pre-negotiated lump-sum fee while achieving 35% profitability. Managed monthly project accounting and approved consultants work progress and invoices . Daily managed a team averaging six staff members. Handled all client meetings and chaired all consultants meetings while coordinating and overseeing deliverables of all engineering disciplines. Figured out innovative design solutions with structural and mechanical engineers. Hands on involvement in concept and schematic design paving the framework for the project’s organic form, curvilinear skeleton and geometry. Transitioned the 3ds Max concept design model to a schematic design coordinated Revit model allowing early involvement of engineering disciplines. Created the proposed Community Design Guidelines.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL & RETAIL - MIXED USE
7th & Market Location: Downtown San Diego, CA, USA
Year: 2014 - 2020 (projected) Land Area: 60,000 sq ft (5,574 sq m) Built Up Area: 1,201,020 sq ft (111,578 sq m) Structural: KPFF Engineers Budget: $350 million Civil: Fuscoe Engineering Owner: Cisterra Mechanical/Plumbing: MA Engineers Architect: Carrier Johnson General Contractor: Turner Program: 160-room Ritz-Carlton hotel, 58 Ritz Carlton branded condominium units, 115 market rate apartments, 32 affordable housing units, gourmet grocer and market, offices, restaurant/ retail, 238 public parking spaces, 673 below grade parking spaces. Project Status: Design Competition (Awarded), Currently in Entitlement Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
Prepared project fee. Assisted in shortlisting teams. Prepared abridged RFP for specialty consultants. Setup internal WBS for team members. Created the contract for conditional incremental compensation model based on competition assumptions and phases of entitlement upon award.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
MIXED USE URBAN TOWER
Urbana Mixed Use Development Location: Tijuana, Mexico
Year: 2013 - current Client: Pacifica Companies Design Architect: Carrier Johnson Local Executive Architect: Hermosillio y Asociados Arquitectos Program: Retail – Entertainment – Residential – Hotel – Commercial Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
Contract preparation, fee assessment, staffing and billing management. Negotiation of additional services
Scale 1:500
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
MIXED USE
Port of San Diego 50 Year Master Plan Vision Location: San Diego, California Significant Parking off Port property
Hotel Marine Retail Police/Coast Guard Boat Yard Convention Center
Year: 2013 Land Area: 2,777 Acre Infrastructure Consultant: Assessed Development Area: 1,449 acres Randall Lamb Commissioner: Port of San Diego Marine Engineer: Moffat & Nichol Lead Urban Designer: HKS Public Engagement: Architect: Carrier Johnson + CULTURE Cook and Schmid Landscape Architect: Spurlock Poirier Economics: CCI Partners
Civic Park Facility
Program: Residential Towers, Low-rise and Rowhouses – Retail – Office – Hospitality
Industrial Medical Navy Rental Car Office
Job title: Architect, Project Manager (at Carrier Johnson + CULTURE)
Restaurant Airport
Surface Parking
Port Facilities
Building Use
Parking
PRELIMINARY DRAFT
The Slough
Navy Shelter Island
63
Harbor Island Navy North Embarcadero
Navy Kellogg Beach
Navy
Prepared scope and agreement for the development assessment and master planning guiding principles. Wrote the inventory assessment report for Cities of San Diego, Coronado, ImperialBeach and Chula Vista. Anaylzed statistical data from the Cities’ GIS Databases concerned with land use, zoning, current building inventory, population patterns and distribution to interpret current conditions and potential future development and growth using Big Data Management methodologies for foresea issues like gentrification, future use, urban development other other factors.
