ARCHITECTURE PORTFOLIO
Shantanu Deshmukh Aspiring Architect Education Golden Kids School, Vidhyabharti College (2014-2017) SSC Percentage: 84.5% HSC Percentage: 71.4% Sinhagad College of Architecture (2017-2022) Bachelor of Architecture: • F.Y. CGPA: 8.0 • S.Y. CGPA: 8.1
• F.Y. CGPA: 8.4 • F.Y. CGPA: 8.0
Skills AutoCAD: SketchUp: Photoshop: InDesign:
8/10 8/10 6.5/10 6.5/10
1
• T.Y. CGPA: 8.5
• F.Y. CGPA: 8.0
Skills AutoCAD: SketchUp: Photoshop: InDesign: Lumion: Twinmotion:
8/10 8/10 6.5/10 6.5/10 8/10 8/10
Expertise Graphic Design, Product Design, Interior Design, Architectural Design, Landscape Design.
Experience Internship at Khosla Associates (2021) Worked as an intern at Khosla Associates, gaining valuable experience in the field of architecture. Collaborated with a talented team on various projects, contributing to the design and development processes. Acquired hands-on experience in project management, client interactions, and the practical application of architectural principles.
Projects Own Bungalow Project (8500 sq.ft) 2022-2023 Designed and executed an 8500 sq.ft bungalow project from concept to completion. Merged modern aesthetics with functionality, leading all phases from client collaboration and conceptualization to detailed design, material selection, and on-site project management. Achieved a seamless blend of style and practicality, resulting in a visually stunning and functionally efficient living space.
Contact Information 2
Phone: Email: Instagram:
9527240339 shantanudeshmukh03@gmail.com @shantanu deshmukh 3 Last updated: November 18, 2023
CONTENTS 1.MUSEUM OF EVOLUTION 2.INTERNSHIP WORK(KHOSLA ASSOCIATES) 3.CAFETERIA 4.HOUSING DESIGN 5.ARCHAEOLOGICAL RESEARCH CENTRE 6.ARCHITECTURE COLLAGE DESIGN 7.TECHNICAL DRAWING 8.RESIDENTIAL PROJECT (OWN WORK)
OUMUAMUA THE MUSEUM OF EVOLUTION
INTRODUCTION 1)MUSEUMS AS SOCIAL LEARNING SPACES FOR KNOWLEDGE PRODUCING PROCESSES, 2)WHY AND WHAT DOES IT MEAN? MUSEUMS ARE DEMOCRATIC EDUCATIONAL INSTITUTIONS THAT CONTRIBUTE TO CULTURE BEING AN ACTIVE RESOURCE IN SOCIETY. THIS IMPLIES THAT MUSEUMS AS SOCIAL LEARNING SPACES FOR KNOWLEDGE PRODUCING PROCESSES CAN CREATE SOCIAL CHANGE AND SUSTAINABLE GROWTH. THEY ARE PLATFORMS FOR ENGAGEMENT AND SOCIAL INCLUSION, FOCUSSING ON KNOWLEDGE SHARING AND PRODUCTION IN RELEVANT AND QUALIFIED SETTINGS FOR TODAY’S CITIZENS, WITH A VIEW TO ENSURING THAT MUSEUMS ARE TRANSFORMED INTO CENTRAL PLAYERS IN THE DEVELOPMENT OF SOCIETIES. IN THE 1972 DECLARATION OF SANTIAGO DE CHILE, ICOM ENCOURAGED MEMBER STATES TO SUPPORT THE SOCIAL ROLE OF MUSEUMS AND MUSEUMS ARE INCREASINGLY VIEWED IN MOST COUNTRIES AS PLAYING A KEY ROLE IN SOCIETY, AND AS A FACTOR IN SOCIAL INTEGRATION AND COHESION. IN THIS SENSE, THEY CAN HELP COMMUNITIES TO TAKE PROFOUND CHANGES IN SOCIETY, INCLUDING THOSE LEADING TO A RISE IN INEQUALITY AND THE BREAKDOWN OF SOCIAL TIES
AIM TO DESIGN SPACE WHERE PEOPLE WILL SEE HOW ARTIST/PEOPLE BRING THEIR VISION TO REALITY. TO DESIGN A SPACE WHERE PEOPLE GET INSPIRE BY OBSERVING THE EVOLUTION OF MANKIND AND HOW THEY CAN
OBJECTIVE
B A
A B
LOCATION :- SANKEY RD, PALACE GUTTAHALLI,BANGALURU,KARNATAKA 560003 13’00’03.0”N 77°34’57.7”E THE SITE IS LOCATED IN BETWEEN KOTAK MAHINDRA PRIME LIMITED AND MAHALAXMI TEMPLE - THE TOPOGRAPHY IF THE SITE HAS 8M SLOPE WHICH HELPS FOR DESIGNING THE BUILDING
WHAT IS THE PURPOSE OF MUSEUM ? THE ACTUAL PURPOSE OF THE MUSEUM IS TH INSPIRE ALL KINDS OF GENERATIONS BY SHOWING EXCEPTIONAL WORK WHICH HAS BEEN DONE BY PEOPLE. IT CONTAINS THE THINGS THAT HAS BEEN DONE WHICH ARE REALLY HARD TO ACHIVE OR SOME SOLUTIONS WHICH ARE ALMOST IMPOSSIBLE AT THAT TIME BUT PEOPLE COMEUP WITH SOLUTION . THE SECOUND PURPOSE OF THE MUSEUM IS TO SHOW POSSIBLITY OF THE FUTURE AND THE THINGS WHICH ARE LOOKING IMPOSSIBLE NOW CAN BE ACHIVE.
Elevation profile AA
Elevation profile BB
THIS SITE IS SELECTED FOR VARIOUS REASONS - THE SITE LIES BETWEEN THE CITY AND THE SUBURB, THEREFORE MAKES IT EASY FOR TRAVELLING AND TRANSPORTING GOODS TO BOTH ENDS. -THE SITE IS ADJECENT TO THE FOREST AND LAKE WHICH GIVE PLEASENT VIEW THE SITE IS LOCATED AT THE CORE OF THE CITY AND IT IS EASY TO EXCESS FOR PUBLIC -THE WINDFLOW OF THE SITE IS FROM LEFT TO RIGHT AND THE GREAN SPACE IS IN LEFT SIDE OF THE SITE WHICH HELPS SITE HAVING OXIDISED ATMOSPHIRE, WHICH GIVES THE SCOPE OF HAVING LESS OPENING
COMPARISION BETWEEN MINDSET OF PEOPLE IN PAST AND NOW 1.IN OLDEN MUSEUMM THAY DON’T EXPLAN THE IMPORTANCE OF ELEMENTS. 2. THAY DON’T EXPLAIN PROPERLY HAW THAY CAME TO EXISTANCE AND HOW MANY PROBLEM THAY FACE ACHIVING IT. 3.WHOLE MUSEUM IS IN ONE SINGLE PATTERN SO IT GETS BORING AT CERTAIN POINT. 4.WE CAN SEE THE ELEMENT THAT ART BUT WE DONT’T GET INSPIRE BY IT BECOUSE WE DONT’T GET INFORMATION PROPERLY 5.THE WAY OF PASSING INFORMATION THIS DAYS IS DIFFERENT WE HAVE TO UNDERSTAND HOW PEOPLE CONSUME INFORMATION THIS DAYS. 6.THE PRIME FOCUS IS TO DESIGN IS TO MAKE SURE PEOPLE UNDERSTAND THE DIFICULTY COME WHILE MAKEING THAT ELEMENT AND HOW THAY OVERCAME IT AND MAKE WHOLE PROCESSS INTERESTING TO MAKE PEOPLE CONSUME INFORMATION PROPERLY.
TO UNDERSTAND HOW THE ADULT GENERATION AND YOUNG GENERATIONS RECIVE INFORMATION AND TO DESIGN EVERYTHING ACCORDING TO IT, SO IT WILL GAIN VALUE, INTEREST AND FUTURE VISION 2) TO RETHINK THE TYPICAL MUSEUM STEREOTYPE AND DESIGN MUSEUM THAT IS EXCEPTED BY YOUNGER GENERATIONS 3) IN THE WORLD OF MISCONCEPTIONS, PASSING THE RIGHT INFORMATION BY SHOWING THE EVOLUTION OF MANKIND AND FUTURE POSSIBILITIES. 4) TO SHOW PEOPLE THAT THE BASIC FUNDAMENTALS OF EVOLUTION IS SAME AND HOW THAT CAN ACHIEVE THE NEXT STEP OF EVOLUTION UNDERSTANDING THOSE BASIC FUNDAMENTALS TRANSPORTATION
1) THE ELEMENT WHICH HAS BEEN SHOWN IN PAST AND FUTURE CAN BE ACCESS OR OPERATE BY VISITORS TO UNDERSTAND THE FUNCTION OF THE ELEMENTS AND TO UNDERSTAND THE SKILLS REQUIREMENT OF FUTURE. 2) THIS SPACE WILL ATTRACT NUMBER OF TOURIST THIS WOULD ENCOURAGE AN INTERACTION AND EXCHANGE OF IDEAS BETWEEN LOCAL PEOPLE AND TOURIST.
AIRPORT - 10km bus stand -4.2 km metro station -3.7 km railway station -5km local bus stand - 10m
WHY METEOR? 1. THE ONLY INTERSTELLER METEOR WHICH COME FROM OUTER SOLAR SYSTEM . 2.IT CAME FROM ABOVE AND ALSO LEAVE FROM ABOVE 3. THE NAME OF THE METIOR IS OUMUAMUA AND THE MEANING OF THE NAME IS MASSANGER FROM THE DISTANT PAST REACHING OUT TO US . 4. WHY THIS METIOR IS IMPORTANT AS THIS CONTAIN THE SAME ELEMENT WHICH IS EARTH CORE WHICH HOLDS THE ANSWERS OF FORMATION OF EARTH OR THE DISTRUCTION OF EARTH. 5. NATURE OF THE METIOR WHILE PASSING IS NOT UNIFORM. IT REVOLVE AROUND ITSELF AND ALSO THROUGH AXIS. 6. THE ONLY EXPLANATION FOR ROTATION OF THE METIOR IS THAT IT WAS THROWN OUT OF SOLAR SYSTEM DURING THE DISTRUCTION OF THE SOLAR SYSTEM. 7. AND THE OTHER POSSIBLE EXPLANATION IS IT WAS THROWN OUT DURING COLITION OF PLANET WHIC HAPPEN DURING FORMATION OF SOLAR SYSTEM. 8.SO THIS METIOR CONTAIN THE ANSWERS WHICH SUGGEST US THE FORMATION OF EARTH OR IT CONTAIN THE ANSWER OF DISTRUCTION OF EARTH. IN THE MUSIUM I HAVE SHOWN THE EVOLUTION OF MANKIND AND WHAT ELEMENTS WHERE HELP HUMAN TO EVOLVE .
LANDSCAPE ACTIVITIES 1. VISITERS CAN EXPERENCE THE STONE AGE ERA. PEOPLE CANSTAY INSIDE THE CAVE TO EXPERENCE THE STONE AGE LIFESTYLE. HOW THAY COOK FOOD ,HOW THAY MAKE TOOLS. HOW THAY PAINT CAVES .HOW THAY MAKE PAINTS.ETC 2. NEANDERTHAL PEOPLE WERE FIRST TO MAKE JEWELRY TO IMPRESS OTHER GENDER THAY WERE FISHERMAN SO THAY MAKE JEWELRY USING SHELLFISH BONES .THAY WERE FIRST TO INTRODUSE CONCEPT OG NECKLASE. IN LANDSCAPE PEOPLE CAN LEARN HOW TO MAKE JEWELRY OF BONE USING BONES. HOW TO CARVE IN BONE. 3.HUMAN FIRST FEEL THE NECESITY OF SEPERATE ROOMS IN HOUSE THE FUNDAMENTAL CONCEPT OF SEPRATE ROOM WAS INTRODUCE TO GIVE IMPORTANCE TO EACH ACTIVITY. EACH ACTIVITY HAS SEPRATE MEANING AND SHOULD HAS SEPRATE SPACE. PEOPLE WILL UNDERSTAND WHY IT IS IMPORTANT TO HAVE SEPRATE SPACE FOR SEPRATE ACTIVITY. 4.HUMANS USE TO LEARN HOW TO USE EAST TO MAKE FOOD LIKE BREAD. PEOPLE WHO VISITS THIS AREA WILL LEARN HOW THIS ANCIANT PEOPLE MAKE YEAST FOOD USING NATURAL ELEMENT AND UTENCILES. 6.HOW TO EXCAVATE ELEMENTS FROM GROUND 8. HOW THE BLOCKCHAIN WORK . HOW THE SYSTEM IS MOST SECURE SYSTEM AND WILL BE THE FOUNDATION OF ALL TRANSITION IN THE WORLD. 9.INSIDE THE METAL PODS THERE WILL BE DEVICE THAT WILL SHOW HOW FUTURE WORLD WILL LOOK LIKE AND WHAT ARE THE POSIBILITIES OF FUTURE. 13.HOW OWER BRAIN CAN BE INHANCE AND CAN BE USE TO CONTROL OWER BRAIN TO INCREASE PRODECTIVITIES AND WILL SHOW THE STAGE AT WHICH THE TECNOLOGY NOW
SITE PLAN CONTAINS
GROUND FLOOR PLAN (1:200)
1.CAVE AREA 2.FIRST ORNAMET EVER MADE FOR WOMENS 3. FIRST DIVISION OF ROOMS IN HOUSE IN STONE MATERIAL 4.MAKING OF FIRST BREAD AND COOKING FOOD 5.MAKING OF FIRST METAL TOOLS 6.DISPLAYS OF FIRST TOOLS EVER MADE 7.EXCAVATION OF MATERIAL FOR EARTH 8.WORKING OF BLOCKCHAIN 9. METAL PODS(DIGITAL LABRARY,VR WORLD EXPLORE ,ETC) 10.DISPLAY OF ROBOTS 11.FIXING AND WORKING OF ROBOTS 12.ADVANCEMENT IN ROBOTS 13.INTERFACE OF HUMAN BRAIN WITH MACHINE 14.SPACE ELEVATORS 15 VR AND AR GLASS EXPERENCE.
CONTENT OF THIS GALLERY AND LANDSCAPE 1.IN THE BIGINING OF THE HUMAN LIFE. HUMAN USE TO LIVE IN CAVES AND USE ONLY MATERIALS THAY FOUND IN NATURE 2. THE THAY ONLY CONSUME THE FRUITS AND VEGITABLES FOUND IN FOREST. THAY LIVE LIVES TAHY SAW IN FRONT OF THEM 3. THE HUMANS STARTS TO INOVATE AND STARTED USING VARIOUS MATERIALS IN NATURE 4.HUMANS HAD STARED LIVING IMPROVED LIFE THAY STARTED LIVING IN CAVES AND START USING STONES AS TOOLS TO CUT PLANTS 5. HUMANS DESCOVER THE IMPORTANCE OF PLANTS AND THY CAME TO KNOW THAY CAN GROWN THEIR OWN PLANTS SO THY STARTED AGRICULTURE 6.THIS LEADS TO SETTLEMENT OF HUMAN AND THEN THAY CAME TO KNOW GROUP OF PEOPLE CAN LIVE GOOD LIFE. 7.THE BRAIN FUNCTION CAN BE INHANCE BY THE MACHINE IMPLANTS AND CAN IMPROVE HUMAN PRODUCTIVITY. THE ABILITY TO DO MANY ADVANCE THINGS CAN BE ACHIVE BY THE INTERFACE OF HUMAN BRAIN AND MACHINE . 8. THE SPACE ELEVATORS CAN BE POSSIBLE AND VARIOUS COMPANYS ARE WORKING ON THIS PROJECT. ONE OF THE COMPANY ARE AUTODESK. THE FUNCTION OF THE ELEVATERS ARE THERE WILL BE TUBE AND THERE WILL BE ELEVATOR INSIDE. 9.SPACE ELEVATORS WILL BE USE FORR REACING SATTLITE, SPACE STRUCTURES SPACE TRAFFICS ETC 10. FOR THE BETTER FUNCTIONING OF FLYING CARS AND CONTROLING THE TRAFFICS WE NEED SPACE STRUCTURES AND TO EXCESS THIS STRUCTURE WE NEED SPACE ELEVATORS.
