2023 Architecture Portfolio (selected works)

Page 1

Portfolio & CV See-Long (Julius) Fan Selected Works 2018-2023


updated to 10 Aug 2023

See-long Fan | Julius

See-Long (Julius) Fan

seelongf@gmail.com VISA: Tier 4 / student

seelongf@gmail.com whatsapp: +852 91360212 mobile: +44 7516027272

Education and Qualifications 2021-Present

Architectural Association School of Architecture | London Experimental Programme - BA(Hons) | RIBA/ARB Part I High Pass in ETS2 Evironment and Energy High Pass in ETS2 Materials and Technologies High Pass in ETS2 Structural Typologies and Design High Pass in MS2 Abstract Nature

2018-2020

HKUSPACE Community College | Hong Kong Higher Diploma in Architectural Studies (HDAS) | 2020 Graduate cGPA 3.61 / 4.00 | distinction

2012-2018

St. Paul’s College | Hong Kong Hong Kong Diploma of Secondary Education (HKDSE) | 2018 Candidate

Employment and Experiences 2023

Purcell (Asia Pacific) | Hong Kong Summer Intern | Full-Time Propose schematic designs for back office with 3D models, drawings and renderings Reviewing and compiling BA14 documents for submission AI preparation and issuance Following up outstanding works / defects and updating rectification status Archiving contractor submissions Prepare cartographic schedule for a declared monument

2020-2021

Architecture Design and Research Group Ltd (AD+RG) | Hong Kong

1

17

27

AD+RG

Living in a Bubble

Hanging by a Thread

July 2020 - September 2021

May 2022 - June 2022

January 2023 - June 2023

5

2

1

0m

ISOMETRIC SECTION A-A 1:100 @ A1

Summer Intern + Architectural Assistant | Full-Time Prepare Diagrams and Renderings for Presentation Prepare 3D Models and CAD Drawings for Submission Prepare Design Options for Clients Collaborate with Local and Overseas Team Members Attend Design Meeting with Clients Arrange Public Engagements Arrange Meetings with Government Departments Coordinate with NGOs and audit teams Oversee and Manage Monetary Arrangements

2019

Architectural Services Department (ArchSD) of HKSAR | Hong Kong Summer Intern | Full-Time Prepare CAD Drawings

2015-2018

St. Paul’s College | Hong Kong

Major Achievements 2020

Hong Kong Housing Society Award | Hong Kong Housing Society Academic Excellence Award | HKUSPACE Community College Principal’s Honours List | HKUSPACE Community College

2019

Outstanding Performance Scholarship | SPSS of HKSAR Principal’s Honours List | HKUSPACE Community College

2018

Principal’s Nomination | St. Paul’s College Most Outstanding Artist Award | St. Paul’s College

Software Graphics 3D Modeling Rendering Drafting

23

39

Purcell

On the Edge

Other Works

July 2023 - September 2023

Photoshop | Illustrator | Indesign | Premiere Pro | Lightroom Revit | Sketchup | Rhino | Maya | Blender Enscape | V-Ray | Twinmotion | Unreal Engine AutoCAD

Language Cantonese | Fluent

11

English | Fluent

Mandarin | Intermediate

Practical Experience

August 2022

Models

Academic Works


PRACTICAL EXPERIENCE July 2020 - September 2021

AD+RG Architecture Design and Research Group Ltd, Hong Kong

Summer Intern + Architectural Assistant

Description In my internship at AD+RG for just more than a year, I have worked on projects of multiple types and scale. From research to competition to design, I was mainly involved in six projects of different stages. Here are three that I selected based on duration and skills involved.

Practical Experience | 1-2


Main Hall Design Iterations

Facade Design Iterations

A 30-Classroom Primary School at Kai Tak Development Schemetic Design - Detail Design Description

Reponsibilities

The primary school is situated in Choi Hung Estate. It is a new campus where existing students and staffs would move into. Embodying the vividness from “Choi Hung” meaning rainbow, the project proposed to reinvigorate the edcuational environment of both the students and staff by introducing playful design elements and spatial configurations that would encourage interaction and a sense of community among its users. This project utilises MiC, Modular Integrated Construction, classrooms are prefabricated modular units to reduce cost and time for construction.

• Propose Exterior and Interior Design Options • Prepare Presentation Diagrams and Renderings • Prepare CAD Drawings for Presentations and Submissions

Software

• Photoshop / Illustrator / Indesign • Sketchup • AutoCAD • Enscape Practical Experience | 3-4


Library Design Iteration

Main Staircase Design Iteration

554 LIGHT TUBE

50

800

800

800

800

76

1334

3600

25

800

57

1

R6

BOOK SHELVES

8

SEATING

1334

BOOK SHELVES

800

6

0

150

40

00

R1000

BOOKSHELVES BELOW

600

600

10

33

TALK TUBES

2400

R450

600

R6

A/C GRILLE

A/C UNIT

400

ACOUSTIC GYPSUM

BOARD CEILING SYSTEM 3

G 7600 6900

600

600

2300 1950

150

2900

F

NOTES & LEGENDS :

600

1200

G 7600 6900

600

600

3

2300 2500

R8 50 500 100

F 150

RECESSED DOWNLIGHT

00

Description

Date

Drawn

R1101

Modular Intergrated Construction Consultant

Rev.

R2000

Description

Date

App.

Drawn

Modular Intergrated Construction Consultant

WINDOW BLINDS

BULKHEAD LINE ABOVE

600

450

FLOOR PATTERN

B

9AH119

Contract No. ASD project No.

8550

Job No.

A1105

A

F.C.L. 2500 A.F.F.L

C

D

CEILING LINE ABOVE

K

R7 2300

2150

4600

600

600

AFFL +800

400

2100

150 450

600

600

200

600

00

2100

5

00

250

R25

0

250

TV LOCATION RESERVED (TO BE PROVIDED BY SSB)

1050

1250 AFFL +800

600

BL

PROJECT TITLE

PROPOSED 24 CLASSROOM PRIMARY SCHOOL AT 1 & 3 LUK LAU AVENUE, CHOI HUNG ESTATE WONG TAI SIN

DRAWING NO.

1105-G01-007

REV NO.

SCALE

1:50 @ A3

PROJECT REF.

A1105

CAD REF.

20210416 Main Staircase.dwg

B.D. REF.

FSD REF.

-

OFFICE USE:

ALL DIMENSIONS ARE IN MILLIMETRE EXCEPT OTHERWISE NOTED

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BYarchitecture design and research group ltd WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.

TALK TUBES

Job No.

A1105

2300

750

AFFL +1100

LIBRARY LAYOUT PLAN

1/F Signed

Date

Designed Drawn

1400

800

STORAGE ROOM

Check

F

E

AFFL +750

R700

TACK BOARD

RAISED PLATFORM

F.C.L. 2500 A.F.F.L.

Revision

- PROPRIETARY 425

2000

AB/8550/DL401

Approved by

SK/CY

PROPRIETARY TACK BOARD BACK SERVICE COUNTER 450D x 750H

MCB & SWITCH CABINET

AFFL +750

4600

Approved

+0.20 FFL

G

20.28 20.23

H 100

1250

Scale Drawing No.

+0.90 FFL

+5.70 FFL

+3.30 FFL

1 : 50 @A3

AB/8550/DL400

Revision

-

WORKING BENCH 600D x 750H

250

100

1120

2230

4200

4200

2700

600

A/C UNIT

R1250

500

R1

1 : 50 @A3

Drawing No.

