Sebastian Aste Cannock Architecture Portfolio

Page 1

SEBASTIAN ASTE CANNOCK PORTFOLIO [2018]


00| TABLE OF CONTENTS 01 POST-GRADUATE MASTER’S WORK

01

1.2 FOSTER + PARTNERS | UAE PAVILION CEILING PROPOSAL - GRASSHOPPER ASSIGNMENT

07

1.1 CHOREOGRAPHY - ROBOTIC BEHAVIOURAL FABRICATION

01

02 PROFESIONAL PRACTICE

11

2.2 URBAN REGENERATION PROPOSAL - PAZ SOLDAN SQUARE

15

2.1 PATISSERIE SHOP

2.3 MIXED USE BUILDING IN CHORRILLOS 2.4 COUNTRY HOUSE IN CAÑETE 2.5 GOLF CLUB - GYM

2.6 BEACH HOUSE IN PUNTA NEGRA

03 UNDERGRADUATE WORK

3.1 THESIS PROJECT - MIXED USE BUILDING

11 21 27 31 35

35 35


Sebastian Aste Cannock saste01@gmail.com +51 936 747 135 +51 01 442 6710


01| POST-GRADUATE MASTER’S WORK 1.1 [Choreography] Robotic Behavioural Fabrication The research is focused on the reaction and adaptation of the fabrication process in response to material and how its unexpected behaviour can influence the design process. A continuous loop between design and fabrication is proposed in opposition to traditional linear ways of production. The process is enabled by the use of a Kinect scanner, a UR-10 robotic arm and software developed in processing. The concept Choreography is taken from the artist and choreographer William Forsythe who proposes the use of external forces to guide dancers in reaction to them and not pre-defining their movements. In this way, the project defines an initial toolpath which changes overtime in reaction to the emergence provided by the material after every scan. Video Link: vimeo.com/252818932 PROJECT

[Choreography] - Robotic Behavioural Fabrication

PROJECT YEAR

2016 - 2017

SCHOOL & PROGRAMME

UCL | Bartlett - MArch AD

CLUSTER

RC1

TUTORS

Alissa Andrasek, Daghan Cam, Andy Lomas, Soomen Ham

TEAM MEMBERS

Jiaweng Ding, Xinyu Zeng

SOFTWARE USED

Processing, Rhino, Grasshopper, Maya, Arnold

1


|1.1 Research Project - Choreography| ROBOTIC BEHAVIOURAL FABRICATION

Fig. 1 Design Application Pavilion

SEBASTIAN ASTE CANNOCK | 2018

2


01| POST-GRADUATE MASTER’S WORK

3

Fig. 2 Research Process Column Fabrication

Fig. 3 Research Process Column Prototype


|1.1 Research Project - Choreography| ROBOTIC BEHAVIOURAL FABRICATION

Fig. 4 Software Developed Deformation Algorithm - Simulation

SEBASTIAN ASTE CANNOCK | 2018

4


01| POST-GRADUATE MASTER’S WORK

5

Fig. 5 Scanning Process Point Filtering


|1.1 Research Project - Choreography| ROBOTIC BEHAVIOURAL FABRICATION

Fig. 6 Design Application Coffee Table

SEBASTIAN ASTE CANNOCK | 2018

6


01| POST-GRADUATE MASTER’S WORK 1.2 Foster + Partners | UAE Pavilion Ceiling Proposal - Grasshopper Assignment The assignment consists on re-imagining Foster+Partners UAE Pavilion for the Milan Expo 2015 actually being located in the UAE instead of Italy. The more open areas of the canyon will now include seating, places to rest, but will need shading from the intense sunlight in order to be useable in the UAE climate. The task was to design and model a simple shading idea using Grasshopper. The strategy for the assignment was to create a ceiling geometry that could merge with the original design, not looking as a supplement. The original curves of the pavilion were used to create an inverted dune by lofting them and controlling the peak of it and the size of the grid cells. The size of the cells‘ openings are controlled by their distance to the peak curve, allowing direct natural lighting into the walls’ patterns while providing shading to the seating areas.

