Architecture Portfolio

Page 1

ARCHITECTURE PORTFOLIO


Shantanu Deshmukh Aspiring Architect Education Golden Kids School, Vidhyabharti College (2014-2017) SSC Percentage: 84.5% HSC Percentage: 71.4% Sinhagad College of Architecture (2017-2022) Bachelor of Architecture: • F.Y. CGPA: 8.0 • S.Y. CGPA: 8.1

• F.Y. CGPA: 8.4 • F.Y. CGPA: 8.0

Skills AutoCAD: SketchUp: Photoshop: InDesign:

8/10 8/10 6.5/10 6.5/10

1

• T.Y. CGPA: 8.5


• F.Y. CGPA: 8.0

Skills AutoCAD: SketchUp: Photoshop: InDesign: Lumion: Twinmotion:

8/10 8/10 6.5/10 6.5/10 8/10 8/10

Expertise Graphic Design, Product Design, Interior Design, Architectural Design, Landscape Design.

Experience Internship at Khosla Associates (2021) Worked as an intern at Khosla Associates, gaining valuable experience in the field of architecture. Collaborated with a talented team on various projects, contributing to the design and development processes. Acquired hands-on experience in project management, client interactions, and the practical application of architectural principles.

Projects Own Bungalow Project (8500 sq.ft) 2022-2023 Designed and executed an 8500 sq.ft bungalow project from concept to completion. Merged modern aesthetics with functionality, leading all phases from client collaboration and conceptualization to detailed design, material selection, and on-site project management. Achieved a seamless blend of style and practicality, resulting in a visually stunning and functionally efficient living space.

Contact Information 2

Phone: Email: Instagram:

9527240339 shantanudeshmukh03@gmail.com @shantanu deshmukh 3 Last updated: November 18, 2023


CONTENTS 1.MUSEUM OF EVOLUTION 2.INTERNSHIP WORK(KHOSLA ASSOCIATES) 3.CAFETERIA 4.HOUSING DESIGN 5.ARCHAEOLOGICAL RESEARCH CENTRE 6.ARCHITECTURE COLLAGE DESIGN 7.TECHNICAL DRAWING 8.RESIDENTIAL PROJECT (OWN WORK)


OUMUAMUA THE MUSEUM OF EVOLUTION


INTRODUCTION 1)MUSEUMS AS SOCIAL LEARNING SPACES FOR KNOWLEDGE PRODUCING PROCESSES, 2)WHY AND WHAT DOES IT MEAN? MUSEUMS ARE DEMOCRATIC EDUCATIONAL INSTITUTIONS THAT CONTRIBUTE TO CULTURE BEING AN ACTIVE RESOURCE IN SOCIETY. THIS IMPLIES THAT MUSEUMS AS SOCIAL LEARNING SPACES FOR KNOWLEDGE PRODUCING PROCESSES CAN CREATE SOCIAL CHANGE AND SUSTAINABLE GROWTH. THEY ARE PLATFORMS FOR ENGAGEMENT AND SOCIAL INCLUSION, FOCUSSING ON KNOWLEDGE SHARING AND PRODUCTION IN RELEVANT AND QUALIFIED SETTINGS FOR TODAY’S CITIZENS, WITH A VIEW TO ENSURING THAT MUSEUMS ARE TRANSFORMED INTO CENTRAL PLAYERS IN THE DEVELOPMENT OF SOCIETIES. IN THE 1972 DECLARATION OF SANTIAGO DE CHILE, ICOM ENCOURAGED MEMBER STATES TO SUPPORT THE SOCIAL ROLE OF MUSEUMS AND MUSEUMS ARE INCREASINGLY VIEWED IN MOST COUNTRIES AS PLAYING A KEY ROLE IN SOCIETY, AND AS A FACTOR IN SOCIAL INTEGRATION AND COHESION. IN THIS SENSE, THEY CAN HELP COMMUNITIES TO TAKE PROFOUND CHANGES IN SOCIETY, INCLUDING THOSE LEADING TO A RISE IN INEQUALITY AND THE BREAKDOWN OF SOCIAL TIES

AIM TO DESIGN SPACE WHERE PEOPLE WILL SEE HOW ARTIST/PEOPLE BRING THEIR VISION TO REALITY. TO DESIGN A SPACE WHERE PEOPLE GET INSPIRE BY OBSERVING THE EVOLUTION OF MANKIND AND HOW THEY CAN

OBJECTIVE

B A

A B

LOCATION :- SANKEY RD, PALACE GUTTAHALLI,BANGALURU,KARNATAKA 560003 13’00’03.0”N 77°34’57.7”E THE SITE IS LOCATED IN BETWEEN KOTAK MAHINDRA PRIME LIMITED AND MAHALAXMI TEMPLE - THE TOPOGRAPHY IF THE SITE HAS 8M SLOPE WHICH HELPS FOR DESIGNING THE BUILDING

WHAT IS THE PURPOSE OF MUSEUM ? THE ACTUAL PURPOSE OF THE MUSEUM IS TH INSPIRE ALL KINDS OF GENERATIONS BY SHOWING EXCEPTIONAL WORK WHICH HAS BEEN DONE BY PEOPLE. IT CONTAINS THE THINGS THAT HAS BEEN DONE WHICH ARE REALLY HARD TO ACHIVE OR SOME SOLUTIONS WHICH ARE ALMOST IMPOSSIBLE AT THAT TIME BUT PEOPLE COMEUP WITH SOLUTION . THE SECOUND PURPOSE OF THE MUSEUM IS TO SHOW POSSIBLITY OF THE FUTURE AND THE THINGS WHICH ARE LOOKING IMPOSSIBLE NOW CAN BE ACHIVE.

