Student Lodge 3 is defined by its materiality and the choices the team has made to pursue the low cost ambitions with regards to that materiality. Inspired by what was salvage dismantling the former caretaker's house and encouraged by the steel and aluminum items received from the demolition of the Rampisham BBC Radio transmission site, Student Lodge 3 was constantly designed with re-use and recombination in mind. The following diagrams will itemize Student Lodge 3 as comprehensively as possible. Besides being an interesting way of quantifying the design decisions, this approach is a way for us to come full circle. As we started with inventories of windowpanes and aluminium ducting collected, drawn and registered, we now inventory all the beams, membranes and screws that hold together the new student accommodation.
BOARDING
PLASTER
FIXINGS
COATING
ULVERSTON
313
Bridport, Dorset _ 18% Hooke Park, Dorset _ 19% Yeovil, Somerset _ 62% Poole, Dorset _ 1%
Bridport, Dorset _ 55% Ulverston, Cumbria _ 42% Norwich, Norfolk _ 3%
Bridport, Dorset _ 100%
18%
19%
Bridport, Dorset _ 100%
1%
3% 266
42% 55%
NORWICH 62%
100%
HP
HP
100%
HP
HP
YEOVIL 7.5
14.8
7.5
BRIDPORT
BRIDPORT
40
POOLE BRIDPORT
7.5
BRIDPORT
TIMBER
INSULATION
MEMBRANES
TAPES
10%
3%
4% 2% 3%
18%
5%
BEVERLEY
3% HUDDERSFIELD
Powerstock, Dorset_ 7% Hooke Park, Dorset_ 72% Salisbury, Wiltshire_ 19% Bridport, Dorset_ 2%
Bridport, Dorset _ 16% Horley, Surrey _ 25% Beverley, East Yorkshire _ 18% Droitwhich, Birmingham _ 5% High Wycombe, Buckinghamshire _ 1% Hooke Park, Dorset_ 2% Huddersfield, West Yorkshire_ 2% Plymouth, Devon_ 30% Southampton, Hampshire_ 1%
291 266
HUDDERSFIELD
Hooke Park, Dorset_ 3% Bridport, Dorset_ 18% Horley, Surrey _ 52% Wimborne, Dorset _ 3% Southampton, Hampshire _ 5% Marlow, Buckinghamshire_ 3% Huddersfield, West Yorkshire_ 2% Yeovil, Somerset_ 4% High Wycombe, Buckinghamshire_ 10%
52%
266
CASTLEFORD
Bridport, Dorset _ 14% Plymouth, Devon _ 70% Burgess Hill, West Sussex 4% Castleford, West Yorkshire 12%
266
12% 7%
2%
DROITWHICH
14%
4%
SOUTHAMPTON
19%
HIGH WYCOMBE
SOUTHAMPTON
MARLOW
137
YEOVIL
72%
70%
145
HIGH WYCOMBE 154
HP
154
HP
HP
HORLEY
HORLEY
38
69
HP
69
BURGESS HILL 137
POWERSTOCK
7.5
7.5
7.5
SALISBURY
86
BRIDPORT
1%
86
16% WIMBORNE
BRIDPORT
BRIDPORT
30%
BRIDPORT
PLYMOUTH
25% 2% 2% 1% 5% PLYMOUTH
18%
Distribution of material sourcing oer category. Distances are taken from Hooke Park and are set in miles.
GLUES AND SEALANTS
Bridport, Dorset _ 23% Hooke Park, Dorset _ 11% Poole, Dorset_ 66%
Bridport, Dorset _ 7% Martinstown, Dorset _ 2% Llanelli, Carthmarthenshire _ 9% Poole, Dorset _ 3% Rampisham Hill, Dorset _ 79%
LLANELLI
2%
GLAZING
INFRASTRUCTURE
METAL
17% Bridport, Dorset _ 100%
11%
7%
Bridport, Dorset Yeovil, Dorset High Wycombe, Buckinghamshire Axminster, Devon
3% 24%
23%
9% 3%
100%
56%
66%
79%
150
145
HP
HP
HP
HP 40
40
RAMPISHAM HILL
YEOVIL
7.5
POOLE
POOLE
7.5
14.8
BRIDPORT MARTINSTOWN BRIDPORT
BRIDPORT
BRIDPORT
AXMINSTER
HIGH WYCOMBE
The team also identified early on that we wanted to stay as local as possible when sourcing the materials for the building, from a sustainable as well as a financially responsible perspective. It soon became clear from local distributors of many products however, that it would be quicker and/or cheaper to go directly to their suppliers in some cases. As with any building project, the ambitions in one realm collided with the schedule and financial logistics of the project as a whole, and decisions were made accordingly. Noteworthy is that most “standard� building supplies were readily availble within the distance radius the Team had set for itself [within 30 miles of site] The specialized items and larger scale objects tended to be sourced from farther North. Another challenger the Team faced was receiving elements of the building without knowing where or how they were going to be incorporated efficiently and effectively. In some cases this also meant rethinking the purchasing strategy. For example, in the case of the insulation, there was continuous debate on the potentials of Polyfloss against its timeconsuming production versus using the barasive salvaged insulation of the significantly more expensive Supaloft Green. This material give and take is directly reflected in the fact that there are 5-6 different types of insulation lining the building.
