Paving the path to a
lasting
CONSTRUCTION
About Us Well made DECISIONS start with
MAKEWELL CONSTRUCTIONS
MAKEWELL
COSTRUCTION Serving the Building Indutry since 20 Years under the leadership of Mr. Rohin B. Shah (PARTNER) B.E (Civil)
MAKEWELL
a Professionally managed Construc on Company commi ed to complete Builders Sa sfac on and enhancing the Building Construc on to a next level
LIST OF TECHNICAL MANPOWER EMPLOYED Name of person
Qualifica on
Mr Bharat Patel Mr Mallikarjun
B.E.Civil D.C.E.
Mr Haresh Chotalia Mr Chirag Thakkar Mr Kamla P. Pandey Mr Sanjay Chaugule Mr Vijay Jadhav
B.E.Civil D.C.E. D.C.E. D.C.E. D.C.E.
Designa on
Porject Manager Porject Manager Sr. Engineer Sr. Engineer Sr. Engineer Sr. Engineer Sr. Engineer
YEARS OF EXPERIENCE
14 Years 13 Years 6 Years 5 Years 4 Years 5 Years 10 Years
MAKEWELL
COSTRUCTION Innova ve with a full fledged Enterprenviral and Empowered team Constantly crea ng Valuable Ideas to a ain Global Benchmark here in India and Abroad
MAKEWELL has always and will in future maintain trust for delivering Quality Construc on
3 Makewell construc ons
Ivy | Iris
Arum | Almenda
PROJECTS COMPLETED
Jonquille | Jamica
Arum | Almendu Nahar Interna onal School Building
Arum | Almendu
Lillium | Lantana
Name of Owner or Organization
Value of work Executed
Date of completion
Name & address of officer to whom reference may be made
Construc on of Two Building (Lilium & Lantana) of S lt + Podium+ 22 Storey at Nahar Amrit Shak , Chandivali, Mumbai - 72, for Nahar Enterprises.
M/s Nahar Enterprises Bhulabhai Desai Road Mumbai.
30 Crores
15.10.2008
Mr P. T. Jain, Nahar Enterprises, B-1, Mahalaxmi Chambers, 22 Bhulabhai Desai Road, Mumbai - 400026.
Construc on of Factory Building of PMT Machines Limited at Pimpri, Pune
M/s PMT Machines Tools Ltd. Pipmpri, Chincwad, Pune.
3 Crores
30.04.2008
Mr. Mahendra Modi ( Architect ) Sayaji gunj, Baroda.
Construc on of Eight Building ( Tilia & Tulipia, Iry, Iris, Arum, Almenta, Mimosa, Mirabillis ) of S lt + Podium+ 22 Storey at Nahar Amrit Shak , Chandivali, Mumbai - 72, for Nahar Enterprises.
M/s Nahar Enterprises Bhulabhai Desai Road Mumbai.
64 Crores
05.03.2010
Mr P. T. Jain, Nahar Enterprises, B-1, Mahalaxmi Chambers, 22 Bhulabhai Desai Road, Mumbai - 400026.
Construc on of O2 Corporate Business Plaza, Project on 23-24, Minerva Estate, Opp Ralliwolf, Mulund (West), Mumbai - 400080
M/s Happy Homes Project Pvt. Ltd. D e o d h a r Ro a d , Mumbai - 400 019.
19.41 Crores
05.03.2011
Mr Umangbhai, Ganga Heritage, Level II, 278, Deodhar Road,Matunga CR, Mumbai - 400019
Construc on of Podium for Nahar Amrit Shak , Chandivali, Mumbai - 72, for Nahar Enterprises.
M/s Nahar Enterprises Bhulabhai Desai Road Mumbai.
12 Crores
30.10.2011
Mr P. T. Jain, Nahar Enterprises B-1, Mahalaxmi Chambers, 22 Bhulabhai Desai Road, Mumbai - 400026.
Reliance Infrasture Ltd.