Elevation profile AA

Elevation profile BB

THIS SITE IS SELECTED FOR VARIOUS REASONS - THE SITE LIES BETWEEN THE CITY AND THE SUBURB, THEREFORE MAKES IT EASY FOR TRAVELLING AND TRANSPORTING GOODS TO BOTH ENDS. -THE SITE IS ADJECENT TO THE FOREST AND LAKE WHICH GIVE PLEASENT VIEW THE SITE IS LOCATED AT THE CORE OF THE CITY AND IT IS EASY TO EXCESS FOR PUBLIC -THE WINDFLOW OF THE SITE IS FROM LEFT TO RIGHT AND THE GREAN SPACE IS IN LEFT SIDE OF THE SITE WHICH HELPS SITE HAVING OXIDISED ATMOSPHIRE, WHICH GIVES THE SCOPE OF HAVING LESS OPENING

COMPARISION BETWEEN MINDSET OF PEOPLE IN PAST AND NOW 1.IN OLDEN MUSEUMM THAY DON’T EXPLAN THE IMPORTANCE OF ELEMENTS. 2. THAY DON’T EXPLAIN PROPERLY HAW THAY CAME TO EXISTANCE AND HOW MANY PROBLEM THAY FACE ACHIVING IT. 3.WHOLE MUSEUM IS IN ONE SINGLE PATTERN SO IT GETS BORING AT CERTAIN POINT. 4.WE CAN SEE THE ELEMENT THAT ART BUT WE DONT’T GET INSPIRE BY IT BECOUSE WE DONT’T GET INFORMATION PROPERLY 5.THE WAY OF PASSING INFORMATION THIS DAYS IS DIFFERENT WE HAVE TO UNDERSTAND HOW PEOPLE CONSUME INFORMATION THIS DAYS. 6.THE PRIME FOCUS IS TO DESIGN IS TO MAKE SURE PEOPLE UNDERSTAND THE DIFICULTY COME WHILE MAKEING THAT ELEMENT AND HOW THAY OVERCAME IT AND MAKE WHOLE PROCESSS INTERESTING TO MAKE PEOPLE CONSUME INFORMATION PROPERLY.

TO UNDERSTAND HOW THE ADULT GENERATION AND YOUNG GENERATIONS RECIVE INFORMATION AND TO DESIGN EVERYTHING ACCORDING TO IT, SO IT WILL GAIN VALUE, INTEREST AND FUTURE VISION 2) TO RETHINK THE TYPICAL MUSEUM STEREOTYPE AND DESIGN MUSEUM THAT IS EXCEPTED BY YOUNGER GENERATIONS 3) IN THE WORLD OF MISCONCEPTIONS, PASSING THE RIGHT INFORMATION BY SHOWING THE EVOLUTION OF MANKIND AND FUTURE POSSIBILITIES. 4) TO SHOW PEOPLE THAT THE BASIC FUNDAMENTALS OF EVOLUTION IS SAME AND HOW THAT CAN ACHIEVE THE NEXT STEP OF EVOLUTION UNDERSTANDING THOSE BASIC FUNDAMENTALS TRANSPORTATION

1) THE ELEMENT WHICH HAS BEEN SHOWN IN PAST AND FUTURE CAN BE ACCESS OR OPERATE BY VISITORS TO UNDERSTAND THE FUNCTION OF THE ELEMENTS AND TO UNDERSTAND THE SKILLS REQUIREMENT OF FUTURE. 2) THIS SPACE WILL ATTRACT NUMBER OF TOURIST THIS WOULD ENCOURAGE AN INTERACTION AND EXCHANGE OF IDEAS BETWEEN LOCAL PEOPLE AND TOURIST.

AIRPORT - 10km bus stand -4.2 km metro station -3.7 km railway station -5km local bus stand - 10m

