San Diego Community College District
PROPOSITIONS S & N PROJECT FACT SHEET Hourglass Park Field House Campus
San Diego Miramar College
Address
10440 Black Mountain Road San Diego, CA 92126 619.388.7800 www.sdmiramar.edu
Architect
Carrier Johnson + CULTURE
Construction Manager
Swinerton Inc.
http://www.sdccdprops‐n.com/Miramar‐College/Projects/1321.aspx
Project Description j p The Hourglass Park Field House is a joint use project with the City of San Diego. This state‐of‐the‐art, fully‐equipped facility provides a gymnasium, fitness center, classrooms, dance rooms, lecture rooms, office space, laundry areas, multi‐purpose areas and a concession stand. It is the third phase of a 32‐acre complex that includes a three‐pool aquatics center and multi‐sport ball fields. The facilities serve college students through athletics and instructional program offerings and area residents through Park & Recreation activities. The project is designed to obtain a LEED (Leadership in Energy and Environmental Design) certification from the US Green Building Council (USGBC).
Sustainability Features High energy performance of the building envelope and HVAC elements by adding additional insulation at roofs and walls, adding lighting occupancy sensors, and air handlers for the HVAC units that utilize cool morning and evening outside air. tili l i d i t id i High‐efficiency irrigation system uses reclaimed water to support drought‐tolerant landscaping. Combined with waterless and low‐flow plumbing fixtures, the Field House saves hundreds of thousands of gallons of water compared to a typically‐built project. EExtensive (20%) use of recycled materials, including high level of t i (20%) f l d t i l i l di hi h l l f post‐consumer materials in steel elements and recycled tires in rubber gymnasium flooring. Over 50% of wood on the project is certified by the Forestry Steward Council as responsibly harvested. N h t b bi Non‐heat absorbing roofing materials help mitigate “heat islands.” fi t i l h l iti t “h t i l d ” Indoor air quality maximized by the use of materials with low chemical content, and increased outside air ventilation. San Diego Community College District • 3375 Camino Del Rio South • San Diego, CA 92108 Phone: 619.338.6546 • Fax: 619.338.6509 • www.sdccdprops‐n.com
By the Numbers Structural Concrete: 4,000 cubic yards Structural Steel: 500 tons Reinforcing Steel: 200 tons Drywall: 40,000 square feet CMU Bl k 35 000 CMU Block: 35,000 square feet f t 1,980 sheets of plywood 31,000 pieces of maple wood flooring 31,500 black rubber pads for gym floor
Fast Facts Project Name
Hourglass Park Field House
Funding Source Funding Source
Proposition S Proposition S
Architect
Carrier Johnson + CULTURE
Construction Manager
Swinerton Inc.
Contractor
CW Driver
Civil Engineer
Burkett & Wong
Electrical Engineer
Michael Wall Associates
Mechanical Engineer
James Mann Associates
Landscape Architect
Howard Associates
Propositions S & N Program Manager
Gafcon, Inc.
Campus Project Manager
Jim Bray, Gafcon, Inc.
Construction Start Date
12/14/06
Project Budget
$27 million
Completion Date
3/13/09 San Diego Community College District • 3375 Camino Del Rio South • San Diego, CA 92108 Phone: 619.338.6546 • Fax: 619.338.6509 • www.sdccdprops‐n.com