LOCATION PLAN 1:1250
SITE PLAN 1:500
The main economic activities in Indonesia is concentrated in its capital, Jakarta. Located in the capital’s outermost suburbs and just 15 minutes away from Tangerang city, the building is ideal in terms of travel. Jakarta and Tangerang are a part of the one of the largest metropolitan areas in the world, Jabodetabek (also known as Greater Jakarta).
KITCHENETTE LOUNGE PC LAB CO-WORKING 1 S MEETING 1, 2, 3 T S A I REST ROOM T FIRST FLOOR A CO-WORKING 2 R S REST ROOM I SPLIT FOYER FLOOR R WORKSHOPS GALLERY RECEPTION S CAFÉ ZONING
Fl Pr
COLOUR SCHEME
Se Pu
LEGEND
ENTRANCE MOOD BOARD i
SECTION 1
SECTION 2
ii
SECTION 3
SECTION 4
iii
VIEW 1
iv
VIEW 2
v
VIEW 3
vi
VIEW 4
vii
VIEW 5
viii
VIEW 6
viii
VIEW 7
ix
VIEW 8
x
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS:
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 1
GROUND FLOOR PLAN 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
1
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS:
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 2
FIRST FLOOR PLAN 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
2
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS:
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR FINISH PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 3
GROUND FLOOR FINISH PLAN 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
3
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS:
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR FINISH PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 4
FIRST FLOOR FINISH PLAN 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
4
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR REFLECTED CEILING PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 5
GROUND FLOOR REFLECTED CEILING PLAN 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
5
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR REFLECTED CEILING PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 6
FIRST FLOOR REFLECTED CEILING PLAN 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
6
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 7
GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
7
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 8
GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
8
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 9
GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
9
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 GROUND FLOOR LIGHTING PLAN (QUANTITATIVE) 10 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
10
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 11
FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
11
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 12
FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
12
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 13
FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
13
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 14
FIRST FLOOR LIGHTING PLAN (QUANTITATIVE) 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
14
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR LIGHTING PLAN (QUALITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 15
GROUND FLOOR LIGHTING PLAN (QUALITATIVE) 1:200
SCALE: 1:200
PAGE:
15
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR LIGHTING PLAN (QUALITATIVE) STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 16
FIRST FLOOR LIGHTING PLAN (QUALITATIVE) 1:200
SCALE: 1:200
PAGE:
16
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR MECHANICAL PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 17
GROUND FLOOR MECHANICAL PLAN 1:200
SCALE: 1:200
PAGE:
17
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR MECHANICAL PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 18
FIRST FLOOR MECHANICAL PLAN 1:200
SCALE: 1:200
PAGE:
18
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR SECURITY PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 19
GROUND FLOOR SECURITY PLAN 1:200
SCALE: 1:200
PAGE:
19
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR SECURITY PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 20
FIRST FLOOR SECURITY PLAN 1:200
SCALE: 1:200
PAGE:
20
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR PLUMBING AND DRAINAGE PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 21
GROUND FLOOR PLUMBING AND DRAINAGE PLAN 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
21
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR PLUMBING AND DRAINAGE PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 22
GROUND FLOOR PLUMBING AND DRAINAGE PLAN 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
22
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR PLUMBING AND DRAINAGE PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 23
FIRST FLOOR PLUMBING AND DRAINAGE PLAN 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
23
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR PLUMBING AND DRAINAGE PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 24
FIRST FLOOR PLUMBING AND DRAINAGE PLAN 1:100
DATE: 3 MAY 2018
SCALE: 1:100
PAGE:
24
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR DOOR AND WINDOW PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 25
GROUND FLOOR DOOR AND WINDOW PLAN 1:200
SCALE: 1:200
PAGE:
25
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR DOOR AND WINDOW PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 26
FIRST FLOOR DOOR AND WINDOW PLAN 1:200
SCALE: 1:200
PAGE:
26
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: DOOR SCHEDULE STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 27
DOOR SCHEDULE 1:50
SCALE: 1:50
PAGE:
27
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: WINDOW SCHEDULE STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 28
WINDOW SCHEDULE 1:50
SCALE: 1:50
PAGE:
28
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: WINDOW SCHEDULE STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 29
WINDOW SCHEDULE 1:50
SCALE: 1:50
PAGE:
29
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: WINDOW SCHEDULE STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 30
WINDOW SCHEDULE 1:50
SCALE: 1:50
PAGE:
30
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
1 31
2 31
DETAIL: RESERVED DESK LAYOUT 1:20
NO.:
DETAIL: RESERVED DESK SECTION 1:20
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: RESERVED CO-WORKING DESK DETAIL STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
3 31
AXONOMETRIC VIEW OF RESERVED DESK
4 31
DETAIL: RESERVED DESK ELEVATION 1:20 DATE: 3 MAY 2018
SCALE: 1:20
PAGE:
31
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB
1 32
DETAIL: FLEXIBLE DESK FRONT ELEVATION 1:20
2 32
DETAIL: FLEXIBLE DESK SECTION 1:20
DRAWING NAME: FLEXIBLE HOT CO-WORKING DESK DETAIL STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
3 31
DATE: 3 MAY 2018
FLEXIBLE DESK LAYOUT 1:20
SCALE: 1:20
PAGE:
32
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
1 33
2 33
KITCHENETTE LAYOUT 1:50
A B
DETAIL NO. SHEET NO.