PROJECT

Foster + Partners | UAE Pavilion Ceiling Proposal

LOCATION

UAE

PROJECT YEAR

2016 - 2017

SCHOOL & PROGRAMME

UCL | Bartlett - MArch AD

COURSE

Grasshopper Assignment

TUTOR

Henrik Malm

SOFTWARE USED

Rhino, Grasshopper, Kangaroo

7

2.D

1.D

0.D


|1.2 Foster + Partners | UAE Pavilion Ceiling Proposal| GRASSHOPPER ASSIGNMENT

1.D SEBASTIAN ASTE CANNOCK | 2018

8


01| POST-GRADUATE MASTER’S WORK PARAMETERS MATRIX

D

C

CEILING HEIGHT

B

A

0 CEILING SUBDIVISION

9

1

2


|1.2 Foster + Partners | UAE Pavilion Ceiling Proposal| GRASSHOPPER ASSIGNMENT CEILING DETAIL

PNEUMATIC DETAIL (TRANSLUCENT ETFE PILLOWS ALLOW DIRECT LIGHTING OVER WALLS ‘ PATTERNS)

LOFTED CELLS (APERTURE AND HEIGHT IN RELATION TO ATTRACTOR’S CURVE DISTANCE)

ATTRACTOR CURVE

SEBASTIAN ASTE CANNOCK | 2018

10


02| PROFESIONAL PRACTICE 2.1 Patisserie Shop La Verite Patisserie shop is located in a new food market in Lima. The market designers have defined the exterior of the counter and are providing a metal framework at both sides of the space. The design concept was to create an atmosphere of elegance, innovation and handcraft at the same time, reproducing the craftsmanship and detail level of the desserts served. A third metal frame was added at the back and the three of them became the canvas for the patterns simulating he preparation of mousses and creams. Software was created allowing the client to play with it and be part of the design process. To simplify the fabrication and reduce costs the pattern is defined by a 2D array which changes height by location, then each element is mapped to a predefined height and colored, producing only five types of elements. These elements are made of pinewood with a section of 1” x 1” and are attached into a CNC milled MDF board.

PROJECT

La Verite Patisserie

LOCATION

Miraflores, Lima, Peru

PROJECT YEAR

2018

PLOT AREA

6m²

11


|2.1 Patisserie Shop|

SEBASTIAN ASTE CANNOCK | 2018

12


02| PROFESIONAL PRACTICE

13


|2.1 Patisserie Shop|

SEBASTIAN ASTE CANNOCK | 2018

14


02| PROFESIONAL PRACTICE 2.2 Urban Regeneration Proposal Paz Soldan Square Paz Soldan Square is located in one of the most important intersections of Lima`s financial district. It is surrounded by Camino Real financial and commercial development, Virgen del Pilar church, Casa Moreyra (historic building) and El Olivar Park. The traffic volume and geometry makes it a very dangerous space for pedestrians. The local council has open a contest of ideas to renovate the plaza and improve its connection with El Olivar Park. The proposal extends the contest objective, taking into account not only the existing space available but reshaping the geometry to generate a safe place for pedestrians and reduce pollution. The strategy consists of reducing intersections and creating cycle lanes connecting the financial district with mass transport station. By changing the geometry, more public and safer space is created. In the center of the square a semi-open pavilion shaped as a secret garden is created as a reminder of the park that is a few blocks away. The concrete floor and bench is mixed with optic fibre and connected to LED lighting, replicating the respiration pattern of the trees. PROJECT

Paz Soldan Square Renovation

LOCATION

San Isidro - Lima, Peru

COLLABORATION

Luis Enrique Zela-Koort (Artist)

PROJECT YEAR

2018

PAVILION AREA

152m²

SQUARE AREA

613m²

15


|2.2 Urban Regeneration Proposal - Paz Soldan Square|

SEBASTIAN ASTE CANNOCK | 2018

16


02| PROFESIONAL PRACTICE

Reduction from 3 to 2 traffic lanes and addition of a segregated cycle lane.

Remove left turn.

