Project Proposal Nandin Bayaraa Shashwat Bista Kamal Hakim Wendy Oliva
MOTE Research Aquarium-Complete Network
Conducted Survey
Nandin
Shash
All
Kamal
Wendy
Wendy
Kamal 1
2
3
4
5
6
7
Weeks 1. Research 2 2. Technology 3 3. Budgeting 5 4. Desig App 3 5. Design Decor 1 6. Design Layout 2 7. Assembled Presentation 2
Critical Non-critical Slack
8
9
10
11
12
13
Research
Male
48%
Female
52%
Have you been to the Sarasota-Bradenton Airport? 0%
Yes
No
20%
40%
60%
80%
What can you remember about the second floor that catches your eye? 0%
Piano
Shops
Aquarium Restaurants
18%
35%
53%
70%
Have you seen the Mote Aquarium located on the second floor? 0%
Yes
No
14%
28%
41%
55%
Have you noticed the Mote Marine wall on the first floor? 0%
Yes
No
23%
45%
68%
90%
Have you ever been to the Mote Marine Laboratory? 47%
Yes
No
48%
50%
51%
52%
Objectives • Enhance the look of the airport aquarium exterior • Create a mobile app for iPad/iPhone •To add an educational component to the exhibit and display. • Redesign the wall display on the first floor of the airport
1st Floor Wall
Floor Decal
Aquarium
Risk Response Matrix Risk Event Airport Requirements & Restrictions
App Development (Will not be able to develop app)
Response
Trigger
Generate new ideas that meet airport requirements.
Airport laws do not approve of ideas because it violates airport laws.
Share & Reduce
Find developers in home country or hire interns with excellent reviews.
The group does not find developer to hire.
Kamal Hakim
Transfer
Find other developers or scrap.
Cannot find developer to hire or create application.
Shashwat Bista
Accept & Reduce
Reduce costs of different technology and other costs.
Cost reduction is too drastic and harms product performance.
All
Accept & Reduce
Present ideas and convince donors to fund project.
No project will be implemented.
MOTE
Accept
Find other alternatives or generate new ideas.
TSA does not approve of changes.
Accept
Submarine (Developer cannot make it) Cost & Contacts to Develop Equipment (Costs are too high & unreachable contacts.)
Lower Budget (Budget donors may not fund project.) TSA (Security issues)
Responsible
Plan
Sarasota Airport
All
Budget $1,500
$13,500
Aquarium
First Floor Exhibit
Budget
$1,500
5,000 3,750 2,500 1,250
$13,500
Aquarium
0
iPads
Other Submarine Mobile App
First Floor Exhibit
Thank You Nandin Bayaraa nbayaraa@c.ringling.edu
Shashwat Bista sbista@c.ringling.edu Kamal Hakim khakim@c.ringling.edu Wendy Oliva woliva@c.ringling.edu