Mohit Waghmare -Architectural Portfolio | KRVIA

Page 1

PORT FOLIO Mohit Waghmare

Selected Works


Mohit Waghmare Architecture Intern E-mail : mohitwaghmare9920@gmail.com Phone : +91 9594379369 Nationality : Indian Birth- date : 05/04/2001

I am currently a 4th year b.arch student studying in KRVIA. This portfolio is the compilation of selected work from my previous semesters. As an architecture intern, I’m keen on working on design and material explorations. Formation and exploration of spaces, Understanding different kinds of landscapes, Site Documentation via means of photgraphy and playing with levels are somethings which I’m keen to do. I like to learn new softwares and work around them which also helps in exploration.

Education June 2007- April 2017

- PVG’s Vidya Bhavan SSC Matriculate in all subjects June 2017–March 2019 -St. Mary’s Junior College HSC Science August 2019 – currently studying - Kamla Raheja Vidyanidhi Institute for Architecture, Maharashtra Bachelor of Architecture


Language English, Marathi, Hindi

Software Autocad

Sketchup

Twinmotion

Enscape

Illustrator

Photoshop

Indesign

Ansys

Rhino 7

Premiere pro

Iightroom

Skills Hand drafting Illustrations Sketching Model making Rendering Photography

Workshops Toxic City Reading Urban Spaces: Memory & Identity Design Terroir: Architecture to the Rescue Tracing Migration and Cultural integration through food Unravelling the Anthropocene: Beyond Climate crisis

by Prajakta Potnis by Andre Baptista by Mamta Patwardhan by Sarah George by Sandeep Menon

Extra Curriculars 2008-2014 - Taekwondo Red belt, Participated at district level and Interschool - Violinist 2020-2021 - Human Resources Director for Rotaract CLub of KRVIA - Successfuly coordinated events for the club

Interests Photography, Reading, Writing, Travelling


Content 01-04

The Ornithologist House, (Seawoods,Navi Mumbai)

05-06

The Pattern (Malvan)

07-10

Architecture of care (Juinagar, Navi Mumbai)

11-12

The Journalists’ Archive (Dadar, Mumbai)

13-16

Working Drawing


19-20

Landscape design

21-22

Material Exploration

23-26 27-28

Hand Drafting, Sketches

Photography

ORTFOLIO

17-18

Architectural Representation Drawing


01


The Ornithologist house Semester 3

Cut and lift

Verb and Noun exercise, here the context is derived from the noun and the form is derived from the verb, designated noun was ‘off tides’ and verb was ‘to cut’, Site here is a park which replicates behaviour of a tide which is a too and fro motion, a constant flux; The form was to cut the site with an intervention in a way leading to a formation of space. Its a space for Ornithologist considering the diversity of birds, the space will be accommodated by one person. The space is specific as well as generic because the person accommodating keeps changing after every few months, from October to March when the Birds Migrate here also there is public space with Aviaries and Information Gallery and a library on first floor and the personal spaces are stacked on ground floor.

02


03


04


05


The Pattern Semester 4 Pattern conveys sense of space quite effectively, the Patterns of elements like Sand, Wind, Waves, fishes encompasses the spirit of the coast of Malvan. Here, the design is based on the concept of Genius loci ( Spirit of the place ), this project is situated on the coast of Malvan, Maharashtra. The form was brought into picture by narrowing down the patterns, the pattern of sand has a motion of constant flux, different times of the day because of changing winds. This pattern was brought into form by lifting land which creates different levels leading to the motion and creating habitual space bellow. The program includes a library and small residential.

06


07


Architecture of care Semester 5 Unlike never before Pandemic shed a light on healthcare and healthcare infrastructure in India as well as globally, this exercise led to detailed analysis of healthcare via means of communication with people, people from different backgrounds/ professions/ age and their experience with local healthcare in recent times/ post pandemic and Pre-Pandemic, which shedding light upon the lack of certain facilities like ramps, lack of waiting space, smaller corridors, inefficient planning. Three different independent blocks are wrapped by a floating ramp allowing circulation on different levels and an inward looking building with multiple open spaces/ pockets on the ground. Program includes a PHC and An Occupational therapy centre ( assessment and intervention to develop, recover or maintain the meaningful activities or occupations of individuals, groups/ communities), Provides cheaper/ free mental healthcare assistance to all the economical backgrounds and an interactive/ therapeutic landscape.