Set back original Av. Conquistadores straight geometry and remove left turn. Elevate traffic lanes to create a boulevard.

New cycle station.

Widen sidewalk in front of church.

Segregated cycle lane in Av. Camino Real.

17


|2.2 Urban Regeneration Proposal - Paz Soldan Square|

Shared cycle path in traffic direction and segregated lane in the opposite way.

New cycle station. Eliminate existing parking. Most dont have minimum dimensions. Create a boulevard in its place for art venues connecting El Olivar Park with Paz Soldan Square

Optic fibre paving stones display walking paths towards El Olivar Park.

SEBASTIAN ASTE CANNOCK | 2018

18


02| PROFESIONAL PRACTICE 2.3 Mixed Use Building In Chorrillos Located in the district of Chorrillos, this mixed use building contains three typolgies which include commercial area, offices and a residential apartment. The building is divided into two sections. The first one is the cafeteria and the other is divided into office areas and a residential apartment. On the right side of the plot, the cafeteria is located with a corner entrance. The ground floor has a double height entrance space and an open kitchen at the back of the counter. The dining room is on the second level, with street views over the entrance space. The restrooms are also located on this level. The reception for the second block is situated in the middle of the building site. This block contains three office units on the second and third level and a residential apartment on the fourth level.

PROJECT

Mixed Use Building

LOCATION

Chorrillos, Lima, Peru

PROJECT YEAR

2015 - 2016

PLOT AREA

210m²

AREA

810m²

19


|2.3 Mixed Use Building In Chorrillos|

SEBASTIAN ASTE CANNOCK | 2018

20


B

C

02| PROFESIONAL PRACTICE A

A 6

B

C

B

C

3rd LEVEL

A

A

B

C

B

C

5

A

2nd LEVEL

A 5

B

C

B

C

1

A

1st LEVEL

A 1 2

1

21

5

10m

C

3

B

4

GROUND LEVEL

1

Café

2

Kitchen

3

Reception Lobby

4

Garage

5

Office

6

Residential Apartment


|2.3 Mixed Use Building In Chorrillos|

CAFÉ

SEBASTIAN ASTE CANNOCK | 2018

22


02| PROFESIONAL PRACTICE

6

6

5

5

5

4

1

23

5

10m

6

6

5

5

1

2

1

1

3

1

SECTION A SECTION B

SECTION C


|2.3 Mixed Use Building In Chorrillos|

OFFICE A

OFFICE B

SEBASTIAN ASTE CANNOCK | 2018

24


02| PROFESIONAL PRACTICE 2.4 Country House In Cañete Located in the Cañete valley, the “L” shape plot is the result of the combination of seven properties. The house is located at the “L” intersection. The strategy used was inspired on republican courtyard houses, reducing the footprint and maximizing the views to the exterior. The house opens to the entrance pathway on one side and to the great garden on the other. The entrance pathway ends at the garage and a courtyard next to it serves as a foyer for the house and the garden. On the right side of the house a cube is subtracted from the volume creating a courtyard for the guest rooms, laundry and games room. A pathway connects this courtyard with the pool deck and barbecue. On the second level the master’s bedroom volume is extruded over the garden. The other bedrooms have views over the entrance hall and over the courtyard. At an intermediate level the private living room is located dominating the interior space with views over the main living room and the entrance pathway.

