Beach & Bay Press, March 19th, 2021

Page 1

HELEN SPEAR 619.813.8503

20+ Years Experience 92109 & 92037 Coastal Acquisitions & Sales

PB

FOREIGN ch’s c Bea PacifiONLY ar C n Foreig ialists Spec

pbforeign.com

92109REALTY.com

858-270-1142

DRE# 01244302

Luxury | Coastal | Residential | Investments

$10 OFF

CAR REPAIR

1727 Garnet Avenue - P.B. Across from Vons in Plaza Center

ANY SERVICE $150 OR MORE

includes

Maximum discount is $40

30 POINT INSPECTION t Change up to 4 qts. t Install new oil filter t Lubricated chassis t Top off vital Not valid with any other fluids t Complete safety inspection offers or specials. t Most vehicles +$3 EPA charge Expires

FRIDAY, MARCH 19, 2021

SAN DIEGO COMMUNITY NEWSPAPER GROUP

10% OFF

ANY OIL CHANGE

Not valid with any other offers or specials. Expires

BEACHANDBAYPRESS.COM

1851 Garnet Ave 6am - 3pm Daily

Renaming PB park

Moving into Red Tier

SEE PAGE 7

SEE PAGE 4

STAGING AREA FOR CITY PROJECT DISRUPTS CROWN POINT

The City is using a section of Crown Point Park as a staging area for a major sewer and water main replacement project for the next three-plus years.

PHOTO BY THOMAS MELVILLE

Residents fed up with sewer construction site at popular park By DAVE SCHWAB

S

The entrance of the Crown Point West Project fenced off staging area in Crown Point Park. PHOTO BY THOMAS MELVILLE

ome neighbors claim the City's use of Crown Point Park as a staging area for a major sewer and water main replacement project for the next three-plus years is seriously eroding their quality of life. The City said the staging area is essential to the ongoing Crown Point West Project, which will replace about 2.45 miles (12,887 linear feet) of existing 8-inch and 12-inch wide water mains with new 8-inch and 12-inch PVC

‘Horrendous pollution in the form of noise, dust, and diesel fumes emanates from this area.’ CROWN POINT RESIDENT DOUG DU CARME

pipeline along Riviera Drive, Buena Vista Street, La Cima Drive, Graham Street, La Palma Street, Parker Place, and Pacific Beach Drive. The Crown Point West Project will also install and relocate approximately 3.92 miles (20,705 linear feet) of new 6-inch to 18-inch wide sewer main pipeline along Riviera Drive, La Cima

Drive, La Mancha Drive, Buena Vista Street, Bayonne Drive, Promontory Street, Moorland Drive, Graham Street, La Palma Street, Parker Place, and Pacific Beach Drive. “The construction zone has taken over a section of Crown Point Park,” said neighbor Doug Du Carme in a recent letter to See PARK, Page 6


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.