Navy Navy
South Embarcadero Marine Terminal
Point Loma Shipyard
Hotel Del Coronado Navy
Marina
B
Navy
E A
Marine Terminal
Navy
C
Marina
H
Wildlife Refuge
Coronado Cays & Marina
Marina
Imperial Beach & Pier
The Eastern Edge
Salt Works & Wildlife Refuge
The Western Edge
PRELIMINARY DRAFT
Sami R. Khoury, AIA Short Portfolio
15
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
URBAN PLANNING
Al Maabar Mixed Use Development St. Regis Hotel and Branded Residences Design Architect: Perkins Eastman Year: 2010 - 2015 (projected) Architect of Record: Arabtech Jardaneh Land Area: 18k sq m (4.45 ac) Landscape Architect: Cracknell Built Up Area: 126k sq m (1.4 mmsf) Interior Designer: Forrest Perkins Budget: approx. USD 200 Million Project Manager: KEO International Owner: Al Maabar Cost Consultant: NEA partners Hotel Operator: Starwood Facilities Manager: Davis Langdon Location: Amman—Jordan
Program: Hospitality (Largest and most luxurious Five Star Hotel in Amman) – Branded Residences – Luxury Retail – Spa and Wellness Center Job title: Senior Projects Engineer, Development (at Al Maabar)
Reviewing and approving design and technical architectural deliverables against design standards, corporate and hotel operator intent. Managing the setup of legal parcelization and by-laws technical documents. Consultants and specialty consultants management including the programme management consultant, design architect, architect of record, landscape architect, interior designer, geotechnical, civil, structural & MEP engineers, cost consultants, facilities manager, kitchen & waste management consultant, security consultant, lighting consultant, fire safety, wind consultant, vertical transportation consultant, traffic engineer, retail mix consultant, procurement agents. Procurement and management of General and Subcontractors. Client representative on construction progress site meetings.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
HOSPITALITY - MIXED USE
Marsa Zayed Waterfront Urban Development Phase One Development - Al Raha Village Location: Aqaba, Jordan Architect: Maisam Architects & Engineers Year: 2011 Masterplanner: Callison Site Area: 3.2 million sq m (790 acres) Infrastructure Design: Arabtech Jardaneh Built up Area: 6.4 million sq m (69 mmsf) Landscape Architect: Franco Zagari Phase 1 site area: 122,958 sq m (30 acres) Masterplan Cost Consultant: AECOM Phase 1 built area: 71,775 sq m (772k sf) Phase 1 Quantity Surveyor: NEA Owner: Al Maabar Business Consultants: Jones Lang LaSalle Program Manager: Hill International Infrastructure Contractor: Hussein Attieh
Phase One Program: Residential - Retail - Clubhouse - Masjid Phase 1 is envisioned as a relaxed low key environment, closely linked to a neighborhood clubhouse and a Masjid through landscaped open space corridors and parks. Phase 1 is located at the southern edge of the greater Marsa Zayed development. The residential program includes townhouse units and structured apartments with neighborhood convenience retail and facilities. Job title: Senior Projects Engineer, Development (at Al Maabar)
Job Description: Design review of concept and detailed design and construction documents. Procurement management including pre-qualification of consultants and contractors, invitation to tender, managing tender queries, tender evaluation, award and final negotiation. Client representative on site progress meetings involving architect, contractor, project manager, quantity surveyors, making sure development goals are met. Managing peer review workshops and third party QA/QC consultants. Specifications review. Government and city authorities’ presentations. Monthly and weekly reporting on works progress to executive management of Al Maabar. Reviewing consultants and contractors claims, and recommending approvals on payment certificates of project consultants and contractors. Reviewing consultant’s recommendations on providing design review on proposed materials.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
WATERFRONT - URBAN DEVELOPMENT
Dubai Festival City, Festival Waterfront Centre Location: Dubai, UAE Year: 2007 Land Area: 78 acres (31.6 ha) Retail Area: 2.5 mmsf (232k sq m) Cost: USD 1 billion Program: Retail - Entertainment
Client: Al Futtaim Group Architects: Jerde Partnership + HOK Engineer: Hyder Consulting Fire Consultant: Ove Arup Contractor: Al Futtaim Carillion Roof Sub-contractor: Waggner Biro
Dubai Festival City is a project which covers 5.2 million sq ft and stretches 3 kilometres along the historic Dubai Creek and optimizes the thriving and visionary spirit of Dubai. Job title: Project Manager, Middle East (at the Jerde Partnership)
Job Description: Full involvement at both Jerde’s head office and site office (2005-2007): Schematic Design - Design Development - Sub Consultants Management 3D modelling of pivotal complex geometries - Construction Documentation Project Management - Construction Management Contract Administration - Document Control Client Management - Commercial Accounts Manager Project close out (early 2008)
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RETAIL - WATERFRONT MIXED USE
DIFC - Dubai International Financial Center Woven Gardens Retail Link Location: Dubai, UAE Client: DIFC Year: 2008 Architect: Jerde Partnership Land Area: 110,157 sq m (27.2 ac) Engineer of Record: W.S. Atkins Built up Area: 805,384 sq m (8.67 mmsf) Project Manager: Turner
Program: Retail - Entertainment - Cultural - Commercial - Residential Job title: Project Manager, Middle East (at the Jerde Partnership)
The project links the Dubai International Financial Center (DIFC) district with a three level luxury retail podium. From Foster’s Index Buildings to the iconic Emirates Towers, the retail spine would welcome both the residents of the district and high profile customers. The center of the project has the DIFC signature towers which Jerde have proposed the organic honey comb egg shell layout at the center.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
Job Description: Contract administration and attending project meetings with client and client’s project management consultant. Handled design coordination with adjacent building blocks. Assured conformance with Masterplan Design Guidelines, including coordinating with different architecture firms, along with Structural, MEP and traffic engineers. Played major role in 3D modelling the road network (Microstation & Rhino) and the site context (3ds Max). Managed data migration between the other consultants and inhouse team.