WHY METEOR? 1. THE ONLY INTERSTELLER METEOR WHICH COME FROM OUTER SOLAR SYSTEM . 2.IT CAME FROM ABOVE AND ALSO LEAVE FROM ABOVE 3. THE NAME OF THE METIOR IS OUMUAMUA AND THE MEANING OF THE NAME IS MASSANGER FROM THE DISTANT PAST REACHING OUT TO US . 4. WHY THIS METIOR IS IMPORTANT AS THIS CONTAIN THE SAME ELEMENT WHICH IS EARTH CORE WHICH HOLDS THE ANSWERS OF FORMATION OF EARTH OR THE DISTRUCTION OF EARTH. 5. NATURE OF THE METIOR WHILE PASSING IS NOT UNIFORM. IT REVOLVE AROUND ITSELF AND ALSO THROUGH AXIS. 6. THE ONLY EXPLANATION FOR ROTATION OF THE METIOR IS THAT IT WAS THROWN OUT OF SOLAR SYSTEM DURING THE DISTRUCTION OF THE SOLAR SYSTEM. 7. AND THE OTHER POSSIBLE EXPLANATION IS IT WAS THROWN OUT DURING COLITION OF PLANET WHIC HAPPEN DURING FORMATION OF SOLAR SYSTEM. 8.SO THIS METIOR CONTAIN THE ANSWERS WHICH SUGGEST US THE FORMATION OF EARTH OR IT CONTAIN THE ANSWER OF DISTRUCTION OF EARTH. IN THE MUSIUM I HAVE SHOWN THE EVOLUTION OF MANKIND AND WHAT ELEMENTS WHERE HELP HUMAN TO EVOLVE .


LANDSCAPE ACTIVITIES 1. VISITERS CAN EXPERENCE THE STONE AGE ERA. PEOPLE CANSTAY INSIDE THE CAVE TO EXPERENCE THE STONE AGE LIFESTYLE. HOW THAY COOK FOOD ,HOW THAY MAKE TOOLS. HOW THAY PAINT CAVES .HOW THAY MAKE PAINTS.ETC 2. NEANDERTHAL PEOPLE WERE FIRST TO MAKE JEWELRY TO IMPRESS OTHER GENDER THAY WERE FISHERMAN SO THAY MAKE JEWELRY USING SHELLFISH BONES .THAY WERE FIRST TO INTRODUSE CONCEPT OG NECKLASE. IN LANDSCAPE PEOPLE CAN LEARN HOW TO MAKE JEWELRY OF BONE USING BONES. HOW TO CARVE IN BONE. 3.HUMAN FIRST FEEL THE NECESITY OF SEPERATE ROOMS IN HOUSE THE FUNDAMENTAL CONCEPT OF SEPRATE ROOM WAS INTRODUCE TO GIVE IMPORTANCE TO EACH ACTIVITY. EACH ACTIVITY HAS SEPRATE MEANING AND SHOULD HAS SEPRATE SPACE. PEOPLE WILL UNDERSTAND WHY IT IS IMPORTANT TO HAVE SEPRATE SPACE FOR SEPRATE ACTIVITY. 4.HUMANS USE TO LEARN HOW TO USE EAST TO MAKE FOOD LIKE BREAD. PEOPLE WHO VISITS THIS AREA WILL LEARN HOW THIS ANCIANT PEOPLE MAKE YEAST FOOD USING NATURAL ELEMENT AND UTENCILES. 6.HOW TO EXCAVATE ELEMENTS FROM GROUND 8. HOW THE BLOCKCHAIN WORK . HOW THE SYSTEM IS MOST SECURE SYSTEM AND WILL BE THE FOUNDATION OF ALL TRANSITION IN THE WORLD. 9.INSIDE THE METAL PODS THERE WILL BE DEVICE THAT WILL SHOW HOW FUTURE WORLD WILL LOOK LIKE AND WHAT ARE THE POSIBILITIES OF FUTURE. 13.HOW OWER BRAIN CAN BE INHANCE AND CAN BE USE TO CONTROL OWER BRAIN TO INCREASE PRODECTIVITIES AND WILL SHOW THE STAGE AT WHICH THE TECNOLOGY NOW

SITE PLAN CONTAINS

GROUND FLOOR PLAN (1:200)

1.CAVE AREA 2.FIRST ORNAMET EVER MADE FOR WOMENS 3. FIRST DIVISION OF ROOMS IN HOUSE IN STONE MATERIAL 4.MAKING OF FIRST BREAD AND COOKING FOOD 5.MAKING OF FIRST METAL TOOLS 6.DISPLAYS OF FIRST TOOLS EVER MADE 7.EXCAVATION OF MATERIAL FOR EARTH 8.WORKING OF BLOCKCHAIN 9. METAL PODS(DIGITAL LABRARY,VR WORLD EXPLORE ,ETC) 10.DISPLAY OF ROBOTS 11.FIXING AND WORKING OF ROBOTS 12.ADVANCEMENT IN ROBOTS 13.INTERFACE OF HUMAN BRAIN WITH MACHINE 14.SPACE ELEVATORS 15 VR AND AR GLASS EXPERENCE.


