SPECIFICATION NOTES - ROOF LEVEL PLANTING Soi l Preparation Any rubbish/vegetative spoil is to be removed f rom site. Green roof to be Fyt ogreen syst em or similar wit h a total system depth of 445mm and total per square meter of 255kg with t he Blower's mix. Soil mix to be a light weight growing medium such as perlite and peat or similar is t o be used t hroughout the si te in the new raised Planters. A ll import ed t opsoil is t o be free of weeds, rubble and other mat erials deleterious to plant growt h and is to incorporate perlit e or vermiculit e and other light weight, high water st orage capacit y com ponents such as peat moss, compost ed sawdust and bark fines, coco peat , washed sand and recommended fert ilizers and water ret ai ning crystals. The Growing medium is to be laid over a prepared sub-base of washed sand. I mported growing medium is t o be lightly and uniformly compacted in 150mm layers t o a minimum dept h of 300mm. Planti ng Planting shall be carried out using accept ed hort icultural pract ices with all plants conformi ng t o the species, size and quantit ies indicated on the Landscape Plan and Plant Schedule. Plant s shall be thoroughly soaked t hrough immersion in water prior t o planting and if the plant ing soil is very dry t hen t he plant ing hole is also t o be f illed with wat er and al lowed t o drain completely. All plant s shall be appropriately hardened off in t he nursery. Use plant s with t he f ol lowing characterist ics: Large healthy root systems with no evidence of root curl or pot bound restrict ion or damage, vigorous, well est ablished, f ree from disease and pest s and of good f orm, consistent wit h the species or variety, hardened off - not soft or forced. Plant s t hat do not meet these requirements will be rejected. P lanting holes for shrubs and groundcovers are t o be of minimum si ze 75mm larger than t he planting pot i n all di rect ions.
Ear thm a ke r Com posti ng B in
Semi-advanced t ree plant ing holes are to be the same dept h as the root ball and 2-3 t imes it s diameter, wit h the top of t he root ball being at grade. Planting holes are not to be excavated using an auger unless the edges of the hole are later broken up using a spade or similar. The use of augers can sm ooth t he side of the hole and lead t o root girdl ing. TOP OF F ENCE
TOP OF PARAPET
Mulc h Organic mul ch is to be suppl ied t o al l garden beds & raised plant ers and is t o be of chipped or shredded vegetabl e mat erial with 80% of particles in the size range 25 to 50mm in plan and 5 t o 10mm in thickness. No parti cles are to exceed 75mm in plan. Mulch shall be f ree of deleterious and extraneous matt er such as soi l, weeds and sticks. Mulch is t o be stockpiled and thoroughly weathered prior to deli very.
+18.8 5
This mulch shall be laid to a minimum depth of 75mm and is to be sloped t owards plant stems but shall be kept back 100mm t o prevent collar rot.
PARAPET +18 .35
E/04 TP 304
A
B
C
D
Irrigati on Irrigat ion is t o be supplied to all garden beds and raised pl anters in t he form of an aut omatic dri p irrigat ion system including a rain shut of f device. Irrigat ion lines are t o be placed below the mulch layer and t he entire syst em is to meet manuf acturer's specificat ions.
E
Rais ed Pl anter B ox es Raised pl anter const ruct ion i s t o include, but not necessarily be limit ed to, t he supply and inst allat ion of agricultural drains, Hydrocell base, plant ing medium, mulch and ir rigati on. Plant er boxes must be eff ectively tanked and lined wit h coref lut e to prevent leaki ng.
6째46' 30.48
Provide drainage cel l layer which will col lect excess water and drain off t o connect ed bladder tanks located under raised deck areas. Drainage cel ls are to be covered with a layer of f ilter fabric and a 100mm deep layer of Hydrocel l Hardf oam RG30. Provide root anchor nett ing over Hardfoam layer.