RETAIL - MIXED USE
San Diego Navy Broadway Waterfront Masterplan Location: San Diego, California Year: 2005 (competition) Land Area: 12 acres (4.86 ha) Built Area: 3.25 mmsf (302k sq m) Budget: USD 115 million
Client: Clark Real Estate Public Land Owner: US Navy Architect: Jerde Partnership Hotel Operator: Starwood Project Finance: Merrill Lynch
Program: Retail - Entertainment - Cultural - Commercial - Residential A competition for a public and private development to provide a new home for the Navy Region Southwest Command, and also house 1.6 million sq ft of Class A waterfront office towers. It also proposes to add convenient and quality neighborhood retail, cultural, and recreational amenities, a 30,000 sf market, a 1,800- seat live performance theater, three new hotels with 813 rooms total, 400,000 sf of retail and restaurant space, substantial on and below grade public parking, and a large flexible public space, The Waterfront Theater, centered around the historic U.S.S. Midway Aircraft Carrier Museum. Job title: Project Manager (at the Jerde Partnership)
Job Description: Project Managed this USD 250,000 fee design competition. Monitored scope & developed an additional USD 40,000 of fees for variation orders for extra scope and project video animation. Contract administration and attending project meetings with client. Monitored design conformance with the masterplanning guidelines imposed by the US Navy and the city of San Diego. Participated in the project’s contextual 3D modelling.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
WATERFRONT - MIXED USE
Ibn Battuta Mall Expansion Location: Dubai, UAE Year: 2009 Mixed-use Programme: 4,500,000 sq ft (418,063 sq m) Budget: USD 1.2 Billion
Client: Nakheel Retail Architect: Cubellis Costa International Project Manager: Thinc Projects Structural and MEP Engineer: Norr Cost Consultant: Davis Langdon
Program: Retail - Entertainment - Commercial - Residential Nakheel Retail’s most ambitious project comprising expanding Dubai’s largest themed mall, resulting in a substantial 18 mmsf (1.6 million sq m) mixed-use development. This includes a retail and entertainment district, a 5-star executive boutique hotel, a 4-star entertainment/lifestyle hotel, a 2-star hotel, Class A office space and luxury residential units and a structured parking supporting this array of uses linked to the Dubai Metro. Job title: Design Architect – Senior Project Designer (at Cubellis Costa Int’l)
Job Description: Designer on the project expansion, coordinating works with structural, MEP consultants. Road Traffic Interface Coordination with Dubai railway. Site as-builts and construction observation for retail shops.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RETAIL - MIXED USE
Commerce Town Center Location: Commerce, LA, CA Year: 2005 Land Area: 36 acres (14.6 ha) Built up Area: 350k sq ft (33k sq m) Budget: approx. USD 80 million
Developer: J.h Snyder Co. Architect: Jerde Partnership
Targeting a prime site in Commerce, on Telegraph Rd. and Tubeway Ave., fronting the I-5 Fwy, Commerce Town Center is a 350k sq ft urban retail center featuring an assorted mix of popular retailers, restaurants and a 3,000-seat theater. Job title: Designer (at Jerde Partnership)
Job Description: Masterplan concept designer for a town center with an open court and outdoor activities. Laid out retail, including 4 anchor stores, 16 screen cinema and 34 shops and parking, with a circular court that transforms to an outdoor market.
FREIGHT ACCESS CINEMA 62,500 16 SCREENS
cinema atrium 7.6k
68,808 SQ FT. GROUND +4l PKG. 980 TOTAL
not a part
87'-0"
not a part
118'-0"
RET. 11.0K
anchor retail 16.0K
GROUND level 80 TOTAL
40'-0"
8.0K
148'-0"
RET. 11.0K
ALK DW Y AR TR BO EN
restrooms
141'-0"
115'-0"
80'-0"
PARKING 1
95'-0"
addition 347' x 295'
99'-0"
EXISTING PERFUME FACTORY 225,401 SQ FT.
main plaza 76
'- 0
G2 KIN VEL PARUND 1L9E6
"
circ.
RET.
13.5K
"
. O GR PKG
INO
AS 5C 4, l 0 3, l 100 2, lPKG.
11.3K
ENT.ZONE
FAMILY
68 '-0
"
VALET IN/OUT
zone 1 - 250 SPACES
49'-0"
15.5K
COMMERCE CASINO
20 5'-
"
0"
96 '-0
zone 3 - 102 SPACES
zone 7- 92 SPACES
BRIDGE +20FT
zone 2 - 58 SPACES
212'-0"
circ.
L2 ENT. 5.5K
'-0
zone 4 - 131 SPACES
32'-0"
NIGHT ENT. ZONE 44'- 0"
"
82'-0"
'- 0"
4 '-
24.0K
0"
CASINO EXPANSION
"
5.6K
'-0
rest.
l1 retail
94
5.0K
84'-0"
rest.
66'-0"
J. h Snyder Co.
5.0K
L2 ENT. 5.0K 10
62'-0"
Commerce BOARDWALK Sami R. Khoury, AIA
rest.
60'-0"
SANTA AN A FWY
60'-0"
5.0K
83'- 0"
L1 RET 14.0K
L1 RET 9.5K 52'-0"
81'-0"
45
133'-0"
rest.