1.IN LANDSCAPE WE CAN ACTUALY USE THE ELEMENTS AND SEE HOE THINGS GET TOGETHER AND FUNCTION 2.THIS WILL GIVE EXPERENCE THIS PEOPLE CAN DO THE STUFF BY THEMSELF WHICH THAY THOUGHT WILL BE VERY DIFFICULT. 3.INTERACTION OF FUTURE AND PAST WILL HELP THEM UNFERSTAND THE IMPORTANCE OF EVERYTHING
FIRST FLOOR PLAN (1:200)
CONTENT IN THE GALLERY AND LANDSCAPE 1. HUMANS START TO DIG IN BIG HOLES AND THAY START TO FIND DIFFERENT ELEMENTS AND THAY START TO USE DIFFERENT THINGS. 2.HUMANS START USEING METAL FOR SOME WORK AND IT WAS FIRST FOUND IN WEST AMERICA. 3. THE FIRST METAL WHICH HUMAN METAL WAS COPPER. ABOUT 8500 YEARS AGO, HUNTER-GATHER BESIDE EAGLE LAKE IN WISCONSIN HAMMERED OUT C CONICAL, 10 CENTIMETER LONG PROJECTILE POINT MADE OF PURE COPPPER. 4. HUMAN START TO GET SETTLE WHEN THAY START FARMING IN AREA SO THAY HAVE TO FIND PLACE TO LIVE. 5.HUMANS START TO EXPRIMENT AND MADE STONES HOUSE, JOINT STONE HOUSE. STONE HOUSE CONTAIN ONE ROOM IN WHICH WHOLE GROUP STAY 6.THEN THAY STARTED TO BUILT BAMBOO HOUSE , LEAVES HOUSE ETC. 7.THE CONSTRUCTION ERA GET STARTED AND THAY STARTED MIXING MATERIAL LIKE STONE AND SAND MUD ETC 8.NOW ENT
HUMANS MATERALS
USE TO
LOTS OF CONSTRUCT
DIFFERSTRUCTURE
9.ROBOTICS AND MACHINE ARE THE FUTURE OF MANKIND THE FUNCTION WHICH IS INREPITING MANNER CAN BE REPLACE BY ROBOTS IN FUTURE THE ROBOTS WILL TAKE ALL THE WORK FROM HUMANS 10.THE MIX REALITY ING DIGITAL ELEMENTS IN
THE
MEANS REAL
SEEWORLD
11.WE CAN ACHIVE LOTS OF ELEMENTS IN MIX REALITY COMPLEX STRUCTURES , GAMES , MEETING ETC MANY OFFICES ARE USING MIX REALITY FOR THEIR MEETING 12.ROBOTICS AND MACHINE WILL BE THE FUTURE OF MANKIND AND MOST OF THE PEOPLE WILL SPEND MORE TIME IN METAVERSE
SECOUND FLOOR PLAN (1:200)
CONTENT OF THIS GALLERY AND LANDSCAPE 1.ARTIFICIAL INTELLIGENCE WILL GO FOR FINDING THE OPTIMAL SOLUTION, AND LEADS TO INTELLIGENCE OR WISDOM; MACHINE LEARNING WILL GO ONLY FOR THE SOLUTION, WHETHER IT IS OPTIMAL OR NOT, AND LEADS TO KNOWLEDGE. 2.THE LATEST DEVELOPMENTS IN ARTIFICIAL INTELLIGENCE ARE CHATBOTS, SMART CARS AND IOT DEVICES. THE HEALTHCARE, BANKING, LOGISTICS AND TRAVEL SECTORS ALL USE ARTIFICIAL INTELLIGENCE TO PROVIDE A SUPERIOR EXPERIENCE. 3.A NEW KIND OF ARTIFICIALLY INTELLIGENT CHATBOT REPLIKA IS DESIGNED TO LEARN FROM A PERSON’S WRITING STYLE AND SOCIAL MEDIA FEEDS, AS WELL AS THE CONTENT OF CONVERSATIONS IT HAS WITH THE PERSON. IN FACT, AI SYSTEMS HAVE BEEN DEVELOPED TO UNDERSTAND OPEN FORM CONTENT LIKE NATURAL LANGUAGE, SOCIAL MEDIA AND EMAIL RESPONSES. 4.POWERFUL SOLUTIONS AND THE CAPABILITIES OF ARTIFICIAL INTELLIGENCE ARE DEVELOPING VERY RAPIDLY, AND AI SYSTEMS HAVE THE ABILITY TO UNDERSTAND HUMAN EMOTIONS AND RESPOND TO THEM. 5. ONE TYPE OF AI THAT IS QUICKLY FINDING ITS WAY INTO MOST CONSUMERS’ HOMES IS THE VOICE ASSISTANT SUCH AS APPLE’S SIRI, AMAZON’S ALEXA, GOOGLE’S ASSISTANT AND MICROSOFT’S CORTANA. 6.HANSON ROBOTIC’S MOST ADVANCED HUMAN-LIKE ROBOT SOPHIA PERSONIFIES PEOPLE’S DREAMS FOR THE FUTURE OF AI. SOFIA IS ALSO A FRAMEWORK FOR CUTTING EDGE ROBOTICS AND AI RESEARCH, PARTICULARLY FOR UNDERSTANDING HUMAN-ROBOT INTERACTIONS AND THEIR POTENTIAL SERVICE AND ENTERTAINMENT APPLICATIONS.
THIRD FLOOR PLAN (1:200)
CONTENT OF THIS FLOOR 1.WEB 1.0 : READ ONLY WEB. IN THIS INITIAL VERSION OF THE WEB, A USER WAS ABLE TO ONLY READ THE CONTENT. APPLICATIONS INCLUDED: NEWS SITES, PORTALS, SEARCH ENGINES ETC. 2.WEB 2.0 : WEB 1.0 + INTERACTION. THIS VERSION OF WEB APPLICATIONS ENABLED USERS TO INTERACT. SO FOR EXAMPLE A USER CAN COMMENT, LIKE A POST ETC. APPLICATIONS INCLUDE SOCIAL NETWORKS, CHATTING APPS ETC. 3.WEB 3.0 : WEB 2.0 + TRUST & VERIFIABILITY. WEB 2.0 APPLICATIONS HARVESTED USERS’ CONTENT AND DATA TO MAKE MONEY, TAKING AWAY THE PRIVACY AND CONTROL FROM THE USERS. WEB 3 IS A MOVEMENT TO SHIFT THE POWER BACK TO THE USERS – MAKING THE WEB OPEN, SECURE, RESILIENT AND PRIVATE 4.THE FIRST ELEMENT OF THE WEB 3 IS DECENTRALIZED WEB. IT MEANS INTERNET APPLICATIONS ON WEB 3 DO NOT RELY ON CENTRALIZED SERVERS. WEB 2 SERVICES GO DOWN WHEN A SERVER GOES DOWN WHEREAS WEB 3 SERVICE CANNOT GO DOWN AS THE DATA IS STORED IN MULTIPLE COPIES ON A P2P ( PEER-TOPEER ) NETWORK. 5.THE SECOND ELEMENT OF THE WEB 3 IS BLOCKCHAIN. IT HELPS PROVIDE VERIFIABILITY, OWNERSHIP AND ECONOMIC INCENTIVE TO THE RIGHTFUL OWNER OF THE CONTENT. 6.THE SMART CONTRACTS STORES THE OWNERSHIP AND TRANSACTIONS DATA ON THE BLOCKCHAIN, MAKING THE OWNERSHIP VERIFIABLE AND DISTRIBUTING THE ECONOMIC BENEFIT TO THE CONTENT OWNERS, NOT THE INTERMEDIATORY PLATFORMS OF THE WEB2 WORLD. WHO ALSO RUNS A NODE ON A BLOCKCHAIN NETWORK, WANTS TO ALTER A BLOCKCHAIN AND STEAL CRYPTOCURRENCY FROM EVERYONE ELSE. IF THEY WERE TO ALTER THEIR OWN SINGLE COPY, IT WOULD NO LONGER ALIGN WITH EVERYONE ELSE’S COPY.
FOURTH FLOOR PLAN (1:200)
1.THE STRUCTURE IS BUILD IN TRUSS BEAM AND I SECTION COLUMN. 2.THE SLAB IS MADE FOR 100MM STEEL SLAB AND OVER THAT THERE IS 100MM CONCRETE SLAB . 3.THE SLAB TO SLAB HIGHT IS 5M AND THE SLAB TO FALSE CEALINNG HIGHT IS 4 M 4.ALL FLOOR HAS ESCILATOR ,ELEVATOR AMD STAIRCASE TO EXCESS 5.THERE IS FIBER REINFORCED CONCRETE PANELS (FRCP) USED FOR COVERING OF THE BUILDING
SECTION AT AA’
SECTION AT BB’
RENDERED ELEVATION
ELEVATION 1.THE ACTUAL PURPOSE OF THE MUSEUM IS TO INSPIRE ALL KINDS OF GENERATIONS BY SHOWING EXCEPTIONAL WORK. WHICH HAS BEEN DONE BY THE PEOPLE. 2.MUSEUM SHOULD CONTAIN THE THINGS WHICH IS REALLY HARD TO ACHIVE. 3.BUT SOME PROPLE CAME UP WITH THE SOLUTION WHICH IS ALMOST IMPOSSIBLE AT THAT TIME. 4.THE SECOUND PURPOSE OF THE MUSEUM IS TO SHOW THE POSSIBILITIES OF THE FUTURE. 5. THE THINGS WHICH IS LOOKING IMPOSSIBLE CAN BE ACHIVE IN FUTURRE. 6.BUT TO ACHIVE THIS PURPOSE WE SHOULD CONSIDER THE VARIOUS MINDSET OF THE PEOPLE. 7.THE STURAL ELEVATION IS TAKEN TO ACHIVE THAT GOAL.
ELEVATION
AIR COOLING LAYOUT (DUCTING LAYOUT)
FIRE FIGHTING LAYOUT
ELECTRICAL SUPPLY LAYOUT
BASEMENT PARKING LAYOUT
1. IN THIS AREA THE EVOLUTION OF AGRICULTURE ERA IS DISPLAED, PEOPLE WILL CAME TO KNOW THAT THE FORMATION OF LARGE GROUP AND FORMATION OF VILLAGE. 2. AGRICULTURE WAS THE BIG REASON WHY HUMANS ACTUAL CAME TOGETHER TO FORM ECONOMY . 3. THE FIRST TRANZECTION VALUE FOR ONE THING TO OTHER IS DONE DUE TO THIS AGRICULTURE FORMATION . 4. THE HUMAN MADE MACHINE TO MAKE THERE LIFE EASY AND MAKE LARGE CROPS IN SMALL LAND . 5. NOW HUMANS CAN MAKE LARGE AGRICULTURAL PLANTS IN CLOSE ROOM USING MACHINE TEMPRATURE,ETC PEOPLE FIGURE OUT HOW TO GROW PLAN AT ANY PLACE. 6.IN FUTURE PEOPLE WILL START FARMING ON ANOTHER PLANET LIKE MARS THE PREPARATION FOR THAT HAS BEEN STARTED AND HUMANS UNDERSTAND THAT IF THAY HAVE TO CREATE CIVILIZATION ON ANOTHER PLANET THEN THAY HAVE TO DO FARMING FIRST BECOUSE THATS BASEC NEED OF HUMANS.
1.THE INTERIOR OF THE GALLERY SHOWS THE EVOLUTION OF CONSTRUCTION TYPE OF BUILDING 2.THE PANEL IS FIXED TO THE STAINLESS STEEL ROD. IT IS ALINE OVER ROOM SO IT CREATE BOX ROOM FEEL. 3.DIFFERENT SIZES OF PANEL REPRESENT THE DIFFERENT SCALE OF THE STRUCTURE 4.PEOPLE CAN SEE THE CHANGE IN THE STYLE IN ARCHITECTURE. 5. IN THE BIGGINING WE USE TO LIVE IN CAVES WHICH IS REALLY UNCONFORTABLE. THEN PEOPLE START TO LIVE IN ROCK AND MUD HOUSES . THEN THINGS GET BETTER AND BETTER . 6.THERE IS RELACTATION AREA IN MIDDLE AREA OF EVERY GALLERY. SMALL CAFETERIA, BOOKS READING AREA. SOFA TO RELAX AND BUFFER SPACE.
1. HUMANS START TO DIG IN BIG HOLES AND THAY START TO FIND DIFFERENT ELEMENTS AND THAY START TO USE DIFFERENT THINGS. 2.HUMANS
START
USEING
METAL
FOR
SOME
WORK
AND
IT
WAS
FIRST
FOUND
IN
WEST
AMERICA.
3. THE FIRST METAL WHICH HUMAN FIND WAS COPPER. ABOUT 8500 YEARS AGO, HUNTER-GATHER BESIDE EAGLE LAKE IN WISCONSIN HAMMERED OUT C CONICAL, 10 CENTIMETER LONG PROJECTILE POINT MADE OF PURE COPPPER 4.
FIRST
THAY
USE
IT
AS
A
WEAPONS
AS
THAY
ARE
SHARP
AT
THE
EDGES.
THAY
USE
IT
TO
HUNTING.
5. THEN THAY FIND OTHER METALS AND THAY STARTED TO BECOME RICH. METAL STARTED GAINING IMPORTANCE AND BECAME IMPORTANT PART OF ECONOMY. AS METAL WAS LIMITED ON THE PLANET AND IT DOES NOT DECAY SO THE 6.
1. MOST OF US ARE SURROUNDED BY THE MACHINE AND WE THINK THAT THE MACHINE HAS TO BE OPRATED BY THE HUMANS 2. BUT WE ARE ENTERING THE ERA IN WHICH AI WILL CONTROL MACHINE AND IT WILL OPRATE BY ITSELF 3.THE MOST ADVANCE ROBOTS ARE DOING THINGS THAT WE DID NOT EXPECT THEM TO DO AND THAY HAVE THEIR OWN MIND 4. KNOWING HOW IT WORK AND HOW WE SHOULD NORMALISE LIVING WITH ROBOTS NOW. 5.ALL THE SECTORS WILL HAVE AI ROBOTICS AND MOST OF THE WORK WILL BE DONE BY ROBOTS. 6. NEXT GENERATIONS WILL KNOW ROBOTS BETTER OR ROBOT WILL KNOW U BETTER THAN ANY OTHER HUMANS
THE
VALUE
OF
THE
METAL
WHICH
DECAYS
LESS
HAS
HIGH
VALUE
AS
WE
CAN
STORE
IT
AND
USE
IT
AGAIN.
.
INTERNSHIP WORK(KHOSLA ASSOCI ATES)
1'-6" 7'-2" 35'-8"
C
ELECTRICAL ROOM 16'0" X 7'4" D4
EXIT
D2
SLOPE - 1:8 STORE 16'8"X16'0"
CUT OUT ON SLOPED ROOF
LVL - 44'-0" LVL - 88'-0"
W34
W3
W3
W34
W34
W3
W3
W35
WOODEN LOUVERS TO DETAIL
3' GLASS RAILING TO DETAIL
LVL - 15'-4"
4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL
PRECAST CONCRETE PERGOLA EXPOSED CONCRETE FINISH
LVL - 44'-0"
LVL - 44'-0"
CW13
DW2
LVL - 0'-0"
CW11
CW13
10'-4"
11'-4"
CW11
LVL - 0'-0" LVL - (-31'-0")
ELEVATION A
ANTE ROOM 9'10"X6'0"
W34
MONIER TILES
CUT OUT ON SLOPED ROOF
15'-9"
UP VERANDAH 8'0" X 16'8''
13'
05
2"X6" WOODEN RAFTERS
DUCT LOUVER TO DETAIL
4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING 14'4" ht COMPOUND WALL
13'-6"
NEIGHBORING PROPERTY
DD
RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH
2"X6" WOODEN RAFTERS WOODEN LOUVERS TO DETAIL
W38
LVL - 185'-1"
3' 1'-6"
01 03
W31
8'-9"
12'-6"
10'-6"
CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER - KERALA TILES
SERVICE ENTRY/EXIT
PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE -PAINT FINISH
PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH
LVL - 201'-9" W31
8" 20'
5'-2"
6'-8"
4'-10"
6'-8"
3'-4"
6'
3'-2"
10'-8"
10'-6"
3'-4"
10'-4"
3'-6"
13'-2"
10'-10"
1'-6" 4'-10"
5'-2"
1'-6" 9'-6"
6" 11'-6"
6'-8"
9" 4'
6'-7"
3'-4"
6'
4'-8"
6'
1'-10" 3'-4"
11'-6"
2'-8" 7'-8"
7'
6'-4"
10'-4"
10'
7'
6'
8'-10"
15'-8"
311'-2" STAGE
1
W4 V1
KITCHEN AND STORE 32'8"X43'8"
CC
SDW1
BUFFET AREA 10'10"X31'8"
DOUBLE HEIGHT BANQUET HALL 37'0"X48'8"
V2
DECK 27'0"X66'0"
3
2
5 6 7
4
8 9
10 11
12 13
14 15
W36
W37
W36
16
17 18 19 20 21 22 23
24
25 26 27 28 29
30 31
33 34 35
32
36
38
37
39
40
41 42 43
44
45
46
47
PT SLAB EXPOSED SIDE - THERMOTILE UNDERSIDE -PAINT FINISH
UP
CC
2"X6" WOODEN RAFTERS
1'-6"
DROP OFF CANOPY ABOVE
WOODEN LOUVERS TO DETAIL RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH GLASS
SDW1
7'-2"
LADIES TOILET 18'2"X11'4"
4'0" WIDE PASSAGE
ENTRANCE PORCH
MAIN ENTRANCE
MD
PRE-FUNCTION FOYER 29'8"X30'8"
LOBBY 14'10" X 16'4"
VERANDAH 10'0"X 16'0"
W2
13'-6" 13'
DW7
W2
PAINT FINISH LVL- 138'-0" CW9
LVL- -128'-4"
CW8
LVL- 110'-4"
CW6
LVL- -104'-2"
D3
CW6
TC TC
W29
DECK 16'8"X140'5"
RO TC
3' 1'-6"
27'-10"
3'
9'-8"
5'-4"
9"
1'-4"
8'-4"
3'-4"
8'-8"
8'-4"
8'-4"
8'-8"
5'-4"
2'
4'-8"
EE
W7
FF
GG
A
HH
AA B
BB
C CC
D
DD
E
EE F
14'-9"
19'-5"
16'-10"
3'-4"
16'-2"
7'-11"
9'-11"
12'-4"
1'-8"
1'-2"
5'-6"
4'-11"
8'-2"
1'-2"
5'-8"
3'-4"
PEDESTRIAN RAMP
S6 S5 S4 S3 S2 S1
S3 S2 S1
ENTRANCE PORCH
9"
1'-2"
5'-4"
FF G GG H HH J
5
4
3
2
1
1'-4"
7'-10"
4'-8"
7'-8"
11'
JJ K
KK KK°
L°
LL M°
MM°
N°
NN° P PP Q° QQ° R RR° S° SS° T TT
U UU
V
PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH
1'-6"
TC
W12
9'
3'-4"
8'-8"
8'
VV
X XX
Y
YY
METAL LOUVERS TO DETAIL
PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH
LVL - 16'-8"
INDOOR BADMINTON COURT BELOW 26'8"X55'1"
2"X6" WOODEN RAFTERS
W35
WOODEN LOUVERS TO DETAIL
W34
W34
W34
RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH
W34
2"X6" WOODEN RAFTERS
W12
7'-2" 35'-8"
RESTAURANT 77'9"X30'4"
CW2
CW9
13'-6" 35'-8"
D6
10'-6"
CW8
CW3
DW1 W11
CW2
W11
KITCHEN 19'0"X26'5"
13'
W10
RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH
4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING 4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL
B39
W20 W18
W18
GENTS TOILET 30'8"X26'8" ENTRANCE LOBBY 26'8"X26'8"
W23
W21
ZUMBA/YOGA STUDIO 26'0"X26'8"
D7 W19
LANDSCAPED COURT 2 8'8"X16'8"
SD2
W18
W10
LANDSCAPED COURT 3 16'0"X9'0"
LVL - 165'-5"
DW2
15'-9"
15'-8"
8'-10"
CW6
6'
12'
46
12 13
14 15 16 17 18 19
20 21 22
23 24 25
10'
45
7'
44
CW4
CW2
CW3
CW1
CW2 B46
B62
CB3
CB3
10'-4"
6'-4"
7'-8"
PB1
41
AA
16' WIDE PASSAGE
26
SECTION DD
40
CB3
7'
DW1
11'-6"
PB1
6'
PB1
D6
4'-8"
6'
PB1
9" 4'
3'-4"
D4 RIBBED
6'-7"
6'-8"
11'-6"
WOOD 6"TO DETAIL
TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT
1'-6" 9'-6"
39
38
36
37
35 34 33
29 28 27 26 25
5'-2"
S2 S1 10'-10"
B15
27'-10"