1
RECREATION DECK BBQ AREA
SHED S/03 TP 203
SHED
SEMI PRIVATE SEATINGAREA
NATIVE GRASSESThemeda triandra (G2)
SEMI PRIVATE SEATING AREA
PLANT SCHEDULE ROOF LEVEL
FENCE
SY M
E/01 TP 301
36.156
BOTANICAL NAME
THEMEDA TRI ANDRA
D/E
HE IGHT X WIDTH AT MATURI TY
SUP PLY SI ZE
QTY
KANGAROO GRASS
E
0.5m X 1m High 25/ m2
140mm Pot
610
TOTAL
610
LANDSCAPING LEGEND
3
Existing Tree to be removed.
Organic Bark Mulch (or similar) garden bed in accordance wit h the Specif ication Not es
Proposed Tree within mulched garden bed/plant er. Refer to Plant S chedule for det ail s.
Modwood decking built on framing above roof slab. Raised for drainage.
Proposed Shrubs in mulched garden bed/plant er. Refer to Plant S chedule for det ail s.
Modwood decking raised on above la wn area in a boardwalk st yle.
Proposed Groundcover in mulched garden bed/plant er. Refer to Plant S chedule for det ail s.
Blue S tone P aving (Honed)
Lawn area of Themeda Triandra 'K angaroo Grass' instant turf laid in accordance wit h manufact urers specificat ion or seeded.
Concrete paving
SHED
COMMUNITYGARDEN PARAPET +12 .57
4
A
COMMON NAME
GRA SSES G2
4
11.
GALV. IRON
GALV. IRON SHED
35.950
2 96째56'
BBQAREA
35 .81 5
3
SEMI PRIVATE SEATING AREA
19.21
SEMI PRIVATE SEATING AREA
36.915
SHED
276째56'
E/ 03 TP303
19.20
S/01 TP 201
Ferti li ser Use 8-9 month Osmocote fertiliser at the rate s pecified by the manufacturer.
35.3 15
ROOF +10.9 4
2
Supply and spread evenly a soil mix comprising of 50% washed sand, 40% Hydrocell flakes, and 10% composed organic mat ter. Compact light ly and evenly in 150mm la yers. Avoid diff erent ial subsidence and excess compaction and produce a finished surface t hat is graded evenly and ready f or plant ing. Allow for 75mm layer of specified mulch to top of beds and a f ini shed level 25-50mm below t he planter rim. Drip irrigati on as specified is to be supplied beneath t he mulch layer.
36.915
15 SOLAR PHOTOVOLTAICARRAYS
SHED COMPOSTING
1
COMMUNITY GA RDENI NG EQUIP MENT STORAGE SHE DS
PARAPET +13.24
B
30.48 186째 47'
PARAPET +14 .85
MODWOOD DECK AND BOARDWA LK
PARAPET PARAPET +13.2 3 +14.8 7
Communal Laundry dry ing area (laundry drying lines fixed t o screen s urround at 1400mm above f loor level)
C
PARAPET +1 3.46
D
MODWOOD BOARDWALK
PARAPET +1 4.90
E
ROOF LANDSCAPE PLAN 1:100
PLANT TYPES GR ASSES KAN GAROO GR ASS 350mm MINIMUM GROWING MEDIUM FILTER FABRIC 20mm D EEP DRAINAGE LAYER PROFILE ROOT BARRIER LAYER 100mm THERMAL IN SU LATION WATER PROOFING MEMBRANE CON CRETE SLAB
THEM EDA TRI ANDRA - G2 Kangaroo Grass