LOUVRE

1400

R10

1950

Approved Scale

8550

Name

SERVICE COUNTER

450

SHOE STORAGE

Check

G/F

250

Designed Drawn

750

400

400

56

STORAGE ROOM

Date

23

COUNTER BELOW

Signed

SKYLIGHT / LIGHT TUBE ABOVE

1300

AFFL +400

400 400 400 FAP UNIT

Name

00

450

SKYLIGHT / LIGHT TUBE

ASD project No.

Drawing Title

R7

LIBRARY REFLECTED CEILING PLAN

600

Drawing Title

RAISED PLATFORM

Checked by

TCH

9AH119 A24-CLASSROOM PRIMARY SCHOOL AT LUK LAU AVENUE, WONG TAI SIN

1500

00

WINDOW BLINDS

Drawn by

9AH119

Contract No.

Project

6250

6850 6250

6850 6250

A/C UNIT

Layout Plan for PQDVC Booklet

DISPLAY CABINET

HEAVY DUTY CARPET TILES ON C/S SCREEDING

J

9AH119 A24-CLASSROOM PRIMARY SCHOOL AT LUK LAU AVENUE, WONG TAI SIN

R7

Description

16/03/2021

WOOD DECKING

Project

A.P.

Date

-

BAG RACK

00

250

Rev.

4050

F.C.L. 2800 A.F.F.L.

4200

DRAWING TITLE Grand Stairs Section

Architect

R12

1350 F.C.L. 3300 A.F.F.L.

2700

BIM Consultant

R6

PERIODICAL RACK AND IPAD STATION

F.C.L. 3500 A.F.F.L.

600

00

4200

150

R1 Architect

2230

6600

400

WINDOW BLINDS

1120

Traffic Consultant

600

1800

825

BIM Consultant

A/C UNIT F.C.L. 4025 A.F.F.L.

600

400

600

600

A.P.

Traffic Consultant

Environmental Engineering Consultant

600

4

3100 A.F.F.L.

600

600

R1450

WINDOW BLINDS

300 280

1000 AFFL Environmental Engineering Consultant

FAP UNIT

280

700

Landscape Consultant

200

Building Services Consultant

Landscape Consultant

280

Building Services Consultant

1200

LOUVRE

A/C UNIT

140

A.P. PERIODICAL RACK AND IPAD STATION BELOW

Structural Consultant

BOOK SHELVES

150

Structural Consultant

5

TUCK SHOP

WOOD DECKING

200

4

280

BOOK SHELVES

SKYLIGHT / LIGHT TUBE ABOVE App.

2400

Rev.

1000 AFFL 2800

5050

FAP UNIT

R7

BOOK SHELVES

5650 5050

5650 5050

SPEAKER

5700

SPRINKLER HEAD

SKYLIGHT / LIGHT TUBE

300

A/C UNIT

00

150

A.P.

R7

600

Practical Experience | 5-6 Rev.

Date

Description

-

16/03/2021

Layout Plan for PQDVC Booklet

Drawn by

Checked by

Approved by

TCH

SK/CY

BL

PROJECT TITLE

PROPOSED 24 CLASSROOM PRIMARY SCHOOL AT 1 & 3 LUK LAU AVENUE, CHOI HUNG ESTATE WONG TAI SIN

DRAWING TITLE Grand Stairs Overall Plan

DRAWING NO.

1105-G01-007

SCALE

1:50 @ A3

PROJECT REF.

A1105

CAD REF.

20210416 Main Staircase.dwg

B.D. REF.

FSD REF.

REV NO.

-

OFFICE USE:

ALL DIMENSIONS ARE IN MILLIMETRE EXCEPT OTHERWISE NOTED

THE OWNERSHIP OF THE COPYRIGHT IN THIS DRAWING IS RETAINED BYarchitecture design and research group ltd WHOSE CONSENT MUST BE OBTAINED BEFORE ANY USE OR REPRODUCTION OF THE DRAWING OR ANY PART THEREOF CAN BE MADE.


Master Planning and Concept Design for a School of Medicine and Affiliated Hospital in Shenzhen Tender Submission - Tender Interview Description

Reponsibilities

Integrating research, health and learning, the proposed design challenges the conventional funcional layout of a medical school. Through utilising the concept of human cells, the functional spaces and prgramme of the proposed design while having their own specific purposes, serve as integral parts of the whole campus. Public spaces inter-connect to each other and become a “Medical Vein” which forms the main spine and core of the entire Medi-Search development. This network of connectivity ultimately enhances the experience of patients, students and teachers.

• Prepare Presentation Diagrams and Renderings • Collaborate with Local and Overseas Members • Consolidate Materials from Team Members Software

• Photoshop / Illustrator / Indesign

Practical Experience | 7-8


Consultancy Study for the Enhancement of Accessibility of the Physical Environment in Hong Kong Surveying - Interim Report - Draft Final Report - Final Report Description

Reponsibilities

On the basis of the hong kong design manual: barrier free access 2008, the objectives of the study are to formulate a strategy, with proposed measures with a view to creating an environment that promotes freedom of choice and independence, and respects the individual’s right to live in a full life with dignity, irrespective of differences in ability and age and facilitating users of different abilities to access buildings and services independently. Stakeholder engagements and webinars were held to collect opinions from various fields of industry to form a stronger foundation of strategy and recommendations.

• Consolidate research and formulate study reports • Arrange and promote public engagements • Arrange meetings with government department • Coordinate with ngos and audit teams • Oversee and manage monetary arrangements Software

如果大家可以多點了解… 29

17

如果可以有更好的管制策施…

• Word / Powerpoint / Excel • Illustrator / Indesign Practical Experience | 9-10


Type 001 Type 001 ExternalExternal Elevation Elevation

Type 001 Type 002 Type 002 ExternalExternal Elevation Elevation External Elevation

ExternalExternal Elevation External Elevation Elevation External Elevation TypeScale 003 Type 003 0021:25 Scale 1:25Scale 1:25 Scale 1:25Type ExternalExternal Elevation External Elevation Elevation

Type 003 External Elevation

Scale 1:25 Scale 1:25

Scale 1:25

Scale 1:25 Scale Scale 1:25 1:25

Scale 1:25

Scale 1:25 Scale 1:25

ExternalExternal Elevation External Elevation Elevation External Elevation

Notes: Notes:

All dimensions All dimensions are in are millimeters in millimeters unlessunless notednoted otherwise. otherwise.

All dimensions are in millimeters unless noted otherwise. All dimensionsAll aredimensions in millimeters Allare dimensions unless inAll millimeters dimensions noted are in otherwise. unless millimeters are in noted millimeters unless otherwise not un

PurcellPurcell shall be shall notified be notified in writing in writing of anyofdiscrepancies. any discrepancies.