LVL - 0'-0"
3'
13'-2"
9'-8"
5'-4"
8'-4"
3'-6"
B9
23 22 21 20 19 18 17
10'-4" B7
7" THK SLAB
16
8"
3'-2"
10'-6"
10'-8"
BANQUET HALL 3'-4"
S6 S5 S4 S3 S2 S1
6'
6'-8"
4'-10"
6'-8"
B2
LVL - 179'-9"
5'-2"
STORE ROOM
20'
PB20
B6
15 14
13 12
PB10
PB12
11 10
7 6 5
9 8
3
4
2
1
PT SLAB
PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH
1'-8"
B4
D2
D2 D1
PRE-FUNCTION FOYER 3'-4"
TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT
B11
RCC STAIRCASE 2 ITALIAN MARBLE TREAD - 1'0" RISER - 6" WIDTH - 3'0"
24
PD1
ROOM-4
B13
LVL - 16'-8"
DW7
14'4" ht COMPOUND WALL
B2
W28
LVL - 16'-8"
LVL - 66'-0"
PEDESTRIAN RAMP
S3
B10
311'-2"
PB1
31 30
32
W28
S6
S5
S4
S3
S2
D6
1'-6" 4'-10"
STAIRCASE EXPOSED SIDE - THERMO TILE ANDUNDERSIDE - PAINT FINISH LIFT PB1 LOBBY
LOBBY PB3
1'-2"
W28
8" THK SLAB
B25
B36
RAILING TO DETAIL
GLASS
S1
DW1
1'-10" 3'-4"
B32
CB3
B43A
ENTRANCE PORCH DW3
10'-4"
LIBRARY/ 11'-4" BUSINESS CENTRE
43 42
1'-6"
SWIMMING POOL 98'0"X40'0"
DW5
7'-2"
DW5
UP 10 11
CW5
CW5
CB3
WEATHERING COURSE
FALSE CEILING
METAL LOUVERS TO DETAIL
8" THK SLAB CB3
LVL - 196'-5"
METAL LOUVERS TO DETAIL DECK 13'6" X 70'8"
AA
B98
CW6
DW3
PB42
47
W28
SKYLIGHT TO DETAIL
8" THK SLAB
PAINT FINISH W16 LVL - 151'-9"
D8
16'0" WIDE PASSAGE
PAINT FINISH
SKYLIGHT TO DETAIL
CB6
PB1
KIDS POOL 18'0"X12'0"
18" TO 10" PT SLAB
TERRACE
B4
ISMB 200
PAINT FINISH
D5
W18
9" PT SLAB
PAINT FINISH LVL - 0'-0"
CUT OUT ON SLOPED ROOF
LVL - 47'-2"
8" THK SLAB B89
2'-8"
LANDSCAPE AREA
8'8"X16'8"
8'8" WIDE PASSAGE
W18
W3
LVL - 196'-5" 4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING
ELEVATION C
JANITOR CLOSET
LANDSCAPED COURT 1 SD2
W18
CARDS ROOM 15'4"X26'8" W18
W3
FALSE CEILING
W31
FALSE CEILING
CW8
B114
13'-6" SERVICE ENTRY
4'8" WIDE SERVICE PASSAGE
D3
13'
STORE 14'0"X15'4"
D6
W23
DECK
SHALLOW WATER BODY 26'8"X26'8" D7
DW8
W21
STEAM
3' 1'-6"
W18
D6
ENTRY
W20
D5
3' 1'-6"
KITCHEN SIZE TO BE EVALUATED BY CONSULTANTS
D8
8'10½" WIDE WALKWAY TO RESTAURANT
DW2
W3 LVL - 211'-9"
4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING
11" THK RCC SLOPED ROOF SLAB
CW9
14'-4" ht COMPOUND WALL
16'0" WIDE PASSAGE
DW1
W3
3' GLASS RAILING TO DETAIL
STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER KERALA TILES
8'-9"
CW6
CW4 W9
8'-9"
10'-6" CW6
12'-6"
CW5
CW5
2"X6" WOODEN RAFTERS CUT OUT ONWOODEN LOUVERS TO DETAIL SLOPED ROOF
15'-9"
W12
12'-6"
WATERBODY
LVL - 7'-8"
RCC FLAT ROOF EXPOSED SIDE - THERMOTILE WOODEN LOUVERS TO DETAIL W38 UNDERSIDE -PAINT FINISH
W12
DUCT
1'-6" 7'-2"
W12
D4
AREA FOR INDOOR GAMES 26'8" x 47'6"
W10
DECK
LVL- -118'-11"
1'-8"
1'-2"
ELEVATION B
ENTRY
TC
FC
W10
SDW1
TC
UP
D6
D
SDW1
309'-5"
Screen/ Partition wall
W8
W5
MD
W29
LVL- 100'-0"
W14
W13
W25
LVL- 127'-4"
B
BB
AV ROOM 26'8"X7'1"
METAL LOUVERS TO DETAIL
W39
LVL - 0'-0"
4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL
SQUASH COURT BELOW 26'8"X 32'6"
W15
BB
DW4
W39
D6
LVL- (-32'0")
14'4" COMPOUND WALL
KK
LOBBY
MINI THEATRE 26'8" X 39'11"
PAINT FINISH
35'-8"
LIFT 6'0" X 5'0"
W6
W39
LVL- 148'-0"
MONIER TILES
SDW2
LVL- 138'-0"
LVL- 96'-6" W39
LVL- (-16'8")
15'-9"
ELECTRICAL SHAFT
KK
10'-6"
D1
8'-9"
D5
V4
RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH UNDERSIDE CANTILEVER - KERALA TILES
CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES
WOODEN LOUVERS TO DETAIL
RAILING 3' TO DETAIL CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES
W5
12'-6"
D5
GENTS TOILET 18'2"X10'8"
Z
V3
3'-4"
8'-8"
8'-4"
8'-4"
LVL - 0'-0"
1'-4"
8'-8"
5'-4"
2'
4'-8"
9"
5'-4"
1'-2"
14'-9"
19'-5" RCC SLOPED ROOF
16'-10"
3'-4"
EXPOSED SIDE - MONIER TILES 309'-5" UNDERSIDE - PAINT FINISH
DW3
16'-2"
PB1
PB1
8'-8"
9'-11"
11'-7"
2"X6" WOODEN RAFTERS
5'-6"
4'-11"
9" 1'-2"
8'-2"
QQ°
R
5'-8" 1'-8" 3'-4"
7'-10"
S°
T
PAINT FINISH LVL - 147'-4"
1'-2"
4'-8"
7'-8"
1'-4"
11'
9'
3'-4"
8'-8"
8'
W16
SEATING LOUNGER
8'-9"
10'-6"
SEATING
DECK
LANDSCAPE AREA
JANITOR CLOSET
SD2
D5
GENTS SALON
CHILDREN'S PLAY AREA 45'0" X 25'0"
MASSAGE ROOM 26'1"X12'9"
Storage
Storage
CW11
CW11
8'
3' 1'-6"
NEIGHBORING PROPERTY
8'-8"
GG
HH LVL - 0'-0"
3'-4"
YY
Y
PB1
SL. NO.
REVISIONS
DATE
SL. NO.
REVISIONS
DATE
CLIENT
DRAWING STATUS
MR.RAJEEV AGRAWAL
EXICUTION
PROJECT
WALL ELEVATIONS
REVISION NO.
PROPOSE VILLA DEVELOPMENT-RAIPUR
DRAWN BY
DRAWING TITLE DATE
DWG. NO.
30-11-2021
--
G
GG
H HH
J
JJ
K
KK
KK°
L°
LL M°
1/8"=1'
MM°
N°
NN°
P
Q°
PP
A
30-11-2021SL. NO.
W34
ISMB 200
ISMB 200
7'-8"
V
DW6
4'-8"
B121
1'-8"
1'-2" 7'-10"
W3
3'-4"
1'-2"
5'-8"
B109
B104
GYM
9'-8"
AA B BB DATE SL. NO.
REVISIONS
8'-2"
7" THK SLAB
5'-6"
9'-11"
4'-11"
6"x8" MS PERGOLA AT 7'-11" BEAM BOTTOM / B69 RCC ROOF SLAB BOTTOM
12'-4"
B83
B95
SD2
DW5
W9
MONIER TILES
W18
PB98
5'-4"
1'-8"
8'-4"
PB40
3'-4"
PB37
8'-8"
8'-4" 149'-1"
E
EE
N°
PB98
8'-4"
1'-4"
8'-8"
5'-4"
2'
3'-4"
16'-2"
4'-8"
C CC REVISIONS
D
DD DATE
CLIENT
LVL - 0'-0"
16'-10"
19'-5"
9"
M° LL 1'-2"
14'-9"
14'-9"
5'-4"
4'-8"
5'-4"
8'-8"
2'
FF
G
GG
H HH
J
JJ
K
L°
8'-4"
KK
KK°
L°
KK° KK
K JJ
W12
W12
10'-6" 35'-8" 13'-6"
8'-8"
W12
3'-4"
W12
J HH H GG G FF
8'-4"
W12
F EE
11" THK RCC SLOPED ROOF SLAB
5'-4"
FALSE CEILING
1'-2"
9'-8"
B38
W13
E
3'
27'-10"
DD
W14
D
CC C
W15
BB
B34
B27
MD
W14
B AA
A
LVL- 127'-4"
S6 S5 S4 S3
WALL ELEVATIONS
REVISION NO.
DATE
30-11-2021
STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER KERALA TILES
FALSE CEILING
10" THK GRADE SLAB
PB105
DRAWN BY
19'-5"
16'-10"
--
DWG. NO.
PB5
PB106
DEALT BY
3'-4"
--
16'-2"
PB105
8'-8"
PB1
9'-11"
11'-7"
9"
5'-6"
4'-11"
SCALE
NORTH
CODE
DOUBLE HEIGHT SQUASH COURT
6'5" WIDE PASSAGE
PB105
1'-2"
DRAWING TITLE
EXICUTION
9" PT SLAB
1/8"=1'
Q° QQ° KK KK° L° LL M° MM° N° NN° P PP THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
SECTION ZZ ISMB 200
ISMB 200
MONIER 6"x8" MS PERGOLA AT TILES BEAM BOTTOM / RCC ROOF SLAB BOTTOM
W3
8" THK SLAB B138
16" CINDER FILLING
GYM B71
8" THK SLAB
15'-10" ht COMPOUND WALL
B123
B129
4" THK RANDOM RUBBLE CW12 SADARAHALLI STONE CLADDING
W3
DW6 16" CINDER FILLING
15'-9"
8'-4"
B40
4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL
SB22
SB23
1'-8"
19'-5"
DRAWING STATUS
PROPOSE VILLA DEVELOPMENT-RAIPUR
6"x8" MS PERGOLA AT BEAM BOTTOM / RCC ROOF SLAB BOTTOM
CW11
FALSE CEILING
B110
8" THK SLAB
B50
B44
B84
B96
B105
CW10
CW2
W21
DW5
CW2
DD
MASSAGE ROOM
WATERBODY
3' 1'-6"
LVL- 148'-0" PAINT FINISH
CB3 SB23
FALSE CEILING
Z
14'4" ht COMPOUND WALL PT SLAB EXPOSED SIDE - THERMOTILE UNDERSIDE -2"X6" WOOD LOUVRES
D11
F
PROJECT
CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES
B151
YY
LVL - 148'-0" CB3
11" THK RCC SLOPED ROOF SLAB
1'-4" B43
W11
MM°
MR.RAJEEV AGRAWAL
18" TO 10" PT SLAB
Y
309'-5"
WATERBODY
9"
5'-4"
XX
UNDERSIDE - PAINT FINISH
4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING
W18
D7
LVL - 44'-0"
SB26
6" THK RCC SLOPED ROOF SLAB
1'-2"
4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING
GENT'S TOILET
TT T SS° S° RR° R QQ° Q° PP P NN°
2''X6" WOODEN RAFTERS RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH
THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
RCC SLOPED ROOF VEXPOSED VV- MONIER TILESX SIDE
STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER - KERALA TILES
8"x8" MS FRAME
9"
LADIES TOILET
UU U
3'
UU
RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH
W7
4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING
W3
SD2
1'-2"
U
TT
STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER KERALA TILES
18" TO 10" PT SLAB
LVL - 0'-0"
11'
VV
SS°
9" PT SLAB
FALSE CEILING W6 V4
PT SLAB EXPOSED SIDE - THERMOTILE UNDERSIDE -PAINT FINISH
13'
RR°
CUT OUT ON SLOPED ROOF
MONIER TILES
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE. W34 W34
SCALE
NORTH
CODE
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.
DEALT BY
--
FF
DOUBLE HEIGHT INDOOR BADMINTON COURT
KEYPLAN GROUND FLOOR PLAN
1'-6"
30-11-2021SL. NO.
A
REVISIONS
7'-2"
REVISIONS
9'
27'-10"
8'-9"
SL. NO.
F
W24
W34
7" THK SLAB
B148
XX X
B
12'-6"
FF
EE
SECTION FF
LVL - 0'-0"
A
EE
E
18" TO 10" PT SLAB
V3
4" THK RIBBED SADARAHALLI STONE CLADDING
LANDSCAPE
DD
DD
4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING
LVL - 0'-0"
12'
D
D V5
CB3
15'-10" ht COMPOUND WALL
C
LVL - 0'-0"
CW11
CC V6
1'-4"
CW13
CW13
6
5
4
ELEVATION D
CW12
13'-6"
LANDSCAPED COURT 20'0"X17'8"
13'
LADIES SALON
D4
3
2
1
C
CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER LVL -TILES 0'-0" UNDERSIDE - KERALA TILES 4" THK RANDOM RUBBLE 6"x8" MS PERGOLA AT BEAM BOTTOM / CLADDING SADARAHALLI STONE RCC ROOF SLAB BOTTOM
15'-9"
13'-6" CW10
D5
GENTS
CW11
CW12
CW11
10'-6"13'
MASSAGE ROOM 25'0"X9'0"
D9
D5
8'-9"
CHANGING ROOM 5'0"X5'0"
G - WC 6'6"X3'8"
D5
12'-6"
STEAM ROOM 6'6"X5'0"
RECEPTION
WAITING
L - WC 6'6"X3'8" LADIES
MASSAGE ROOM 26'1"X12'9"
N
D5
3' 35'-8" 1'-6"
D8
STEAM ROOM 6'6"X5'0"
D9 D5
CW11
15'-9"
CHANGING ROOM 5'0"X5'0"
MASSAGE ROOM 25'0"X9'0" CW10
Z
AC / PHE DUCT 4'0" X 2'6"
BB
2''X6" WOODEN RAFTERS RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES V1UNDERSIDE - PAINT FINISH V2
PAINT FINISH LVL - 11'-10"
STEAM
W20
B
PT SLAB EXPOSED SIDE - THERMOTILEW24 UNDERSIDE -PAINT FINISH
W24
PAINT FINISH LVL - 0'-0"
W17
W20
V7
35'-8"
D5
SD2
AA V8
DUCT
W18
LANDSCAPED COURT 1 8'8"X16'8"
A 12'-6"
W18
LANDSCAPED COURT 2 8'8"X16'8"
LOUNGER
7'-2"
LIBRARY / BUSINESS CENTER 43'4"X43'4"
JACUZZI 18'0"X12'0"
STEPS LADIES TOILET 30'8"X26'8"
1'-6"
8'8" WIDE PASSAGE
SHALLOW WATERBODY 26'8"X26'8"
DUCT
CAFETERIA/GAMING 49'0"X26'8" W11
MASSAGE ROOM
RESTAURANT
PB50
PB1
PB101
PB1
PB1
PB101
WATERBODY
PB1
PB1
PB1
12'
SERVICE ENTRY/EXIT
51 7'-2128
77 6'-3128 77 150'-3128
51 16'-2128
51 52'-2128
77 28'-9128
45'
77 46'-9128
18'
45'
77 46'-9128
45'
77 6'-3128
77 4'-0128 77 10'-9128
77 28'-9128
51 25'-2128
77 28'-9128
EXIT
51 104'-10256
79'-7205 256
77 805'-0128
PB1
A
01
+1'6" LVL +0'0" LVL
+0'0" LVL
ENTRANCE PORCH
PB1
12
SECTION AA
13
14
14
15
QQ°
112" 06 05 04
ELEVATION B
1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE
A
01
PB1
+0'0" LVL
PB1
+0'0" LVL
S6 S5 S4 S3 S2 S1
16
T
3" 4
SS° S°
112"
13
14
15
16
65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1'1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE
112"
BRICK MASONRY AS PER STRUCTURE
TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT
03
04
05
PB1
27'-10205 256
36'
112"
51 26'-1256
METAL LOUVERS TO DETAIL
HIGHLIGHT WALL
YY
WALL A ( HIGHLIGHT ) WALL B
COVE LINE
65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE BRICK MASONRY AS PER STRUCTURE
UP
PLAN
N
Z
VERANDAH 8'0" X 16'8'' KOTA STONE FLOORING
D4
3" 4
BOTTEGA CALIZA
596 X 596
WALL D
BOTTEGA CALIZA
596 X 596
53
FLOORING
VERESE CENERE
600 X 1200
71
COVE LINE
HIGHLIGHT WALL
TYPICAL DETAIL C - SECTION THROUGH NICHE
KEY PLAN - FIRST FLOOR
65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1'1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE
BEDROOM 3 TOILET (DAUGHTER'S) 8'0"X11'0"
N
DETAIL A- COVE LIGHT
WALL A
KEY PLAN - FIRST FLOOR BEDROOM 4 TOILET (GUEST'S) 12'11"X5'3"
FLOORING TILE BOTTEGA ACERO
DETAIL A- COVE LIGHT
1'
2'-6" POINT START
2'-10"
3'
2'-10"
4"
1'-2" 1'-9"
1'-4" 1'-8"
1'-10"
ENTRY
3' 1' 3' 2'
2'-10"
1'-9"
3'
2'-6" START POINT
7'-8"
1'
START POINT
2'-6"
1'-6"
3'
6'-6"
3'-6" 2'-3"
1'-6"
1'-812
2'-10"
7'-8"
1'
2'-10"
2'-5"
1'-4"
TOP OF THE WASH BASIN NOT MORE THAN THAT
HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN
3'-6"
START POINT
1'
1' 6'-6"
7'-8"
4"
4"
6" SUNKEN 4"
2'
HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN
SHOWER CUBICLE AS PER DETAIL
2'-5"
2'
MIXER AS PER VENDOR
WALL HUNG WC AS PER VENDOR SPECIFICATION 1 2" DROP
12" SUNKEN
FLOORING TO BE FINISHED IN 600mm X 1200mm VERESE CANERE TILES AS PER SPECIFICATION
1'-4"
6" THK L SHAPE- LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE VANITY COUNTER
FIRST FLOOR FFL
B
7'-8"
START POINT
LINTEL LVL
START POINT
VENTILATOR AS PER ARCHITECTURE DETAIL
2'
1'
COURIAN TOP
WALL B, C, D
FIRST FLOOR FFL
12" SUNKEN
WALL TO BE FINISHED IN (596MM X 596 MM) BOTEGA CALIZA AS PER SPECIFICATION
START POINT
5"
2'
6" THK LEDGE WALL
BOTTEGA CALIZA TILES
VANITY COUNTER AS PER VENDOR SPECIFICATION WALL HUNG WC AS PER VENDOR SPECIFICATION
FIRST FLOOR FFL
12" SUNKEN
SUNKEN SLAB AS PER STRUCTURE
LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT
HIGHLIGHT WALL - LINE PEKIN BOTTEGA ACERO - Horizontal
NICHE TO BE FINISHED IN 6MM CORIAN
1/4"
GYPSUM BOARD
DETAIL B - LEDGE WALL
3'
SHOWER HEAD AS PER VENDOR
WALL-D
WALL-C
TYPICAL DETAIL C SECTION THROUGH NICHE
\\team-b\D\PC10_E Drive_190202\Team B_Project Files\ONGOING PROJECTS\SIDHARTH BHATIA\REFERENCE\BOTTEGA ACERO.jpg
5"
2'
PLASTER
4"
97
PLASTER
WASH BASIN AS PER VENDOR SPECIFICATION
3'-812
53
1'
123
2'
7'-8"
AREA (Sqft)
DOVER MODERN LINE 316 X 900 ARENA(Horizontl- Beige)
MIRROR AS PER SPECIFICATION