CONTENT OF THIS GALLERY AND LANDSCAPE 1.IN THE BIGINING OF THE HUMAN LIFE. HUMAN USE TO LIVE IN CAVES AND USE ONLY MATERIALS THAY FOUND IN NATURE 2. THE THAY ONLY CONSUME THE FRUITS AND VEGITABLES FOUND IN FOREST. THAY LIVE LIVES TAHY SAW IN FRONT OF THEM 3. THE HUMANS STARTS TO INOVATE AND STARTED USING VARIOUS MATERIALS IN NATURE 4.HUMANS HAD STARED LIVING IMPROVED LIFE THAY STARTED LIVING IN CAVES AND START USING STONES AS TOOLS TO CUT PLANTS 5. HUMANS DESCOVER THE IMPORTANCE OF PLANTS AND THY CAME TO KNOW THAY CAN GROWN THEIR OWN PLANTS SO THY STARTED AGRICULTURE 6.THIS LEADS TO SETTLEMENT OF HUMAN AND THEN THAY CAME TO KNOW GROUP OF PEOPLE CAN LIVE GOOD LIFE. 7.THE BRAIN FUNCTION CAN BE INHANCE BY THE MACHINE IMPLANTS AND CAN IMPROVE HUMAN PRODUCTIVITY. THE ABILITY TO DO MANY ADVANCE THINGS CAN BE ACHIVE BY THE INTERFACE OF HUMAN BRAIN AND MACHINE . 8. THE SPACE ELEVATORS CAN BE POSSIBLE AND VARIOUS COMPANYS ARE WORKING ON THIS PROJECT. ONE OF THE COMPANY ARE AUTODESK. THE FUNCTION OF THE ELEVATERS ARE THERE WILL BE TUBE AND THERE WILL BE ELEVATOR INSIDE. 9.SPACE ELEVATORS WILL BE USE FORR REACING SATTLITE, SPACE STRUCTURES SPACE TRAFFICS ETC 10. FOR THE BETTER FUNCTIONING OF FLYING CARS AND CONTROLING THE TRAFFICS WE NEED SPACE STRUCTURES AND TO EXCESS THIS STRUCTURE WE NEED SPACE ELEVATORS.

1.IN LANDSCAPE WE CAN ACTUALY USE THE ELEMENTS AND SEE HOE THINGS GET TOGETHER AND FUNCTION 2.THIS WILL GIVE EXPERENCE THIS PEOPLE CAN DO THE STUFF BY THEMSELF WHICH THAY THOUGHT WILL BE VERY DIFFICULT. 3.INTERACTION OF FUTURE AND PAST WILL HELP THEM UNFERSTAND THE IMPORTANCE OF EVERYTHING

FIRST FLOOR PLAN (1:200)


CONTENT IN THE GALLERY AND LANDSCAPE 1. HUMANS START TO DIG IN BIG HOLES AND THAY START TO FIND DIFFERENT ELEMENTS AND THAY START TO USE DIFFERENT THINGS. 2.HUMANS START USEING METAL FOR SOME WORK AND IT WAS FIRST FOUND IN WEST AMERICA. 3. THE FIRST METAL WHICH HUMAN METAL WAS COPPER. ABOUT 8500 YEARS AGO, HUNTER-GATHER BESIDE EAGLE LAKE IN WISCONSIN HAMMERED OUT C CONICAL, 10 CENTIMETER LONG PROJECTILE POINT MADE OF PURE COPPPER. 4. HUMAN START TO GET SETTLE WHEN THAY START FARMING IN AREA SO THAY HAVE TO FIND PLACE TO LIVE. 5.HUMANS START TO EXPRIMENT AND MADE STONES HOUSE, JOINT STONE HOUSE. STONE HOUSE CONTAIN ONE ROOM IN WHICH WHOLE GROUP STAY 6.THEN THAY STARTED TO BUILT BAMBOO HOUSE , LEAVES HOUSE ETC. 7.THE CONSTRUCTION ERA GET STARTED AND THAY STARTED MIXING MATERIAL LIKE STONE AND SAND MUD ETC 8.NOW ENT

HUMANS MATERALS

USE TO

LOTS OF CONSTRUCT

DIFFERSTRUCTURE

9.ROBOTICS AND MACHINE ARE THE FUTURE OF MANKIND THE FUNCTION WHICH IS INREPITING MANNER CAN BE REPLACE BY ROBOTS IN FUTURE THE ROBOTS WILL TAKE ALL THE WORK FROM HUMANS 10.THE MIX REALITY ING DIGITAL ELEMENTS IN

THE

MEANS REAL

SEEWORLD

11.WE CAN ACHIVE LOTS OF ELEMENTS IN MIX REALITY COMPLEX STRUCTURES , GAMES , MEETING ETC MANY OFFICES ARE USING MIX REALITY FOR THEIR MEETING 12.ROBOTICS AND MACHINE WILL BE THE FUTURE OF MANKIND AND MOST OF THE PEOPLE WILL SPEND MORE TIME IN METAVERSE

SECOUND FLOOR PLAN (1:200)