08


09


10


11


Journalists’ Archive Semester 6 The project revolves around the relationship between the intervention and the history, identity of Dr. Babasaheb Ambedkar. The program was derived with an assistance from a site study based in a majorly dalit influenced area, which had various Ambedkarite organisations, which assisted in vaccination drives, educational workshops, resolving community disputes, small scale journalism. An Archival for Dalit journalists who document and produce content hand in hand with communities via public intervention. The program focuses on inspiring and introducing people from all the communities and background to such organisations and communities. The idea Behind the design is to reflect a strong yet a transparent identity of Dr. Ambedkar.

12


1270 1350

60

1600

D4 1500

C 12

C 13

385

1785

+350MM

2725

LS 2

D11

1430

1550

4105

W10

3725

C 14

R2 P1 F2 S1

+800MM

-1.13

LS 3

D10

1015

C 15

GROUP THERAPY

2820

+800MM

2 1

2820

4280

UP

3

IC7

5165

3

2740

4

D14 3

105

D11

5

D14

3080

6

21 22

2120

163 1500

1600

-0.97

1500

7

IC6

800

+800MM

R2 P1 F2 S1

590

8

3905

+800MM

W2

9

4230

WAITING AREA

3670

W13

10

D13

R2 P1 F2 S1

ADMIN

2120

+800MM

+800MM 2360

11

3080 800

R2

CAFETERIA F2 P1 S1

2300

900

4360

R2 P1 F2 S1

PANTRY

12

4726

5240

13

3

W24

GROUP R2 P1 F2 S1 THERAPY

14

W25

150

+800MM

3080

250

2000

16 15

D12

800

17

870

800

D13

C 11

880180

2040

C 10

7226

60

890

C9 2925

18

5425

2410

1410 20 19

C8

22

D6

D12

W5

+800MM

2580

+800MM

135

2530

800

C6

4360

-0.45

21

1500

+800MM

W12

NURSING R2 P1 F2 S1 STATION

RESTROOM

1

W11

2980

D6

2150

C5

1710

830

W13

IC5 C7

1660

R2 P1 F2 S1

WARD

EMPLOYEE R2 P1 F2 S1 RESIDENCE

-0.95

55

3665

1710

1410

W14

C4

+800MM

1800

100

IC4

3010

IC1

22

1455

L1 L2

K1 K1

-0.79 2190

W5

120

W15

JANITOR'S R2 P1 F2 S1 ROOM

+760MM

J2

200

2650

1380

2320

2150

2550

2980

23

2290

R2P1 RESTROOM F5 -

W5

+800MM R2 P1 F2 S1

1500

D6

C3

REPOSITORY

24

21

IC3

800

J1

1750

3000

C2

W10

25

D16

IC2

1335

4285

3000

4055

25

3045

H

G

-0.63

2950

1630

1

F1 F2

E

50

3235

D15 C1

D1 D2

-0.47

545

2660

C

B 4500

1800

A3 245 50

3420

A1 A2

2605

4575

95

C 16

W8

855

5500

283

C 17

W9 3 C 18

LS 1

5000

UGT

12960

12960

1:10

3398

RWH

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

IC8

24

UP

2895

3150

W7

D3

5

3070

8000

C 23

REPOSITORY

2000

+600MM

2115

D4 665

800

1600

C 24

D5

D4 625

447

1600

955

1885

1000

D8 800

800

+600MM

D6

+600MM

+600MM

D7 916

2480

R2 P1 F2 S1

R2 P1 F2 S1

+600MM 235

D1

2520

W1

315

D6

D6

D6

W5

W5

W5

DISABLED TOILET

1375

PHARMACY

LABOUR ROOM

4885

4923

85

DIAGNOSIS R2 P1 F2 S1 ROOM

4436

R2 P1 F2 S1

OPD

4926

90 4926

800

D2

4480

2350

6

W6

R2P1 F5 -

RESTROOM

R2 P1 F2 S1

+600MM

D2

5

2210

+450MM

5200

W7

C 26

2395

C 25

1940

WAITING R2 P1 F2 S1 AREA

4

W7

C 22