RCC SLAB & BEAM AS PER STRUCTURAL DRAWING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL START POINT START POINT
2'
2'
TILE SIZE (MM)
DOVER MODERN LINE 316 X 900 ARENA(Horizontl- Beige)
(HIGHLIGHT)
20MM
TILE TYPE
WALL A
WALL B
NICHE TO BE FINISHED IN 6MM CORIAN
\\team-b\D\PC10_E Drive_190202\Team B_Project Files\ONGOING PROJECTS\SIDHARTH BHATIA\REFERENCE\BOTTEGA CALIZA.jpg
6" SUNKEN
LINTEL LVL
2'X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL
COURIAN TOP
GYPSUM BOARD
6'-6"
2'-10" START POINT
1 2" DROP
1'-4" 1'-4"
3'-9"
APPLICATION
6" THK LEDGE WALL
LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT
3'-6" 7'-8"
4" WALL-D
1 2" DROP
4'-10"
4" WALL-D
4'-10"
START POINT
TOP OF THE WASH BASIN NOT MORE THAN THAT
2'-10"
B
12" SUNKEN
LINTEL LVL
START POINT
SHOWER CUBICLE AS PER DETAIL
WALL-B
4"
VENTILATOR AS PER ARCHITECTURE DETAIL
START POINT START POINT
SUNKEN SLAB AS PER STRUCTURE
SHOWER CUBICLE AS PER SPECIFICATION
1 2" DROP
WALL D & C TO BE FINISHED IN 596 MM X 596 MM BOTEGA CALIZA
1/4"
83 89 87
4'
6" SUNKEN 4"
HIGHLIGHT WALL TO BE FINISHED IN (316MM X 900MM) DOVER MODERN LINE ARENA TILES AS PER SPECIFICATION
WALL-A
FLOORING TO BE FINISHED IN 600 MM X 1200 MM VERESE CENERE
4'
PLAN : BEDROOM - 4 (GUEST ROOM) TOILET (FLOORING)
4" 4"
99
596 X 596 596 X 596 596 X 596
12'-9"
START POINT
2'
1'-4" START POINT
SUNKEN SLAB AS PER STRUCTURE
4"
87
596 X 596
BOTTEGA CALIZA BOTTEGA CALIZA BOTTEGA ACERO
DETAIL AT B
ELECTRICAL ROOM 10'10" X 7'4"
FLOORING TO BE FINISHED IN BOTTEGA ACERO 596 MM X 596 MM TILES AS PER SPECIFICATION
WALL-D
AREA (Sqft)
LINE PEKIN BOTTEGA ACERO( Horizontal) 450 X 1200 BOTTEGA CALIZA
WALL C WALL D FLOORING
03
KEY
TILE SIZE (MM)
START POINT START POINT
PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
FLOORING TO BE FINISHED IN 600mm X 1200mm VERESE CANERE TILES AS PER SPECIFICATION
12" SUNKEN
6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE VANITY COUNTER
2'-914
WALL C
TILE TYPE
4"
START POINT
MATCH TO THE VANITY COUNTER TOP
3'-6"
2'-10"
APPLICATION
12'-11"
4'
1 2" DROP
HIGHLIGHT WALL A & B TO BE FINISHED IN 316 MM X 900 MM DOVER MODERN LINE ARENA
WALL-C
WASH BASIN AS PER VENDOR SPECIFICATION
WALL-C
PLAN - BEDROOM 3 (DAUGHTER'S) - FLOORING
06
51 43'-2128
5
START POINT
(HIGHLIGHT)
05
CLUBHOUSE BANQUET ENTRANCE STEPS DETAIL
MAIN ENTRANCE
5"
DETAIL B - LEDGE WALL
WALL A AND WALL B (HIGHLIGHT WALL) WALL C AND WALL D DOVER MODERN LINE ARENA - Horizontal - Beige Colour BOTTEGA CALIZA
FLOORING
VERESE CENERE
BRICK MASONRY AS PER STRUCTURE
D2
DETAIL AT A
A
A
02
SECTION AA
2 4
SERVICE ENTRY/EXIT
PART PLAN- GROUND FLOOR-BANQUET ENTRANCE STAIRCASE AND RAMP DETAIL AT B
3
01
DETAIL AT B
DETAIL AT A
01
27'-10205 256
3
4 2
N
65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE BRICK MASONRY AS PER STRUCTURE
36'
5
SECTION CC
SECTION AA
A
START POINT
B
51 26'-1256
TREAD - RIVER FINISH KOTA 15 STONE (5OMM THICK)
W5
B
LVL - 179'-9"
FIRST FLOOR FFL
START POINT START POINT
MIRROR AS PER SPECIFICATION TOP OF THE 6" THICK LEDGE WALL TO BE IN LINE WITH TOP OF WASHBASIN COUNTER
1'-11"
10'-914
SS°
BRICK MASONRY AS PER STRUCTURE
TREAD - 1'7 1/2" KOTA STONE RISER - 6" KOTA STONE
02
B
MD
S°
DETAIL AT A
03 02 01
TREAD - 1'7 1/2" KOTA STONE RISER - 6" KOTA STONE
VERANDAH 10'8"X 16'0" KOTA STONE
RR°
RR°
65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1'1/2" FROM KOTA SURFACE OF RISER
RISER- RIVER FINISH KOTA STONE 16 TREAD - RIVER FINISH KOTA STONE (65MM THICK)
15
SS° S°
R
03
RISER- POLISHED CEMENT
U TT
Q°
16
6"
11
13
6"
12
PB1
A
10
11
PB1
UU
PB104
10
A
SDW1
6 5 4 3 2 1
2'
1'
02
2'
20MM
03
SHOWER CUBICLE AS PER SPECIFICATION
WALL DADOING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES
WALL-C
START POINT
2'6"
+1'6" LVL
MAIN ENTRANCE
START POINT
MATCH TO THE VANITY COUNTER TOP
04
D2
6"
05
1'-11"
FLOORING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA ACERO TILES
7'-10"
C-C
TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT
D2
FIRST FLOOR FFL
4"
WALL D TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES
2'
A VERANDAH +3'0" LVL
B
04
PAINT FINISH LVL - 11'-10"
SLOPE OF THE RAMP IS 1:8 LENGTH OF THE RAMP IS 24" RIVER FINISH KOTA STONE (65MM THICK)
DECK
+3'0" LVL
B
6"
06
05
6"
+3'0" LVL
06
6"
VERANDAH
65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1 1/2" FROM FINISHED SURFACE OF RISER RISER-20MM THK POLISHED FINISH KOTA STONE
DECK
+3'0" LVL
Z
DECK 27'0"X66'0" KOTA STONE
START POINT
DOUBLE HEIGHT BANQUET HALL 37'0"X48'8" ITALIAN MARBLE FLOORING
MD
1 2" DROP
LVL - 16'-8"
SDW1
V
MD
RCC SLAB & BEAM AS PER STRUCTURAL DRAWING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
START POINT
C-C
2'9"X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL
WALL-B
2'
CB5
B208
DUCT-1
1 2" DROP
UP INV.B219
START POINT
2'-512" 1 2" DROP
START POINT START POINT
6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER
3'-11"
WALL-D
3'-10"
7'-8"
Z
YY
2'X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL
PLAN : BEDROOM - 4 (GUEST ROOM) TOILET
12" SUNKEN
WALL-A
A
3'
START POINT
Y
5"
WALL DADOING TO BE FINISHED IN 596 MM X 596 MM BOTEGA CALIZA
DUCT-4
3'
2'
START POINT
FLOORING TILE DOVER ACERO - Raw Finish
RCC SLAB & BEAM AS PER STRUCTURAL DRAWING 4"
START POINT START POINT
FLOORING TO BE FINISHED IN 600 MM X 1200 MM VERESE CENERE
1 2" DROP
WALL-C
6" SUNKEN
LINTEL LVL
WALL HUNG WC AS PER VENDOR SPECIFICATION SHOWER CUBICLE AS PER SPECIFICATION
START POINT
XX
C-C
4'-7"
WALL A, B & C OTHER WALLS - DOVER ARENA
START POINT
X
2"
C-C
WALL-B
ELEVATION B
VV
HIGHLIGHT WALL TO BE FINISHED IN 316 MM X 900 MM DOVER MODERN LINE ARENA
2"
START POINT
START POINT
V
2'
START POINT START POINT
4'
START POINT
UU
2'
START POINT
U
START POINT
TT
X VV INV.B209
LINTEL LVL
HIGHLIGHT WALL TO BE FINISHED IN 450 MM X 1200 MM LINE PEKIN BOTTEGA ACERO TILES
T
2'
WALL-B
START POINT
WALL-A
SS°
2'
C-C
WALL D HIGHLIGHT WALL - VERTEX IVORY - vertical
- REVISION MADE: THE SHOWERE CUBICLE POSITION IS SHIFTED - HATCHED THE FLOOR TILE FOR FLOOR DROP - LEDGE WALL ADJUSTED
6" THK L SHAPE- LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE VANITY COUNTER VANITY COUNTER AS PER VENDOR SPECIFICATION
WALL-A
12" SUNKEN
W4
S°
2'
WASH BASIN AS PER VENDOR SPECIFICATION FLOORING TO BE FINISHED IN BOTTEGA ACERO 596 MM X 596 MM TILES AS PER SPECIFICATION SUNKEN SLAB AS PER STRUCTURE SPOUT AS PER VENDOR
WALL-A
TOP OF THE WASH BASIN NOT MORE THAN THAT
+0'0" LVL TREAD 1'6" KOTA STONE RISER 6" EXPOSED CEMENT
XX
TOP OF THE 6" THICK LEDGE WALL TO BE IN LINE WITH TOP OF WASHBASIN COUNTER
: HIGHLIGHT WALL
12'-11"
A
START POINT
PLAN - BEDROOM 3 (DAUGHTER'S) - FLOORING
PEDESTRIAN RAMP
128 SQ.FT
START POINT
Y
06 05 04 03 02 01
1'
6'-6" 2'
DECK
+3'0" LVL
W1
FIRST FLOOR FFL
WASH BASIN AS PER VENDOR SPECIFICATION
WALL-C
2'-3"
1 2" DROP
VANITY COUNTER AS PER VENDOR SPECIFICATION
TREAD - RIVER FINISH KOTA STONE (65MM THICK)
W4
SDW1
7'-8"
WALL-D
SDW1
DOVER ACERO (Raw finish) 596 X 596
START POINT
WALL DADOING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES
7'-10"
C-C
W5
FLOORING
5"
DETAIL B - LEDGE WALL
START POINT
RISER- 20MM THK POLISHED FINISH KOTA STONE
06 05 04 03 02 01
YY
MIRROR AS PER SPECIFICATION
5"
LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT
DETAIL A- COVE LIGHT
START POINT
C
SLOPE - 1:8
FLOORING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA ACERO TILES
3'-11"
12" SUNKEN SLAB
WALL D
SCALE
1/8"=1'
START POINT
C
DUCT-1
1 2" DROP
--
GYPSUM BOARD
98 SQ.FT 121 SQ.FT
DUCT-4 4" START POINT START POINT
1 2" DROP
SUNKEN SLAB AS PER STRUCTURE
DEALT BY
FILLING
6" THK LEDGE WALL
112 SQ.FT 113 SQ.FT
450 X 900
WALL-B
Z
SHOWER CUBICLE AS PER SPECIFICATION
WALL-B
E:\New folder\2182-Rama Raipur Villas_Image 10_Restaurent-01.jpg
1 2" DROP
3'-10"
E:\New folder\2182-Rama Raipur Villas_Image 09_Massage_room-04.jpg
W25
C-C
12" SUNKEN SLAB
NORTHWALL-C
AREA
316 X 900 316 X 900 316 X 900
VERTEX IVORY
START POINT
17
TILE SIZE (MM)
DOVER ARENA DOVER ARENA
WALL D (HIGHLIGHT WALL)
START POINT
16
12" SUNKEN
HIGHLIGHT WALL TO BE FINISHED IN LINE PEKIN BOTTEGA ACERO 450MM X 1200MM TILES AS PER SPECIFICATION SHOWER CUBICLE AS PER DETAIL MIXER AS PER VENDOR
3'-11"
START POINT
15
START POINT
START POINT
14
START POINT START POINT
START POINT
13
RUNA NERO
WALL B TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES
START POINT
12
LINTEL LVL
DRAWN BY
KEY PLAN - THIRD FLOOR MASTER SUITE - BATH 11'0" X 11'9" (SURESH)
HIGHLIGHT WALL -C & D
RCC SLAB & BEAM AS PER STRUCTURAL DRAWING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
WALL HUNG WC AS PER VENDOR SPECIFICATION
C-C
BATH TUB
LEDGE WALL TO BE IN LVL WITH TOP OF VANITY COUNTER
WALL A & B:
ENDLESS BIANCO ( 600 X 1200 MM)
HIGHLIGHT WALL TO BE FINISHED IN 450 MM X 1200 MM LINE PEKIN BOTTEGA ACERO TILES 6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER
112 112
C-C
TILE TYPE DOVER ARENA
WALL B WALL C
2'-5"
HIGHLIGHT WALL
2'
5"
FLOORING TO BE FINISHED IN 596mm X 596mm DOVER ACERO TILES AS PER SPECIFICATION
FINISHED TOP SURFACE OF LEDGE WALL TO BE MATCHED WITH TILE LINE
: COVE LINE
2'9"X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL
WALL-A
SLOPE OF THE RAMP IS 1:8 LENGTH OF THE RAMP IS 24" RIVER FINISH KOTA STONE (5OMM THICK)
APPLICATION
HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN
COVE LINE
DETAIL B- COVE LIGHT
3'
MIXER AS PER VENDOR
--
HIGHLIGHT WALL TO BE FINISHED IN 450MMX 900MM VERTEX IVORY TILES
CODE
WALL A
80
START POINT
DRAWING PLAN -THIS MASTER SUITEIS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
ENDLESS GRIGIO ( 600 X 1200 MM)
GYPSUM BOARD LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT
512
KEY PLAN - FIRST FLOOR
600 X 1200
START POINT START POINT
HH
3'
WASH BASIN AS PER VENDOR SPECIFICATION
5'-11"
FIRST FLOOR FFL
DWG. NO.
WALL - C
START POINT
ENDLESS GRIGIO
BEDROOM 2 TOILET (SIDHARTH'S) 7'5"X11'5 12"
THROUGH NICHE
2'-10"
(HIGHLIGHT)
FLOORING
65
600 X1200 94 600 X1200 73 EACH STRIP-600 X 5) 600 X1200 114 EACH STRIP-600 X 5)
TOP OF THE WASH BASIN NOT MORE THAN THAT
RUNA NERO
AREA(Sqft)
600 X1200
DATE
4"
(HIGHLIGHT)
WALL D
TILE SIZE (MM)
DRAWING TITLE
30-11-2021
GG
SPOUT AS PER VENDOR
WALL DADOING TO BE FINISHED IN 316 MM X 900 MM DOVER ARENA TILES
WALL ELEVATIONS
4"
FF
VANITY COUNTER AS PER VENDOR SPECIFICATION
C-C
2"
1'
REVISION NO.
4"
EE
HIGHLIGHT WALL TO BE FINISHED IN 450MMX 900MM VERTEX IVORY TILES AS PER SPECIFICATION
1'
EXICUTION
PROJECT
PROPOSE VILLA DEVELOPMENT-RAIPUR
SHOWER CUBICLE DD AS PER DETAIL
START POINT
DRAWING STATUS
MR.RAJEEV AGRAWAL
2' X 2" TILE STRIPS
12" SUNKEN SLAB
WALL DADOING TO BE FINISHED IN 316 MM X 900 MM DOVER ARENA TILES
SHOWER HEAD AS PER VENDOR KEY PLAN 614
1'
3'-112
SHOWER CUBICLE AS PER SPECIFICATION FLOORING TO BE FINISHED IN 596 MM X 596 MM DOVER ACERO TILES
L°
4"
START POINT POINT START
2'-3"
CLIENT
KK°
A START POINT POINT START
3'
19'-5" WALL - D
LINTEL LEVEL
START POINT
KK
HH
WALL-B
4"
6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER
1 2" DROP
K
B
4"
14'-9"
JJ
POINT START
GG
RCC SLAB & BEAM AS PER STRUCTURAL DRAWING
WALL - B
5'-4"
J
1'-4"
5'-612
4'-8"
H HH
FF
SUNKEN SLAB AS PER STRUCTURE
3"
2'-10"
GG
WALL HUNG WC AS PER VENDOR SPECIFICATION FLOORING TO BE FINISHED IN 596 MM X 596 MM DOVER ACERO TILES
1 2" DROP
LINTEL LVL
VENTILATOR V6 AS PER ARCHITECTURE DETAIL
1' SUNKEN
G
MATCH TO THE VANITY COUNTER TOP
ENDLESS BIANCO ENDLESS BIANCO RUNA NERO
WALL - B
4'
1' 6"
5'-4"
2'
1' SUNKEN
FFD WALL
2'-512"
TILE TYPE
WALL A
2'-014"
1'-6"
8'-8"
1'-2"
DETAIL A- HIGHLIGHT WALL TILING PLAN : BEDROOM-2 ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWINGTOILET(SIDHARTH'S) IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE. TYPICAL DETAIL C - SECTION FLOORING TILE WALL B WALL C
2'-3"
START POINT
2'-10"
1'-4"
8'-4"
F
9"
6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER ZZ
12" SUNKEN SLAB
5'11"X1' NICHE TO FINISHED IN DOVER ARENA TILE AS PER DETAIL
WALL - A
5'-1"
DATE
EE
1'-4"
POINT START
START POINT
EE
PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
5'-5"
WATERBODY PB1
4"
BB
VANITY COUNTER AS PER VENDOR SPECIFICATION
3"
WALL-A
DUCT-1
RESTAURANT PB1
2'
4"
WASH BASIN AS PER VENDOR SPECIFICATION
2'-3"
C-C
2'
ENTRANCE PORCH
MAIN ENTRANCE
SPOUT AS PER VENDOR
PLAN - MASTER SUITE
CW5
2'-5"
8'-4" 149'-1"
FLOORING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS GRIGIO TILES SUNKEN SLAB AS PER STRUCTURE
E
CW4 CW5
START POINT
3'-6"
8'-8"
CW3
2'
1/4"
APPLICATION
FIRST FLOOR FFL
VANITY COUNTER AS PER VENDOR SPECIFICATION
WALL - C
1'-9"
1'
NICHE TO BE FINISHED IN 6MM CORIAN
20MM
A
CW2
1'
3'-414
B55
CB4
W21
1'-812
HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN
6'-6" 3'-6"
3'-4"
2'-3"
REVISIONS PLASTER
2"
4"
WALL - D
2'-10"
7'-8"
SL. NO.
