Samy e selim cv

Page 1

MAJOR ACHIEVEMENTS: 

Madinaty District 8 Design Development, Detailed Master planning & Co-ordination. (280 (G+5) buildings District) (40’000’000 $)

Madinaty District 5 Construction Drawings & Co-ordination. (80 Villas in 5 prototypes) (10’000’000 $)

Porto Sokhna Golf Residence and deep south sectors Design and presentation

Porto Sokhna Hand 2 Golf Residence Design and presentation

Aghakhan Organization Aleppo Hotel Interior Design. Working Drawings, and detailed drawings

Aghakhan Organization Damascus Hotel Interior Design. Working Drawings, and detailed drawings

Participated as a part of a team in planning the SEZONE (Sokhna Industrial zone) project.

Cordoba garden village villas. Architecture and interior design

Lootah investments Labour camps (G+4) 12000 labour each Jabal Ali Area (599-2280,599-2281) (Design + Municipality Approvals + On Site Drawings modifications and revisions)

Sharjah Gates Project El-Majaz area 3D Modeling

Graduation project was ranked in 1st place on the architecture department graduation projects Cairo University.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.