Construc on of 220/33 kv Gas Insulatedy system at S. V. Road, Goregaon (West), Mumbai.
12.86 Crores
15.08.2012
Mr D.P.Singh, Reliance Infrastructure Ltd, 220 kv Aarey Receiving , Dinkar Desai Road, Aarey Colony, Goregaon (East), Mumbai - 400065.
Construc on of Four Building ( Jonquille, Jamaica, Lilac & Laurel ) of S lt + Podium+ 22 Storey at Nahar Amrit Shak , Chandivali, Mumbai - 72, for Nahar Enterprises.
M/s Nahar Enterprises Bhulabhai Desai Road Mumbai.
57.00 Crores
30.10.2013
Mr P. T. Jain, Nahar Enterprises, B-1, Mahalaxmi Chambers, 22 Bhulabhai Desai Road, Mumbai - 400026.
Contruc on of Podium Phase II for Nahar Amrit Shak , Chandivali Site, Mumbai 400072 for Nahar Enterprises
M/s Nahar Enterprises Bhulabhai Desai Road Mumbai.
16.00 Crores
12.04.2014
Mr P. T. Jain, Nahar Enterprises, B-1, Mahalaxmi Chambers, 22 Bhulabhai Desai Road, Mumbai - 400026.
Name of Work
(without Cement & Steel )
5 Makewell construc ons
EQUIPMENT LIST DETAILS OF SHUTERING MATERIAL Particular of Equipments
No.of Unit
Kind Make
Capacity
Steel Span Trusses
600
SJB
-
Steel Props
2000
SJB
-
H-Frame & Accessories
1500
SJB
-
Wooden Props Plywood and Wooden Chavi & Centring Materials
Lots
-
6 Makewell construc ons
Particular of Equipments
No.of Unit
Kind Make
Mixer Machines
1
Universal
3 Bag
Mixer Machines
8
Build Well
1 Bag
Builders Hoist
4
Build Well
1 Bag
Petrol Vibrator with Needles
12
Enfield
-
5 HP Dewatering Pump
4
Kirloskar
5HP
2 HP Dewatering Pump
6
Enfield
2HP
1HP Monoplock Pump
6
PEW
1HP
Suc on Pump 1HP
4
Enfield
1HP
Thedolite
2
Lawrence & mayo
-
Dumpy Level
2
Lawrence & mayo
-
Cube Tes ng Machine
3
Concord
-
Silt Jar
6
Slump Cone
3
Sand & Aggregates Seives
Capacity
Concord
-
2set 36
Concord
-
Steel Tapes
4
Freemens
30Mtr.
Vernier Caliper
2
Micrometer screw
2
Wire gauge
2
Magnifying glass
2
Concrete Cube moulds
Screw driver sharp
2 Set
Meggar
1
A right angle (steel)
4
Concrete Pump
Tapria
1
Putmister Pvt. Ltd.
100 mtr.
Concrete Pump
1
Swing
50 mtr.
Weigh Batching Machine
2
*All the above equipment are in impeccable condi on and fully owned by us.
2 Bags
Designing the face of a future-ready metropolis.
Project details
Trident Building commercial/ office Bldg.
Parshva Jyote Residential Bldg.
Ohm Business plaza Commercial
Sarvam Building Commercial cum Residential Building
Area
Race Course Road, Baroda
Panvel
Opposite Circuit House, Halar Road.
Atul Sta on,NH-8
53000.00 Sq. Residen al.
36000 Sq. commercial with Escalator and Li
3290 Sq. Commercial and 40300 Sq. Residen al
Panvel
Valsad
Atul Sta on
How much Sq.
Loca on
2.5 lakh Sq.
Vadodara
Paving the path to
a lasting CONSTRUCTION
UPCOMING PROJECT LIST
Trident Building
Atul Project
Ohm Business Plaza ( Valsad)
Parshwa Jyot Building
92 Bellevue, Borivali
9 Makewell construc ons