3'0"X1'0" NICHE TO FINISHED IN ENDLESS BIANCO TILE AS PER DETAIL
DW5
SPOUT AS PER VENDOR HIGHLIGHT WALLS A TO BE FINISHED IN (600MM X1200MM)RUNA NERO TILES AS PER SPECIFICATION
DD
TILE CENTER LINE
1 2" DROP
8'-4"
1'-8"
D
2'
3'-712 3'-614
(600MM X1200MM)RUNA NERO TILES AS REVISIONS DATE PER SPECIFICATION
WALL-C
3'-9"
WALL-B
3'-712
WALL-D START POINT
HIGHLIGHT WALLS A TO BE FINISHED IN
30-11-2021SL. NO.
5'-4"
C C CC WALL
START POINT
REVISIONS
E:\New folder\2182-Rama Raipur Villas_Image 03-club_swiming_pool-02.jpg
WASH BASIN AS PER VENDOR SPECIFICATION
C-C
MIRROR AS PER SPECIFICATION VENTILATOR AS PER SPECIFICATION MIXER AS PER VENDOR
10"
HIGHLIGHT WALL TO BE FINISHED IN 450MMX 900MM VERTEX IVORY TILES 6'-412
SHOWER CUBICLE AS PER DETAIL
POINT START START POINT
5'-614
BATH TUB AS PER SPECIFICATION
3'-9"
TOP OF THE WASH BASIN NOT MORE THAN THAT
1'-4"
1 2" DROP
512 3'
3'-614
7'-8"
7'-314
WALL-D START POINT
START POINT
12'
11'-512
9'-8"
BB
4"
MIXER AS PER VENDOR WASH BASIN AS PER VENDOR SPECIFICATION VANITY COUNTER AS PER VENDOR SPECIFICATION
2"
SL. NO.
E:\New folder\2182-Rama Raipur Villas_Image 08_Drop off-01.jpg
E:\New folder\2182-Rama Raipur Villas_Image 06_Club Waterbody-01.jpg
8" THK SLAB
LINTEL LVL
WALL DADOING TO BE FINISHED IN 316 MM X 900 MM DOVER ARENA TILES FLOORING TO BE FINISHED IN 596 MM X 596 MM DOVER ACERO TILES
114"
16" CINDER FILLING 8" THK SLAB
B74
6"
WALL HUNG WC AS PER VENDOR SPECIFICATION
WALL DADOING TO BE FINISHED IN (316MM X 900MM) DOVER ARENA TILES AS PER SPECIFICATION
START POINT
START POINT
1' SUNKEN
N
PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
4"
SHOWER CUBICLE AS PER SPECIFICATION
START POINT
4'-6"
1 2" DROP
6"x8" MS PERGOLA AT BEAM BOTTOM / RCC ROOF SLAB BOTTOM 8"x8" MS FRAME
MONIER TILES
W2
MIRROR AS PER SPECIFICATION
1' SUNKEN
B
SDW2
SHOWER CUBICLE AS PER DETAIL
GROUND FLOOR FFL
AA
2'-514" as per site C-C START POINT
1 2" DROP
6'-314
3'-5"
2'-3"
WALL-B
1'-6" 7'-2" 11'-512
8'-9"
10'-6"
12'-6"
35'-8" 13'
13'-6"
15'-9"
6"
SHOWER HEAD AS PER VENDOR
EQ
PB47
3'
DOOR D4 AS PER SPECIFICATION FLOORING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS GRIGIO TILES
6'-314
RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH UNDERSIDE CANTILEVER - KERALA TILES
CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES
W36
4"
START POINT
SHOWER CUBICLE AS PER SPECIFICATION
A
5'11"X1' NICHE TO FINISHED IN DOVER ARENA TILE AS PER DETAIL 6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER
POINT START START POINT
27'-10"
2'
1 2" DROP
DUCT-1
L°
POINT START START POINT
2'
KK°
START POINT
START POINT
CENTRE-LINE FOR TILING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
B
4"
EQ
START POINT
KK
WALL - A
8" THK SLAB
5"
SECTION HH
SUNKEN SLAB AS PER STRUCTURE
K
WALL B CENTER LINE
HEALTH SPA
1'-2"
FLOORING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS GRIGIO TILES
JJ B
4"
C
WALL HUNG WC AS PER VENDOR SPECIFICATION
W2
LINTEL LVL
PB1
PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
J
B132
LANDSCAPED COURT
WALL DADOING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS BIANCO TILES
H HH
3'-734
START POINT
8" THK SLAB
7'-514
WATERBODY
GG
W37
CENTER LINE
FILLING
WALL-A
G START POINT START POINT
POINT START
WALL DADOING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS BIANCO TILES MIRROR AS PER SPECIFICATION VANITY COUNTER AS PER VENDOR SPECIFICATION WASH BASIN AS PER VENDOR SPECIFICATION SHOWER CUBICLE AS PER DETAIL 6" THK FULL HEIGHT SKIN WALL
W36
3'-314
1' SUNKEN 16" WALL CINDER A 8" THK SLAB B132
PLAN : BEDROOM-2 TOILET(SIDHARTH'S) CW11
FF
POINT START
GROUND FLOOR FFL
3'0"X1'0" NICHE TO FINISHED IN ENDLESS BIANCO TILE AS PER DETAIL
B142
F
START POINT
4'
SHOWER HEAD AS PER VENDOR 4" THK RANDOM RUBBLE HIGHLIGHT WALLS A TO BE FINISHED IN CLADDING (600MMSADARAHALLI X1200MM)RUNASTONE NERO TILES AS PER SPECIFICATION
B153
EE
START POINT
1 2" DROP
RCC SLOPED ROOF BIANCO TILES EXPOSED SIDE -WASH MONIER TILES BASIN AS PER UNDERSIDE - PAINT FINISH VENDOR SPECIFICATION RAILING GLASS VANITY TO COUNTER AS PER VENDOR SPECIFICATION DETAIL CANTILEVER SHOWER CUBICLE AS PER STEEL SLOPED ROOF SPECIFICATION EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES IN FLOORING TO BE FINISHED 600 MM X 1200 MM ENDLESS 6"x8" MS PERGOLA AT BEAM BOTTOM / GRIGIO TILES RCC ROOF SLAB BOTTOM
WALL-C
14'-4" ht COMPOUND WALL
3' 1'-6"
E
PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL
START POINT
START POINT
C-C
DD
START POINT
600 MM X 1200 MM ENDLESS
C-C
START POINT
D START POINT
ZZ RCC SLAB & BEAM AS PER STRUCTURAL DRAWING
POINT START
PT SLAB WALL HUNG AS PER VENDOR EXPOSED SIDEWC - THERMOTILE SPECIFICATION UNDERSIDE -PAINT FINISH 2"X6" WOODEN RAFTERS WALL DADOING TO BE FINISHED IN
C-C 5'-314
2'
CC
4"
START POINT
C:\Users\Shantanu\Desktop\5.jpg
C
LINTEL LVL
START POINT
C:\Users\Shantanu\Desktop\3.jpg
BB
START POINT
C:\Users\Shantanu\Desktop\2.jpg
C:\Users\Shantanu\Desktop\1.jpg
B
6"
AA 6" THK FULL HEIGHT SKIN WALL
START POINT
A
WALL-A
4"
7'-514
POINT START START POINT
SECTION GG
R
YY
QQ°
SL. NO.
REVISIONS
KEY
PART PLAN- GROUND FLOOR-ENTRANCE STAIRCASE
30-11-2021SL. NO.
REVISIONS
DATE
SL. NO.
REVISIONS
CLUBHOUSE KITCHEN ENTRANCE STEPS DETAIL
PLAN
DATE
CLIENT
MR.RAJEEV AGRAWAL PROJECT
PROPOSE VILLA DEVELOPMENT-RAIPUR
DRAWING STATUS
EXICUTION REVISION NO.
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.
DRAWN BY
DRAWING TITLE
STEPS DETAIL DATE
30-11-2021
DWG. NO.
CODE
--
NORTH
A
Q° CLUBHOUSE MAIN ENTRANCE STEPS DETAIL
PART PLAN- GROUND FLOOR-KITCHEN ENTRANCE STAIRCASE
KEY
PLAN
DEALT BY
--
SCALE
1/8"=1'
THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
SL. NO.
REVISIONS
30-11-2021SL. NO.
REVISIONS
DATE
SL. NO.
REVISIONS
DATE
CLIENT
SIDHARTH BHATIA PROJECT
RESIDENCE,BANGALORE
DRAWING STATUS
TENDER - ADVANCE COPY REVISION NO.
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.
DRAWN BY
DRAWING TITLE
TOILET DETAILS DATE
21-09-18
DWG. NO.
CODE
--
NORTH
DEALT BY
--
SCALE
1/8"=1'
THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
TC
EQ
V1 3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
EQ
M
M
L
L K J H
B'
MIDLANDING 1 +7'6" FFL
DUCT
8"
C
1
D2
EQ
9
10
11
E SL OP N AI DR R WA TE
1'-5
RAIN WATER
8"
1'-4
1'-10
5'-9
1'-10
1'-10
1'-10 1'-10
9' WIDE PASSAGE 1'-10 1'-10
1'-10
1'-10
1'-10
2537.5 SQ.FT
TO BE CONFIRMED BY THE ARCHITECT
VITRIFIED TILES- AS PER SELECTION
538.64 SQ.FT
VITRIFIED TILES- AS PER SELECTION
538.64 SQ.FT
1588.23 SQ.FT
ENGINEERED WOODEN FLOORING
1588.23 SQ.FT
RIVER FINISH KOTA
1399.5 SQ.FT
RIVER FINISH KOTA
1399.5 SQ.FT
RIVER FINISH KOTA
1399.5 SQ.FT
TILES AS PER SPECIFICATION (KITCHEN AND STORE- ENDLESS BEIGE 2'X2' TOILET TILES AS PER SELECTION)
461.5 SQ.FT
TILES AS PER SPECIFICATION (KITCHEN AND STORE- ENDLESS BEIGE 2'X2' TOILET TILES AS PER SELECTION)
461.5 SQ.FT
TILES AS PER SPECIFICATION (KITCHEN AND STORE- ENDLESS BEIGE 2'X2' TOILET TILES AS PER SELECTION)
461.5 SQ.FT
CHINESE MOSAIC
1065 SQ.FT
CHINESE MOSAIC
1065 SQ.FT
CHINESE MOSAIC
1065 SQ.FT
FIRST FLOOR - FLOORING FINISHES
TERRACE FLOOR - FLOORING FINISHES
TC
V4
B
(MASTER BEDROOM)
12'10"X9'4"
FC
FC
TC
12'10"X9'4"
TC
TC
TC
FC
FC
LEGEND RIVER FINISH KOTA 22.5" x 22.5"
NOTE: FLOORING AT THE LANDSCAPE AREA CAN FOLLOW THE LANDSCAPE CONSULTANT'S FLOORING PATTERN WITH RIVER FINISH KOTA
888 SQ.FT
FIRST FLOOR - FLOORING FINISHES
W1 W3 SW1 SW2 DW1 DW2 CW1 CW2
OPENABLE WINDOW + CORNER FIXED WINDOW
CW3 CW4 CW5 CW6
OPENABLE WINDOW + CORNER FIXED WINDOW
2+3+0 1+0+0
7'-0"
1+0+0
0'-0"
7'-6"
0+0+1
SD1 SLIDING DOOR SD2 SLIDING DOOR SD3 SLIDING DOOR SD4 SLIDING DOOR SFD1 SLIDING FOLDING DOOR
VARIES
8'-0"
8'-0"
0'-0"
7+6+0
8'-0"
1+1+0
DECK
8'-8"
BEDROOM 2
7'-0"
8'-0"
0'-0"
8'-0"
0+1+0
DINING
9'-4"
8'-0"
0'-0"
8'-0"
1+0+0
PUJA ROOM
9'-0"
8'-0"
0'-0"
8'-0"
1+0+0
8'-0"
0'-0"
8'-0"
1+0+0
OPENABLE WINDOW
MASTER BEDROOM
FIXED WINDOW
STAIRCASE
SLIDING WINDOW
KITCHEN
SLIDING WINDOW
RIVER FINISH KOTA 22.5" x 22.5"
888 SQ.FT
8" HT BUND WALL
UP
5'5"X8'0"
D3
TOILET
UP
UP
DB access
DUCT
GUEST BEDROOM 16'X14'0"
TC D3
TOILET -1 8'6" X 8'0"
MIDLANDING 1 UP
DB access
DUCT
TERRACE 15'7"X14'0"
PASSAGE BELOW
15'0"X6'9"
LANDSCAPE GARDEN
WALK IN CLOSET 8'0"X11'4"
HEAD ROOM 5'0" x 8'0"
41 42 43 44 45
LIFT 5'2"X5'2"
4' WIDE PASSAGE
33
32
31 30
29 28 27 26 25
24 23
OHT 8'2"X8'0"
DUCT
ELECTRICAL SHAFT
DB access
DUCT CHAJJA PROJECTION ABOVE
8" HT BUND WALL
D3
3' HT RAILING 8" HT BUND WALL
TERRACE 24'6" X 29'8"
D3 D2
TC
D2
TC
TC
SD1
BEDROOM 2 15'0"X18'0"
SD3
TOILET
(PARENTS BEDROOM)
40
D6
V1
(BEDROOM -2)
TC
LIVING 15'8"X18'0"
36 37 38 39
15'0"X6'9"
CW4 CW2
TOILET -1 8'6" X 8'0"
34 35
TERRACE 15'7"X14'0"
WALK IN CLOSET
(BEDROOM -2)
DN MID LANDING 2
DUCT
DW2
D3
V6
D3
ELECTRICAL SHAFT
PASSAGE BELOW
15'0"X6'9"
V2
WALK IN CLOSET
W3
WALK IN CLOSET - 1 5'11" X 8'0"
TOILET
(BEDROOM-2)
DW2
D3
LIFT 5'2"X5'2"
DN
W3
DUCT
V1
TOILET
(BEDROOM-2)
V2 V6
D3
WALK IN CLOSET - 1 5'11" X 8'0"
ELECTRICAL SHAFT
V1
D3
D2
MIDLANDING 1
(GUEST BEDROOM)
9'0"X8'0"
ELECTRICAL SHAFT
DB access