3150

W7

C 21

1585

W7

C 20

1974

W7

1498

1600

C 19

4885

3

2894

4

2

1950

1 6555

D9

270

2360

W2

215

235

C 27

2360

W3

220 240

3385

W4

W5

330

W5

6

C 28

C 29

C 30

IC10

IC9

IC8

-0.45

-0.48

-0.51

DC Prefabricated Security cabin

9000 3600

+600MM

245 50

A1 A2

13

A3

4500

545

B

3235

C

50

D1 D2

2950

3045

E

25

F1 F2

4285

1750

G

2650

H

200

J1

J2

2190

100

K1 K1

3665

55

L1 L2

-1.29


Working drawings Semester 6 A3

D2

B

H

F1

L2

J1

+9500MM

MANGALORE TILESS

ROOF TOP LEVEL +8700MM

450MM DEEP RCC BEAM

ROOF BOTTOM LEVEL

CHAJJA

CAFETERIA

MEDITATION SPACE

LIBRARY F

F

+4500MM

SECOND FLOOR LVL

WAITING ROOM

CAFETERIA

230MM THK BRICK WALL

GROUP THERAPY

FLOOR FINISH

150MM THK PCC BED 200MM THK DRY RUBBLE SOLING

+500MM PLINTH LEVEL

300MM*450MM RCC PLINTH BEAM

+0.0MM GL

FOOTING PCC BED 150MM THICK DRY RUBBLE SOLING COMPACT SOIL

CEMENT FIBRE PANEL 50 MM THK DRY RUBBLE SOLING 200MM THK RAMMED EARTH

ANCHOR BOLTS CEMENT FIBRE PANEL 50 MM THK BRICK WALL 230 MM THK

RCC SLAB 150 THK MANGALORE TILE STEELRCC CHANNEL 400*150 SLAB 150 THK EAVES MANGALORE TILE STEEL CHANNEL 400*150 EAVES

GUIDE RAIL

STEEL CHANNEL 200*150 ANCHOR BOLTS

VITRIFIED TILE 12MM THK

BRICK WALL 230 MM THK 450MM DEEP RCC 200*150 BEAM STEEL CHANNEL

SCREED 25MM THK VITRIFIED TILE 12MM THK

DRY RUBBLE SOLING 200MM THK RAMMED RCC LIFT EARTH SHAFT 10 MM THK

GUIDE RAIL

WATERPROOFING 10 MM THK

RCC LIFT SHAFT 10 MM THK WATERPROOFING 10 MM THK RAFT SLAB 300MM THK

450MM DEEP RCC BEAM GLASS LOUVERED VENTILATOR

SCREED 25MM THK DOWNTAKE PIPE

RAFT SLAB 300MM THK

GLASS LOUVERED VENTILATOR NOTES 1. ALL DIMENSIONS ARE IN MILLIMETERS. 2. DO NOT SCALE THE DRAWINGS. 3. THIS DRAWING IS THE PROPERTY OF THE ARCHITECT AND SHOULD NOT BE COPIED WITHOUT THEIR PERMISSION. THIS DRAWING IS THE COPYRIGHT PROPERTY OF THE ARCHITECT. 4. FOLLOW THE WRITTEN DIMENSIONS ONLY. 5. ALL STRUCTURAL DIMENSIONS ARE TO BE REFERRED. 6. ALL THE SERVICES TO BE REFERRED FROM SERVICE CONSULTANT DRAWINGS. 7. FOR ALL OTHER DETAILS, REFER TO THE RELEVANT DRAWINGS. PLEASE REFER TO RESPECTIVE TO THE RESPECTIVE SCHEDULES / TABLES, NOTES AND REMARKS. 8. ALL EXISTING GROUND LEVELS TO BE VERIFIED BY CONTRACTOR BEFORE COMMENCEMENT OF WORK. 9. IN CASE OF DISCREPANCY, IT SHOULD BE IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT / CONSULTANT.

DOWNTAKE PIPE

3

3

S C A L E- : - 1 : 5 0 SHEET:- SECTION BB' PROJECT:- HEALTHCARE CENTRE MUMBAI, MAHARASHTRA- 400063

3

1

4

5

3

1

4

5

KAMLA RAHEJA VIDYANIDHI INSTITUTE OF ARCHITECTURE AND EXAMINERS SIGNATURE ENVIRONMENTAL STUDIES MOHIT WAGHMARE ROLL NO. 1988 DATE:-08.04.22

6

MANGALORE TILES

+9800MM

MANGALORE TILE

RCC SLAB 150 MM THICK RCC BEAM 450MM THICK

CEMENT MORTAR REINFORCED WITH POLYMER LATEX

RAIN WATER GUTTER MANGALORE TILES

RCC SLAB 150 MM THICK RCC BEAM 450MM THICK

RCC SLAB 150 mm THK

ROOF TOP LEVEL

MANGALORE RAIN WATERTILE GUTTER (REFER MORTAR DETAIL) REINFORCED WITH POLYMER LATEX CEMENT RCC LINTEL RCC SLAB 150 mm THK