VALET PARKING 43 TOTAL
89'-0"
zone 8 - 98 SPACES
MAIN BOARDWALK ENTRY
126'-0"
RETAIL 16.5K
EXISTING HOTEL
"
65
zone 5 - 79 SPACES
'- 0
AVE
9.6K
S TUBEWA Y
57
ret.
Short Portfolio
UP
L L1,
118'-0"
76'-0"
73'-0"
18.4K
0"
RETAIL 20K
75 '-0
148'-0"
263'-0"
zone 6 - 42 SPACES
158'-0"
15 8'-
41'-0"
84'-0"
l2 restaurants 16.0K
120'-0"
TELEGRAP
H RD.
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RETAIL
Lease Plan SCALE 1"=150'
May 9, 2006
Bella Terra Location: Huntington Beach, CA Year: 2002 Land Area: 50 acres (20 hectares) Built up Area: 770k sq ft (71.5k sq m) Cost: USD 170 million
Developers: J.h Snyder Co., DJM Capital Partners, Inc., The Ezralow Company Architects: Perkowitz + Ruth, Jerde Partnership, L.A. Group (landscape design)
Bella Terra is a redevelopment renovation project of the former Huntington Beach Town Center, Southern California’s oldest enclosed mall. The center was converted to an all-outdoor experience and became a vibrant retail and entertainment destination including a 20-screen theatre, restaurants, specialty retail and other large retail anchors. . Job title: Design Staff (at Perkowitz + Ruth Architects)
Job Description: Elevation design and colored rendering. Parking layout and delivery truck Autoturn design simulation.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RETAIL
United States Courthouse - Bakersfield, California Location: Bakersfield, CA Client: General Services Administration Year: 2004 Tenants: Magistrate Court, Land Area: 5.3 acres (2.1 ha) U.S. Marshals Service, Built up Area: 42k sf (3.9k sq m) U.S. Probation & Pretrial Services Budget: approx. USD 25 million Architect: Carrier Johnson+Culture
The project submittal responded to a public competition Request for Proposal by the General Services Administration for the Bakersfield courthouse. Organized into five zones the courthouse layout was as follows: 1. Public 2. Judges 3. Probation Officers
4. Administrative and Marshals 5. Prisoners high security cells
Job title: Designer (at Carrier Johnson + Culture)
Job Description: Prepared Concept design drawings package. Participated in solving program & circulation. Created 3D model, presentation renderings and flythrough animation.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
FEDERAL - INSTITUTIONAL
Computer Science Building 3, UC Irvine Location: Irvine, California Year: 2004 Built up Area: 160,000 sq ft (14,864 sq m) Cost: USD 40.2 million Client: University of California Irvine Architect: Carrier Johnson + Culture Contractor: Hensel Phelps Construction Co. Project Award: LEED Gold (2009) Job title: Designer (at Carrier Johnson + Culture)
Job Description: Prepared colored presentation plans for concept design. Coordinated concept plans and elevations in preparation for Revit BIM modeling. Started the BIM Model after schematic design at the outset of Revit implementation in the firm’s pipeline.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
EDUCATIONAL
Jumeirah Garden City Masterplan Location: Dubai, UAE Year: 2007 Urban Redevelopment Land Area: 9 million sq m (2,224 acres) Budget: USD 95 billion Client: MERAAS Holding Urban Planning Design Architect: the Jerde Partnership
This urban development was conceptualized to be a part of the 2015 strategic plan for Dubai. The development consists of about dozen districts and envisioned about an urban redevelopment area of about 14 million sq m (150 million sq ft). The Jumeirah Garden City aimed to cater to a population of 50,000 to 60,000 residents.
Job title: Project Manager, Middle East (at the Jerde Partnership)
Job Description: Architect representative and client manager. Design coordination between the Client’s Development manager and design team. Site analysis and context survey. Site context 3d modelling. Project presentation and coordination with EO Office (Dubai’s Engineers Office). Contract and commercial account manager.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
WATERFRONT - URBAN DEVELOPMENT
Jumeirah Hills Masterplan Location: Dubai, UAE Year: 2007 Land Area: 1.5 million sq m (371 acres) Built up Area (GFA): 4.64 million sq m (50 million sq ft) Client: Sama Dubai Urban Planning Design Architect: the Jerde Partnership Project Manager: E.C. Harris The masterplan offers visitors and residents a wide spectrum of worldclass amenities and entertainment, Jumeirah Hills is a multi-faceted, evolving community featuring an vast diversity of urban centers, commercial corridors, and artistic enclaves in Dubai. The masterplan for this rich cultural landscape aims to distill the energy and spirit found in other great city centers around the world into one incredible destination. Job title: Project Manager, Middle East (at the Jerde Partnership)
Job Description:
Participation in 3D modeling and design of the central towers of masterplan’s elements. Client management working on communication with client’s development team, additional scope fee negotiation, contract and commercial account manager.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
WATERFRONT - URBAN DEVELOPMENT
Sheikh Zayed Bin Sultan Al Nahyan Grand Masjid Location: Aqaba, Jordan Client: Al Maabar International Investments Year: 2012-2014 Architect: Dar Al Omran Land Area: 18,000 sq m (4.5 acre) Cost Consultant: AECOM Built up Area: 3,885 sq m (41,817 sq ft) Project Manager: Hill International Cost: USD 6 million Contractor: Central Contracting Est.
