PREFAB HOUSE IIT Advanced Studio Fall 2008 Professor Fredrick Phillips
h
l
l
South Elevation
South SouthSection Section
DN
two components assembled in factory
decks swing shut to provide structural stability while traveling Floor Framing Plan
Roof Framing Plan
3
1
2
3/4” Wood Clad
3” Rigid Insulation
Wood Cant
3/4” Rainscreen Vertical Furring
Double 2 x 12 Rim Joist
5/8” Gypsum Board 3/8” OSB
Typ R-19 Insulation 3/4” Horizontal Furring
1/4” Lyon
5/8” Gypsum Board 2 x 6 Studs @ 16 O.C 5/8” Gypsum Board 2 x 6 WPC Decking
Double 2 x 12 Rim Joist
1’ Poured Concrete Foundation
Wall Detail 1
Wall Detail 2
Wall Detail 3
Wall Detail 4