Period 4: Final presentation

Standardisation of the LABIC | Phase 2: Maturation

“Towards the end of the process, we reach the final sprint, a moment of consolidation of all the aspects that have been developed in the previous phases”.

and/or users of the solution (adopters), and the design of a sustainable business model.

This sprint mode intends to focus the team´s attention and seize on the collective stimulation to expedite the last steps of the maturation process. The main last objective of this period is that for the last ten days the teams test their viable final products on users, potential investors, and general public. In this way they give the project visibility and improve the team´s synergies.

This public activity18 that takes place at the end of the maturation process is aimed at the team presenting its product and pitching it to the interest groups. It is important that as well as presenting the project, they highlight the results of the pilot tests and the feedback received from the beneficiaries. And even more crucial to emphasize the scalability possibilities of the project and the financial needs.

(18) As an example, please see the final presentation at the LABICMEX that took place in Guanajuato (México), in 2021: bit.ly/presentacionfinallabicmex