PROJECT

Country House

LOCATION

Cañete, Lima, Peru

IN ASSOCIATION WITH

Arch. Omar Zarzosa

POSITION

Designer

PROJECT YEAR

2014

PLOT AREA

1,400m²

AREA

470m²

25


|2.4 Country House In Cañete|

SEBASTIAN ASTE CANNOCK | 2018

26


B

02| PROFESIONAL PRACTICE 8 15

8

8 14

A

1st LEVEL

B

B

A

8

9

10

12

7

11

8

6

5

3

4

A

A 2

13

1

B

GROUND LEVEL

15 1

3

6

10

SECTION B

14 2

1

27

5

3

10m

4

SECTION A


|2.4 Country House In Cañete|

SEBASTIAN ASTE CANNOCK | 2018

28


02| PROFESIONAL PRACTICE 2.5 Golf Club - GYM Located at the east of Lima, Los Andes Golf Club is a country club with an old infrastructure and poor facilities for families. After an initial conversation with the directors, a set of interventions were defined. These ones included a new service building, the exzzsion of the existing lockers room, a children playground and a new gym. After the analysis of the existing infrastructure, we determined that the best approach was to use the same materials which were predominantly wood and stone. An empty open space on a terrace facing the pool was defined as the best location for the gym. Due to the direct sun radiation into the main façade, a wood lattice was developed over the rotating panels allowing for the temperature control of the space. The lattice cage forms the main space of the gym while it attaches to two stone volumes at each side, one for the toilets and the other for a golf bags deposit.

PROJECT

Los Andes Golf Club - GYM

LOCATION

Chosica, Lima, Peru

IN ASSOCIATION WITH

Arch. Omar Zarzosa

POSITION

Designer

PROJECT YEAR

2012

PLOT AREA

600m²

AREA

280m²

29


|2.5 Golf Club - GYM|

SEBASTIAN ASTE CANNOCK | 2018

30


02| PROFESIONAL PRACTICE

FRONT ELEVATION

5

4

1

3

SECTION A

1

SECTION B

2

4

C

6

A

4

5

1

31

5

10m

B

3

2

A

1

C

GROUND LEVEL

SECTION C

B


5

|2.5 Golf Club - GYM|

4

1

3

SECTION A

1

2

4

SECTION B

C

6

A

SECTION C

B

4

2

5

1

5

10m

A

1

B

C

GROUND LEVEL

3

1

Main Entrance

4

Gym

2

Security

5

Entrance

3

Golf Bags Deposit

6

Toilets

SEBASTIAN ASTE CANNOCK | 2018

32


02| PROFESIONAL PRACTICE 2.6 Beach House In Punta Negra Located at the top of a hill in the beach district of Punta Negra, the house has views of the ocean from the third level. The project is excavated from the hill, opening in its interior through the entrance pathway, allowing natural lighting in all the spaces. This pathway connects with the second floor. On the right block a guestroom, family room and the service area are located. At the left side the living room and dining room connects visually with the kitchen which is located on the third level. The kitchen is connected through a bridge to the right volume where a two level terrace with a pool and barbecue area opens into the exterior. On the top of the left block the master’s bedroom and another guestroom are located, both connected by an open terrace.

