Water and Compressed Air
Form
5
Deadline: January 21, 2011
Shanghai China March 15-17, 2011 Please return form to: SEMI China Rm.201, 295 Zuchongzhi Road Zhangjiang Hi-tech Park, Pudong Shanghai, 201203, China Contact: Ms. May Pu Phone: +86.21.5027.0909*202 Fax: +86.21.5027.4829 E-mail: may@semi.org.cn
Exhibitor Name: ___________________________________ ________________________Booth Number: ____________ Address:_____________________________________ ____ Contact Person: ___________________________________ Phone: __________________Fax:_________________ ____ Email: ____________________________________________ Mobile: ___________________________________________
Item
Unit Price(RMB)
Quantity
Total Price
Water Supply and Drainage Water supply to booth with 10m pipe up & down. Ø 15mm, P. 4kg/cm2
3,200
Water supply to machine with 10m pipe up & down. Ø 20mm, P. 4kg/cm2
4,800
Water connection to booth, per point
450
Water connection to machine, per point
450
Compressed Air
≤ 6HP-10HP (≤0.9m3/Min & 8~10kgf/cm ), Ø19mm
0.5HP-5HP ( 0.4m3/Min & 8~10kgf/cm2), Ø10mm 2
3
10 Bar 1m /Min, inner size 25mm Compressed Air connection, per point
4,000 4,800 5,500 600
For water supply and air compressor services, exhibitors are required to bring along their adaptor to connect to their equipment.
All water and compressed air orders must have a drawing indicating the location of the water and compressed air points.
Please use Form 7 (Location Plan) to indicate the locations and fax this to SEMI China before
January 21, 2011. Any relocating of the power points at show site will incur a 50% additional charge from SEMI China.
Exhibitors with very sensitive equipment are advised to bring their own stabilizer.
Exhibitors must bring their own special regulating units if they require very specific water temperature or water pressure.
Payment must be made after receiving the invoice from SEMI China.
Full cost of equipment or services will be applied for any cancellation of an order beginning
Late order (after the deadline of January 21, 2011) will be surcharged 30%. Any order received after February
January 21, 2011. 21, 2011 and any onsite order will be surcharged 50%.
Signature: __________________________________ Date: _________________________