GREEN ROOF DETAIL 1:2 0
armsby architects Design Architectsand EnergyConsultants 51 Bay Street, Port Melbourne, VIC, 3207 M: 0403 153 890 T:(03) 9676 2296 F:(03) 9646 1135 E: armsby@armsby.com.au
Client
RICHMOND ICON NO RTH
A -
TOWN PLANNING RFI AMENDM ENTS FOR COM MENT ONLY
AP FG
13.12.20 11 01.09.20 11
Re v
De scri pti on
By
Date
Project
APARTMENTS 1-3 RAILWAY PLACE CREMORNE VIC Project Num ber
1109
Drawi ng
ROOF LANDSC APE PLAN Drawi ng Num ber
TP152 Proj ect St atus TOWN PLA NNING 1: 100 @ A 1 Scale 1: 200 @ A 3
Revi si on A
A
B
C
D
E
PYROLYTIC GLASS PAN EL TO STAIRWELL D OORS FOR NATURAL LIGH TING TO LOBBY. NATURAL VEN TILATION THROUGH STAIRWELL TO EXTERIOR (FIRE RATED)
COMMU NITY GARDEN
ELECTRIC SLOAR POWER PV CELLS
COMMUNITY SHEDS
35,950
3.9 45
SITE BOUNDARY
RL +35,950 ROOF
35,915 35 ,3 15
3.1 00
RECREATIONALDECKAREA
36,9 15
36 ,1 56 BBQAREABEYOND SITE BOUNDARY
36,915
OUTLINE OF APPROVED DEVELOPMENT PERMIT NUMBER P623/2011 NOT OF EXISTING CONDITIONS
PLANT + EQUIPMEN T AREA (UND ER METAL SCREEN ENCL OSURE)
LIFT LOBBY
3.1 45
LIFT LOBBY
3.1 45
LIFT LOBBY
3.1 45
RL +31,970 8. LEVEL - SEVENTH FLOOR
LIFT LOBBY
RL +28,825 7. LEVEL - SIXTH FL OOR
RL +25,680 6. LEVEL - FIFTH FLOOR 1.965
3.1 45
RL +22,535 5. LEVEL - FOUTH FL OOR
LIFT LOBBY
3.1 45
RL +19,390 4. LEVEL - THIR D FLOOR NEW MATURE TREE (APPROX. 9m H IGH)
SWAN STREET
LIFT LOBBY
3.1 45
RL +16,245 3. LEVEL - SECOND FLOOR LIFT LOBBY
RAILWAY PLACE
3.850 LIFT LOBB Y
1.8 30
STORAGE
10,610
17 2 SWAN STREET
172 SWAN STREET
CAR PARK
8,000
2.5 00
RL +8,000 1. LEVEL - GROU ND FLOOR
BASEME NT P LA NT
EXIST GROUN D L IN E
RL +5,500 -1 LEVEL - BASEMENT
3.881
S/01
2.410
2.6 10
RL +10,500 MEZZANINE LEVEL
2.190
2.4 90
RL +13,100 2.L EVEL - FIRST FL OOR
5.715
6.010
5,500
6.89 5
5.79 5
2.1 34
SECTION 1 1:10 0
armsby architects Design Architectsand EnergyConsultants 51 Bay Street, Port Melbourne, VIC, 3207 M: 0403 153 890 T:(03) 9676 2296 F:(03) 9646 1135 E: armsby@armsby.com.au
Client
RICHMOND ICON
A -
TOWN PLANNING RFI AMENDM ENTS FOR COM MENT ONLY
AP FG
13.12.20 11 01.09.20 11
Re v
De scri pti on
By
Date
Project
APARTMENTS 1-3 RAILWAY PLACE CREMORNE VIC Project Num ber
1109
Drawi ng
SECTION 1 Drawi ng Num ber
TP201 Proj ect St atus TOWN PLA NNING 1: 100 @ A 1 Scale 1: 200 @ A 3
Revi si on A
LAUND RY DRYING LINES
PLANT + EQUIPMENT AREA (UND ER METAL SCREEN ENCLOSURE)
COMMUNITY GAR DEN
3 36,915 1.60 0
1
35,915
SITE BOUNDARY
SITE BOUNDARY
35,315
BALCONY
3.145
RL +3 1,970 8. LEVEL - SEVEN TH FLOOR
NO D ISTIN CT VIEW TO ROOF TERRACE BELOW
3.945
RL +3 5,950 ROOF