Purcell shall be notified in writing of any discrepancies. Purcell shall bePurcell notified shall in writing be Purcell notified ofPurcell shall any inbe writing discrepancies. shall notified be of notified any in writing discrepancies. in writing of any dis of

Key Plan Key Plan not tonot scale to scale

Key Plan not to scale

1260 1260 1627 Type Type 001001 Type 001 External Elevation External External Elevation Elevation Type 005 Type 005 Type 003 ScaleScale 1:25 1:25 Scale 1:25 ExternalExternal Elevation Elevation External Elevation

935

Key Plan Key Plan Key Plan Key Plan not to scale not to scale not to scale not to scale

1070 1260 Type Type 002 002 External External Elevation Elevation Type 006 Type Type 006 005 ScaleScale 1:25 1:25 ExternalExternal Elevation External Elevation Elevation

5520

1260 1627

1260

1070

1070

1070

1070

2420

2420

1220

1220

1220

1220

1220 1220 1070 1304 1220 1304 005Type Type 005 1304 Type 006 Type 007 Type 005 TypeType Type 006 Type 006Type 006 Type 007 Type 007Type 007 Type 002 Type Type 003 003 003 005 External External Elevation External Elevation Elevation ExternalExternal Elevation External Elevation Elevation ExternalExternal Elevation External Elevation Elevation External Elevation External Elevation External ElevationExternal External Elevation Elevation External Elevation External Elevation Type 007 Type Type 007 006 Type 008 Type Type 008 007 Type 008 Scale Scale 1:25 Scale Scale 1:25 Scale 1:25Scale 1:25 Scale 1:25 Scale 1:25Scale 1:25 Scale 1:25 Scale 1:25 Scale 1:25 Scale 1:25 ScaleScale 1:25 1:25 1:25 1:25Scale 1:25 5520 5520 ExternalExternal Elevation External Elevation Elevation ExternalExternal Elevation External Elevation Elevation External Elevation

5520

Scale 1:25 Scale Scale 1:25 1:25

Scale 1:25 Scale Scale 1:251:25

5520

5520

5520

Scale 1:25

Scale 1:25 Scale 1:25

All dimensions are in millimeters unless noted otherwise. Purcell shall be notified in writing of any discrepancies. DATE DRAWN DESCRIPTION DRAWN DESCRIPTION

REV

CLIENT

PROJECT

TITLE

2471

2450

2450

2430

JOB NUMBER

242438

2430

2450

2450 2430

2471 2190

2190

2190

2430 2190

TITLE

TITLE

Existing Doors Existing - Main Doors Building - Main (1 Building of 3) (1 of 3)

1260

1260

1070

930

1070

930

930

930

1070

1220

730

1220

730

730

730

2150

1220

1304

700 2150 1304

2150

700

700

2150 700

810

1304

810

810

SIZE 930

890

890

810

SCALE SIZE

SCALE LAST REVISED

LAST REVISED DRAWN

A1L 1:25 A1L 730 JF 860 1:25 08/09/202308/09/2023

890

890

860

CHECKED DRAWN

CHECKED

SIZE

RSJF730

RS 730

A1L 1:25

Type Type 016 009 Type 009 Type 010Type 010 Type 010 TypeFOR010 Type Type 005005 Type 005 Type Type 006006 Type Type 007007Type 015 Type 008009 008 Type 014 Type 014 TypeType 014 014Type 006 Type 015 TypeType 015 015Type 007 Type 009Type Type 017 Type 017 Type Type 017SUITABILITY/REASON 017 Type 016 TypeType 016 016Type 008 REV REV SUITABILITY/REASON FOR ISSUE ISSUE External External Elevation External Elevation Elevation ExternalExternal Elevation External Elevation Elevation ExternalExternal Elevation External Elevation External External Elevation Elevation External Elevation External External Elevation Elevation External External Elevation Elevation External Elevation External Elevation Elevation External External External Elevation External Elevation External Elevation ElevationElevationExternal External External Elevation External Elevation External Elevation Elevation ExternalExternal Elevation External External Elevation External Elevation External External Elevation ElevationElevation 0Elevation ISSUE 0 Elevation FOR ISSUE INFORMATION FOR INFORMATION Type 014 Type 015 Type 014Scale Type1:25 014 Type 015Scale Type 015 Type 009 Type 009 Type Type 009Scale 1:25 010 Type 0101:25 Scale 1:25 011 Type Type 011 010Scale 1:25 Type 011 Type 007 008 Scale Scale 1:25 1:25Type Scale 1:25 Scale 1:25 1:25 Scale 1:25 Scale 1:25 Scale Scale 1:25 ScaleScale 1:25 1:25 Scale 1:25 ScaleScale 1:25 1:25 Scale 1:25 Scale 1:25ScaleScale ScaleScale 1:25 1:25 Scale 1:25Type Scale 1:251:25 1:25Scale 1:25 1:25 Scale 1:25 ScaleScale 1:25 Scale 1:25Scale Scale 1:25NAME 1:25 Scale Scale 1:25 1:25 DRAWING DRAWING NAME External External ElevationElevation External External ElevationElevation ExternalExternal Elevation Elevation External Elevation ExternalExternal Elevation Elevation ExternalExternal Elevation External Elevation Elevation External Elevation External Elevation External Elevation External Elevation External Elevation KYL-PUR-01-XX-DR-CA-1500 KYL-PUR-01-XX-DR-CA-1500 890

Scale 1:25

Scale 1:25 Scale Scale 1:251:25

930

930

Scale 1:25 Scale 1:25

REV REV DATEDATE DRAWN DESCRIPTION

CLIENT

3278

3278

3278

King Yin Lei Heritage Foundation PROJECT

2429

2471

2450

2450

2450

2450

2471

2471

2450

2450

2450

2450

2450

2450

2450

242438 1949

1949

TITLE

DATE

DRAWN DESCRIPTION

REV

DATEREV

Type 011 SUITABILITY/REASON FO External ISSUE FOR Type 016 Scale 1:25 DRAWING NAME External KYL-PUR-01-XX-DR REV

0

Scale 1:25

DATE DRAWN REV REV DESCRIPTION DATE DRAWN DATE DESCRIPTION DRAWN DRAWN DESCRIP D

CLIENT

KingKing Yin Yin Lei Lei Heritage Heritage Foundation Foundation

King Yin Lei Heritage Foundation King Yin King Lei Heritage YinKing Lei King Heritage Yin Foundation Lei YinHeritage Lei Foundation Heritage FounF

CLIENT

CLIENT

CLIENT CLIENT

PROJECT PROJECT

PROJECT

PROJECT

Revitalisation Revitalisation of King of King Yin Yin Lei Lei

Revitalisation of King Yin Lei

Revitalisation Revitalisation of King Revitalisation Revitalisation Yin of King Lei Yin of King Lei of King Yin LY

PROJECT

PROJECTPROJECT

JOB NUMBER JOB NUMBER

JOB NUMBER

JOB NUMBER

242438 242438

242438

242438 242438 242438 242438

TITLE TITLE 1949

1949

1949

1949

2060 2450

1949

JOB NUMBER

2471 2190

2430

Revitalisation of King Yin Lei

REV

2450

DATE

DRAWN DRAWN DESCRIPTION DESCRIPTION

Scale 1:25 Scale 1:25

LAST R

08/0

700

CLIENTCLIENT

2429

REV

Scale 1:25

Scale 1:25

SCALE

Existing Existing Doors Doors - Main - Main Building Building (1 of(13)of 3)

TITLE

JOB NUMBER JOB NUMBER JOB NUMBER 2450

Scale 1:25 Scale 1:25

860

2450

860

2430

Scale 1:25

Scale 1:25

890

2450

890

2430

Scale 1:25 Scale 1:25

Scale 1:25

2150

1304

2429

Scale 1:25

2150

2429

2150

1220

TITLE

TITLE

TITLE

TITLE

2450

1260

Existing Doors - Main B

2450

2430

2430

2060 2471

2060 2450

2471 2060

2060

JOB NUMBER

242438 242438

Revitalisation of King Y 2471

3345

3278

3278

3345

3278 3345

2420

2430

2430 2450

2430 2450

2430

2420

2420

2420

My internship at Purcell was mainly involved in two enhancement projects at different stages, one of research and documentation the other of schematic design and contract documentation. Because of the scale and nature of the projects, the approach is quite distinct from my work at AD+RG.

