San Diego Community College District
PROPOSITIONS S & N PROJECT FACT SHEET Mesa College Parking Structure Campus
San Diego Mesa College
Address
7250 Mesa College Drive San Diego, CA 92111‐4998 619.388.2604 www.sdmesa.edu
Architect
Delawie Wilkes Rodrigues Barker
Construction Manager
McCarthy Construction Rendering
http://www.sdccdprops‐n.com/Mesa‐College/Projects/1221.aspx
Project Description j p The new 1,100‐space, four‐level parking structure is part of an overall $34 million East Campus Improvement Project that includes a complete road realignment and new east campus entry, along with a 7,000 square‐foot police substation. Photovoltaic panels will be installed on the top level to harvest solar energy, offsetting the energy needs for the new police station as well as the new Allied Health Building, a $24.9 million project located just west of the parking structure.
Sustainable Features Sustainable Features The concrete used in the new parking structure includes the addition of fly ash ‐ a commonly‐used coal combustion product – as a strengthening agent. When the fly ash is added to concrete, When the fly ash is added to concrete the amount of concrete needed can also be reduced. As an ‘open’ parking structure, there is no need for mechanical ventilation systems. The landscape plan uses a variety of Th l d l i t f drought‐tolerant plants and trees that are compatible to the neighborhood. The landscape plan utilizes a highly efficient irrigation system with a special controller that automatically measures available moisture in the air, and waters plants accordingly, saving the potential of tens of thousands of gallons of water annually. San Diego Community College District • 3375 Camino Del Rio South • San Diego, CA 92108 Phone: 619.338.6546 • Fax: 619.338.6509 • www.sdccdprops‐n.com
Fast Facts Project Name
Mesa College Parking Structure
Funding Source
Proposition S
Architect
Delawie Wilkes Rodrigues Barker
Contractor
Barnhart Heery
Civil Engineer Civil Engineer
RBF Consulting, Latitude 33 RBF Consulting, Latitude 33
Electrical Engineer/Mechanical Engineer
TKG Consulting Engineers
Landscape Architect
Wimmer Yamada and Caughey
Program Manager for Propositions S & N
Gafcon, Inc.
Campus Project Manager
Daniel Sicile‐Kira, Gafcon, Inc.
Construction Start Date
June 2007
Project Budget
$34.4 M (entire East Campus Improvement Project)
Completion Date
March 2009 San Diego Community College District • 3375 Camino Del Rio South • San Diego, CA 92108 Phone: 619.338.6546 • Fax: 619.338.6509 • www.sdccdprops‐n.com