CONTENT OF THIS GALLERY AND LANDSCAPE 1.ARTIFICIAL INTELLIGENCE WILL GO FOR FINDING THE OPTIMAL SOLUTION, AND LEADS TO INTELLIGENCE OR WISDOM; MACHINE LEARNING WILL GO ONLY FOR THE SOLUTION, WHETHER IT IS OPTIMAL OR NOT, AND LEADS TO KNOWLEDGE. 2.THE LATEST DEVELOPMENTS IN ARTIFICIAL INTELLIGENCE ARE CHATBOTS, SMART CARS AND IOT DEVICES. THE HEALTHCARE, BANKING, LOGISTICS AND TRAVEL SECTORS ALL USE ARTIFICIAL INTELLIGENCE TO PROVIDE A SUPERIOR EXPERIENCE. 3.A NEW KIND OF ARTIFICIALLY INTELLIGENT CHATBOT REPLIKA IS DESIGNED TO LEARN FROM A PERSON’S WRITING STYLE AND SOCIAL MEDIA FEEDS, AS WELL AS THE CONTENT OF CONVERSATIONS IT HAS WITH THE PERSON. IN FACT, AI SYSTEMS HAVE BEEN DEVELOPED TO UNDERSTAND OPEN FORM CONTENT LIKE NATURAL LANGUAGE, SOCIAL MEDIA AND EMAIL RESPONSES. 4.POWERFUL SOLUTIONS AND THE CAPABILITIES OF ARTIFICIAL INTELLIGENCE ARE DEVELOPING VERY RAPIDLY, AND AI SYSTEMS HAVE THE ABILITY TO UNDERSTAND HUMAN EMOTIONS AND RESPOND TO THEM. 5. ONE TYPE OF AI THAT IS QUICKLY FINDING ITS WAY INTO MOST CONSUMERS’ HOMES IS THE VOICE ASSISTANT SUCH AS APPLE’S SIRI, AMAZON’S ALEXA, GOOGLE’S ASSISTANT AND MICROSOFT’S CORTANA. 6.HANSON ROBOTIC’S MOST ADVANCED HUMAN-LIKE ROBOT SOPHIA PERSONIFIES PEOPLE’S DREAMS FOR THE FUTURE OF AI. SOFIA IS ALSO A FRAMEWORK FOR CUTTING EDGE ROBOTICS AND AI RESEARCH, PARTICULARLY FOR UNDERSTANDING HUMAN-ROBOT INTERACTIONS AND THEIR POTENTIAL SERVICE AND ENTERTAINMENT APPLICATIONS.

THIRD FLOOR PLAN (1:200)


CONTENT OF THIS FLOOR 1.WEB 1.0 : READ ONLY WEB. IN THIS INITIAL VERSION OF THE WEB, A USER WAS ABLE TO ONLY READ THE CONTENT. APPLICATIONS INCLUDED: NEWS SITES, PORTALS, SEARCH ENGINES ETC. 2.WEB 2.0 : WEB 1.0 + INTERACTION. THIS VERSION OF WEB APPLICATIONS ENABLED USERS TO INTERACT. SO FOR EXAMPLE A USER CAN COMMENT, LIKE A POST ETC. APPLICATIONS INCLUDE SOCIAL NETWORKS, CHATTING APPS ETC. 3.WEB 3.0 : WEB 2.0 + TRUST & VERIFIABILITY. WEB 2.0 APPLICATIONS HARVESTED USERS’ CONTENT AND DATA TO MAKE MONEY, TAKING AWAY THE PRIVACY AND CONTROL FROM THE USERS. WEB 3 IS A MOVEMENT TO SHIFT THE POWER BACK TO THE USERS – MAKING THE WEB OPEN, SECURE, RESILIENT AND PRIVATE 4.THE FIRST ELEMENT OF THE WEB 3 IS DECENTRALIZED WEB. IT MEANS INTERNET APPLICATIONS ON WEB 3 DO NOT RELY ON CENTRALIZED SERVERS. WEB 2 SERVICES GO DOWN WHEN A SERVER GOES DOWN WHEREAS WEB 3 SERVICE CANNOT GO DOWN AS THE DATA IS STORED IN MULTIPLE COPIES ON A P2P ( PEER-TOPEER ) NETWORK. 5.THE SECOND ELEMENT OF THE WEB 3 IS BLOCKCHAIN. IT HELPS PROVIDE VERIFIABILITY, OWNERSHIP AND ECONOMIC INCENTIVE TO THE RIGHTFUL OWNER OF THE CONTENT. 6.THE SMART CONTRACTS STORES THE OWNERSHIP AND TRANSACTIONS DATA ON THE BLOCKCHAIN, MAKING THE OWNERSHIP VERIFIABLE AND DISTRIBUTING THE ECONOMIC BENEFIT TO THE CONTENT OWNERS, NOT THE INTERMEDIATORY PLATFORMS OF THE WEB2 WORLD. WHO ALSO RUNS A NODE ON A BLOCKCHAIN NETWORK, WANTS TO ALTER A BLOCKCHAIN AND STEAL CRYPTOCURRENCY FROM EVERYONE ELSE. IF THEY WERE TO ALTER THEIR OWN SINGLE COPY, IT WOULD NO LONGER ALIGN WITH EVERYONE ELSE’S COPY.