JOB NUMBER

DRAWN D

King Yin Lei Heritage F

PROJECT

Revitalisation Revitalisation of King Yin of Lei King Yin Lei

24303278

2430

2430

2430

3278

3300

3300

3300

3285 3345

Description

3278

3285

3278

3300

3285

King Yin Lei KingHeritage Yin Lei Heritage Foundation Foundation PROJECT

DATE

CLIENT

2060

DATE REV

CLIENT

2060

REV

Key Plan not to scale

2450

Summer Intern

Type 006 External Elevation

Scale 1:25

Type 013 Type 013Type 013 External Elevation External External ElevationElevation

is physically present.

Do not scale from this drawing. All dimensions are to be verified on site before proceeding with the work.

Purcell Asia Pacific Ltd

5520

Type 008 External

Scale 1:25

08/09/2023 16:24:34 Notes: Type 013 Type 013 TypeType 013 013 ExternalExternal Elevation External Elevation External Elevation ElevationDrawings are based on survey data and may not accurately represent what

Scale 1:25 Scale 1:25ScaleScale 1:25 1:25

2420

2420 1260

1260

1627

3345

3345

3300 4150

3345

3300 4150

2420 1627

Scale 1:25 ScaleScale 1:25 1:25

Purcell

3300

3300 4150

3345

3285 3345

3285

3220

3285

3285

935

1070

Scale 1:25 Scale 1:25

3220 3300

935

2420

2420

2190

41503285 2190

4150 2190 3300

4150 3300

4150

3285

3220

3285

3220

3285

3285

3285 2190

1780

PRACTICAL EXPERIENCE

1070

08/09/2023 16:2 08

Key Plan not to scale

1780

Scale 1:25

Notes:Notes:

Do not Doscale not from scale this fromdrawing. this drawing. All dimensions All dimensions are toare be to verified be verified on siteDo on site not scale from this drawing. All dimensions are to be verified on site Do not scale from Do not thisscale drawing. Do from not All this Do scale dimensions drawing. notfrom scalethis All are from dimensions drawing. to this be verified drawing. Allare dimensi on toAll be sit beforebefore proceeding proceeding with the with work. the work. before proceeding with the work. before proceeding before with proceeding the before work.with proceeding before the proceeding work. with thewith work. the work.

All dimensions are in millimeters unless noted otherwise.

Scale 1:25

08/09/2023 Notes: 16:20:00 Notes:

08/09/2023 16:20:00

Purcell shall be notified in writing of any discrepancies.

Type 002 July 2023 - September 2023 External Elevation

08/09/2023 08/09/2023 16:20:00 16:20:00 Notes:

Drawings are based on survey data and may not accurately represent what is physically present. Do not scale from this drawing. All dimensions are to be verified on site before proceeding with the work.

935

Scale 1:25 Scale 1:25Scale 1:25

Scale 1:25

Drawings Drawings are based are based on survey on survey data and datamay andnot mayaccurately not accurately represent represent what Drawings what are based on survey data and may not accurately represent what on survey Drawings are based Drawings areDrawings based dataon Drawings and are survey may based not are data on accurately based and survey may on data survey not represent accurate anddata may wa is physically is physically present. present. is physically present. is physically present. is physically present. is physically is physically present.present.

Notes:

1780

ExternalExternal Elevation External Elevation Eleva External Elevation

Scale 1:25 Scale 1:25Scale 1:25

Scale 1:25

Existing Doors - Main Building (1 ofExisting 3) Doors Existing - Main Existing Doors Existing Building - Main Doors Doors (2 Building - of Main 3) - Main Build (2 ofB

Existing Doors - Main Building (1 of 3) SIZE 730

2150

700

2150

810

2150

780

780

780

780

890

SIZE

Type 015 External Elevation Scale 1:25

Type Type 009009 Type 016 External Elevation Elevation External Elevation External Type 010 ScaleScale 1:25 1:25 Scale 1:25 External Elevation

860 009 Type 017 External Elevation Type 011 Scale 1:25 1:25 Scale External Elevation

Scale 1:25

Scale 1:25

890

SCALE

890

LAST REVISED

1258

1258

DRAWN

CHECKED

1258

1258

890

860

860

1210

1210

1210

1210

SIZE SCALE SCALE

1:251:25 A1L A1L 1090

860

REV

REV

LAST REVISED LAST REVISED

SIZE DRAWN DRAWN CHECKED CHECKEDSCALE

08/09/2023 JF JF 1090 08/09/2023 1090 1090

SUITABILITY/REASON SUITABILITY/REASON FOR ISSUE FOR ISSUE

RS RS A1L 1:25 REV

1250

LAST REVISED

DRAWN SIZE

08/09/2023 1250

JF A1L 1:25 RS A1L 1:25A1L 08/09/2023 1:25 1:25 08/09/2023 JF 08/09/202 08/0 RS JF12 A1L

SUITABILITY/REASON FOR ISSUE

REV

CHECKED SIZE SCALE

SCALESIZE LAST SIZE REVISED SCALE SCALE LAST REVISED DRAWN LAST REVISED LAST CHECK DRA R

SUITABILITY/REASON REV REV SUITABILITY/REASON FOR REVISSUE SUITABILITY/REASON FOR SUITABILITY/REASON ISSUE FOR ISSUE FO

08/09/2023 JF RS 780 1258 121 0 780 ISSUE ISSUE FOR FOR INFORMATION INFORMATION 0 ISSUE FOR INFORMATION 0 ISSUE 0 FOR 0ISSUE 0INFORMATION FOR ISSUE ISSUE INFORMAT FORFOR INFO 780 0 1258 1258 Type Type 010010Type 019 Type Type 011011 Type 019 TypeType 019 019Type 010 Type 020 Type 020 TypeType 020 020Type 011 Type 021 Type 021 Type Type 021 021 Type 022 Type 022 Type 023 DRAWING DRAWING NAME NAME DRAWING NAME DRAWING NAME DRAWING NAME DRAWING DRAWING NAME NAME External External Elevation External Elevation External Elevation Elevation External External Elevation External Elevation External Elevation Elevation External External Elevation External Elevation External Elevation Elevation External External Elevation Elevation External Elevation External External Elevation Elevation External Elevation External Elevation External External Elevation ISSUE FOR INFORMATION KYL-PUR-01-XX-DR-CA-1500 KYL-PUR-01-XX-DR-CA-1500 KYL-PUR-01-XX-DR-CA-1500 KYL-PUR-01-XX-DR-CA-1501 KYL-PUR-01-XX-DR-CA KYL-PUR-01-XX-DR Type 018 Type 018 Type 019 Scale Type 020 Type1:25 018 Type1:25 019Type 019KYL-PUR-01-XX-DR-CA-1501 Scale 1:25 1:25 Scale 1:25 Scale 1:25ScaleScale ScaleScale 1:25 1:25 Scale 1:25 Scale 1:25ScaleScale 1:25 1:25 Scale 1:25 1:25 1:25 Scale 1:25 Scale Scale 1:25ScaleScale 1:25 1:25 Scale 1:25 Scale 1:25 DRAWING NAME Scale External Elevation External Elevation External External External ElevationElevation External External ElevationElevation KYL-PUR-01-XX-DR-CA-1500 A1L 1:25