RAIN WATER GUTTER GLASS LOUVERED VENTILATOR

MEN'S CHANGING ROOM MEN'S CHANGING ROOM

RAIN WATER GUTTER (REFER DETAIL) RCC LINTEL

THERAPY ROOM

THERAPY ROOM

RCC SILL

+4650MM

450MM DEEP RCC BEAM

SECOND FLOOR LVL

+4650MM

GLASS DEEP LOUVERED VENTILATOR 450MM RCC BEAM

WARD

WARD

WAITING ROOM

WAITING ROOM

CEMENT FIBRE PANEL 50 MM THK GLASS LOUVERED VENTILATOR

CEMENT FIBRE PANEL 50 MM THK 450MM DEEP RCC BEAM

GLASS 450MMLOUVERED DEEP RCCVENTILATOR BEAM

RCC SILL

SECOND FLOOR LVL

+0.0MM +800MM GL PLINTH LEVEL

11

6

+9800MM ROOF TOP LEVEL

+800MM PLINTH LEVEL

SHEET NO.

GLASS LOUVERED VENTILATOR

GLASS LOUVERED VENTILATOR

LABOUR ROOM

FLOOR FINISH THK PCC BED 150MM DRY RUBBLE SOLING 200MM THK

LABOUR ROOM

RCC PLINTH BEAM FLOOR FINISH 400MM*450MM THK PCC BED 150MM DRY RUBBLE SOLING 200MM THK

BRICK WALL 230MM THK FLOOR FINISH PCC BED 150MM THK BRICK WALL 230MM DRY THK RUBBLE SOLING FLOOR FINISH RCC BEAM THK PCCPLINTH BED 150MM 300MM*600MM DRY RUBBLE SOLING

RCC PLINTH BEAM 300MM*600MM FOOTING

RCC PLINTH BEAM 400MM*450MM

+0.0MM GL

150MM PCC BED

FOOTING RUBBER SOLING 150MM PCC BED COMPACT SOIL RUBBER SOLING COMPACT SOIL

NOTES 1. ALL DIMENSIONS ARE IN MILLIMETERS.

S C A L E- : - 1 : 5 0

KAMLA RAHEJA VIDYANIDHI

14


+4.43M +4.43M

+4.43M

+3.7M

+3.7M

+3.7M 1:60 SLOPE

IC1 1:60 SLOPE

+2.86M

GULLY TRAP

INSPECTION CHAMBER

1:60 SLOPE

IC1

+2.86M

RCC COLUMN

INSPECTION CHAMBER

DOM

FIXED METAL FRAME GLASS LOUVRED WINDOW

GULLY TRAP

GULLY TRAP

NAHNI TRAP URINAL DOMESTIC DOWNTAKE FIXED METAL FRAME GLASS LOUVREDWATER WINDOW CLOSET

RCC COLUMN DOMESTIC DOWNTAKE BRICKW FIXED METAL FRAME GLASS LOUVRED WIND

1:100 SLOPE

+0.12M

-

40MM TILE DROP

R2 P1 F5

-

+760MM 40MM TILE DROP

PLAN SECTION

PLAN

1500

400

450

400

SOIL WATER

650

IC 25MM THK CERAMIC TILE 25MM SCREED RCC SLAB 150MM THK BBC

+0.76M +0.57M +0.12M

+2.26M

+2.26M

FIXED GLASS LOUVRE WINDOW SILL FLUSHING DOWNTAKE DOMESTIC DOWNTAKE

DOMESTIC DOWNTAKE 25MM THK CERAMIC TILE 25MM SCREED RCC SLAB NAHNI TRAP 150MM THK BBC 25MM THK CERAMIC TILE 25MM SCREED RCC SLAB 150MM THK BBC

