HUSD Presentation

Page 1

healdsburg unified school district

Maintenance Plan CMMCP Presentation


Step 1

Plan Development

1

Create Assessment Form

2

Populate Assessment Form with Collected Data

3

Analyze Collected Data


Assessment Form Why an assessment form? Creates a formulated and structured data collection process to assists in facility needs assessments

FORM


Data Collection

Assessment FORM 3rd Party Information Architectural Assessment Engineering Consultation GC Proposals Industry Standards and Best Practices HUSD Data Collection Master Plan Building Systems Conditions Work Order System Technical Documents


Data Analyzation What are key take-aways? • Snapshot of facility conditions • Prioritization across district • Maintenance scheduling • Budgetary needs

Assessment FORM 3rd Party Information Architectural Assessment Engineering Consultation GC Proposals Industry Standards and Best Practices HUSD Data Collection Master Plan Building Systems Conditions Work Order System Technical Documents

v

v

v

v


Step 2

Plan Implementation

1

Tier 1 Maintenance Implementation Priorities

2

Tier 2 Maintenance Implementation Priorities

3

Cost & Schedule


Tier 1 Priorities • Structural

• Power Distribution

• Building Envelope

• HVAC

• Plumbing Systems

• Communications & Signal • Fire Systems


Tier 2 Priorities • EMS

• Doors / Hardware

• Site-Scaping

• Finishes

• Walls / Partitions

• Furnishings • Equipment • Everything Else


Cost & Funding


Funding Sources Fund 21 Facility Bond General Fund Fund 40 - Special Reserve Capital Outlay Fund 25 - Developer Fees Fund14 - Deferred Maintenance Prop 39 RRMA


Final


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.