Type 018 Type 018 TypeType 018 018 REV ExternalExternal Elevation External Elevation External Elevation Elevation0 Scale 1:25 Scale 1:25ScaleScale 1:25 1:25

SUITABILITY/REASON FOR ISSUE

Scale 1:25

Scale 1:25 Scale 1:25

Scale 1:25

Scale 1:25 Scale 1:25

Scale 1:25


1070

Pur

Ke not

1990

1070

2303

735 2303

998 2303

998

1072

1050

1133

1510

08/09/2023 15:25:42

520

Do not scale from this drawing. All dimensions Do not scale are to from be verified this drawing. on site All dimensions are to be verified on site 1629 before proceeding before proceeding with the work. 3522 with the work. 2284

2284

2284

1629

1520

1520

1520

1510

All dimensions are in millimeters unlessAll noted dimensions otherwise. are in millimeters unless noted otherwise. 1520

520

08/09/2023 15:25:42

Drawings are based on survey data andDrawings may not accurately are based on represent survey data whatand may not accurately represent what 1003 1003 is physically present. is physically present. 1070

1990

1990

1990

1990

598

not to scale

Key Plan not to scale

Notes: 670

670

1240

1133

2284

2300

2300

2300

Purcell shall bePlan notified in writing of any discrepancies. 553 Key

553

Scale 1:25 Scale 1:25 Scale 1:25

Notes:

Purcell shall be notified in writing of any discrepancies.

Purcell shall be notified in writing of any Purcell discrepancies. shall be notified in writing of any discrepancies.

KeyType Plan Key Plan H-1 PhotoTypeReference Type E-1 Type E-1 Type F-1 Type F-1 Type B-2 C-1 Type C-1 Reference Photo ReferenceType Photo Reference Photo Reference Photo Reference Photo Reference Photo Reference Photo Reference Reference Photo Reference Photo Reference Photo Reference Type G-1 Type G-1 Photo H-1 Type I-1 not to scale not to scale (External Elevation) (ExternalExternal Elevation) Elevation) Elevation) (External Elevation) (External Elevation) External Elevation (External External Elevation (External Elevation) External Elevation External Elevation External Elevation Elevation (External External Elevation (External Elevation) (Interior Elevation) (Interior Elevation) (External Elevation) (External External Elevation External Elevation External Elevation (External External Elevation) Elevation External Elevation Reference Photo Reference Photo Type Reference Photo Reference Photo Reference PhotoType L-1Scale 1:25 Reference Photo Photo Type K-1 Type L-2 Type Type K-1 Type L-2M-1Type Y-2Reference Photo Type M-1 Reference Photo Y-1 Scale 1:25 Scale 1:25L-1 Scale Photo 1:25 Scale 1:25 Scale 1:25 Scale 1:25 ScaleReference 1:25 Scale 1:25Type Scale 1:25 Scale 1:25 Scale 1:25Reference (External Elevation) (External Elevation) (Internal Elevation) (External Elevation) (External Elevation) (External Elevation) External (Internal (External Elevation) External Elevation External Elevation External Elevation(External External Elevation Elevation) (External Elevation) External Elevation External Elevation Elevation External Elevation External Elevation External ElevationElevation)

Scale 1:25

735

1089

1240

1003

1240

980

735

1089

Scale Scale 1:251:25 Scale1133 1:25 735

998

980

735

1070

Scale1:25 1:25 998 ScaleScale 1:25

1070

998

1089

1270

1070

Scale 998 1:25 1058

1058

1270

1240

670

Type FH Scale 1:10

1072

1070

1270

Notes:

Type FK Scale 1:10

Revitalisation of King Yin Lei 1070 Documentation Research and

Scale 1:25

1270

1070

1440

Scale 1:25

1072

1072

Scale 1:25

1440

985

Type B-2 External Elevation

1070

12/09/2023 14:48:43

Drawings are based on survey data and may not accurately represent what is physically present. 1072

2120 are to be verified on site 1050 Do not scale from this drawing. All dimensions

1050

1070

2120

1070

553

2120

553

520

1629

520

553

before proceeding with the work. Reference Photo Type G-1 Type H-1Type Type E-1Reference TypePhoto E-1 Type E-1Photo Type F-1Reference Type E-1 Type Reference F-1Photo F-1 Reference Type B-2 Type B-2 Type B-2 Type B-2Reference TypePhoto C-1 Type C-1Photo Type C-1 Reference Photo Reference PhotoC-1 Type Reference Photo Reference Photo Reference Photo Reference Reference Photo Reference Photo Reference Photo Reference Photo P are in millimeters unless noted otherwise. (Interior Elevation) (External Ele (External Elevation) (External Elevation) (External(External Elevation) Elevation) (External (External Elevation) (External Elevation) (External Elevation) (External Elevation) (External Elevation) (External (External Elevation) Elevation) (External Elevation) External Elevation External Elevation External (External Elevation External Elevation External Elevation External Elevation External Elevation External Elevation External Elevation E External ElevationAll dimensions External Elevation External Elevation External Elevation External Elevation External ElevationElevation) ExternalElevation) Elevation External Elevation

ReponsibilitiesScale 1:25

Type FB Scale 1:10

Purcell shall be notified in writing of any discrepancies.

Type FC Key Plan Scale 1:10

Type FL Scale 1:10

Type FO

Scale 1:25

Scale 1:25

Scale 1:25

Scale 1:25

Scale 1:25

Scale 1:25

Scale 1:25

Scale 1:25

REV

Scale 1:25 Scale 1:25

Scale 1:25

DATE

DRAWN DESCRIPTION REV

Scale 1:25

Scale 1:25

CLIENT

not to scale

DATE

DRAWN DESCRIPTION

Scale 1:25

Scale 1:25

CLIENT

REV

DATE

Scale 1:25 DRAWN DESCRIPTION

Type O-1

Scale 1:25

Reference Photo

985

985

Scale 1:25

Type O-1

Type P-1Reference Photo

1070

1001

1219

490

1510

1510

Reference Photo Type P-1

SIZE

Type Y-1 Type Y-3 Reference Photo Type Q-1 Reference Photo (External Elevation) External Elevation External Elevation

SCALE

A1L 1:25

LAST REVISED

SCALE SIZE DRAWN

CHECKED

08/09/2023 A1LJF 1:25 RS

LAST REVISED

DRAWN

CHECKED

08/09/2023

JF

RS

Re

JOB

REVISED DRAWN K-1 | LAST PracticalType Experience 13-14 1:25 08/09/2023 JF 24 A1LExternal 0 ISSUE FOR INFORMATION 0 ISSUE FOR INFORMATION Elevation DRAWING NAME DRAWING NAME Reference REV SUITABILITY/REASON Type Y-4 FOR ISSUE Photo Refere Type Y-2 Reference Photo Scale 1:25 TITL Reference Photo Type Reference Photo Q-1 Elevation) KYL-PUR-01-XX-DR-CA-1400 KYL-PUR-01-XX-DR-CA-1400 0 Elevation) ISSUE FOR INFORMATIO (External (External (Exter External Elevation External Elevation