2 RECREATIONALDECKAREA 1.0 00 min
4
BALCONY RL +2 8,825 7. LEVEL - SIXTH FLOOR
3.145
TIMBERLOOK TO BAL CON Y INTER IOR BALCONY
BALCONY
3.145
RL +2 2,535 5. LEVEL - FOUTH FLOOR BALCONY
27.950
3.145
RL +2 5,680 6. LEVEL - FIFTH FLOOR
3.145
RL +1 9,390 4. LEVEL - TH IRD FLOOR BALCONY
3.145
RL +1 6,245 3. LEVEL - SECOND FLOOR
VOID SPACE OPEN TO ALLOW NATURAL VENTILATION
BALCONY
2.490
RL +1 3,100 2.LEVEL - FIR ST FLOOR STORAGE/ BI KE S PACE S (LOFT SPACE OVER CARPARK ENTRY) CA R PA RK
ACCESS LANE
BIN STORE
2.610
RL +1 0,500 MEZZANINE LEVEL
GREEN STREET
RL +8 ,0 00 1. LEVEL - GR OUND FLOOR 2.500
BASEME NT PLANT A REA BEYOND
RL +5 ,5 00 -1 LEVEL - BASEMEN T 5 RAILWAY PLACE
1-3 R AILWAY PLACE
1A GREEN STREET
CLEAR ZONE R EQUIRED FOR CAR STAC KER S BEYON D
1.775
4.125
4
S/02
4.050
3
4.050
4.125
2
1.075
1
SECTION 2 1:10 0
armsby architects Design Architectsand EnergyConsultants 51 Bay Street, Port Melbourne, VIC, 3207 M: 0403 153 890 T:(03) 9676 2296 F:(03) 9646 1135 E: armsby@armsby.com.au
Client
RICHMOND ICON
A -
TOWN PLANNING RFI AMENDM ENTS FOR COM MENT ONLY
AP FG
13.12.20 11 01.09.20 11
Re v
De scri pti on
By
Date
Project
APARTMENTS 1-3 RAILWAY PLACE CREMORNE VIC Project Num ber
1109
Drawi ng
SECTION 2 Drawi ng Num ber
TP202 Proj ect St atus TOWN PLA NNING 1: 100 @ A 1 Scale 1: 200 @ A 3
Revi si on A
A
B
C
D
E
PLANT + EQUIPMENT AR EA (UN DER METAL SCREEN ENC LOSUR E)
ELEC TRIC SLOAR POWER PV C EL LS
COMMU NITY GARDEN
OUTLINE OF APPROVED DEVELOPMENT PERMIT NUMBER P623/2011 NOT OF EXISTING CONDITIONS
COMMU NITY SHED S
35,315
3.94 5
SITE BOUNDARY
RL +35,950 ROOF
36,915
RECREATIONAL DECKAREA
BBQAREABEYOND
36,156
35,915
35 ,9 50
BALCONY 32,970
SITE BOUNDARY
36 ,91 5
3.14 5
BALCONY 29,825
3.14 5
BALCONY 26,680
3.14 5
BALCONY 23,535
3.14 5
RL +31,970 8. LEVEL - SEVEN TH FLOOR
BALCONY 20,390
RL +28,825 7. LEVEL - SIXTH FLOOR
RL +25,680 6. LEVEL - FIFTH FLOOR
RL +22,535 5. LEVEL - FOUTH FLOOR
3.14 5
RL +19,390 4. LEVEL - THIR D FLOOR BALCONY 17,245
NEW MATURE TREE (APPROX. 9m HIGH)
RL +16,245 3. LEVEL - SECON D FLOOR 3.14 5
BALCONY 14,100
RAILWAY PLACE
1.740
CAR PARK
8,000
RL +8,0 00 1. LEVEL - GR OUN D FLOOR
BA SEMENT PLANT AREA
2.50 0
PEDESTRIAN UNDERPASS
5,500
RL +5,5 00 -1 LEVEL - BASEMEN T
3.881
S/03
STORAGE AREA
CAFE
2.410
2.61 0
RL +10,500 MEZZANINE LEVEL
2.190
2.49 0
RL +13,100 2.LEVEL - FIR ST FLOOR
5.715
6.010
6.8 95
5.7 95
2.1 34
SECTION 3 1:100
armsby architects Design Architectsand EnergyConsultants 51 Bay Street, Port Melbourne, VIC, 3207 M: 0403 153 890 T:(03) 9676 2296 F:(03) 9646 1135 E: armsby@armsby.com.au