PARTITION LINTEL

W5

+0.76M +0.57M

W5

+0.76M +0.57M

+0.12M

+0.12M

IC

W5

FALSE CEILING

FIX

+3.7M

PA

FIXED GLASS LOUVRE WINDOW PARTITION

FLUSHING DOWNTAKE

FLU DO

+3.16M

DO DO

1500

+3.16M

PARTITION +2.26M FLUSHING DOWNTAKE

+3.16M

FA

W5

+2.26M

DOMESTIC DOWNTAKE

NAH

450

900

2350

+3.16M

+2.26M

2350

2350

E WINDOW

W5

W5

2350

FIXED GLASS LOUVRE WINDOW

+3.16M

FIXED GLASS LOUVRE WINDOW

RCC BEAM

+4.43M

FALSE CEILING

FALSE CEILING

W5

+3.7M

900

W5

LINTEL

+3.16M

SILL FLUSHING DOWNTAKE W5 +2.26M DOMESTIC DOWNTAKE

+3.7M

+3.7M

PARTITION

+4.43M

450

+3.7M

2350

+4.43M

FALSE CEILING

650

RCC BEAM

+4.43M

+3.7M

SECTION +4.43M

+4.43M

400

SECTION

2350

LE DROP

RESTROOM 4.4 X 3.0

PLAN

Start

+760MM

40MM TILE DROP

Start

+760MM

25MM T 25MM RCC S 150MM

PARTITION 25MM THK CERAMIC TILE 25MM SCREED 500 500 VITRIFIED TILES RCC XSLAB 150MM THK BBC HANGER

1:100 SLOPE

40MM TILE DROP

Start

-

+0.12M

R2 P1 F5

RESTROOM 4.4 X 3.0 R2 P1 F5

650

RESTROOM HANGER 4.4 X 3.0

40MM TILE DROP

+0.76M +0.57M

HANGER25MM THK CERAMIC TILE 25MM SCREED RCC SLAB 150MM THK BBC

500 X 500 VITRIFIED TILES

NAHNI TRAP URINAL BRICKWALL WATER CLOSET

1500

+0.12M

40MM TILE DROP

PARTITION 40MM TILE DROP

40MM TILE DROP

1:100 SLOPE

+0.76M +0.57M

650

+0.76M +0.57M

1:100 SLOPE

PARTITION 500 X 500 VITRIFIED TILES BRICKWALL

650

NAHNI TRAP URINAL 1:100 WATER CLOSETSLOPE

1:100 SLOPE

650

RCC COLUMN

900

IC1+2.86M

INSPECTION CHAMBER

25M 25M RCC 150

NAHNI TRAP 25MM THK CERAMIC TILE 25MMSCREED THK CERAMIC TILE 25MM 25MM SCREED RCC SLAB RCC SLAB 150MM THK BBC 150MM THK BBC

SOIL WATER

LEGEN

LEGEND

DOMESTIC FLUSHING

SECTION

SECTION SECTION

NOTES 1. ALL DIMENSIONS ARE IN MILLIMETERS. 2. DO NOT SCALE THE DRAWINGS. 3. THIS DRAWING IS THE PROPERTY OF THE ARCHITECT AND SHOULD NOT BE COPIED WITHOUT THEIR PERMISSION. THIS DRAWING IS THE COPYRIGHT PROPERTY OF THE ARCHITECT. 4. FOLLOW THE WRITTEN DIMENSIONS ONLY. 5. ALL STRUCTURAL DIMENSIONS ARE TO BE REFERRED. 6. ALL THE SERVICES TO BE REFERRED FROM SERVICE CONSULTANT DRAWINGS. 7. FOR ALL OTHER DETAILS, REFER TO THE RELEVANT DRAWINGS. PLEASE REFER TO RESPECTIVE TO THE RESPECTIVE SCHEDULES / TABLES, NOTES AND REMARKS. 8. ALL EXISTING GROUND LEVELS TO BE VERIFIED BY CONTRACTOR BEFORE COMMENCEMENT OF WORK. 9. IN CASE OF DISCREPANCY, IT SHOULD BE IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT / CONSULTANT.

15

WASTE SOIL

SECTION

SECTION SECTION NOTES 1. ALL DIMENSIONS ARE IN MILLIMETERS.