CUT-OUT IN SLAB ABOVE
DECK 9'0"X14'0"
CHAJJA PROJECTION ABOVE
D2 D3
LIFT 5'2"X5'2"
DN
W3
3' HT RAILING
TERRACE 29'5" X 12'1"
TERRACE BELOW FAMILY AREA 14'10"X15'0"
TERRACE 15'8"X15'8"
TC D2
TC DUCT
TC
D2
TC
W1
MASTER BEDROOM 20'9"X18'0"
D2
TC
TC
SD1
BEDROOM 2 15'0"X18'0"
SD3
W1
MASTER BEDROOM 20'9"X18'0"
(PARENTS BEDROOM)
D3
8'0"X11'4"
V5
DECK 9'8"x18'0"
TC
DECK 9'8"x18'0"
TC
SLOPE DOWN
D3
3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
TC
D2
PARENT'S BEDROOM 16'6"X16'0"
F
D3
TC
E
3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
D3
CW6
TC
TC
WALK IN CLOSET
D3
TC
(MASTER BEDROOM)
TOILET
12'10"X9'4"
(MASTER BEDROOM)
(MASTER BEDROOM)
TC
WALK IN CLOSET (MASTER BEDROOM)
12'10"X9'4"
TC
12'10"X9'4"
CV1
TC
CW5
D3
TOILET
TC
12'10"X9'4"
MD
PARKING 21'7"X26'5"
CW1
CW6
TC
DUCT
UP
INFORMAL LIVING 15'0"X9'4"
A'
TC
CW1
CV1
TC
SD1
ENTRANCE VERANDAH 15'0"X5'0"
12" X 12" TERRACOTTA TILES ON EXTERIOR SIDE OF SLOPING ROOF
DECK 17'2"X6'0"
UP
LANDSCAPE GARDEN UP
TC
LEGEND
D
TC
TC
TC
TC
TC
TC
TC
TC
TC
TC
MAIN ENTRY
PARKING ENTRY
FIRST FLOOR- UNDERSIDE ROOF FINISH - ROCK CANYON
FIRST FLOOR- UNDERSIDE ROOF FINISH - IPE WOOD
ROCK CANYON PAINT 8463
TERRACE FLOOR- ROOF FINISH
PAINT FINISH
GROUND FLOOR- UNDERSIDE ROOF FINISH
WOODEN CLADDING
FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL
12'10"X9'4"
TC
FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL
FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL
FIRST FLOOR - ROOF UNDERSIDE FINISHES
TERRACE FLOOR - ROOF FINISHES
C
G'
ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)
TILES AS PER SELECTION
TERRACOTTA TILES - 12" X 12"
GROUND FLOOR - ROOF UNDERSIDE FINISHES
(MASTER BEDROOM)
UNDERSIDE ROOF FINISHES
ROOF PROJECTION ABOVE
B SKYLIGHT TO DETAIL SANDSTONE CLADDING
RAI
DRA
IN SLO
E WA TE IN RA
TC
V4 LVL 37'-11"
LVL 28'-3"
11'
SD3
CW1
D4
SERVANT'S TOILET 4'6"X6'6"
PUJA 9'0"X3'10"
LVL 16'-5"
CW6
13
14
15
16
1
2
3
4
5
6
7
8"
E'
9
10
11
A
TC
12
13
14
15
LVL -16'-5"
SD4
FAMILY ROOM
FIXED WINDOW + SLIDING DOOR
FAMILY ROOM
5'-6"
3'-0"
2'-6"
23'6"
2'-0"
3'-6"
5'-6"
8'-0"
8'-0"
0+1+0
CW7
1
V1 V2 V3 V4 V5 V6 V7 CV1
MIDLANDING-1 BEAM BOTTOM
4'-6"
10'-0"
8'-0"
2'-6"
1+0+0
8'-0"
0+1+0
8'-0"
0+1+0
8'-0"
0+1+0
15'-0" - (7'-0" + 8'-0")
5'-6" + 8'-0"
2'-6" + 0'-0"
FIXED WINDOW + SLIDING DOOR + FIXED WINDOW
TERRACE
14'-0"-(3'-6"+ 7'-0"+ 3'-6")
5'-6" + 8'-0"
2'-6" + 0'-0"
BEDROOM 2
15'8"-(5'-8" + 4'-0" + 6'-0")
5'-6"
2'-6"
8'-0"
0+1+0
LIVING ROOM
15'2"-(4'-4" + 4'-6" + 6'-4")
7'-0"
1'-0"
8'-0"
1+0+0
BEDROOM 1
13'7"-(4'-4" + 4'-0" + 5'-3")
5'-6"
2'-6"
8'-0"
0+1+0
GUEST BEDROOM
13'3"-(4'-4" + 4'-8" + 4'-3")
7'-0" 7'-0"
1'-0" 1'-0"
8'-0" 8'-0"
1+0+0
5'-6"
2'-6"
8'-0"
0+1+0
OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW
PARENT'S BEDROOM 11'10"-(2'-4"+ 3'-4"+ 6'-2") MASTER BEDROOM 10'11"-(2'-4"+ 4'-4"+ 4'-3")
3'-10"
4'-6"
2'-4" 1'-4" 2'-2" 2'-10"
11'-2"
14'-8"
8'-10"
3'-2"
6'-8"
5'-8"
4'-4"
ELEVATION A (WEST SIDE)
16'-5"
7'-10"
99'-4" R
16
Q
P
N
M
L K
J
6'-1"
5'-8"
3'
1'
6'
5'
4'-8"
4'-9"
1'-1"
69'-4"
H
G
F
E
D
C
B
A
1
2
3
4
5
6
7
8"
9
10
11
3'-4"
CW4
8'
4'-3"
12
5'-6"
D5
13
14
15
16
D3
D2
CLOSET
TC
(GUEST BEDROOM)
5'5"X8'0"
D3
SLIDING WINDOW + CORNER FIXED WINDOW
22'-3" - (6'-8" + 3'-10" + 11'-9" )
DINING VARIES
TOP HUNG VENTILATOR
3'-0"
TOILET - BEDROOM 2
TOP HUNG VENTILATOR
HEIGHT
WIDTH
ITEM
SILL HT. LINTEL HT. NO
7'-0"
1'-0"
3'-0"
5'-0"
8'-0"
1+0+0 0+1+0
2'-0"
6'-0"
8'-0"
2'-0"
5'-0"
7'-0"
1+0+0
SERVANT'S ROOM
10'-9"
2'-0"
6'-0"
8'-0"
1+0+0
TOILET(PARENT'S BEDROOM) WALK - IN CLOSET
7'-4"( 2'-0" + 5'4")
2'-0"
6'-0"
8'-0"
1+0+0
2'-0"
6'-0"
8'-0"
0+1+0
2'-0"
6'-0"
8'-0"
1+0+0
2'-0"
6'-0"
8'-0"
0+1+0
POWDER ROOM
TOP HUNG VENTILATOR
TOP HUNG + FIXED VENTILATOR
SERVANT'S TOILET
(BEDROOM 2)
2'-0" 4'-6" (2'-0"+2'-6")
OPENABLE + CORNER FIXED VENTILATOR
TOILET (MASTER BEDROOM)
13'-0" (2'-0" + 4'-0" + 7'0")
MD D1 D2 D3 D4 D5 D6
1+1+0
8'-0"
2'-0" 2'-0"
LOUVRED VENTILATOR OPENABLE + TOP HUNG VENTILATOR FIXED VENTILATOR
DESCRIPTION MAIN DOOR (OPENABLE DOOR + FIXED WINDOW)
WIDTH
INFORMAL LIVING
15' - (4'-4"+10'-8")
DOOR
KITCHEN
DOOR DOOR
8'-0"
3'-6" 3'-0"
0'-0"
8'-0"
4'-0"
VARIES VARIES
SILL HT. LINTEL HT. NO 0'-0"
8'-0"
0'-0"
8'-0" 8'-0" 8'-0"
W1
OPENABLE WINDOW + CORNER FIXED WINDOW
CW3 CW4 CW5 CW6
OPENABLE WINDOW + CORNER FIXED WINDOW
8'-0"
1+0+0
7'-0"
0'-0"
7'-0"
1+0+0
3'-0"
7'-6"
0'-0"
7'-6"
0+0+1
VARIES
8'-0"
LOCATION
W3 SW1 SW2 DW1 DW2 CW1 CW2
2+3+0
8'-0"
0'-0"
2'-9"
TERRACE STAIRCASE
SERVANT'S TOILET
DESCRIPTION
1+0+0
0'-0"
8'-0"
POWDER ROOM
DOOR
DOOR
ITEM
1+0+0
8'-0"
2'-6"
DOOR
SD1 SLIDING DOOR SD2 SLIDING DOOR SD3 SLIDING DOOR SD4 SLIDING DOOR SFD1 SLIDING FOLDING DOOR
1+0+0
HEIGHT
LOCATION
7+6+0
8'-0"
0'-0"
8'-0"
1+1+0
8'-0"
0'-0"
8'-0"
1+0+0
DECK
8'-8"
BEDROOM 2
7'-0"
8'-0"
0'-0"
8'-0"
0+1+0
DINING
9'-4"
8'-0"
0'-0"
8'-0"
1+0+0
PUJA ROOM
9'-0"
8'-0"
0'-0"
8'-0"
1+0+0
OPENABLE WINDOW
WIDTH
MASTER BEDROOM
FIXED WINDOW
FAMILY ROOM
FIXED WINDOW + SLIDING DOOR
FAMILY ROOM
23'6"
2'-0"
KITCHEN
SLIDING WINDOW
SILL HT. LINTEL HT. NO
5'-6"
3'-0"
STAIRCASE
SLIDING WINDOW
HEIGHT
2'-6" 3'-6"
5'-6"
8'-0"
8'-0"
0+1+0
CW7
1
V1 V2 V3 V4 V5 V6 V7 CV1
MIDLANDING-1 BEAM BOTTOM
4'-6"
10'-0"
8'-0"
2'-6"
1+0+0
8'-0"
0+1+0
8'-0"
0+1+0
8'-0"
0+1+0
15'-0" - (7'-0" + 8'-0")
5'-6" + 8'-0"
2'-6" + 0'-0"
FIXED WINDOW + SLIDING DOOR + FIXED WINDOW
TERRACE
14'-0"-(3'-6"+ 7'-0"+ 3'-6")
5'-6" + 8'-0"
2'-6" + 0'-0"
SLIDING WINDOW + CORNER FIXED WINDOW
BEDROOM 2
15'8"-(5'-8" + 4'-0" + 6'-0")
5'-6"
2'-6"
8'-0"
0+1+0
LIVING ROOM
15'2"-(4'-4" + 4'-6" + 6'-4")
7'-0"
1'-0"
8'-0"
1+0+0
BEDROOM 1
13'7"-(4'-4" + 4'-0" + 5'-3")
5'-6"
2'-6"
8'-0"
0+1+0
GUEST BEDROOM
13'3"-(4'-4" + 4'-8" + 4'-3")
7'-0" 7'-0"
1'-0" 1'-0"
8'-0" 8'-0"
1+0+0
5'-6"
2'-6"
8'-0"
0+1+0
OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW
PARENT'S BEDROOM 11'10"-(2'-4"+ 3'-4"+ 6'-2") MASTER BEDROOM 10'11"-(2'-4"+ 4'-4"+ 4'-3")
ITEM
DESCRIPTION
LOCATION
SLIDING WINDOW + CORNER FIXED WINDOW
22'-3" - (6'-8" + 3'-10" + 11'-9" )
DINING VARIES
TOP HUNG VENTILATOR
3'-0"
TOILET - BEDROOM 2
TOP HUNG VENTILATOR
POWDER ROOM
TOP HUNG VENTILATOR
HEIGHT
WIDTH
SILL HT. LINTEL HT. NO
7'-0"
1'-0"
3'-0"
5'-0"
8'-0"
1+0+0
UP
DB access
DUCT
GUEST BEDROOM 16'X14'0" V2
6'-0"
8'-0"
2'-0"
5'-0"
7'-0"
1+0+0
8'-0"
1+0+0
8'-0"
1+0+0
10'-9"
2'-0"
6'-0"
7'-4"( 2'-0" + 5'4")
2'-0"
6'-0"
2'-0"
6'-0"
8'-0"
0+1+0
2'-0"
6'-0"
8'-0"
1+0+0
2'-0"
6'-0"
8'-0"
0+1+0
TOP HUNG + FIXED VENTILATOR
SERVANT'S TOILET
(BEDROOM 2)
OPENABLE + CORNER FIXED VENTILATOR
TOILET (MASTER BEDROOM)
13'-0" (2'-0" + 4'-0" + 7'0")
(BEDROOM -2)
LVL 15'-3"
LANDSCAPE GARDEN
CW4
D3 TC
LIVING 15'8"X18'0"
WALK IN CLOSET
" GROUT JOINT LVL 14'-3"
LVL 10'-0"
LVL 10'-0"
LVL 10'-0"
3'-2"
5'-6"
15
4'-3"
14
LEGEND
8'
13
3'-4"
12
4'-9"
1'-1"
CW7
4'-8"
9
5'
8"
6'
3'
6
V5
4
6'-1"
3
N
D
TC
16'-5"
A
1
LEGEND
5'-8"
B
6'-8"
4'-4"
C
D
3'-2"
E
8'-10"
F
14'-8"
G
2'-10"
H
2'-2"
J
1'-4"
K L
2'-4"
4'-6"
11'-2"
M
N
1'-3"
Q
TC
REVISIONS
DATE
SL. NO.
REVISIONS
DATE
CLIENT
DRAWING STATUS
MR.RAJEEV AGRAWAL
DRAWN BY
DRAWING TITLE
EXICUTION
PROJECT
DATE
REVISION NO.
PROPOSE VILLA DEVELOPMENT-RAIPUR
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.
--
LANDSCAPE GARDEN UP
TC
3 4
SL. NO.
REVISIONS
30-11-2021SL. NO.
REVISIONS
DATE
SL. NO.
REVISIONS
DATE
1/8"=1'
2"
3 4 OUT
TC
TC
TC
TC
LEGEND
LEGEND ROCK CANYON PAINT 8463 SANDSTONE CLADDING
UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH
ROCK CANYON PAINT 8463
FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL
SANDSTONE CLADDING
FIRST FLOOR - WALL FINISHES
WALL FINISHES CLIENT
DRAWING STATUS
MR.RAJEEV AGRAWAL
FINISHES
REVISION NO.
PROPOSE VILLA DEVELOPMENT-RAIPUR
DRAWN BY
DRAWING TITLE
EXICUTION
PROJECT
THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
8" IN
COPING DETAIL FOR COMPOUND WALL
GROUND FLOOR - WALL FINISHES
UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH
SCALE
NORTH
CODE
TC
MAIN ENTRY
PARKING ENTRY
FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL
A KEY PLAN - GROUND FLOOR PLAN
DEALT BY
--
DWG. NO.
30-11-2021
12'10"X9'4"
UP
WOODEN CLADDING
UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH
30-11-2021SL. NO.
(MASTER BEDROOM)
DECK 17'2"X6'0"
B
C
JODHPUR SANDSTONE CLADDING - 6'X2'
FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCHUP MODEL
UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH
TC
WALK IN CLOSET
TOILET
12'10"X9'4"
CV1
TC
CW5 SD1
ENTRANCE VERANDAH 15'0"X5'0"
TERRACOTTA TILES - 12" X 12"
A KEY PLAN - GROUND FLOOR PLAN
D3
(MASTER BEDROOM)
MD
PARKING 21'7"X26'5"
MS SECTIONS COATED WITH CHOCOLATE BROWN PAINT FINISH
WOODEN CLADDING
CW6 D3
11'-5"
2'-7"
P
ELEVATION DETAIL FOR JODHPUR SANDSTONE CLADDING
ROCK CANYON PAINT 8463
B
C
JODHPUR SANDSTONE CLADDING - 6'X2'
TERRACOTTA TILES - 12" X 12"
CW1
INFORMAL LIVING 15'0"X9'4"
ELEVATION B (SOUTH SIDE)
7'-10"
2
MS SECTIONS COATED WITH CHOCOLATE BROWN PAINT FINISH
REVISIONS
W1
DECK 9'8"x18'0"
TC
TC
N
D
5'-8"
1'
5
FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCHUP MODEL
SL. NO.