FOURTH FLOOR PLAN (1:200)


1.THE STRUCTURE IS BUILD IN TRUSS BEAM AND I SECTION COLUMN. 2.THE SLAB IS MADE FOR 100MM STEEL SLAB AND OVER THAT THERE IS 100MM CONCRETE SLAB . 3.THE SLAB TO SLAB HIGHT IS 5M AND THE SLAB TO FALSE CEALINNG HIGHT IS 4 M 4.ALL FLOOR HAS ESCILATOR ,ELEVATOR AMD STAIRCASE TO EXCESS 5.THERE IS FIBER REINFORCED CONCRETE PANELS (FRCP) USED FOR COVERING OF THE BUILDING

SECTION AT AA’

SECTION AT BB’

RENDERED ELEVATION


ELEVATION 1.THE ACTUAL PURPOSE OF THE MUSEUM IS TO INSPIRE ALL KINDS OF GENERATIONS BY SHOWING EXCEPTIONAL WORK. WHICH HAS BEEN DONE BY THE PEOPLE. 2.MUSEUM SHOULD CONTAIN THE THINGS WHICH IS REALLY HARD TO ACHIVE. 3.BUT SOME PROPLE CAME UP WITH THE SOLUTION WHICH IS ALMOST IMPOSSIBLE AT THAT TIME. 4.THE SECOUND PURPOSE OF THE MUSEUM IS TO SHOW THE POSSIBILITIES OF THE FUTURE. 5. THE THINGS WHICH IS LOOKING IMPOSSIBLE CAN BE ACHIVE IN FUTURRE. 6.BUT TO ACHIVE THIS PURPOSE WE SHOULD CONSIDER THE VARIOUS MINDSET OF THE PEOPLE. 7.THE STURAL ELEVATION IS TAKEN TO ACHIVE THAT GOAL.

ELEVATION


AIR COOLING LAYOUT (DUCTING LAYOUT)

FIRE FIGHTING LAYOUT

ELECTRICAL SUPPLY LAYOUT

BASEMENT PARKING LAYOUT


1. IN THIS AREA THE EVOLUTION OF AGRICULTURE ERA IS DISPLAED, PEOPLE WILL CAME TO KNOW THAT THE FORMATION OF LARGE GROUP AND FORMATION OF VILLAGE. 2. AGRICULTURE WAS THE BIG REASON WHY HUMANS ACTUAL CAME TOGETHER TO FORM ECONOMY . 3. THE FIRST TRANZECTION VALUE FOR ONE THING TO OTHER IS DONE DUE TO THIS AGRICULTURE FORMATION . 4. THE HUMAN MADE MACHINE TO MAKE THERE LIFE EASY AND MAKE LARGE CROPS IN SMALL LAND . 5. NOW HUMANS CAN MAKE LARGE AGRICULTURAL PLANTS IN CLOSE ROOM USING MACHINE TEMPRATURE,ETC PEOPLE FIGURE OUT HOW TO GROW PLAN AT ANY PLACE. 6.IN FUTURE PEOPLE WILL START FARMING ON ANOTHER PLANET LIKE MARS THE PREPARATION FOR THAT HAS BEEN STARTED AND HUMANS UNDERSTAND THAT IF THAY HAVE TO CREATE CIVILIZATION ON ANOTHER PLANET THEN THAY HAVE TO DO FARMING FIRST BECOUSE THATS BASEC NEED OF HUMANS.

1.THE INTERIOR OF THE GALLERY SHOWS THE EVOLUTION OF CONSTRUCTION TYPE OF BUILDING 2.THE PANEL IS FIXED TO THE STAINLESS STEEL ROD. IT IS ALINE OVER ROOM SO IT CREATE BOX ROOM FEEL. 3.DIFFERENT SIZES OF PANEL REPRESENT THE DIFFERENT SCALE OF THE STRUCTURE 4.PEOPLE CAN SEE THE CHANGE IN THE STYLE IN ARCHITECTURE. 5. IN THE BIGGINING WE USE TO LIVE IN CAVES WHICH IS REALLY UNCONFORTABLE. THEN PEOPLE START TO LIVE IN ROCK AND MUD HOUSES . THEN THINGS GET BETTER AND BETTER . 6.THERE IS RELACTATION AREA IN MIDDLE AREA OF EVERY GALLERY. SMALL CAFETERIA, BOOKS READING AREA. SOFA TO RELAX AND BUFFER SPACE.


1. HUMANS START TO DIG IN BIG HOLES AND THAY START TO FIND DIFFERENT ELEMENTS AND THAY START TO USE DIFFERENT THINGS. 2.HUMANS

START

USEING

METAL

FOR

SOME

WORK

AND

IT

WAS

FIRST

FOUND

IN

WEST

AMERICA.

3. THE FIRST METAL WHICH HUMAN FIND WAS COPPER. ABOUT 8500 YEARS AGO, HUNTER-GATHER BESIDE EAGLE LAKE IN WISCONSIN HAMMERED OUT C CONICAL, 10 CENTIMETER LONG PROJECTILE POINT MADE OF PURE COPPPER 4.

FIRST

THAY

USE

IT

AS

A

WEAPONS

AS

THAY

ARE

SHARP

AT

THE

EDGES.

THAY

USE

IT

TO

HUNTING.

5. THEN THAY FIND OTHER METALS AND THAY STARTED TO BECOME RICH. METAL STARTED GAINING IMPORTANCE AND BECAME IMPORTANT PART OF ECONOMY. AS METAL WAS LIMITED ON THE PLANET AND IT DOES NOT DECAY SO THE 6.