REV

985

1510

Scale 1:25

ReferenceType Photo Reference Photo Reference Photo H-1 Type H-1 (Interior Elevation) Elevation) External Elevation (External External Elevation (External Elevation) 985

Reference Photo Type G-1 Type G-1 Type FC Scale 1:10(Interior Elevation) External Elevation External Elevation Scale 1:25

1001

1219

530

530

555

555

985

Type FN Scale 1:10

Type FQ Scale 1:10

Type FT Scale 1:10

1985

1510

Type FN Scale 1:10

1510

King Yin Photo Lei Reference Heritage Lei Heritage Foundation Photo Reference Reference Photo Type J-1 Type J-1Type Type I-1is a declared Type I-1 sitting I-2 photographic Type I-2 Type I-3 Type I-3 K-1 K-1 Type L-1Foundation Type Type L-2 L-1ReferenceRP Reference Photo in the Reference Photo Reference Photo Reference Photo Type Reference Photo Reference Photo Reference Reference Photo Reference Photo Photo PhotoKing Yin King Yin monument Mid• Type Prepare schedules Type K-1 Reference Photo TypeReference L-1 Type L-2 Type M-1 Scale 1:10 Lei Scale 1:10 CLIENT PROJECT PROJECT (External Elevation) (External Elevation) (External Elevation) External Elevation External Elevation (External Elevation) (External Elevation) (External Elevation) (External Elevation) (InteriorElevation Elevation)External (Interior Elevation) (Interior Elevation) (Interior Elevation) (ExternalExternal Elevation) (External Elevation) (Internal Elevation) (External Elevation External Elevation External Elevation Elevation External Elevation Elevation External Elevation External Elevation External Elevation Elevation(IE Levels of Hong Kong. FirstExternal built in 1930s as a residence, • External Prepare cartographic schedules External Elevation External Elevation External Elevation External ElevationExternal King Yin Lei Heritage Foundation Scale 1:25 Scalesince 1:25 gone through Scaleseveral 1:25 Scale 1:25 Scale 1:25 Scale 1:25 Scale 1:25 Scale 1:25 Scale 1:25 Yin Lei Revitalisation Scale 1:25 1:25 Scale 1:25 Scale 1:25Scale 1:25 Scale 1:25 Scale 1:25 Revitalisation Scaleof1:25 it has owners and now of King King Yin Lei Scale PROJECT is in Batch VI of the Revitalising Historic Buildings JOB NUMBER JOB NUMBER Revitalisation of King Yin Lei Through Partnership Scheme. The Scheme seeks 242438 242438 JOB NUMBER public participation in preserving historic buildings and putting them to good use. Currently owned by Tianda 242438 TITLE TITLE REV Institute, the group plans to 1133 readapt the complex Existing Window Schedule - Main Existing Building Window Schedule - Main Building 1133 1003 1003 2120 CLIE TITLE as a tea studio at the mansion and use the villa as a Kin Existing Window Schedule Annex Blo learning centre to promote Chinese culture,1078history 2310 1000 1078 2310 1000 3520 600 598 3522 PRO and environmental studies. 1510

Type FQ Scale 1:10

Key Plan not to scale

Type Type I-2 J-1 Type I-3 Reference Photo Reference Reference Photo Photo (External Elevation) (Interior Elevation) External Elevation External Elevation External Elevation (Interior Elevation) 1072

980

1219

All dimensions are in millimeters unless noted otherwise. 1240

735

Scale 1:25

985

985

12/09/2023 15:07:29

Drawings are based on survey data and may not accurately represent what

physically present. Drawings isare based on survey data and may not accurately represent what is physically present.

735

Scale 1:25

Scale 1:25

12/09/2023 14:48:43

All dimensions are in millimeters unless noted otherwise.

2300

1240

1050

1070

Scale 1:25

1510

Scale 1:25 Scale 1:25 Scale 1:25

1520

1520

Notes:

Scale 1:25

Type Type I-1 I-3 Type I-2 Reference Photo Reference Reference Photo Photo (External Elevation) (External Elevation) External Elevation External Elevation (Interior Elevation) External Elevation

Do not scale from this drawing. All dimensions are to be verified on site

2120

998

1240

1072

Scale 1:25 Scale 1:25

Scale 1:25

before proceeding with All thedimensions work. Do not scale from this drawing. are to be verified on site before proceeding with the work.

Purcell 2120 shall be notified in writing of any discrepancies.

750

1058

Scale 1:25 1240

750

1058

1270

1070

1058

Scale 1:25

1089 980

Notes:

998

978

1440

978

1440

978

1000

Scale 1:25

Type I-1 Reference Type I-2 Reference PhotoPhoto (External Elevation) External Elevation (External Elevation) External Elevation

All dimensions are in millimeters unless noted otherwise.

Key Plan not to scale

1070

Scale 1:25

Scale 1:25 Scale 1:25

1070

Purcell shall be notified in writing 998 of any discrepancies.

1270

Scale 1:25 750

770

1070

Scale 1:25

1089

Type FP Scale 1:10 1270

Scale 1:25

1219

Scale 1:25

Reference Photo (External Elevation)

Do not scale from thisare drawing. to may be verified on site represent what Drawings based All ondimensions survey dataare and not accurately before proceeding with the work. is physically present.

1070

Scale 1:25

2284

2284

1990

1990

Scale 1:25

12/09/2023 14:48:43

Drawings are based on survey data and may not accurately represent what 12/09/2023 14:48:43 is physicallyNotes: present.

750

Type B-2 Type C-1Type Reference Photo Type A-1 Type A-1Reference Type B-1Reference Type Reference B-1Photo B-1 Reference TypePhoto A-2 Type A-2Photo Type A-3Reference Type A-2 TypePhoto A-3 Type A-3Photo Type A-3 Reference PhotoA-2 Type Reference Photo Reference Photo Reference Photo Reference Reference Photo Reference Photo Reference Photo Reference Photo P (External Elevation) (External Ele External Elevation External Elevation (External Elevation) (External(Interior Elevation) Elevation) (External (Interior Elevation) (Interior Elevation) (Interior Elevation) (Interior Elevation) (Interior Elevation) (External (Interior Elevation) Elevation) (External Elevation) External Elevation External Elevation External Elevation E External Elevation External Elevation External Elevation External ElevationElevation) ExternalElevation) Elevation External (Interior Elevation External Elevation External Elevation External Elevation External Elevation Scale 1:25

Type I-1 External Elevation

2300

2300

Scale 1:25

Type FL Scale 1:10

Type FP Scale 1:10

Notes:

770

1072

Type A-1 Reference Photo (External Elevation) External Elevation

978

Scale 1:25770

Scale 1:25740

1072

770

1000

1000

740

before proceeding with the work.

