![](https://assets.isu.pub/document-structure/201106204422-d5854de0cbe919faa5e782c85f4d07b7/v1/3f38b127d86a843eef4cb5829ea98579.jpg?width=720&quality=85%2C50)
1 minute read
Just One More Thing
from PYLON: JUL|AUG Issue
by AIA Brooklyn
The impalpable sustenance of me from all things at all hours of the day, The simple, compact, well-join’d scheme, myself disintegrated, every one disintegrated yet part of the scheme, The similitudes of the past and those of the future, The glories strung like beads on my smallest sights and hearings, on the walk in the street and the passage over the river, The current rushing so swiftly and swimming with me far away, The others that are to follow me, the ties between me and them, The certainty of others, the life, love, sight, hearing of others.
Others will enter the gates of the ferry and cross from shore to shore, Others will watch the run of the flood-tide, Others will see the shipping of Manhattan north and west, and the heights of Brooklyn to the south and east, Others will see the islands large and small; Fifty years hence, others will see them as they cross, the sun half an hour high, A hundred years hence, or ever so many hundred years hence, others will see them, Will enjoy the sunset, the pouring-in of the flood-tide, the falling-back to the sea of the ebb-tide.
Advertisement
— Walt Whitman excerpt from Crossing Brooklyn Ferry
Photo by Fabio Luzzi
The Announcement of the Decade
![](https://assets.isu.pub/document-structure/201106204422-d5854de0cbe919faa5e782c85f4d07b7/v1/2861f14ebf5bf7c5f7c49d66c2ff31f3.jpg?width=720&quality=85%2C50)
Revised AIA core documents are now available
Like the Agave Americana, the plant that blooms every ten years, the core set of AIA Contract Documents is only updated every ten years. This ensures your design and construction projects are protected against changing industry trends and needs.
In the 2017 versions of AIA contracts, you can now use fill points to prompt the parties to discuss and insert a “Termination Fee” when necessary, and there is a new evaluation provision by the architect, if the contractor proposes alternative means and methods. Plus, make any AIA contract appropriate for a sustainable project with the new Sustainable Exhibit. Learn more and download free samples at aiacontracts.org/aiachapter