2. DO NOT SCALE THE DRAWINGS. GULLY TRAP 3.

S C A L E - 1 : 3 0 SHEET:- TOILET DETAIL PROJECT:- HEALTHCARE CENTRE MUMBAI, MAHARASHTRA- 400705

THIS DRAWING IS THE PROPERTY OF THE ARCHITECT AND SHOULD NOT BE COPIED WITHOUT THEIR PERMISSION. THIS DRAWING IS THE COPYRIGHT PROPERTY OF THE ARCHITECT. NOTES 4. FOLLOW THE WRITTEN DIMENSIONS ONLY. 1. ALL DIMENSIONS ARE IN MILLIMETERS. 5. ALL STRUCTURAL DIMENSIONS ARE TO BE REFERRED. KAMLA RAHEJA VIDYANIDHI 2. DO NOT SCALE THE DRAWINGS. 6. ALL THE SERVICES TO BE REFERRED FROM SERVICE CONSULTANT DRAWINGS. 3. THIS DRAWING THE PROPERTY OF THE ARCHITECT AND NOT BEDETAILS, COPIEDREFER WITHOUT THEIR 7. SHOULD FOR ALL OTHER TO THE RELEVANT DRAWINGS. PLEASE REFER TO RESPECTIVE TO THE INSTITUTE OF ARCHITECTURE AND ISEXAMINERS PERMISSION. THIS DRAWING IS THE COPYRIGHT PROPERTYRESPECTIVE OF THE ARCHITECT. SCHEDULES / TABLES, NOTES AND REMARKS. SHEET NO. GROUND LEVELS TO BE VERIFIED BY CONTRACTOR BEFORE COMMENCEMENT OF WORK. SIGNATURE ENVIRONMENTAL STUDIES 4. FOLLOW THE WRITTEN DIMENSIONS ONLY. 8. ALL EXISTING 5. ALL STRUCTURAL DIMENSIONS ARE TO BE REFERRED. 9. IN CASE OF DISCREPANCY, IT SHOULD BE IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT / 6. ALL THE SERVICES TO BE REFERRED FROM SERVICE CONSULTANT DRAWINGS. CONSULTANT. MOHIT WAGHMARE 7. FOR ALL OTHER DETAILS, REFER TO THE RELEVANT DRAWINGS. PLEASE REFER TO RESPECTIVE TO THE PROJECT:- HEALTHCARE CENTRE RESPECTIVE SCHEDULES / TABLES, NOTES AND REMARKS. ROLL NO. 1988 8. ALL EXISTING GROUND LEVELS TO BE VERIFIED BY CONTRACTOR BEFORE COMMENCEMENT OF WORK. 9. IN CASE OF DISCREPANCY, IT SHOULD BE IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT / MUMBAI, MAHARASHTRA- 400705 CONSULTANT.

S C A L E - 1 : 3 0

DATE:-12.10.22

09

SHEET:- TOILET DETAIL

S C A L E - 1 : 3 0 SHEET:- TOILET DETAIL

K INST E

KAMLA RAHEJA VIDYANIDHI MOH INSTITUTE OF ARCHITECTURE AND EXAM PROJECT:- HEALTHCARE CENTRE SIGN ENVIRONMENTAL STUDIES ROL MUMBAI, MAHARASHTRA- 400705 MOHIT WAGHMARE ROLL NO. 1988 DATE:-12.10.22

DAT


Cable tumbuckle

Threaded wsahe

Timber open rise

25

Bolt and wash Stainless stell U plate securing the U welded to tread

24 23

F

22

21 F

20 19

1000

150MM THK PCC BED

18

200MM THK DRY RUBBLE SOLING

SCALE:-1:8

17

300MM*600MM RCC PLINTH BEAM

16 10

15 Cable tumbuckle suspension cable in chrome

51

14

Threaded wsaher bolt supported at cable end

13 10mm Chrome cable

Timber open rise tread

13

12

Abrasive layer

Steel pin bolted to tread and wall

Wear Layer

1000

Bolt and washer Stainless stell U plate securing the U plate welded to tread

51

Cable Fastener

11

250

F

10 Oak wood plank Seal

9Cable Fastener cap

F

8 150MM THK PCC BED

10

Cable anchor that attaches to the steel handrail bolted to the wall

10

5

Suspension bolt NOTES Cable Fastener 1. ALL DIMENSIONS ARE IN MILLIMETERS. 2. DO Abrasive NOT SCALE layer THE DRAWINGS. Bolt securing 3. THISWear DRAWING IS THE PROPERTY OF THE ARCHITECT AND SHOULD NOT BE COPIED WITHOUT THEIR and Layer attached to tension PERMISSION. THIS DRAWING IS THE COPYRIGHT PROPERTY OF THE ARCHITECT. cable 4. FOLLOW THE WRITTEN DIMENSIONS ONLY. 5. ALL STRUCTURAL DIMENSIONS ARE TO BE REFERRED. 6. ALL THE SERVICES TO BE REFERRED FROM SERVICE CONSULTANT DRAWINGS. 7. FOR ALL OTHER DETAILS, REFER TO THE RELEVANT DRAWINGS. PLEASE REFER TO RESPECTIVE TO THE RESPECTIVE SCHEDULES / TABLES, NOTES AND REMARKS. 8. ALL EXISTING GROUND LEVELS TO BE VERIFIED BY CONTRACTOR BEFORE COMMENCEMENT OF WORK. Oak wood plank 9. IN CASE OF DISCREPANCY, IT SHOULD BE IMMEDIATELY BROUGHT TO THE NOTICE OF THE ARCHITECT / Seal CONSULTANT. 10