985

1070

1050

1072

REV

0

1440

Scale 1:25 740

Scale 1:25

All dimensions are in millimeters unless notedAll otherwise. Do not scale from this drawing. dimensions are to be verified on site

Type FC Scale 1:10

1270

1519 1000

DRAWING NAME

A1L 1:25

SCALE

SIZE

TITLE

JOB NUMBER

242438

DATE

CLIENT

PROJECT

Type FT Scale 1:10

REV

740

Scale 1:25

Type FB Scale 1:10

1240

1270

1050

1072

1070

Type FN

Do bef

2303

1240

2300

750

1072

1070

Type A-1 External Elevation

Type FC Scale 1:10

1070

1058

1058

978

1440

978

1440

Dra is p

750

1519

Type FS Scale 1:10

Scale 1:25

Description

No

Type A-1 Type B-1 Type B-1 A-2 Type A-2 Type A-3 Type A-3 Reference Photo ReferenceType Photo Reference Photo Reference Photo Reference Photo Reference Photo Reference Photo Reference Reference Photo Type B-2 Type B-2 Photo Type C-1 Type C-1 Photo Reference Photo Reference Reference Photo Type E-1 (External Elevation) (ExternalExternal Elevation) Elevation) Elevation) (External Elevation) (External Elevation) External Elevation External Elevation External Elevation Elevation (Interior External Elevation (Interior Elevation) External Elevation (Interior External Elevation (Interior Elevation) (External Elevation) (External Elevation) External E External Elevation External Elevation External Elevation (External External Elevation) Elevation (External Elevation) J-1Reference Photo Type I-1 Type I-2Reference Photo Type I-3 Reference Photo Type I-2 Reference Photo Photo Type Reference Photo Reference Photo ScaleType TypeScale I-3 1:25 Type Reference Photo Scale 1:25 Scale 1:25 Scale 1:25 Scale I-1 1:25 Scale Reference 1:25 Scale 1:25 Scale 1:25 Scale 1:25 Scale 1:25 1:25 J-1 Scale 1:25 External(Interior Elevation (External Elevation)External Elevation (External Elevation)External Elevation (Interior Elevation) External Elevation (Interior Elevation) External Elevation External(External ElevationElevation) External Elevation External(External ElevationElevation) Elevation) (Interior Elevation)

Scale 1:25

Type FC Scale 1:10

Key Plan not to scale

All

770

1519

SUITABILITY/REASON FOR ISSUE

KYL-PUR-01-XX-DR-CA-1600 1072

ISSUE FOR INFORMATION

1000 CHECKED

RS JF 12/09/2023

LAST REVISED

1519

1070

Existing Floor Finishes (1 of 2)

770

Revitalisation of King Yin Lei

King Yin Lei Heritage Foundation

DRAWN DESCRIPTION

1072 DRAWN

1000 1072

740

Type A-1 External Elevation

Type FA Scale 1:10

1990

1990

2284

2300

2303

2300

2303

before proceeding Scale 1:25 with the work. Purcell shall be notified in writing of any discrepancies. Purcell shall be notified in writing of any discrepancies. All dimensions are in millimeters unless noted otherwise. Key Plan Key Plan not to scale not to scale Purcell shall be notified in writing of any discrepancies.

1519

1519

740

Type FS Scale 1:10

FL 1:10

Scale 1:25

SUITABILITY/REASON FOR ISSUE

REV

SUITABILITY/REASON FOR ISSUE SIZE SCALE


A Private Member’s Club

Schemetic Design - Detail Design - Construction - DLP Description

Reponsibilities

This enhancement project is part of a master plan to improve the facilities and experience of its inhabitants in a private member’s club by revamping certain areas within the building. These works vary in function, stages and scales and thus my involvement is as diverse, from schematic design to completion stages.

• Propose schematic designs • Reviewing and compiling BA14 documents • AI preparation and issuance • Attending weekly site coordination meetings • Following up outstanding works / defects and updating rectification status

Practical Experience | 15-16


Bachelor’s Degree Project May 2022 - June 2022, Year 1

Living in a Bubble Reimagining Nakagin Tower, Ginza, Tokyo Japan

Tutors: Anna Muzychak & Monia De Marchi

Description This residential tower is a spin on the decomissioned Nakagin Capsule Tower. Building on its existing site, the project proposes to carry the spirit of its predecessor while challenging the social phenomenons of Japanese otaku and drinking culture.

Academic Works | 17-18


FIFTH ITERATION OF MAS

TWO PHENOMENA IN TOKYO Massings Development

TWO PHENOMENA IN TOKYO

MASSING DIAGRAMS

FIFTH ITERATION OF MASSING MODEL SOCIALIZE,

DESIRE FRIENDSHIP AND WARMTH FROM SOCIAL RELATIONSHIP

SOCIALIZE,

Liberal Arrangement of Units

DESIRE FRIENDSHIP AND WARMTH FROM SOCIAL RELATIONSHIP

Public Areas Inserted into Permenant Units

STAGE 1

UNHELATHY,

STAGE 2

DESIRE PRIVATE TIME AND SPACE TO BE WITH ONESELF Liberal Arrangement of Units STAGE 1

UNHELATHY,

Otaku

DESIRE PRIVATE TIME AND SPACE TO BE WITH ONESELF

Public Areas Inserted into Permenant Units STAGE 2

Ramps surrounding the Units and Public Area that Are

Accesible to Only Residents MASSING DIAGRAMS OVERALL MASSING STAGE 3

Final Proposal

Changing the Form of Public Space into Bubbles

CORE AND CIRCULATION STAGE 4

Otaku are individuals that lock themselves in their room for a long period of time, they are not sociable and generally do not like interacting with other people. If given the choice, they would like to be left alone with their own business. They make a living through businesses done online.

Drinking Culture Local companies have a culture of inviting its employees to drink in bars after work. However, the salarymen do not necessarily enjoy hanging out with their employers after work and yet they do it out of courtesy. It is common to find them drunk at all corners of the streets during the night as they do not want to go with their colleagues. More fortunate salarymen would usually be alone at night.

Strategy The projects is a combination of residence and hotel units. We wanted to challenge the concept of community the otaku lacks and privacy the salarymen desires. 140 permanent units would be for the otaku, residents would have to negotiate with their neighbours when using any furniture while 40 portable units would serve the salarymen, allowing them to sleep in any spot they choose in the building.

PUBLIC AREASPublic Area OVERALL MASSING

Residential Units

Lobby Residential Units PUBLIC PROGRAMS CORE AND CIRCULATION Common Area

Bath

Academic Works | 19-20


r pen

ONE-WAY MIRROR PANEL

34200mm

14430mm

34200mm +794mm

+355mm +1300mm

+940mm

+940mm +940mm

+940mm

BATH

34200mm

10350mm

+940mm

15000mm

15820mm

+1393mm

33000mm

0mm

34200mm

14900mm +530mm

+940mm

-100mm

+1000mm

34435mm

- 40mm

+940mm

+1000mm

31700mm +600mm

CLOSED-OFF UNITS

+400mm

+600mm

+600mm

GLASS PANEL WITH STEEL FRAME COMMON AREA 14400mm

+940mm

GLASS PANEL WITH STEEL FRAME

NETTING GRASSLAND

TYPICAL PERMANENT MODULE FLOOR PLAN 1:50 @ A3

BATHING AREA

5

2

1

0m

5

2

1

0m

COMMON AND BATHING AREA 1:50 @ A1

UNITS PLAN 1:100 @ A3

2000

Opening on the outer layer membrane, open to deflate the bubble

Fan to inflate the bubble suit

150

Opennings for hand

420 1000

Openning for people

220

Material-frosted PVC

(Model, 159mm)

Fan to inflate the bubble suit

Portable Capsule Units

Permanent Foldable Units

Everyone has a different idea of privacy. These are inflatables hotel guests would wear as their sleeping pods, inspired by the capsule hotels prominent in Japan. Guests would be put on these suits scattered along the pathways of the building and inflate them into sleeping pods at any spot, whether it is a dark corner or roof top of the building. A variety of spatial conditions with different parameters of privacy are designed for these guests to choose and sleep in. Giving them the privacy they desire while respecting the phenomenon of salarymen sleeping anywhere they want.