As part of the Marsa Zayed Development in Aqaba Jordan, the Sheikh Zayed Bin Sultan Al Nahyan Grand Masjid comes to echo the original brilliant white Sheikh Zayed Mosque in Abu Dhabi. Job title: Senior Projects Engineer, Development (at Al Maabar)
Job Description: Design review and recommendations. Project progress reporting. Client representative for the site primary infrastructure construction. Participation in procurement management, tender evaluation and final negotiation for superstructure contractor.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RELIGIOUS
414 Bamboo Lane Mixed Use Location: Chinatown, Los Angeles, CA Year: 2006 Built up Area: 6,266 sq ft (582 sq m) Land Area: 2,443 sq ft (227 sq m) Budget: USD 1.3 million Architect: Corsini Stark Architects
The building is an elegant 3 Story structure located in Chinatown. It is fronted by vertical bronze tubes on the facade which, when they age, will form a patina that shall visually reference bamboo forests. Designed to house offices on the second and third floor and a restaurant or commercial space on the first street level. Within the urban fabric, the building fits its program on a difficult site that is only accessible from a narrow alleyway. Job title: Design and Management Consultant (at Corsini Stark)
Job Description: Rhino 3d modeling and 3ds max visualization of building. Full texture mapped modeling of site context for city plan check review and neighborhood approval.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
COMMERCIAL
Southwester Law School Graduate Housing Location: Los Angeles, California Year: 2009 – 2013 (projected) Land Area: 1.27 acres (5,140 sq m) Built Up Area: 105,000 sq ft (9,755 sq m) Budget: USD 20 Million Architect: Corsini Stark Architects Client: Southwestern Law School The project is state-of-the-art graduate student housing complex for Southwestern Law School. Job title: Design and Management Consultant (at Corsini Stark)
Job Description: 3D BIM modeling & project visualization services. CD and SD design and project management support.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL
Delaware Avenue Condominiums Location: Santa Monica, CA Year: 2005 Land Area: 8,200 sq f (762 sq m) Built up Area: 7,000 sq ft (650 sq m)
Construction Budget: USD 1.6 million Architect: Corsini Stark Architects
Four-unit townhouse multi-family residential project located on a narrow linear site with its shorter end facing the street. The building blocks have been skewed and clustered in a stepped way to allow better lighting. The roofs are lined with Photovoltaic panels. Job title: Design and Management Consultant (at Corsini Stark Architects)
Job Description: FormZ modeling, clash interference detection, and 3ds max rendering.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL
SAMMY’S WOODFIRED PIZZA
30
14
13
20
11
31
10
25
4
12
14
13
11
25
27
5
4
24
9
6
12
7
22
23
B 18
8 19
25
27 2
3
28 21
31
22
1
A
12 13 14 15 16 17 18
7
24
32
8
7
26
18
27
5
4
21
17
24
32
3
28 21
31
1
9
6 Airport
3
ABOVE EXTERIOR WINDOW LIQUOR DISPLAY BLADE SIGN GRAB & GO CASE
24
9
4A
PEDESTRIAN NOTE LEGEND: TRAFFIC 1 AIRLINE SEATING AREA FLOW 2 GRAB & GO ENTRY 3 RESTAURANT ENTRY 4 STONE FINISH 5 WOOD SCREEN 6 REQ. EGRESS DOOR TO MATCH WOOD SCREEN FINISH 7 BRANDING WALL: SAMMY’S STAINLESS STEEL SIGN W/ RED BACK LIGHT W/ WOODFIRED PIZZA ROUTED INTO STONE SUBMITTAL : CONCEPT DESIGN PHASE 8 BASE #1 BUILDING COLUMN FINISH TO REMAIN FEBRUARY 11, 2011 9 BASE BUILDING UPLIGHT TO REMAIN 0 BUILDING 5 15 10 BASE N BULKHEAD TO REMAIN
LAWA 3
10
RAMP UP
11 BLADE SIGN
9
A
WOODFIRED PIZZA
8
7 Job Description: 19 the base master schedule MS project file for the Support in creating architectural design works of the retail concessionaires of the Tom Bradley Terminal. Support in Concept and schematic design. 18 21 17 21 3D modeling 27 and visualization of the project.