SD1
MASTER BEDROOM 20'9"X18'0"
DUCT
UP
99'-4"
7
ELEVATION DETAIL FOR JODHPUR SANDSTONE CLADDING
ROCK CANYON PAINT 8463
8'0"X11'4"
PARENT'S BEDROOM 16'6"X16'0" LVL 0'-0"
LVL 14'-3"
LVL 31'-5"
69'-4"
10
TC
TC
D2 SD4
11
D2
BEDROOM 2 15'0"X18'0"
(PARENTS BEDROOM)
D3
LVL 15'-3"
LVL 14'-7"
16
8'0"X11'4"
D2
TC
SD3
TOILET
(PARENTS BEDROOM)
D3
LVL 11'-5"
SW1
ELEVATION D (EAST SIDE)
V1
WALK IN CLOSET 15'0"X6'9"
LVL 16'-9"
D3
1+0+0
DUCT
TOILET -1 8'6" X 8'0"
D3
DW2
D3
V6
WALK IN CLOSET - 1 5'11" X 8'0"
TERRACE 15'7"X14'0"
PASSAGE BELOW
15'0"X6'9"
CUT-OUT IN SLAB ABOVE
ELECTRICAL SHAFT
TOILET
(BEDROOM-2)
SD2
LVL 30'-11"
SW2
LVL 11'-5"
0+1+0
2'-0"
2'-0"
SERVANT'S ROOM TOILET(PARENT'S BEDROOM) WALK - IN CLOSET
2'-0" 4'-6" (2'-0"+2'-6")
CW3
1+1+0
8'-0"
2'-0"
LOUVRED VENTILATOR OPENABLE + TOP HUNG VENTILATOR FIXED VENTILATOR
LIFT 5'2"X5'2"
DN
MIDLANDING 1 UP
V1
D3
D2
W3
DUCT
TOILET
(GUEST BEDROOM)
9'0"X8'0"
ELECTRICAL SHAFT
DB access
DECK 9'0"X14'0"
FAMILY AREA 14'10"X15'0"
TERRACE 15'8"X15'8"
TC
STORE 5'0"X7'4"
D3
LIFT 5'2"X5'2" UP
10
DW1
D3 D1
DN
POWDER ROOM 4'6"X8'0"
3'-2"
DUCT
3'
LOCATION
TC
BEDROOM 1 14'11"X18'10"
MS
UTILITY YARD 8'0"X10'9"
LVL 66'-1" CW5
LVL 12'-7"
V3
11'-5"
LVL 30'-11"
DESCRIPTION
TC CW3
TC
DB access
DINING 21'9"X15'0"
LVL 45'-1"
SD1 MD
CW2
CW7
LVL 6'-6"
ELEVATION C (NORTH SIDE)
F'
9' WIDE PASSAGE
TC
A
CW7
LVL -16'-5"
SD2
LVL 59'-4"
TC
TC
FC
SW2
TC V7
KITCHEN 20'9"X18'10"
FC
TC
D3
SFD1
" GROUT JOINT
LVL 26'-5"
CW1
LVL 0'-0"
LVL 28'-3"
TC
A
TC
SERVANT'S ROOM 9'4"X6'6"
SW1
LVL 45'-1"
LVL 28'-3"
30'
DW1
DECK 10'0"X14'7"
LANDSCAPE GARDEN LVL 26'-5"
LVL 22'-3"
CV1
A
TC
TC
TC
TC
3'
SL OP DR
AI
N
CHAJJA PROJECTION ABOVE ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
V4
12
SLIDING WINDOW + CORNER FIXED WINDOW
PAINT FINISH
TERRACOTTA TILES - 12" X 12"
DW1
FAMILY AREA 14'10"X15'0"
TERRACE 15'8"X15'8"
TC
STORE 5'0"X7'4"
CLOSET
(GUEST BEDROOM)
R
1+0+0 1+0+0
8'-0" 8'-0"
0'-0"
7'-6"
ROCK CANYON PAINT 8463
WOODEN CLADDING
TC
BEDROOM 1 14'11"X18'10"
MS
9' WIDE PASSAGE
8'-0" 8'-0" 8'-0"
0'-0" 0'-0"
7'-0"
LEGEND
PE
3'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)
ITEM
REAPER BACKING AT REGUALR INTERVALS
DETAIL THROUGH SECTION BB TYPICAL ROOF CLADDING DETAIL
TERRACOTTA TILES - 12" X 12"
LEGEND
LVL 12'-7"
SILL HT. LINTEL HT. NO
ROOF SLAB AS PER STRUCTURAL DETAIL
1"X1/2" SOLID
WOOD BEADING 1" 2 34MM X 25MM THK BATTEN/
PAINT FINISH WOODEN CLADDING
TC
TC
SW2
TC TC
DW1
D3
D3
LIFT 5'2"X5'2"
11'
0'-0" 0'-0" 0'-0"
8'-0" 8'-0"
2'-9" 3'-0"
HEIGHT
EQ
TC CW3
TC
BEDROOM 1 14'11"X18'10"
MS
30'
8'-0" 8'-0" 8'-0"
2'-6"
TERRACE STAIRCASE
WIDTH
1"X1/2" SOLID WOOD BEADING RECESSED BY FROM EDGE OF ROOF
TC
EQ
IPE WOOD WALL CLADDING AS PER APRROVED SPECIFICATIONS
ROCK CANYON PAINT 8463
34MM X 25MM THK BATTEN/ REAPER BACKING AT REGULAR INTERVALS 1"X1/2" SOLID WOOD BEADING
TC
11'
3'-0"
POWDER ROOM
DOOR
SERVANT'S TOILET
LOCATION
EQ
B
LEGEND
IPE WOOD WALL CLADDING AS PER APRROVED SPECIFICATIONS
DETAIL THROUGH SECTION AA REFER PART PLAN
TC
TC
2'
3'-6"
DOOR
DOOR
DESCRIPTION
EQ
EDGE DETAILS FOR IPE WOOD CLADDING AT MASTER BEDROOM SLOPING ROOF
TC
TC
TC
TC CW3
TC
6'
4'-0"
VARIES VARIES
ITEM
EQ
ROOF SLAB AS PER STRUCTURAL DETAIL
SD1
NOTE: FLOORING AT THE LANDSCAPE AREA CAN FOLLOW THE LANDSCAPE CONSULTANT'S FLOORING PATTERN WITH RIVER FINISH KOTA
TC
SW2
TC V7
D1
DN
10
11'
15' - (4'-4"+10'-8")
KITCHEN
SILL HT. LINTEL HT. NO
EQ
PAINT FINISH BASE WHITE-ASIAN PAINTS
DECK 17'2"X6'0"
UTILITY YARD 8'0"X10'9"
D5
POWDER ROOM 4'6"X8'0"
G
30'
INFORMAL LIVING
DOOR DOOR DOOR
HEIGHT
EQ
TC
MAIN ENTRY
GROUND FLOOR - FLOORING FINISHES
TC
TC
TC
TC
D3
DB access
DINING 21'9"X15'0"
V3
11'
MAIN DOOR (OPENABLE DOOR + FIXED WINDOW)
WIDTH
EQ
D4
SERVANT'S TOILET 4'6"X6'6"
SW1
KITCHEN 20'9"X18'10"
2'
MD D1 D2 D3 D4 D5 D6
LOCATION
EQ
SERVANT'S ROOM 9'4"X6'6"
DECK 10'0"X14'7"
PUJA 9'0"X3'10"
PATHWAY
DESCRIPTION
EQ
WALK IN CLOSET
CW2
ITEM
12'10"X9'4"
12'10"X9'4"
B
KOTA FLOORING PATTERNS
LANDSCAPE GARDEN
KOTA COPING
F'
TC
(MASTER BEDROOM)
TOILET
(MASTER BEDROOM)
ROOF PROJECTION ABOVE
PART PLAN (FIRST FLOOR)- BATTENS FRAMEWORK MASTER BEDROOM
CV1
TC
CW5
PARKING ENTRY
FLOORING FINISHES
B'
FC
RA
2537.5 SQ.FT
TO BE CONFIRMED BY THE ARCHITECT
ENGINEERED WOODEN FLOORING
11'
A
9' WIDE PASSAGE
9' WIDE PASSAGE
GROUND FLOOR - FLOORING FINISHES
2537.5 SQ.FT 538.64 SQ.FT 1588.23 SQ.FT
WALK IN CLOSET
12'10"X9'4"
ER
D3
34MM X 25MM THK BATTEN/ REAPER BACKING AT REGULAR INTERVALS
B
WALK IN CLOSET C
TC
B
1'-10
TC
15'0"X6'9"
CW6
N WAT
12'10"X9'4"
LANDSCAPE GARDEN
SD2
FC
D3
TOILET
CV1
D3
A
A
D
TC
(MASTER BEDROOM)
12'10"X9'4"
UP
VITRIFIED TILES- AS PER SELECTION
A
A
PART PLAN (FIRST FLOOR) MASTER BEDROOM
UP
ENGINEERED WOODEN FLOORING
1"X1/2" SOLID WOOD BEADING 34MM X 25MM THK BATTEN/ REAPER BACKING AT REGULAR INTERVALS
TC
WALK IN CLOSET TOILET
(MASTER BEDROOM)
B
MD
1'-10
16
1'-10"
TC
D
C
TOILET
LEGEND
15
1'-10"
TC
TC
LEGEND
14
B
W1
CW6
(MASTER BEDROOM)
ENTRANCE VERANDAH 15'0"X5'0"
TC
13
1'-6
EQ
PARKING 21'7"X26'5"
TC
TC
LEGEND
E
A
A
TC
1'-10
1'-3"
SD1
W1
TC
(MASTER BEDROOM)
TC
SD1
MASTER BEDROOM 20'9"X18'0"
TC
DECK 17'2"X6'0"
MAIN ENTRY
12
F
A
A
TC
TC
CW1
INFORMAL LIVING 15'0"X9'4"
SFD1
EQ
D3
D2
DECK 9'8"x18'0"
TC
DUCT
UP
SD4
SD1
PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL
PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL
SLOPE
IN
B
12'10"X9'4"
11
TC
TC
TC
12'10"X9'4"
10
1'-10"
MASTER BEDROOM 20'9"X18'0"
F E
1'-3"
DRAIN SLOPE
TOILET
(MASTER BEDROOM)
9
1'-10"
H
3" THK BOXING PROJECTION ALL THREE SIDES POLISHED CEMENT FINISH
TC
SLOPE
CC
BEDROOM 2 15'0"X18'0"
SD3
8'0"X11'4"
V5
8"
G
V1
ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)
EQ
7"
(PARENTS BEDROOM)
D3
PARENT'S BEDROOM 16'6"X16'0"
CV1
TC
CW5
MASTER BEDROOM 20'9"X18'0"
EQ
8'0"X11'4"
D2
TC 1'-10
TOILET
(PARENTS BEDROOM)
16
L K
TC
TC
TERRACE 15'7"X14'0"
D3 TC
WALK IN CLOSET
15
TC
1'-10
D2
TC
14
DW2
D3
CW4
LIVING 15'8"X18'0"
TC
WALK IN CLOSET (MASTER BEDROOM)
13
J
TILES AS PER SELECTION
RIVER FINISH KOTA STONE
RAIN WATER DRAIN
D3
12
TC
MASTER BEDROOM 20'9"X18'0"
D3
TC
M
PASSAGE BELOW
15'0"X6'9"
G
WALK IN CLOSET 15'0"X6'9"
CW2
CW6 D3
11
DUCT
TOILET -1 8'6" X 8'0"
D3
V1
TOILET
(BEDROOM-2)
V2 V6
TC
CW1
DUCT
D2
ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)
G
MASTER BEDROOM 20'9"X18'0"
DECK 9'8"x18'0"
TC
SLOPE DOWN
ENTRANCE VERANDAH 15'0"X5'0"
GUEST BEDROOM 16'X14'0"
10
1'-10
WALK IN CLOSET - 1 5'11" X 8'0"
ELECTRICAL SHAFT
DB access
LANDSCAPE GARDEN
W1
LANDSCAPE GARDEN
C'
RIVER FINISH KOTA STONE
BEDROOM 2 15'0"X18'0"
SD3
SD1
1'-10
9' WIDE PASSAGE
DRAIN SLOPE RAIN WATER
V5
MD
PARKING ENTRY
UP
DUCT
9
D3
V1
CUT-OUT IN SLAB ABOVE
DECK 9'0"X14'0"
CC
8"
D2
LIFT 5'2"X5'2"
DN
MIDLANDING 1 UP
9'0"X8'0"
IPE WOOD WALL CLADDING AS PER APRROVED SPECIFICATIONS
1'-10
W3
DUCT
TOILET
(GUEST BEDROOM)
UP
D3
DECK 9'8"x18'0"
A
RAILING TO DETAIL METAL AND WOOD
TERRACE 24'6" X 29'8"
D3
D3
D2
1'-10
1'-1
TC
5'5"X8'0"
FAMILY AREA 14'10"X15'0"
TERRACE 15'8"X15'8"
TC
STORE 5'0"X7'4"
CLOSET
(GUEST BEDROOM)
ELECTRICAL SHAFT
DB access
1'-6"
UP
LOUVRE SCREEN AT FIRST FLOOR LINTEL LEVEL MS PAINTED CHOCOLATE BROWN
TC
UP
DUCT
TC
TC
TC
N
PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL
TERRACE 15'7"X14'0"
DW2
D3
D2
BEDROOM 2 15'0"X18'0"
SD3
8'0"X11'4"
TC
P
D3
LIFT 5'2"X5'2"
10
8" HT BUND WALL
DW1
D3 D1
DN
(PARENTS BEDROOM)
D3
D'
FC ABOVE
RAILING TO DETAIL METAL AND WOOD
D5
POWDER ROOM 4'6"X8'0"
3' HT RAILING
BEDROOM 1 14'11"X18'10"
MS
6"
UTILITY YARD 8'0"X10'9" 1'-10
DUCT V3
TC
(BEDROOM -2)
DUCT
UP
PARKING 21'7"X26'5"
DUCT
TOILET -1 8'6" X 8'0"
D3
ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)
OHT 8'2"X8'0"
ELECTRICAL SHAFT
DB access
D3
TC
R
E'
8'0"X11'4"
LIFT 5'2"X5'2"
4' WIDE PASSAGE
24 23
SD2
TOILET
(PARENTS BEDROOM)
HEAD ROOM 5'0" x 8'0"
41 42 43 44 45
CHAJJA PROJECTION ABOVE
8" HT BUND WALL
D2
INFORMAL LIVING 15'0"X9'4"
FC
WALK IN CLOSET
5'-8"
B
WALK IN CLOSET
40
29 28 27 26 25
D3 TC
PARENT'S BEDROOM 16'6"X16'0"
Q
FC ABOVE
WALK IN CLOSET - 1 5'11" X 8'0"
ELECTRICAL SHAFT
DB access
PASSAGE BELOW
15'0"X6'9" TILES AS PER SELECTION
TC
RAIN WATER DRAIN
31 30
6'
CC TO WALL
2
ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)
TC
32
11'
EQ EQ
3
6'-8"
D
C
36 37 38 39
D6
WALK IN CLOSET
CW7
16'-5"
16'-5"
7
4
TOILET
V6
4'-4"
D
2
1
MAIN ENTRY
6
5
TC
E
34 35
33
DW2
D3
V6
TC
LIVING 15'8"X18'0"
3" THK BOXING PROJECTION ALL THREE TC SIDES EXPOSED CEMENT PLASTER FINISH
PERGOLA AT GROUND FLOOR LINTEL LEVEL PRECAST EXPOSED CONCRETE FINISH
(BEDROOM -2)
EQ EQ
5'-8"
E
EQ
LANDSCAPE GARDEN
PERGOLA @ FF SLAB LEVEL PRECAST EXPOSED CONCRETE FINISH
UP
5
6
3'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)
SCREEN WALL TO DETAIL MILD STEEL CHOCOLATE BROWN
A 4
7
E SLOP
1
8
(BEDROOM-2)
V2
RIVER FINISH KOTA STONE
2 UP
PARKING ENTRY 3
G'
SANDSTONE CLADDING
3
9
R DRAIN WATE
RIVER FINISH KOTA STONE
V2
CW4 CW2
RAIN
DECK 17'2"X6'0"
10
PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL
E SLOP
CW5 SD1
UP
11
3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
LIFT 5'2"X5'2"
TREADS - 1'0" RISER - 6" WIDTH - 3'10" RCC STAIRCASE TREADPOLISH KOTA RISERTEAKWOOD BACKED BY PLYWOOD
DN
R DRAIN WATE
3" CHAJJA PROJECTION ABOVE ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
MD
FC ABOVE
SCREEN WALL TO DETAIL MILD STEEL CHOCOLATE BROWN
2
FC ABOVE
MARBLE / TERRAZO
ENTRANCE VERANDAH 15'0"X5'0"
EQ D2
CW1
INFORMAL LIVING 15'0"X9'4"
SQUARE INTERLOCKING PAVER BLOCKS
MARBLE / TERRAZO
W3
F
DN MID LANDING 2
TERRACE 15'7"X14'0"
PASSAGE BELOW
15'0"X6'9"
TO BE CONFIRMED BY THE ARCHITECT
15'0"X6'9"
EQ
CC TO WALL
PARKING 21'7"X26'5" CAR PORCH WALL AND CEILING EXPOSED POLISH CEMENT
FAMILY AREA 14'10"X15'0"
RAIN
ROCK CANYON (ASIAN PAINT 8463)
B
EQ
ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)
ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)
D3
G
F
3" THK BOXING PROJECTION ABOVE
PARENT'S BEDROOM 16'6"X16'0"
ODU
12 13 14 15 16 17 18 19 20 21 22
TC
8'-10"
9' WIDE PASSAGE
CC TO WALL
3'-2" 6'-8" 4'-4"
UP
1
E
SL
TERRACE 15'8"X15'8"
TE WA
3" THK BOXING PROJECTION IN GROUND FLOOR
A'
D2 EQ
DUCT
1
G
13' ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)
AIN
RA
MASTER BEDROOM ABOVE
V5
DUCT
TOILET -1 8'6" X 8'0"
V1
TOILET
(BEDROOM-2)
LANDSCAPE GARDEN
DW1
R DR
IN
TC
C
TC
BEDROOM 1 14'11"X18'10"
PE
EQ
2
C
8'0"X11'4"
TILES AS PER SELECTION
W3 D3
DUCT
DUCT
GUEST BEDROOM 16'X14'0"
CUT-OUT IN SLAB ABOVE
WALK IN CLOSET - 1 5'11" X 8'0"
ELECTRICAL SHAFT
DB access
CC TO WALL
(PARENTS BEDROOM)
D3
ODU
O.D.U @ 1'6" FROM FGL SCREEN WALL TO DETAIL MILD STEEL CHOCOLATE BROWN
8'0"X11'4"
ODU
ODU
A
D
C
O.D.U @ 1'6" FROM FGL
TOILET
(PARENTS BEDROOM)
ENGINEERED WOODEN CC TO DOOR D3 FLOORING (AMERICAN WALNUT)
UP
V1
D2
FC
FC
SW2
TC
IN SLO DRA
8'-10"
WALK IN CLOSET
MARBLE / TERRAZO
O.D.U OVER PUJA ROOM ROOF SLAB
TC
CW3
ER N WAT RAI
LIVING 15'8"X18'0"
F E
SKYLIGHT BELLOW
MS
B
G
RC ABOVE
ODU
3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
D2
MIDLANDING 1 UP
9'0"X8'0"
LIFT 5'2"X5'2"
DN
W3
DUCT
TOILET
(GUEST BEDROOM)
15'0"X6'9"
3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
RAIN WATER DRAIN SLOPE
3'-2"
RC ABOVE
D3
D3
SD2
CW4 CW2
TC
5'5"X8'0"
CW3 TC
DB access
DINING 21'9"X15'0"
CW7 CHAJJA PROJECTION ABOVE
D2
CLOSET
(GUEST BEDROOM)
ELECTRICAL SHAFT
DB access
KITCHEN 20'9"X18'10"
SD4
FAMILY AREA 14'10"X15'0"
TERRACE 15'8"X15'8"
TC
STORE 5'0"X7'4"
D3
LIFT 5'2"X5'2" UP
DECK 9'0"X14'0"
TC
D
SD2
LANDSCAPE GARDEN
D3
TERRACE 29'5" X 12'1"
TERRACE BELOW DW1
D3 D1
DN
POWDER ROOM 4'6"X8'0"
DUCT
RIVER FINISH KOTA STONE
B
G
D5
V3
R
TC
SW2
TC V7
30'
EQ
TC
FC
FC
TC
D3
SFD1
UTILITY YARD 8'0"X10'9"
3'-2"
3' HT RAILING
11'
RIVER FINISH KOTA STONE
EQ
MARBLE / TERRAZO
CUT-OUT IN SLAB ABOVE
DECK 9'0"X14'0"
99'-4"
GUEST BEDROOM 16'X14'0"
5'-6" TC
TC
D4
SERVANT'S TOILET 4'6"X6'6"
SW1
PUJA 9'0"X3'10"
1'-10
8" HT BUND WALL
2'
3" THK BOXING PROJECTION ABOVE
1 UP
9'0"X8'0"
TILES AS PER SELECTION
P
N
K SCREEN WALL TO DETAIL MILD STEELJ CHOCOLATE BROWN 3'6" ht COMPOUND WALL H ROCK CANYON (ASIAN PAINT 8463)
FLOOR LEVEL
(GUEST BEDROOM)
D3
D2
PIPED TO VRV UNIT
TOILET
D3
MARBLE / TERRAZO
P
N
C'
2
5'5"X8'0"
ELECTRICAL SHAFT
DB access
4'-3"
TC
TC
TC
TC
SERVANT'S ROOM 9'4"X6'6"
DECK 10'0"X14'7"
LANDSCAPE GARDEN TC
BEDROOM 1 14'11"X18'10"
MS
3'
1
8'
TC
TC CW3
TC
DB access
DINING 21'9"X15'0"
CW7
3'-4"
TC
TC
V4 FC
FC
SW2
TC V7
KITCHEN 20'9"X18'10"
6'
2
F 1'-1"
4'-9"
TC
TC
TC
D3
SFD1 SD4
9' WIDE PASSAGE
3
PUJA 9'0"X3'10"
16
3'
4
15
6'
5
14
2'
6
4'-8"
13
10
RAILING TO DETAIL METAL AND WOOD
14'-8"
7
D
5' TC
OP
PERGOLA @ GF LINTEL LEVEL PRECAST EXPOSED CONCRETE FINISH
ON TERRACE DUCT
CC TO WALL
8
CC TO DOOR
12
9' WIDE PASSAGE
EQ
9' WIDE PASSAGE
CC TO WALL
UP 9
CLOSET
(GUEST BEDROOM)
6'
PERGOLA AT TERRACE FLOOR SLAB LEVEL PRECAST EXPOSED CONCRETE 8" MS FRAME
IRON COUNTER AT 3'6" HT (FL) WM (FRONT LOAD) & DRYER BELOW
STORE 5'0"X7'4" VITRIFIED
LIFT 5'2"X5'2"
3'
1'
3" THK BOXING PROJECTION IN GROUND FLOOR
@ 2'10"HT BLACK GRANITE COUNTER SS SINGLE BOWL SINK
FC ABOVE TILES
TREADS - 1'0" RISER - 6" WIDTH - 3'10" RCC STAIRCASE TREADPOLISH KOTA RISERTEAKWOOD BACKED BY PLYWOOD
EQ
2'-2"
D3
5'-8" TC
Q
D' RIVER FINISH KOTA STONE
D3
1
DN
10
14'-8"
2
11
DRAIN SLOPE
DB access
D1
PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL
FIRST FLOOR SLAB ABOVE
C
3
TILES AS PER SELECTION
DUCT
B
4
POWDER ROOM 4'6"X8'0"
2'-10"
J H
5
D5
V3
6'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)
Q
UTILITY YARD 8'0"X10'9"
CC TO DOOR
10
(BEDROOM -2)
V7
KITCHEN 20'9"X18'10"
VITRIFIED TILES
6'-1"
TC
D3
DINING 21'9"X15'0"
11'-2" 2'-4"
C
1'-4"
L K
R
10'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)
D4
FC ABOVE
MARBLE / TERRAZO
EQ
9
PERGOLA AT GROUND FLOOR LINTEL LEVEL PRECAST EXPOSED CONCRETE
SERVANT'S TOILET 4'6"X6'6"
SW1 FC ABOVE
SD4
MARBLE / TERRAZO
M
7'-10"
VITRIFIED TILES
D
EQ
3'-2"
SERVANT'S ROOM 9'4"X6'6"
V4
THK BOXING N 3"PROJECTION
CW7
8"
RAIN WATER
3'-10"
5'-6"
SPACE FOR GAS CYLINDERS GRANITE TOP PLATFORM TO COVER THE GAS BANK AT 4' HT
SFD1 4'-6"
4'-3"
R
PUJA 9'0"X3'10"
ALL THREE SIDES EXPOSEED CEMENT PLASTER FINISH
7
E 8'
SKYLIGHT ABOVE
P
6
CC TO WALL
RIVER FINISH KOTA STONE
5
EQ
11'-5"
DECK 10'0"X14'7"
LANDSCAPE GARDEN
4
69'-4"
3'-4"
3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH
Q
3
F 1'-1"
4'-9"
11' ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)
PRECAST EXPOSED CONCRETE PERGOLA @GROUND FLOOR LINTEL LEVEL
2
CC TO WALL
4'-8"
1
RAIN WATER DRAIN SLOPE
5'
16
3'-10"
6'
15
4'-6"
3'
1'
14
11'-2"
5'-8"
R
13
2'-4"
6'-1"
12
D
E 69'-4" 7'-10"
11
EQ
10
CC TO WALL
9
11'-5"
8"
1'-4"
7
2'-2"
6
2'-10"
5
99'-4"
4
1'-3"
3
TC
D4
SERVANT'S TOILET 4'6"X6'6"
SW1
2
TC
SERVANT'S ROOM 9'4"X6'6"
V4
DECK 10'0"X14'7"
LANDSCAPE GARDEN
1
DATE
30-11-2021
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.
