Continuing Education César E. Chávez Campus 1901 MAIN STREET | SAN DIEGO, CA 92113 | 619.388.2604 | WWW.SDCE.EDU
PROJECT DESCRIPTION
SUSTAINABLE FEATURES
The new César E. Chávez Campus will be a 67,924 square foot facility with 22 classrooms for vocational training, English as a Second Language, Adult Basic Education, General Education Diploma preparation, Business Information Technology, Parent Education and Emeritus (age 55+) programs. It will become the Campus of Excellence for Allied Health Career Training.
•
The facility will include a multi-purpose room, administrative offices and a Small Business Incubator. Underground parking will provide 149 parking spaces, including preferred parking for carpools and high fuel efficiency vehicles. An adjacent parking structure will provide 320 spaces.
•
•
•
• The building design is on track to obtain a Leadership in Energy and Environmental Design (LEED) Silver certification from the United States Green Building Council (USGBC).
The energy efficient design will exceed California’s building efficiency standards by at least 14%. Low-flow and waterless plumbing fixtures will reduce water consumption by over 40% as compared to a typical building. A modular wetland structure will capture and filter storm water. These structures look like slightly raised planters located near storm drains. Runoff is filtered by vegetation, improving quality before it enters the storm drain system. The site has easy access to public transportation. Bicycle storage and changing rooms will be provided. Drought tolerant landscaping and high efficiency irrigation will reduce landscape-related water use by 50%.
SAN DIEGO COMMUNITY COLLEGE DISTRICT 3375 CAMINO DEL RIO SOUTH | SAN DIEGO, CA 92108 | PHONE: 619.338.6546 | FAX: 619.338.6509 WEBSITES: PUBLIC.SDCCDPROPS-N.COM & PUBLIC.SDCCDPROPS-N.COM/PROJECTS/CE/PAGES/CESARCHAVEZ.ASPX
PROJECT NAME .................................................
CÉSAR E. CHÁVEZ CAMPUS
FUNDING SOURCE ...........................................
PROPOSITION S
ARCHITECT .......................................................
TINEZ + CUTRI
CONSTRUCTION MANAGER .............................
RUDOLPH & SLETTEN
STRUCTURAL ENGINEER ...................................
FLORES LUND CONSULTANTS, INC.
ELECTRICAL ENGINEER .....................................
LSW ENGINEERS, INC.
MECHANICAL ENGINEER ...................................
MERRICK & ASSOCIATES
LANDSCAPE ARCHITECT ...................................
PARTERRE LANDSCAPE ARCHITECTURE
CAMPUS PROJECT MANAGER ...........................
SCOTT ELLIS, URS CORP.
FF&E PROJECT MANAGER...................................
ELOISA RAYMUNDO, GAFCON, INC.
PROPOSITIONS S & N PROGRAM MANAGER ....
GAFCON, INC.
CONSTRUCTION TIMEFRAME ...........................
2013 - 2015
PROJECT BUDGET .............................................
$48.5 MILLION