Client
RICHMOND ICON
A -
TOWN PLANNING RFI AMENDM ENTS FOR COM MENT ONLY
AP FG
13.12.20 11 01.09.20 11
Re v
De scri pti on
By
Date
Project
APARTMENTS 1-3 RAILWAY PLACE CREMORNE VIC Project Num ber
1109
Drawi ng
SECTION 3 Drawi ng Num ber
TP203 Proj ect St atus TOWN PLA NNING 1: 100 @ A 1 Scale 1: 200 @ A 3
Revi si on A
REC REATION AR EA (METAL SCR EEN ENCL OSUR E)
4
3
ELECTRIC SOLAR POWER PV CELL S ON R OOF BEHIN D
METAL SC REEN (MS1)
2
1
36.915 L IFT OVERR UN
36 .91 5
PAL E TTE OF E X TERNA L MA TERIA LS & F INISH ES :
SITE BOUNDARY
3.980
RL +31 .97 0 8. L EVEL - SEVENTH FLOOR 3.145
SITE BOUNDARY
35.95 0
RL +35 .95 0 ROOF
SPLAYED WALLS BEYOND (P3) TO MATCH WALL PAN EL S
AL UCOBOND COLUMN FACE (AC1)
PC1
Pre cast concrete. Natural Light/White Oxide finish
TF1
Timber Eff ect Finish. Modwood 'Black bean'
GL1
Clear glazing, metropolis bronze pearl powder coat ed frames
P1
Paint finish - Colourbond 'Dune'
P2
Paint finish - Colourbond 'Woodland Grey'
3.145
RL +28 .82 5 7. L EVEL - SIXTH FLOOR SURROUND FRAME (P2) CLEAR GLASS (GL1) BALU STRADE TO ALLOW MAXIMU M LIGHT PENETR ATION
RL +25 .68 0 6. L EVEL - FIFTH FL OOR 3.145
P3
AC1
Alucobond or similar met al cladding Pure Whit e.
AC2
Alucobond or similar met al cladding Smoke silver met allic
AC3
Alucobond or similar met al cladding Deep Grey
MS1
Perforat ed black st eel screen
3.145
RL +22 .53 5 5. L EVEL - FOUTH FLOOR
3.145
RL +19 .39 0 4. L EVEL - THIRD FLOOR 1.500 PER FORATED METAL SCREEN AND GATE BEYOND (MS1 )
ST1
PLANTER 6.490
RL +13 .10 0 2.LEVEL - FIRST FLOOR 800
3.261
VEHICLE ACCESS LANE
5.100
RL +10 .50 0 MEZZANINE LEVEL
RL +8.000 1. L EVEL - GROUND FLOOR LASER CUT METAL SCREEN AND GATE (MS1)
Honed Blue St one
12.530
3.145
RL +16 .24 5 3. L EVEL - SECOND FLOOR
Paint finish - Colourbond 'Surf Mist '
GREEN STREET
LASER CUT METAL SCREEN TO CARPARK ENC LOSUR E (MS1)
RL +5.500 -1 LEVEL - BASEMENT 5 RAILWAY PL AC E ADJOINING WAREH OUSE / GAL LERY BUILDING
E/01
1-3 RAILWAY PLACE
5 GREEN STREET ADJOINING C OMERCIAL / RESIDENTIAL BUILDING
NORTH 1: 100
armsby architects Design Architectsand EnergyConsultants 51 Bay Street, Port Melbourne, VIC, 3207 M: 0403 153 890 T:(03) 9676 2296 F:(03) 9646 1135 E: armsby@armsby.com.au
Client
RICHMOND ICON
A -
TOWN PLANNING RFI AMENDM ENTS FOR COM MENT ONLY
AP FG
13.12.20 11 01.09.20 11
Re v
De scri pti on
By
Date
Project
APARTMENTS 1-3 RAILWAY PLACE CREMORNE VIC Project Num ber
1109
Drawi ng
NORTH ELEVATION Drawi ng Num ber
TP301 Proj ect St atus TOWN PLA NNING 1: 100 @ A 1 Scale 1: 200 @ A 3
Revi si on A