3

SCALE:-1:100

10

4

SCALE:-1:2

13

Steel pin bolted to tread and wall

Cable turnbuckle / hinge

51

Bolt and washer Stainless stell U plate securing the U plate welded to tread

10mm Chrome cable

40

6

51

SCALE:-1:40

4

7

SCALE:-1:8

250

Cable tumbuckle suspension cableDRY in chrome 200MM THK RUBBLE SOLING Threaded wsaher bolt supported at cable end 300MM*600MM RCC PLINTH BEAM Timber open rise tread

KAMLA RAHEJA VIDYANID INSTITUTE OF ARCHITECTUR ENVIRONMENTAL STUDIE

2

SHEET:- STAIRCASE 1 DETAIL

MOHIT WAGHMARE

PROJECT:- HEALTHCARE CENTRE

ROLL NO. 1988

MUMBAI, MAHARASHTRA- 400063 1500

DATE:-08.04.22

Cable Fastener cap

10

Chrome washer Chrome bolt

40

4

Chrome tension cable

Chrome cable end

SCALE:-1:8 SCALE:-1:40

SCALE:-1:2

10

NOTES 1. ALL DIMENSIONS ARE IN MILLIMETERS. 2. DO NOT SCALE THE DRAWINGS. 3. THIS DRAWING IS THE PROPERTY OF THE ARCHITECT AND SHOULD NOT BE COPIED WITHOUT THEIR PERMISSION. THIS DRAWING IS THE COPYRIGHT PROPERTY OF THE ARCHITECT.

Cable anchor that attaches to the steel

SCALE:-1:100

KAMLA RAHEJA VIDYANIDHI INSTITUTE OF ARCHITECTURE AND ENVIRONMENTAL STUDIES

EXAMINERS SIGNATURE

SCALE:-1:20

16

SCALE:-1:2

SHEET NO.


4.0

6.6

3.9

5.8

Clinic

4.1

3x3

3.10

Ward 5.4x5

Woven bamboo jaali

Disabled

5.1476

Toilet

Disabled

2x1.5

Woven bamboo jaali

2x1.5

2.5

2.5x2

Admin 5x3 Woven bamboo jaali

5.6155

3.9

Pharmacy

Men

3x3 5.8

3.10

Disabled

Reception

2.6013

Sanitary machine

Disabled

2x1.5

Urinals

2x1.5

2.9

Resting space

Woven bamboo jaali

2.5

Woven bamboo jaali

PVC membrane

3.9

Semi Transparent glass panels

Up

Up

Up

Sanitary machine

2.9 Urinals

Resting space

Up

Up

Up

N

ROOF PLAN

PLAN

Up

N

N C11

C10

C12

Clinic

Clinic

3x3

3x3

3.10

Ward 5.4x5

Toilet

C8

C7

Woven bamboo jaali

Disabled 2x1.5

Woven bamboo jaali

Ward

C9

5.4x5

Disabled 2x1.5

2.5

2.5x2

Admin 5x3 Woven bamboo jaali

A-A'

Toilet 2.5x2

3.9

Pharmacy

Men

3x3

C4

Reception Sanitary machine

Urinals

Up

Up

2.9

Resting space

Up

N

B-B'