10 2
29 30 31 32
SAMMY’S WOODFIRED PIZZA SYMBOL LEGEND:
2
1
26
DRY STORAGE WALK-IN REF. PREP AREA DISH WASHING GLASS DISPLAY CASE WOOD SCREEN BRANDING WALL
LEASE LINE Job title: Design and Management Consultant (at Corsini Stark Architects)
18 [Terminal 4 : Space 4A]
SF SF SEATS SEATS SEATS SEATS
Program: – Retail – Food and Beverage – Interior Design and Storefront Renovations 7
21
RAMP UP
B
2,156 941 32 8 20 60
Location: Los Angeles, California NOTE LEGEND: Year: 2010 19 HOST STATION 1 CONCOURSE 10 4 20 25 20 in 2 GRAB & GO ENTRY Area COCKTAIL BAR Concessions Terminal 4: 18,000 sq ft (1,670 sq m) 15 3 RESTAURANT ENTRY 21 BASE BUILDING STANDARD FINISH: 4 POS Terminal 4 Area: 200,000 sq ft (18,580 sq m) ALUM. COLUMN COVER 5 COOK LINE 22 UTILITY CLOSET 6 WOOD BURNING OVEN 23 IT CLOSET Owner: LAWA 7 STONE SLAB BAR TOP 424 STONE FLOOR UPHOLSTERED BANQUETTE TILE 25 QUARRY Los89 Angeles World Airports Concessionaires Retail Renovation TABLE SEATING 8 26 ADA COMPLIANT BAR 10 WAIT STATION REQ. EGRESS DOOR 7 Architect: Corsini2728 Stark Architects 11 KITCHEN ROLL DOWN FIRE DOOR
4
15
23
4A
30 31 Terminal 4 – The LAX modernization project SAMMY’S TOTAL SF KITCHEN/ PIZZA BAR/ G&G BANQUETTE TABLES BAR TOTAL
PLAN
scale: 1/8”=1’-0”
8
4
11 8
6
4
7
8
4
5
8
LAWA
[Terminal 4 : Space 4A] [Terminal 4 : Space 4A]
SUBMITTAL #1 : CONCEPT DESIGN PHASE FEBRUARY 11, 2011 0
5
3
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
15
10
ELEVATION A
scale: 1/8”=1’-0”
AIRPORT - CONCESSIONAIRES
Los Angeles Agora Mixed Use Development PBS Headquarters Location: Above and West of the Hollywood 101 Fwy, Downtown LA Year: 2004 at USC (Thesis) - revisited 2009 Land Area: 15 acres (6 hectares) Built Gross Area: 1,600,000 sq ft (149,000 sq m) Proposed Owner: PBS - Public Broadcasting Service Urban and Architectural Designer: Sami R. Khoury Program: TV/Radio Broadcast Station - Convention Center - Retail - Commercial Offices - City Roof Garden - Parking Structures - Public Parks - Sports Facilities As a parallel reinforcement and in response to the Grand Avenue redevelopment in Downtown Los Angeles, comes this public private development partnership proposal that aims to make use of the ignored land parcels typically resulting from the city’s freeways and road networks. Learning from the experience of Boston’s Big Dig project, which puts the freeway network under ground to allow the maximization of the pedestrian experience in Downtown area and increases the landscaped plots above ground, the Los Angeles Agora project proposes making use of the air space above the Hollywood 101 Freeway and its butterfly connections’ land plots to house the PBS Radio and Television Broadcast Towers to complement the dynamic motion of cars with a sky freeway roof garden linking LA’s existing landmarks into one meshed network of activities accessible to pedestrians.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
BROADCAST STATION - MIXED USE
Albert Basin Mixed Use Master Plan Location: Newry, Northern Ireland Year: 2003 Land Area: 15.5 acres (6.3 ha) Built up Area: 1.1 million sq ft (100,000 sq m) Budget: GBP 53 million (USD 85 million) Public Land Owner: Newry and Mourne District Council Client: Parker Green International Urban Designer: Sami R. Khoury The Albert Basin is a 15 acre site owned by Newry and Mourne District Council, located to the South of Newry City Centre. The site is bordered to the East by Newry Canal, the oldest summit level Canal in the British Isles, and to the East by Newry River. Following an announcement in December 2003, Albert Basin is set to become a significant City Centre mixed use development. The Diagrams layering sequences how the site shall be developed: 1. Underground parking with ramps leading down to parking basement from the street level. 2. Street network connecting the existing city streets to the site and to the ramps at multiple points to provide easy car access. 3. The concourse on which the development should sit provides a platform for the parcels of each building. 4. The water deck, which has the boat slips and a public walkway that shall blend between pedestrian, landscape and existing city streets. 5. Linear public landscape would flow through the development to provide life activating the mixed use areas to get rid of the dead city center. Office Retail Housing Hotel and Civic
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
The concept enhances the site’s linearity as it flows along the canal and river. It provides a smooth street flow along an axis parallel to the Quays, the river and the canal. The scale of buildings breaks down as approaching the edges of the site, and as they approach the Northern part, their scale completely blends with the urban fabric, becoming small townhouses maintaining integrity in a smooth transition.