We want to challenge how far otakus would go to isolate themselves. In these permanent units, each otaku has their own unit but the furniture and facilities are all shared with their neighbours. Most of them are panels that fold down from the walls allowing the tenant to configure the unit to their own desire. However all of these panels would create openings in the walls which reveal the adjacent neighbour, moving in and out of their units would also require them to pass through other spaces, forcing them to negotiate and interact with the neighbours around. By creating their own space, they would have to invade others.

BUBBLE SUIT DIMENSIONS 1:10 @ A2

TYPICAL PERMANENT MODULE SECTION 1:50 @ A3

Academic Works | 21-22


Competition August 2022

On the Edge Retreat and Lookout Point, Cabo da Roca, Portugal

Description The brief requires a look-out point and a retreat for an individual with respect to the context where the westernmost of Europe meets the Atlantic Ocean. The proposed design celebrates the contrast between the sturdiness of the cliff and ferocity of the sea and wind. Allowing the visitor and individual to experience the same site in two different languages.

Academic Works | 23-24


Existing Stone Wall Polished Stainless Steel 2

1 Corten Steel Platform Knitted Fabric 4

3

10

5

1 10 2

4

3

2

1

4

3

2

m

Look-out Point Entrance to Retreat 5

3

Open-air kitchen

4

Bedroom and Restroom

Dominance

Land / Cliff

1

m

Sturdy / Safe

Look-out Point The area is for visitors to come and enjoy the view, natural elements such as the wind and cliff serve as part of a relaxing experience. 2

3

Subordinate

1 4

10

5

3

2

1

m

10

5

Volatile / Insecure

Retreat

4

4

Sea / Wind

4

3

2

1

m

The individual coming into this space would feel unconfortable. Most of the retreat is exposed to the seawind and rain. The bedroom and kitchen is visible from the look-outpoint, the individual while having an individual space does not have a lot of privacy.

Academic Works | 25-26


Bachelor’s Degree Project January 2023 - June 2023

Hanging by a Thread An urban fabric making assembly, Jakarta Indonesia

Tutors: Ricardo Olavo Ostos & Nicholas Zembashi

Description Located at the mouth of the Pluit Reservoir, people in the Kampung Gedong Pompa have often been used as a scapegoat for the polluted water and thus flooding in the area. In violation of the 5m clearance required for riverbank inspection, they are constantly facing the pressure of being evicted while living in dreadful conditions. The project proposes to uplift some of the lost traditions among the people in the kampung area while improving their living conditions in hopes to infinitely delay the inevitable.

Academic Works | 27-28


Batik-Making

1

2

3

4

5

6

7

Drawing

Wax Painting

Wax Stamping

Dyeing

Fixating

Dewaxing

Drying

Natural Dye-making

Flooding The site sits below sea level, during wet seasons from October to January, residents would face the threat of floods reaching as high as the first storey of buildings. Residents would either have to move they belongings to neighbour’s house or to the second floor. Food and medication is very limited.

Eviction The government blames the kampungs for flooding due to water pollution. A policy is set out to demolish all kampungs within 5m of the riverbank and evict its residents far away, they would have to find new jobs and adapt to new neighbourhoods. Some kampungs would “green” their village to prevent eviction.

Water Pollution With poor sewage systems, waste in the kampungs is often discarded into nearby rivers. The only way for the residents to access clean water is buying them outside of the village which cuts into a portion of their income which is barely enough for them to buy food or medicine.

1

2

3

4

5

Extracting

Preparation

Boiling and Soaking

Crushing and Filtering

Dyeing

Craft of Batik jack tree: bark

Batik is a method of dyeing fabric that is local to Indonesia. However society has forgotten the use of traditional craftsmanship to produce dye naturally instead opting for chemicals.

Academic Works | 29-30


Academic Works | 31-32


Wax Painting

Communal Washing

Harvesting Plants

Kampung Gedong Pompa

A

B

Dried Batik to be Waxed

Drying Batik Above

C

D

Public Corridor and Communal Harvest Above

Pool Collecting Dripping Water from Batik

Entrance

+5m

0m

Entrance

0m

0m +2.1m -3.1m (water level)

+3m

+3m

Dewaxing and Hanging Above

+1.5m

+1.5m

Pluit Reservoir -3.1m (water level) +2.95m

+0.9m

VOID

+2.1m

VO ID Pluit Reservoir

+0.75m

+2.1m

-3.1m (water level) +1.2m

+1.5m

+1.5m

0m +2m

Hand Drawing

Wax Painting

0m +1.2m

Wax Stamping 0m Entrance Crushing and Filtering

Dyeing

Leftover Dye to be Reused

Boiling and Soaking Raw Materials

Fixating

Pool Collecting Dripping Water from Batik Courtyard

A

B

Preparation and Cleaning

Wax Painting

Public Pavilion and Communal Farm

Wax Stamping

Public Pathway

Crushing and Filtering

Route of Batik

Dyeing

Water Cycle

Hydroponic Nursery

D

Dried Batik to be Sold in Market

Warehouses and Factories

tik Ba ed t os rke op a Pr M

Hand Drawing

C

25

15

10

5

0 m

Fixating Entrance to Proposed Batik Market

Dewaxing

Proposal Plan 1:150

Soaking and Boiling Drying

Existing Markets

Dyeing Fabric

Academic Works | 33-34


Space Forming with Grids

Adding Plantation for Dye-making

To organise the functions, a two grid systems were used to put similar functions into groups to allow smooth operation of batik production. The public corridor faces the kampungs while the factory faces the main road.

Natural dyes for batiks come from the plantation grown nearby, these plantations double as a greenery communal space. When the plants are mature, they will be harvested and processed for dye making.

Existing Warehouse

Hydroponic Nursery

Factories and Warehouses

Public Corridor

Lifting up the Site

Connection with Site

The site is lifted up to minimise disturbance to water flow at the canal underneath. By elevating different functions, theese spaces intersect with one another from above and below.

Entrances are introduced to access the building and allow travelling across the canal.

Dried Batik to be Waxed

Matured Plants to be Harvested as Natural Dyes

Kampung Gedong Pompa

Perforated Nettings

Batiks Ready for Dyeing

Existing Warehouse

Existing Main Road

Repurposed Space for Existing Shops

Entrance

Existing Canal

Motorcycle Parking and Entrance

Existing Road for Motorcycles

Kampung Storefronts

Existing Retaining Wall 10

5

2

1

0

m

Academic Works | 35-36


Academic Works | 37-38


Other Works 2021-2023

Models Academic Works

Experimenting through Making

There a lot of experiments that goes into the physical manifestation of an idea. While most of the time uncertain, it is only by interacting with materials and going through the process of uncertainty that propels projects into new directions.

Academic Works | 39-40


Beijing Aquatic Centre Sectional Model 1:50

Recreating inflatable membranes with vacuum formed polystyrene

Academic Works | 41-42


Hybrid Model

Making small-scale inflatable membranes

Beijing Aquatic Centre with Space Flowers 1:50

Academic Works | 43-44


Sinking Fortress

Creating space with membranes

Passing down knowledge with transforming spaces Scale not defined

Academic Works | 45-46


Academic Works | 49-50


See-Long Fan, Julius seelongf@gmail.com +44 7516027272 +852 91360212


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.