DEALT BY
--
DWG. NO.
--
SCALE
NORTH
CODE
1/8"=1'
THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
70'X100' W - COMMON AREAS 12" Sunken CB1
AC UNIT
12" Sunken
AC UNIT
B28
B44
B27
CB1
B44
B35
B38
AC UNIT
CC TO WALL
CB4
B45
CW2
COLUMN LINE
B26
B26
COLUMN LINE
LINTEL HEIGHT
B33
AC UNIT
B8
CB40A
COLUMN LINE
COLUMN LINE
B48
CB10A
B6
AC UNIT
B9
B8A
B6A
LINTEL LVL
PRECAST SPIRAL STAIRCASE
KITCHEN
15'7½" x 18'3"
BEDROOM 1
PUJA
17'6" x 17'4½"
7'6" x 7'9"
SD4
CW7
BATHROOM 1 8'9" x 8'3"
SFD1
D2
SFD1
D1
LANDSCAPE
CW2
CW2
4'3" HIGH SCREEN WALL 2nd CLASS TEAK WOOD
GARDEN
LINTEL LVL
COLUMN LINE
SFD1
MD
AC UNIT
AC UNIT
B21A
B20A
COLUMN LINE
CC TO DOOR
B21
B20
AC UNIT
B35A
LINTEL HEIGHT
CC TO WALL
COLUMN LINE
A
A
BEDROOM 2 12" Sunken B38
LINTEL HEIGHT
OPEN BAR COUNTER
CW7
PASSAGE
FOYER
PASSAGE
LIVING ROOM
FOYER
FOYER
ELEVATION - WALL A
D
9
ELEVATION - WALL B
6
ELEVATION - WALL C
3
9
3
9 6" BLIND SPACE
10'9" x 13'0"
2
7
9
2
7
9
P
M
ELEVATION - WALL D
ELEVATION - WALL B
DN 14
P
B34A
6" BLIND SPACE
WALL - A
LINTEL HEIGHT
AC UNIT
AC UNIT
B48
CB40A
PB1
PB8
D
BAR
17'10" x 11'3"
CW7
PB8
7
2 N
2
7
PLAN : DINING AREA
9
KEY PLAN - GROUND FLOOR
15'9" x 8'7"
TREAD - 1'0" RISER - 0'6" WIDTH - 4'6"
PB1
9 ELEVATION - WALL C
WALL - C
M
LIVING AREA-15'8" X 18'0"
VERANDAH
WALL-A
KEY PLAN - GROUND FLOOR
WALL - B CB8A
B2
B26
LINTEL HEIGHT
AC UNIT
COLUMN LINE
CB4
B31
COLUMN LINE
B31
B13
B26
B39
LINTEL HEIGHT
CB45A
CB40A
B48
CB4
C-C
3'-314"
CB45A
B49
B39
COLUMN LINE
6" BLIND SPACE
WALL - D
N
WALL - B
PASSAGE TO BE PUT ON HOLD AT SITE CB40A
11
WALL - C
G
B48
M
9
N
D2
CB4
FAMILY AREA-14'10" X 15'0"
KEY PLAN - FIRST FLOOR
WALL - A
ELEVATION - WALL D
3'-314"
3'-314"
DETAIL B - COVE LIGHT
PART PLAN- POWDER ROOM (6'10½" x 4'10½")
PASSAGE
DETAIL A - LEDGE WALL
PB1
10
G
7 ELEVATION - WALL C
H
CB21A
CB4
CB4
LINTEL HEIGHT
COLUMN LINE
COLUMN LINE
SD2
N
PASSAGE
WALL - C
G
G
FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT
PB1
PB1
PB1
CB4
G 7
H
3'-314"
GYPSUM BOARD LED STRIP LIGHT
10
H
CB21A
SD2
PB1
10
ELEVATION - WALL B
B13
G ELEVATION - WALL D
G
PB1
H
H 7
11
10
PLAN : PASSAGE AT CUTOUT AREA
PLAN : PASSAGE AREA FIRST FLOOR
11
PASSAGE PB1
7 ELEVATION - WALL A
7
CB8A
7
ELEVATION - WALL C 9
PB1
B39
10
H
LINTEL HEIGHT
SW2
11
7
B28
COLUMN LINE
WALL - C
7
G
WALL - A AC UNIT
B32
CB45A
ELEVATION - WALL C
H
11
H
LINTEL HEIGHT
CB3
M
11
PASSAGE PASSAGE
CB21A B49
10
7
P
6" BLIND SPACE WALL - A
CB4
B49
ELEVATION - WALL B 7
MD
D2
WALL - B
P
CB4 CB45A
B39
ELEVATION - WALL A
M
ELEVATION - WALL D
6" BLIND SPACE
11
P
WALL - B
9
CB10A
B8 B8A
P
WALL - D
7
M ELEVATION - WALL B
SFD1
SD2
D2
PASSAGE
WALL - D
B8 B8A
11
D2
DW2
FAMILY AREA
CB10A
CB3 B48
9
D2
6" BLIND SPACE
FAMILY AREA
FAMILY AREA CB40A
7
DW2
RAILING TO DETAIL
D2
ELEVATION - WALL A
DW2
SW2
6" THK FINISHED LEDGE WALL
WALL - C
PART PLAN- POWDER ROOM (6'10½" x 4'10½")
CB21A
B49
CC TO WALL
SW2
DW1
ENTRANCE
KEY PLAN - GROUND FLOOR
WALL - D
CB3A B2
B32
UP
WALL - A
WALL - A
WALL - D
CB3A
AC UNIT
ROAD
LAND SCAPE GARDEN
UP
WALL-D
WALL-B
WALL-C
WALL - C
SW2
UP
B
9
DINING AREA - 21'9" X 15'0"
DN
GROUND FLOOR FFL
GROUND FLOOR FFL
C-C
B28
ENTRY
LEATHER FINISHED KOTA FLOORING
DINING
PB7
3
ELEVATION - WALL C
PASSAGE
CC TO DOOR
70'X100' W - GROUND FLOOR
DW1
LIVING ROOM
TREAD - 1'0" RISER - 0'6" WIDTH - 4'1¼"
LEATHER FINISHED KOTA FLOORING
COLUMN LINE
4'3" HIGH SCREEN WALL TO DETAIL 2nd CLASS TEAK WOOD
N
CC TO WALL
3
KEY PLAN - GROUND FLOOR
5'0" x 5'6"
FOYER
15'9" x 10'3"
B33
COLUMN LINE
PLAN : LIVING AREA
FOYER-15'0" X 9'4"
LIFT
CC TO DINING
WALL - C
D
B
5' WIDE PASSAGE
13 12 11 10
16'6" x 23'4½" (DOUBLE FLOOR HEIGHT)
CB4
LIVING ROOM
WALL - B
PLAN : INFORMAL LIVING AREA
M
CC TO WALL
9 PB2
D
PB11
PB1
UP
AC UNIT
B45
LINTEL HEIGHT
B28
PB1
ELEVATION - WALL D
P
ELEVATION - WALL A
FOYER
B 9
PB1
WALL - D
WALL - C
D ELEVATION - WALL D
N
6" BLIND SPACE
G
PB1
PB7
COLUMN LINE
WALL - D
WALL - B
B27
LINTEL HEIGHT
6
LINTEL HEIGHT
DINING
15'9" x 18'0"
COURT YARD
PASSAGE
PB1
PB8
B34
WALL - D
WALL - A
G
PB1
G CC
CC TO WALL
D
WALL - A
12" Sunken
CC TO WALL
DINING
PB1
PB1
ELEVATION - WALL B
9
D
PB1
ELEVATION - WALL A
G 6
PB8
PB1
PB1
RAMP UP
B
PB8
WALL - B
PB1
WALL - B
PB2
9
B
PASSAGE
6'10½" x 4'10½"
PB8
6
D
LIVING ROOM
TOILET
TO BE PUT ON HOLD AT SITE
PB1
KEY PLAN - FIRST FLOOR
PASSAGE AREA FFL- 14'9"X14'
PASSAGE AREA - 13'9"X14'
KEY PLAN - GROUND FLOOR
70'X100' W - FIRST FLOOR POWDER ROOM - 1 (6'10½" x 4'10½") SL. NO.
REVISIONS
30-11-2021SL. NO.
REVISIONS
DATE
SL. NO.
REVISIONS
DATE
CLIENT
MR.RAJEEV AGRAWAL PROJECT
PROPOSE VILLA DEVELOPMENT-RAIPUR
DRAWING STATUS
EXICUTION REVISION NO.
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.
DRAWN BY
DRAWING TITLE
WALL ELEVATIONS DATE
30-11-2021
DWG. NO.
CODE
--
NORTH
DEALT BY
--
SCALE
1/8"=1'
THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
SL. NO.
REVISIONS
01.12.2018SL. NO.
REVISIONS
DATE
SL. NO.
REVISIONS
DATE
CLIENT
DRAWING STATUS
EXECUTION COPY
POWDER ROOM -1
RESIDENCE, BANGALORE
R4
30-11-2021
PROJECT
REVISION NO.
ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.
DRAWN BY
DRAWING TITLE
SIDHARTH BHATIA
DATE
DWG. NO.
SBR GD 301.9
--
NORTH
DEALT BY
--
SCALE
1/4"=1'
THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.
CAFETERIA
SECTION
ELEVATION
ISOMETRIC VIEW MASTER PLAN
LED CEILING LIGHTS
TOILET TILES
MALE TOILET 3400x2400MM
FEMALE TOILET 3400x2400MM
MALE +4000 TOILET 3400x2400MM
CERA MAKE FLOORING TOILET TILES DIM - 600 X 600 MM COLOUR - WHITE
+4000 +600
FEMALE TOILET 3400x2400MM
PLANE FALSE CEILING
+600
+600
+600
TILE DROP 18 MM THK GRANITE AS A TILE DROP
TILE DROP 18 MM THK GRANITE AS A TILE DROP
INDOOR FLOORING WOODEN TEXTURED VINYL FLOORING
REFRIGERATOR
LED CEILING LIGHTS +4000
SERVENT TOILET
SERVENT TOILET 1900x2000MM
PLANE FALSE CEILING
+4000 1900x2000MM
REFRIGERATOR
+600
+600
GRID FALSE CEILING
KITCHEN 4800x5000MM
KITCHEN 4800x5000MM
+600
+600
TILE DROP 18 MM THK GRANITE AS A TILE DROP
+4000 +3600 LOADING / UNLOADING PLATFORM +600
LOADING / UNLOADING PLATFORM LOADING / UNLOADING PLATFORM +600 +600
TILE DROP 18 MM THK GRANITE AS A TILE DROP
LOADING / UNLOADING PLATFORM +600
+4000 STANDALONE AC
LED CEILING LIGHTS KITCHEN FLOORING QUARRY TILES FLOORING TILES COLOUR - BROWN DIM - 300 X 300 MM
UP TILE DROP 18 MM THK WOOD AS A TILE DROP
ENTRANCE 4000x4000MM +600
FLOORING PLAN
UP ENTRANCE 4000x4000MM +600
FALSE CEILING PLAN
HOUSING DESIGN,PUNE
ROOFING MASTER PLAN
MASTER PLAN
ELEVATION
ELEVATION
3bhk
1bhk floor plate
2bhk
1bhk
2bhk floor plate
pent house
pent house
pent house floor plate
3bhk floor plate
SECTION
SECTION
ARCHAEOLOGICAL RESEARCH CENTRE
MASTER PLAN
ELEVATION
ELEVATION
SECTION
SECTION
ARCHITECTURE COLLAGE DESIGN
+19.0M
S2
22.0 21.0
STUDIO 135 sq.m
COMPUTER ROOM
+17.0M
MINI LIBRARY
TOILET (BOYS)
S2
STUDIO 135 sq.m
TOILET (GIRLS)
STUDIO 135 sq.m
AV ROOM 70 sq.m
COMMON ROOM 135 sq.m AV ROOM 70 sq.m
+14.5M +14.5M
+14.5M
+14.0M AV ROOM 70 sq.m
+14.5M AV ROOM 70 sq.m AV ROOM 70 sq.m
+20.0M AV ROOM 70 sq.m AV ROOM 70 sq.m
+12.0M
EXAM ROOM AV ROOM 70 sq.m ggg
PRINTING SHOP +14.5M
SICK ROOM
+10.00M
STORE ROOM
LIVING ROOM VERANDA 4M X 4M
BED ROOM 4M X 4M
LIVING ROOM VERANDA 4M X 4M
4M X 4M
BED ROOM 4M X 4M
LIVING ROOM VERANDA 4M X 4M
4M X 4M
BED ROOM 4M X 4M
LIVING ROOM
LIVING ROOM VERANDA 4M X 4M
4M X 4M
KITCHEN
4M X 4M
KITCHEN
BED ROOM
KITCHEN
4M X 4M
KITCHEN
KITCHEN
BED ROOM +18.0M
VERANDA 4M X 4M
4M X 4M
4M X 4M
+09.0M
+03.0M +14.0M
+07.0M
+04.0M
LIVING ROOM VERANDA 4M X 4M
LOBBY
BALYCONY 7M X 3M
PASSAGE
TOILET 2.5M X 2.5M
ROOM 1 7M X 5M
PASSAGE
TOILET 2.5M X 2.5M
ROOM 1 7M X 5M
VERANDA 4M X 4M
4M X 4M
4M X 4M
LIVING ROOM VERANDA 4M X 4M
4M X 4M
BED ROOM 4M X 4M
LIVING ROOM VERANDA 4M X 4M
4M X 4M
LIVING ROOM VERANDA 4M X 4M
4M X 4M
+00.0M
+00.0M LOBBY
LOBBY
PASSAGE
TOILET
7M X 3M
LIVING ROOM
BED ROOM
ROOM 1 7M X 5M
2.5M X 2.5M
BALYCONY
4M X 4M
+00.0M
canteen 10M X 9M
kitchen
LOBBY
3.8m x 9m PASSAGE
TOILET 2.5M X 2.5M
4M X 4M
BED ROOM
KITCHEN
4M X 4M
KITCHEN
BED ROOM
KITCHEN
4M X 4M
KITCHEN
KITCHEN
BED ROOM
ROOM 1 7M X 5M
LOBBY
PASSAGE
LOBBY
ROOM 1 7M X 5M
TOILET
LOBBY
ROOM 1 7M X 5M
TOILET
2.5M X 2.5M
ROOM 1 7M X 5M
PASSAGE
PASSAGE
LOBBY
ROOM 1 7M X 5M
TOILET
2.5M X 2.5M
SPORTS GROUND
PASSAGE TOILET
2.5M X 2.5M
2.5M X 2.5M
BALYCONY
BALYCONY
BALYCONY
BALYCONY
7M X 3M
7M X 3M
7M X 3M
7M X 3M
N
SPORTS GROUND +00.0M
+00.0M
SCALE 1:200
+0.00M
MASTER PLAN
FRONT ELEVATION
+00.0M
TECHNICAL DRAWING
RESIDENCE (OWN PROJECT)
UP
TERRACE 19'6" X 4'6"
OFFICE 10'11" X 15'5"
OFFICE TABLE
LIVING ROOM 19'6" X 16'0"
T.V.UNIT
COFEE TABLE
STORAGE
BED SIDE TABLE
TOILET 7'3"X6'0"
DINING ROOM 11'2" X 20'9"
BED SIDE TABLE
WARDROBE
BEDROOM 12'0"X12'0"
LIFT 5'4"X4'7"
UP
SHOWER AREA 4'0"X 4'11"
DINING TABLE
TOILET 8'0"X4'11"
BED SIDE TABLE
PUJA ROOM 7'6"X7'2"
BEDROOM 12'0"X14'9"
T.V.UNIT
STORAGE
STORE 7'7"X7'0"
BED SIDE TABLE
STORAGE
SHOWER AREA 4'0"X 4'11"
TOILET 8'0"X4'11"
DRESSING 7'7"X10'1"
WARDROBE
DRESSING
KITCHEN 11'2"X17'5"
WARDROBE
WASHING MACHINE
UP
UTILITY 9'1"X10'11"
GROUND FLOOR PLAN