ABOUT THE STUDIO Three exercises are included in the studio. The first was to comprehend the City of Perth, Australia’s local planning scheme. It was a individual work based studio endeavour. The second exercise was to determine the market feasibility of a specific site, which I chose to be close to our Vadodara Town Planning Proposal. It was also a individual work based project. In between through out the semester I was involved in preparingthe Town Planning Scheme for Vemali in Vadodara in a group of 5 people.

ABOUT THE SITE I was exposed to two cities as a result of this studio. The first is the city of Perth, where I learned about their micro-planning system. We were supposed to make a town planning scheme for a greenfield site in Vadodara in the second city. During this studio, I learned about the site’s various strengths, issues, and opportunities through a regional to micro level analysis and stakeholder consultation, which I attempted to resolve through a proposed town planning scheme.

INDIVIDUAL CONTRIBUTION Apart from the individual tasks in exercises 1 and 2, I had demonstrated my efficacy and contribution to numerous sectors throughout the semester in the town planning scheme formulation exercise. My main contribution in the first iteration was to research and analyse the regional context of Vadodara and tie it to our 19-square-kilometer study area. My main contribution to the second iteration was the Zoning proposal. My contribution to the Third Iteration was mostly in the land reconstitution section as well as the drafting of urban design principles. My main contribution in the final Iteration was to fine-tune the reconstitution and urban design guidelines, as well as to organise the overall presentation in terms of graphics and contents.


CONTENTS Local Planning Scheme, City of Perth, Western Australia

4-5

Town Planning Scheme in Vadodara Reginal and City Level connectivity First Impression Analysing Suitability & Potentiality of the study area Individual Concept of zoning Zoning & Road Network Zonal Level DCR Identification of final TPS Road network of the TPS incorporating Green & NMT Principals of Reconstitutions Final Reconstitution & Appropriation Urban Design Guidelines Valuation

Market Feasibility analysis, Vadodara Closing the Loop & Key Learnings

6-7 8 9 10 11 12 13 14-15 16 17 18-19 20-21 22 23


Land development model: land pooling Legislative acts/notifications/policy/rules etc.: Part 5 of the Planning and Development Act 2005, (PD Act) & City of Perth act, 2016 Scheme is prepared by: Department of Planning, Lands and Heritage, Western Australia Scheme is sanctioned by: : Western Australia Planning Commission Scheme is implemented by: : Local Government Scheme is maintained by: Local Government

Key Learning from this exercise: Implimentation Mechanism of Micro level Planning & Finalcial Model

1. LG resolves to prepare a scheme or adopt a scheme prepared by landowners within scheme area 2. LG forwards resolution to WAPC within 28 days. 3. WAPC provides LG with comments 4. LG publishes notice of resolution in Gazette and local newspaper 5. LG prepares Scheme

1. LG resolves to proce forward 2. WAPC recommends proval should be given 3. Minister gives consen tised subject t 4. LG resolves to p 5. LG modifies Sch


eed with the Scheme and ds to WAPC s to Minister whether apn for advertising Scheme nt to Scheme being adverto modifications proceed with Scheme heme within 42 days

1. Minister consents to modifications 2. LG advertises Scheme 3. LG reviews all submissions received during advertising and considers whether 4. Scheme should be modified 5. LG resolves to adopt Scheme without modifications 6. LG forwards Scheme to WAPC.

1. WAPC submits Scheme to Minister with recommendations 2. Minister approves Scheme 3. LG endorses Scheme documents and forwards to WAPC within 42 days. 4. WAPC endorses Scheme documents and forwards to Minister. 5. Minister endorses Scheme documents. r.22 6. LG publishes Scheme in local newspaper

5


A comprehensive study and analysis of Vadodara’s existing situation, beginning with the regional setting and concluding with a proposal for an IT and knowledge-based town planning scheme for a greenfield site in Dena. To connect the scheme with the city and make it more economically viable.

Key Learning from this exercise:

the process of land value mechanism, cost of the proposals, funding, and other interventions.


7



River, waterbodies Water courses & tertiary channels Marshy depressed land Areas under HFL & FTL of major water bodies Environmentally Sensitive areas & Habitats

Connectivity Current Growth Agricultural Potential Proximity Development Wind Direction

9



11



13



15



17



Building Step-Back after podium level enhances vistas from the street and provides efficient light and ventilation to the building units Continuous Arcade at ground floor level flowing the podium line, in order to create active building frontages and increase vibrancy of the street.

19



21


Final Plot number : 167 Plot area : 15220 sq.m. Proposed D.P. Use : Residential Existing Use : Green Field ( Surrounded by all residential plots) Plot Ownerswhip: Chimanlal Khimchand Maheta ( Private) Tenure: Government