PROJECT

Bech House

LOCATION

Punta Negra, Lima, Peru

IN ASSOCIATION WITH

Arch. Alonso Valdizan

POSITION

Designer

PROJECT YEAR

2011

PLOT AREA

18.5m²

AREA

290m²

33


|2.6 Beach House In Punta Negra|

SEBASTIAN ASTE CANNOCK | 2018

34


A

A

02|

9 PROFESIONAL PRACTICE

B

4

B

10

B

B 10

11

4

10 10

4

B

6

Open Hall

2

Garage

3

Tv Room

4

Bedroom

5

Laundry

6

Service Bed Room

B

3 7 4 8

7

Living Room

8

Dining Room

9

Kitchen

10

Terrace

11

Pool

3rd 10 LEVEL 11

A

A 5

1

A

A

2nd LEVEL

3

9

7

1

B

B

2

SECTION B

2nd LEVEL

A

A

1st LEVEL

A

A 4

4

10 5

6

9

B

B

B

3 7

7 1

B 8

4

2 8

35

5

10m

1

A

1

SECTION A 1st LEVEL

A

A

GROUND LEVEL

5

10m


|2.6 Beach House In Punta Negra|

A 4

10

B

B 10

11

4

10

A

3rd LEVEL A

A

4

9

B

B

10

B

B 10

11

4

10

4

10

3rd LEVEL

A

A

2nd LEVEL

10

A

A 5

6

7

9

11

SEBASTIAN ASTE CANNOCK | 2018 3

36


02| PROFESIONAL PRACTICE B B

4

10 10 4 4

2nd LEVEL LEVEL 2nd

11

10 10

10 10

3

7

11 11

1 5 5

6 6

1 1

SECTION B

B B

3 3

3 3

2

7 7

2 2

SECTION B B SECTION

4 4

1st LEVEL LEVEL 1st

4

4

10

4 4

9

9 9

7

4 4

10 10

7 7

8 8

8

B B 2 2

ROUND ROUND LEVEL LEVEL 37 10m 10m

SECTION A 1

5

10m 1 1

5 5

SECTION A A SECTION 10m 10m


|2.6 Beach House In Punta Negra|

SEBASTIAN ASTE CANNOCK | 2018

38


03| UNDERGRADUATE WORK 3.1 Thesis Project - Mixed Use Building The Jesuits Company want to rent half of the property they own next to Fatima church and the sea coast. In this property they have some facilities including housing, meeting rooms, funeral parlours and library. They aim to divide the plot into two independent blocks for the developer to build a hotel in one and reallocate their facilities in the other half next to the church. The aim of the project is to combine both units into a single building, giving as a result more open public space, a better integration with the church and the street, while clearly differenciating both units accesses, and the reduction of typical rear facades. Most of the ground floor has open facades with the exemption of the volume next to the back facade of the church, where the kitchen and the ramp to acces the parking facilities are located. This volume works as a joint between the church and the project. The distribution of the building is to provide as much guestrooms with views to the horizon as possible and to mantain the scale of the church and the zoning limits which are twenty storeys at one side and seven at the other. PROJECT

Mixed Use Building

LOCATION

Miraflores, Lima, Peru

PROJECT YEAR

2015-2016

PLOT AREA

9,655m²

AREA

83,346m²

THESIS DIRECTOR

Arch. Juvenal Baracco

39


|3.1 Thesis Project - Mixed Use Building|

SEBASTIAN ASTE CANNOCK | 2018

40


4

03| A

5

5

5

UNDERGRADUATE WORK A 6 8

5

5

7

HOTEL

B

B

1st LEVEL

3 2

2 1 5

5

5

5

4 3

2

A 5

5

1

6

3 3

3

GROUND LEVEL 0

41

20

50m

Lobby Reception

2

Lobby Bar

3

Stores

4

Personnel Entrance

5

Back of the House

6

Hotel Restaurant

7

Specialty rant

8

Theme Restaurant

9

Guestrooms Area

10

Ballroom Foyer

11

Ballroom

12

Executive Lounge

13

Spa

14

Gym

15

Terrace

16

Pool Deck

17

Parking

Restau-

JESUIT COMMUNITY

B

3

A

1

1

Lobby

2

Meeting Rooms

3

Parlours Reception

4

Lobby Lounge

5

Dining Room

6

Rooms

7

Executive Lounge

8

Terrace

9

Funeral Parlours


|3.1 Thesis Project - Mixed Use Building|

SEBASTIAN ASTE CANNOCK | 2018

42


B

03| UNDERGRADUATE WORK

B

14th LEVEL

5

A

A

9 5

9 9 9 9 6 6 6 6 6 6

15

13

5

11

5

1

5 17 17 17

5

2

4 1

17 17 17

8 8 8 8

BBB

9 9 9 9

6

9

8 7

6

5

SECTION B

14th LEVEL

8

5

7

5

A

9

5

10

10

5

A

9

5

10

10

5

5 5

5

5

5

A A

11

0

43

B B

15

13

5

6 5 5

20

10 12

5

14 10 12

1 5 17 17 17

50m

5

5 8 8 3 5

A A

B

11

15 13 5

1

2nd LEVEL

5 17 17 17

5

5

8 8 8 8

4 1 5 9 17 5 17 17

24

4

5

5 8

5

8

6 6

5

5

5

SECTION A

2nd LEVEL

B

119 9 9 9 6 6 6 6 6 6

16 9 9 9 9 9 9 9 9 9

5

A A B SECTION

7 7

B

5

9 9 9 9

1st LEVEL

B

16 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9

1st LEVEL


|3.1 Thesis Project - Mixed Use Building|

SEBASTIAN ASTE CANNOCK | 2018

44



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.