Los Angeles Artists’ Colony Location: Downtown Los Angeles, CA, USA
Years: 2000 (revisited 2009-2012 for www.architecture-studio.fr competition) Land Area: 6,500 sq ft (604 sq m) Built Up Area: 25,600 sq ft (2,378 sq m) Proposed Owners: The Brewery Art Colony & University of Southern California Designer: Sami R. Khoury
The Brewery Art Colony, LA, has been called the largest live-and-work artists’ colony in the world, yet it is at a distance from Downtown LA. However, in Downtown LA there are many other scattered smaller art colonies. Proposing partnership between the Brewery and the USC, this project yearns to join the LA’s artistic environment with the USC Fine Arts Department with the objective of hosting 12 visiting artists/art faculty members from around the world over varying time intervals, to have them develop mutual relationships. The expressionist form is sculpted to allow maximum views to Downtown and best lighting for art creation.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
CULTURAL
USC Rowing Crew Boathouse Location: Long beach, California Year: 2000 Land Area: 43,792 sq ft (4,608 sq m) Built up Area: 13,501 sq ft (1,254 sq m) Proposed Client: University of Southern California Designer: Sami Khoury
The proposed project houses the USC Rowing Crew Boathouse at the intersection of two canals in Belmont Shore at Long Beach, CA. The prime location which is exposed to three bridges, and the nature of the fluid program with its adjacency to the water urged the building’s formation into an expressive fluid form that aims to facilitate launching 60-footer boats from their storage bays into the water in the easiest and fastest manner. The building combines two arched bridge structures with a shell structure that sits on curvilinear shear walls that concurrently carry the boat racks.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
SPORTS - EDUCATIONAL
Los Angeles Maritime Museum Expansion Location: San Pedro, Los Angeles, California Year: 2003 Land Area: 10.8 acres (4.38 hectares) Built up Area: 71,811 sq ft (6,671 sq m) Proposed Client: Los Angeles Maritime Institute Designer: Sami R. Khoury The existing Los Angeles Maritime Museum is located at the foot of 6th Street in San Pedro. The project’s intention is to create an extension of the gallery spaces and to combine the Museum with a Maritime institute, which is an educational facility that supports the museum to increase the community’s intellect and provide a student community on the waterfront. The other mission is to develop the waterfront to create a link between the existing fire station and the museum, allowing a promenade that links the pedestrians from the Catalina Island Ferry to the end of the waterfront.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
CULTURAL
Automobile Service Center and Gas Station Location: Amman, Jordan Year: 1997 Land Area: 6,800 sq m (73,195 sq ft) Built up Area: 630 sq m (6,781 sq ft), Covered Area: 1,750 sq m covered (18,836 sq ft) Designer: Sami R. Khoury The facility combines most automobile services; gas fueling pumps, mechanics’ shop, automated car wash, three car bays with a pit and two hydraulic car jacks, plus a convenience shop, car accessories shop, and three offices. The program elements are organized in a hybrid socio-commercial setting leading to customer interaction with most functions. Volumes and spaces are sculpted to express speed forms and organic motion. Functions are clustered into four masses of different volumes and are enclosed under two intersecting canopies creating a central mass and forming two axes; a dominant axis, and a recessive axis: • •
The main axis has the pumping area and the market. The recessive axis has the mechanics’ facilities and the automated car wash function.
The car wash experience turns into a visible assembly line process exposed through a panoramic window that leads the customers into the restaurant area creating an interaction between the machinery, the workers and the customers.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
COMMERCIAL SERVICES
Left Coast Press Newspaper Plant Location: Little Tokyo, Downtown Los Angeles, California Year: 2002 Land Area: 48,623 sq ft (45,17 sq m) Built up Area: 110,927 sq ft (10,305 sq m) Proposed Client: Left Coast Press Designer: Sami R. Khoury Located at Little Tokyo in Los Angeles next to MOCA opposite of the federal building and adjacent to the Japanese memorial monument west of the site, the project combines all the necessary programatic and functional elements of a publishing house and a paper pressplant in one location. It relates to site context and public through transforming the main elements of the pressplant, mainly the press machine, into a panoramic exhibit. The program includes: • Office Spaces: serving the editors, writers, managers, layout, and publisher. • Production Spaces: that house the pressplant functions which are the plate making room, paper storage, press room, mail room, delivery truck space and parking • Public space: Internet cafe and public paths to welcome people and engage the with the pressplan.
The Program’s organization is split by a public path that devides the site into two zones, offices and production, affording the plant exposure for its paper press machine its the major sculptural element, and teaching the public the process of making the newspaper.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
INSTITUTIONAL
Skid Row Housing FIFTH FLOOR FORTH FLOOR
Location: Skid Row, Central City East, Downtown Los Angeles, CA Year: 2003 Land Area: 27,343 sq ft (2,540 sq m) Built up Area: 108,407 sq ft (10,071 sq m) Proposed Owner: Skid Row Housing Trust Designer: Sami R. Khoury The project is situated in Skid Row which is a location in Downtown Los Angeles with the largest stable populations of homeless persons in the United States. Skid Row Housing Trust is a supportive housing organization that aims to end homelessness by providing homes that are affordable coupled with the help needed to permanently break the cycle of homelessness. The project examines the role of creating a space of transformation within a troubled socioeconomic and urban context. A six-story mass, Skid Row Apartments encompasses 89 transitional housing units along with a communal space, a theatre, and cheap retail area that can provide jobs to the inhabitants of the project. The project has amenities and facilities such as a dining area, communal kitchen, meeting rooms, covered and uncovered outdoor decks and gathering areas and a laundry facility. In addition the building incorporates offices and conference rooms that provide social services and workshops for tenants as part of the assistance program to help transitional them back into society.