Admin 5x3

C6

C5

Pharmacy 3x3 C4

C3

N

Reception C1

C2

4.8

0.5145

17


Stanchion Stanchion Bamboo jaali for ventialtion Bamboo jaali for ventialtion

750mm door

PRODUCED BY AN AUTODESK STUDENT VERSIO

350mm Primary beam

PRODUCED BY AN AUTODESK STUDENT VERSION

Aluminium roofPrimary with PVC membrane 350mm beam

PRODUCED BY AN AUTO

Aluminium roof with PVC membrane

Reception

Ledge 2.6013

Architectural Representation drawings

Foundation details Up

7.4 STEEL TRUSS

7.4

ALUMINIUM PROFILE

Bamboo 6mm dia Bamboo 6mm dia

SPACER

Woven bamboo Jaali wall

1.0

3.5203

1.5

Semester 4

Urinals

Admin 5x3

Woven bamboo jaali

Up

Pharmacy 3x3

Full tim

ReceptionDaily

Total

GUSSET PLATE

15MM BOLT

SPACER

Floati water Total

2.6m

230mm Stanchion

17.8

Holding down bolts 6mm dia

GUSSET PLATE

50mm Grouting

Daily

Steel packing

POLYCHROME INSULATING GLASS

PLAN

Woven bamboo Jaali wall

Location tube

Anchor plate BRICK WALL

150mm RCC plinth

0.62

150mm RCC plinth

350mm

0.62

Rubble soling

Flush pipe 25mm

Rcc foundation

2.4120

Domestic pipe 25mm

Rubble soling Plinth beam

150mm

300mm RCC footing Rammed earth

UGT v Soil pipe 100mm PRODUCED BY AN AUTODE lxbxh= Naani trap Heigh Bamboo wall joinery Drainto pipe lxbx1. lxb=1.

Foundation details

Truss and glass joinery

Plinth beam 300mm RCC footing

0.8197

Rammed earth

Aluminium roof with PVC membrane

3.2446

350mm Primary beam

Water outlet/ Cutout

Stanchion

C

GUSSET PLATE

A

STEEL TRUSS 15MM BOLT

25mm Domestic ALUMINIUM PROFILE 230mm Stanchion

SPACER SPACER

Half brick thick wall

Jet spray

Holding down bolts 6mm dia

TUDENT VERSION

25mm flush

GUSSET PLATE

POLYCHROME INSULATING GLASS

100 mm soil pipe

50mm Grouting

Aluminium roof with PVC membrane

Steel packing

Aluminium roof with PVC membrane C plate for support

Anchor plate

BRICK WALL

Tiles 160x150mm Slope 1:100

Rcc foundation

350mm Primary beam

50mm drain pipe

Truss

Bolts Angle plates Nani Trap

Truss

Half brick thick wall 200mm Stanchion

360mm Primary Bamboo jaali for beam ventialtion Stanchion Bamboo jaali for ventialtion Stanchion 150mm Brick wall STEEL TRUSS ALUMINIUM PROFILE

SPACER

POLYCHROME INSULATING GLASS

Flush pipe Flush pipe

Truss and glass joinery

Soil pipe Naani trap Soil pipe Naani trap Gully trap Inspection Gully trap chamber Rubble soling Inspection chamber Rubble soling Plinth beam

PRODUCED BY AN AUTODESK STUDENT VERSION

Foundation details

360mm Primary beam

150mm Brick wall

7.6

Location tube

C plate for support

750mm door Tertiary Ledge beam

Truss and glass joinery 150mm RCC plinth

0.25

Bamboo to wall joinery

210mm Rubble soling

Plinth beam 300mm RCC footing

Rammed earth

1.0

3.5203

1.5

230mm Stanchion Holding down bolts 6mm dia

GUSSET PLATE

Aluminium roof with PVC membrane

15MM BOLT

Steel packing

Bolts

350mm Primary beam

SPACER

50mm Grouting

350mm Primary beam

Location tube

Angle plates

Anchor plate

Stanchion

200mm Stanchion

Bamboo jaali for ventialtion

GUSSET PLATE

Rcc foundation

Tertiary beam

BRICK WALL

7.4

Foundation details

Full time worke Daily water req Total water req

Bamboo 6mm dia

PVC membrane Bamboo to wall joinery Insulation

300mm

Woven bamboo Jaali wall

Isolation layer

3.4208

150mm RCC plinth

0.62

300mm

Rubble soling PVC membrane Insulation

Bolts

3.4208

Plinth beam

Isolation layer

Aluminium roof

Bolts

2.6m 17.8

Rammed earth

Aluminium roof

1

ALUMINIUM PROFILE

SPACER

GUSS

350mm Primary beam Bolts Angle plates

300mm RCC footing

Rammed earth

Tertiary beam

Daily Water re

B

200mm Stanchion

Rammed earth

Floating popul water required Total water req

GUS

STEEL TRUSS

300mm RCC footing

POLYCHROME INSULATING GLASS

Plinth beam 300mm RCC footing

Amou Amou

350mm Primary beam

350mm

2.4120

350mm Primary beam Aluminium roof with PVC membrane

Flush pipe 25mm

C plate for support

Truss

360mm Primary beam Bamboo jaali for ventialtion Stanchion

Domestic pipe 25mm

Roof detail Truss and glass joinery

Roof detail Soil pipe 100mm

Amount stored Amount stored

18volume UGT


19


Landscape design

20


21


Material Exploration

22


23


Sketches and Hand Drafted drawings

24


Sketches

25


Illustrations

26


27


Photography

28


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.