KITCHENETTE LAYOUT 1:50
NO.:
DATE:
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: KITCHENETTE DETAIL STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
3 33
KITCHENETTE LAYOUT 1:50
4 33
KITCHENETTE SECTION 1:50
5 33
KITCHENETTE SECTION 1:50
DATE: 3 MAY 2018
SCALE: 1:50
PAGE:
33
GENERAL NOTES
3 34
DETAIL 1 1:5
The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
4 34
A B
DETAIL NO. SHEET NO.
DETAIL 2 1:5
NO.:
DATE:
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: KITCHENETTE CABINET DETAIL STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME:
5 34
DETAIL 3 1:5
3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
1 34
SECTION 4 CABINET DETAIL 1:10
2 34
SECTION 5 CABINET DETAIL 1:50
6 34
DETAIL 4 1:5
SCALE: 1:50 / 1:5
PAGE:
34
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
2 35
LOUNGE SECTION 1:50
GENERAL NOTES
A B
3 35
1 35
A B
DETAIL NO. SHEET NO.
LOUNGE SECTION 1:50
LOUNGE LAYOUT 1:50
NO.:
DATE:
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: LOUNGE SEATING AREA DETAIL STUDENT NAME:
4 35
LOUNGE SECTION 1:50
SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 35
LOUNGE AXONOMETRIC LAYOUT 1:50
5 35
LOUNGE ELEVATION 1:50
DATE: 3 MAY 2018
SCALE: 1:50
PAGE:
35
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
2 36
SHELVING WALL AXONOMETRIC
3 36
SHELVING AXONOMETRIC 1:20
4 36
A B
SHELVING LAYOUT 1:20
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GALLERY SHELVING AND ROOM SIGNAGE DETAIL STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.:
1 36
SHELVING WALL SECTION 1:20
5 36
SHELVING WALL SECTION 1:20
6 36
ROOM SIGNAGE SECTION DETAIL 1:20
7 36
ROOM SIGNAGE FRONT VIEW 1:20
2
DATE: 3 MAY 2018
SCALE: 1:20
PAGE:
36
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS:
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: GROUND FLOOR FURNITURE AND MATERIAL PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 GROUND FLOOR FURNITURE AND MATERIAL PLAN 37 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
37
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS:
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FIRST FLOOR FURNITURE AND MATERIAL PLAN STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
1 FIRST FLOOR FLOOR FURNITURE AND MATERIAL PLAN 38 1:200
DATE: 3 MAY 2018
SCALE: 1:200
PAGE:
38
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FURNITURE AND MATERIAL LIST STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
SCALE: 1:20
PAGE:
39
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FURNITURE AND MATERIAL LIST STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
SCALE: 1:20
PAGE:
40
GENERAL NOTES The contractor to be responsible for: -Verifying all drawings, specifications, dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. -Submitting samples and shop drawings for review and approval by designer before commencing works. -Ensuring that all work is in accordance with all national building codes. -All necessary repairs, patching and cleaning of site during and after completion of works. -Verifying existing site conditions prior to submission of quotations. -Not starting the construction unless these drawings are signed and approved. -All work specified on all drawings, specifications, supplies (all necessary materials) and labour required to complete all phases of work are in accordance with the designer's standards.
GENERAL NOTES
A B
NO.:
DATE:
A B
DETAIL NO. SHEET NO.
REVISIONS: -
PROJECT TITLE CONSTRUCTION PACKAGE SI CO-WORKING HUB DRAWING NAME: FURNITURE AND MATERIAL LIST STUDENT NAME: SHANIA JUSTINA - 7522743 MODULE NAME: 3001AAD INTERIOR ARCHITECTURE AND DESIGN BA FINAL MAJOR PROJECT TERM 1718 JANUARY - MAY COURSEWORK NO.: 2
DATE: 3 MAY 2018
SCALE: 1:20
PAGE:
41