Roof SIXTH FLOOR FORTH FLOOR THIRD FLOOR
FIFTH FLOOR THIRD FLOOR SECOND FLOOR
D
C
FORTH FLOOR SECOND FLOOR BASEMENT PARKING
B
B
D
RETAIL
PUBLIC SPACE
SKID ROW HOUSING
WATER ELEMENTS
C
OUTDOOR SITTING
THIRD FLOOR BASEMENT PARKING
FIRST FLOOR PLAN
B
B
SECOND FLOOR
RETAIL
PUBLIC SPACE
SKID ROW HOUSING
WATER ELEMENTS
Sami R. Khoury, AIA Short Portfolio
OUTDOOR SITTING
FIRST FLOOR PLAN
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL
Echo Park Apartments Housing Project Location: Echo Park,Los Angeles, California Year: 2001 Land Area: 38,000 sq ft (3,530 sq m) Built up Area: 96,858 sq ft (9,000 sq m) Designer: Sami R. Khoury
The Echo Park housing projects proposal chooses a prime site fronting the Echo Park Lake in Los Angeles, and has the Downtown Los Angeles view from the rear, while being adjacent to the Hollywood 101 Freeway, yet at an exit off-ramp on a very busy street corner. The site’s long axis of faces north and south, with the Northern view being the Lake and the Southeastern view being Downtown Los Angeles. The project affords a density of one unit per 800 sq ft (74 sq m) of lot area and to provide support space not exceeding 2000 sq ft (186 sq m). The building is laid out as follows: 1. Eastern Zone has 8 one bedroom units, 4 floors of double loaded corridors on every floor. 2. Central Zone has 24 two-story two bedroom units, 4 floors with a double loaded corridor every other floor. It also has 2 handicap units that are three bedrooms equipped with a lift. 3. Western Zone has the community space and 6 three bedroom units, and 7 one bedroom units. This zone forms the corner of the site.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL
Venice Beach Townhouses Location: Venice, California Year: 2001 Land Area: 22,142 sq ft (2,057 sq m) Built up Area: 19,865 sq ft (1,846 sq m) Designer: Sami R. Khoury
The project is located on a plot parallel to Abbot Kinney Boulevard on Electric Avenue, in Venice Beach in Los Angeles. The area is famous for its boutique retail and high end restaurants and many artists and designers reside on the adjacent plots. Thus the project proposes 8 housing units on the plot for a similar user group of audio and visual artists while providing them with a community space that serves their needs. With having different types of artists ranging audio and visual, some artists would need bright rooms to work on their visual art work, while others would need dark, or sound insulated rooms to work in. Thus some have studios with wide glass windows while others have underground basement workspace. The building’s different masses are uniquely colored coded according to their function. The studios are yellow, the servant spaces which are the bathrooms, the parking , and the stairs are colored in brown, while the living spaces and bedrooms are colored in light grey. Each room has an outdoor space that serves it. The living outdoor spaces have trellises that shade them. The trellises give a different character from the bedroom spaces. From the outside, and the inside, each unit has one parking space and one unit is handicap equipped with an elevator. All units have an entry from the street. There are four types of units that repeat twice, four two-bedroom units, and four one-bedroom units, half of them have underground dark studios. The units are two stories, but they alternate in height forming a sectional silhouette, where there are voids where units are raised, creating voids punching in the complex forming two pathways and gathering spaces over two decks. The deck on the corner is larger than the one in the middle to emphasize the site’s corner as it lies on a wider visual axis.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL
Six-Unit Beach Row House Project Location: Hermosa Beach, California Year: 2001 Land Area: 10,440 sq ft (968 sq m) Built up Area: 8,400 sq ft (780 sq m) Designer: Sami R. Khoury The project is located on a linear narrow lot with the longer access facing the beach. The site is on a slope with the higher level being on the street and the lower level being the ocean front walk. The beach facing faรงade has a protruding upper level creating a shaded seating area facing the water. Each two units are couple together through mirroring forming one reinforced concrete structural entity sharing two columns and the shear walls. Circulation is minimized to the side of the units as land value is high on the beach front.
Sami R. Khoury, AIA Short Portfolio
email: sami@samikhoury.com Cell :+1.619.993.8163
LinkedIn: www.linkedin.com/in/samikhoury
RESIDENTIAL