1. MOST OF US ARE SURROUNDED BY THE MACHINE AND WE THINK THAT THE MACHINE HAS TO BE OPRATED BY THE HUMANS 2. BUT WE ARE ENTERING THE ERA IN WHICH AI WILL CONTROL MACHINE AND IT WILL OPRATE BY ITSELF 3.THE MOST ADVANCE ROBOTS ARE DOING THINGS THAT WE DID NOT EXPECT THEM TO DO AND THAY HAVE THEIR OWN MIND 4. KNOWING HOW IT WORK AND HOW WE SHOULD NORMALISE LIVING WITH ROBOTS NOW. 5.ALL THE SECTORS WILL HAVE AI ROBOTICS AND MOST OF THE WORK WILL BE DONE BY ROBOTS. 6. NEXT GENERATIONS WILL KNOW ROBOTS BETTER OR ROBOT WILL KNOW U BETTER THAN ANY OTHER HUMANS

THE

VALUE

OF

THE

METAL

WHICH

DECAYS

LESS

HAS

HIGH

VALUE

AS

WE

CAN

STORE

IT

AND

USE

IT

AGAIN.

.


INTERNSHIP WORK(KHOSLA ASSOCI ATES)


1'-6" 7'-2" 35'-8"

C

ELECTRICAL ROOM 16'0" X 7'4" D4

EXIT

D2

SLOPE - 1:8 STORE 16'8"X16'0"

CUT OUT ON SLOPED ROOF

LVL - 44'-0" LVL - 88'-0"

W34

W3

W3

W34

W34

W3

W3

W35

WOODEN LOUVERS TO DETAIL

3' GLASS RAILING TO DETAIL

LVL - 15'-4"

4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL

PRECAST CONCRETE PERGOLA EXPOSED CONCRETE FINISH

LVL - 44'-0"

LVL - 44'-0"

CW13

DW2

LVL - 0'-0"

CW11

CW13

10'-4"

11'-4"

CW11

LVL - 0'-0" LVL - (-31'-0")

ELEVATION A

ANTE ROOM 9'10"X6'0"

W34

MONIER TILES

CUT OUT ON SLOPED ROOF

15'-9"

UP VERANDAH 8'0" X 16'8''

13'

05

2"X6" WOODEN RAFTERS

DUCT LOUVER TO DETAIL

4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING 14'4" ht COMPOUND WALL

13'-6"

NEIGHBORING PROPERTY

DD

RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH

2"X6" WOODEN RAFTERS WOODEN LOUVERS TO DETAIL

W38

LVL - 185'-1"

3' 1'-6"

01 03

W31

8'-9"

12'-6"

10'-6"

CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER - KERALA TILES

SERVICE ENTRY/EXIT

PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE -PAINT FINISH

PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH

LVL - 201'-9" W31

8" 20'

5'-2"

6'-8"

4'-10"

6'-8"

3'-4"

6'

3'-2"

10'-8"

10'-6"

3'-4"

10'-4"

3'-6"

13'-2"

10'-10"

1'-6" 4'-10"

5'-2"

1'-6" 9'-6"

6" 11'-6"

6'-8"

9" 4'

6'-7"

3'-4"

6'

4'-8"

6'

1'-10" 3'-4"

11'-6"

2'-8" 7'-8"

7'

6'-4"

10'-4"

10'

7'

6'

8'-10"

15'-8"

311'-2" STAGE

1

W4 V1

KITCHEN AND STORE 32'8"X43'8"

CC

SDW1

BUFFET AREA 10'10"X31'8"

DOUBLE HEIGHT BANQUET HALL 37'0"X48'8"

V2

DECK 27'0"X66'0"

3

2

5 6 7

4

8 9

10 11

12 13

14 15

W36

W37

W36

16

17 18 19 20 21 22 23

24

25 26 27 28 29

30 31

33 34 35

32

36

38

37

39

40

41 42 43

44

45

46

47

PT SLAB EXPOSED SIDE - THERMOTILE UNDERSIDE -PAINT FINISH

UP

CC

2"X6" WOODEN RAFTERS

1'-6"

DROP OFF CANOPY ABOVE

WOODEN LOUVERS TO DETAIL RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH GLASS

SDW1

7'-2"

LADIES TOILET 18'2"X11'4"

4'0" WIDE PASSAGE

ENTRANCE PORCH

MAIN ENTRANCE

MD

PRE-FUNCTION FOYER 29'8"X30'8"

LOBBY 14'10" X 16'4"

VERANDAH 10'0"X 16'0"

W2

13'-6" 13'

DW7

W2

PAINT FINISH LVL- 138'-0" CW9

LVL- -128'-4"

CW8

LVL- 110'-4"

CW6

LVL- -104'-2"

D3

CW6

TC TC

W29

DECK 16'8"X140'5"

RO TC

3' 1'-6"

27'-10"

3'

9'-8"

5'-4"

9"

1'-4"

8'-4"

3'-4"

8'-8"

8'-4"

8'-4"

8'-8"

5'-4"

2'

4'-8"

EE

W7

FF

GG

A

HH

AA B

BB

C CC

D

DD

E

EE F

14'-9"

19'-5"

16'-10"

3'-4"

16'-2"

7'-11"

9'-11"

12'-4"

1'-8"

1'-2"

5'-6"

4'-11"

8'-2"

1'-2"

5'-8"

3'-4"

PEDESTRIAN RAMP

S6 S5 S4 S3 S2 S1

S3 S2 S1

ENTRANCE PORCH

9"