HP
HOOKE PARK FOREST
NORWAY SPRUCE Picea Abies
68 TREES 2500 LINEAR METERS 14m3 Sawn Timber STUDWALLS BRACING SUBFLOORING SUBROOFING RAFTERS TRUSSES INTERIOR WALLS WINDOWFRAMES
LARCH Larix Decidua
WESTERN RED CEDAR Thuja Plicata
2 TREES 22 LINEAR METERS 0.26m3 Sawn Timber
18 TREES 1700 LINEAR METERS 7.2m3 Sawn Timber
ENTRANCE RAFTERS
CLADDING DECKING CLADDING BATTENS FLOORING
CORSICAN PINE Thuja Plicata
9 TREES 260 LINEAR METERS 2.2m3 Sawn Timber RAFTERS
BEECH Fagus Sylvatica
TIMBER SEASONING SHELTER SCRAP
145 LINEAR METERS 0.6m3 Sawn Timber FLOORING INTERIOR FINISH
EAST BROTHERS TIMBER BRIDPORT TIMBER WHITNEY SAWMILLS EGGARDON FARM
SWEET CHESTNUT Castanea Sativa
4 TREES 61 HOPPUS FEET 2.1m3 Sawn Timber JOINERY
DOUGLAS FIR Pseudotsuga menziesii
+ TANELIZED BATTENS
+
86 LINEAR METERS 0.3m3 Sawn Timber
420 LINEAR METERS 0.5m3 Sawn Timber
370 LINEAR METERS 6.6m3 Sawn Timber
ROOFING [SLATING] BATTENS
DECK BEAMS JOISTS
28L
PAINT _ TIMBER SEALANT _
10L 18L
INSULATION
56M
COATING
95KG
3
CELOTEX PIR INSULATION_ EARTHWOOL_ ROCKSILK [SALVAGED] SUPALOFT INSULATION QUILT_ POLYFLOSS [PRODUCED ON SITE] _
4.2KM
PLASTERS
TAPES
RUBBER ROOFING TAPES _ PLASTER TAPES _ SEALING TAPES_ GLAZING TAPES_
BOARDING
144M GLAZING
41M
2
PLYWOOD [TEMP] _
30M2
AQUAPANEL _ PLASTERBOARD _
39M2 75M2
55M 390M 2575M 1150M
METAL [SALVAGED] _ 1350KG METAL [PURCHASED] _ 250KG
STEEL _
2
ALUMINIUM _ GLAZING UNITS [SALVAGED] _ GLAZING UNITS [PURCHASED] _
35.3M2 5.7M2
METAL
470KG 1160KG
1.6TONS
8M3 7M3 15M3 22M3 4M3
86850 FIXINGS
1.86 TONS
INFRASTRUCTURE GRAVEL
SCREWS _ STAINLESS STEEL BRADS _
25000 8000
GALVANIZED NAILS _ RAPID FIRE STAPLES_
11000 28000
PACKERS_ JOIST HANGERS_
930 175
WIRE ROPE GRIPS_ EYE HOOKS_ BOLTS_
100 25 925
NUTS_ WASHERS_
570 1100
PASLODE IM350 NAILS_ 55MM
1625M
_
11000
3500 45DECK_
1750
60MM _
5400 COLLATED_ 3000
80MM _
2600 SS40MM
_
600
90MM _
700 SS70MM
_
800
100MM _
1400 SS100MM _ 300
130MM _
1300
200KG SCREWS
1500 SLATES 2.7 TONS SALVAGED
2
MEMBRANES
PLASTIC SHEETING [TEMP] _
300M2
MEMBERANES AND BARRIERS ROOFING MEMBRANE_
1005M2 170M2
MISCELANEOUS _ 170M2 _
352KG EPDM
150M2
WOODFILLER _ SILICONE _ PU FOAM_ GLUES_
67L
GLUES AND SEALANTS