1'-2"

5'-4"

FF G GG H HH J

5

4

3

2

1

1'-4"

7'-10"

4'-8"

7'-8"

11'

JJ K

KK KK°

LL M°

MM°

NN° P PP Q° QQ° R RR° S° SS° T TT

U UU

V

PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH

1'-6"

TC

W12

9'

3'-4"

8'-8"

8'

VV

X XX

Y

YY

METAL LOUVERS TO DETAIL

PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH

LVL - 16'-8"

INDOOR BADMINTON COURT BELOW 26'8"X55'1"

2"X6" WOODEN RAFTERS

W35

WOODEN LOUVERS TO DETAIL

W34

W34

W34

RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH

W34

2"X6" WOODEN RAFTERS

W12

7'-2" 35'-8"

RESTAURANT 77'9"X30'4"

CW2

CW9

13'-6" 35'-8"

D6

10'-6"

CW8

CW3

DW1 W11

CW2

W11

KITCHEN 19'0"X26'5"

13'

W10

RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH

4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING 4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL

B39

W20 W18

W18

GENTS TOILET 30'8"X26'8" ENTRANCE LOBBY 26'8"X26'8"

W23

W21

ZUMBA/YOGA STUDIO 26'0"X26'8"

D7 W19

LANDSCAPED COURT 2 8'8"X16'8"

SD2

W18

W10

LANDSCAPED COURT 3 16'0"X9'0"

LVL - 165'-5"

DW2

15'-9"

15'-8"

8'-10"

CW6

6'

12'

46

12 13

14 15 16 17 18 19

20 21 22

23 24 25

10'

45

7'

44

CW4

CW2

CW3

CW1

CW2 B46

B62

CB3

CB3

10'-4"

6'-4"

7'-8"

PB1

41

AA

16' WIDE PASSAGE

26

SECTION DD

40

CB3

7'

DW1

11'-6"

PB1

6'

PB1

D6

4'-8"

6'

PB1

9" 4'

3'-4"

D4 RIBBED

6'-7"

6'-8"

11'-6"

WOOD 6"TO DETAIL

TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT

1'-6" 9'-6"

39

38

36

37

35 34 33

29 28 27 26 25

5'-2"

S2 S1 10'-10"

B15

27'-10"

LVL - 0'-0"

3'

13'-2"

9'-8"

5'-4"

8'-4"

3'-6"

B9

23 22 21 20 19 18 17

10'-4" B7

7" THK SLAB

16

8"

3'-2"

10'-6"

10'-8"

BANQUET HALL 3'-4"

S6 S5 S4 S3 S2 S1

6'

6'-8"

4'-10"

6'-8"

B2

LVL - 179'-9"

5'-2"

STORE ROOM

20'

PB20

B6

15 14

13 12

PB10

PB12

11 10

7 6 5

9 8

3

4

2

1

PT SLAB

PT SLAB EXPOSED SIDE - THERMO TILE UNDERSIDE - PAINT FINISH

1'-8"

B4

D2

D2 D1

PRE-FUNCTION FOYER 3'-4"

TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT

B11

RCC STAIRCASE 2 ITALIAN MARBLE TREAD - 1'0" RISER - 6" WIDTH - 3'0"

24

PD1

ROOM-4

B13

LVL - 16'-8"

DW7

14'4" ht COMPOUND WALL

B2

W28

LVL - 16'-8"

LVL - 66'-0"

PEDESTRIAN RAMP

S3

B10

311'-2"

PB1

31 30

32

W28

S6

S5

S4

S3

S2

D6

1'-6" 4'-10"

STAIRCASE EXPOSED SIDE - THERMO TILE ANDUNDERSIDE - PAINT FINISH LIFT PB1 LOBBY

LOBBY PB3

1'-2"

W28

8" THK SLAB

B25

B36

RAILING TO DETAIL

GLASS

S1

DW1

1'-10" 3'-4"

B32

CB3

B43A

ENTRANCE PORCH DW3

10'-4"

LIBRARY/ 11'-4" BUSINESS CENTRE

43 42

1'-6"

SWIMMING POOL 98'0"X40'0"

DW5

7'-2"

DW5

UP 10 11

CW5

CW5

CB3

WEATHERING COURSE

FALSE CEILING

METAL LOUVERS TO DETAIL

8" THK SLAB CB3

LVL - 196'-5"

METAL LOUVERS TO DETAIL DECK 13'6" X 70'8"

AA

B98

CW6

DW3

PB42

47

W28

SKYLIGHT TO DETAIL

8" THK SLAB

PAINT FINISH W16 LVL - 151'-9"

D8

16'0" WIDE PASSAGE

PAINT FINISH

SKYLIGHT TO DETAIL

CB6

PB1

KIDS POOL 18'0"X12'0"

18" TO 10" PT SLAB

TERRACE

B4

ISMB 200

PAINT FINISH

D5

W18

9" PT SLAB

PAINT FINISH LVL - 0'-0"

CUT OUT ON SLOPED ROOF

LVL - 47'-2"

8" THK SLAB B89

2'-8"

LANDSCAPE AREA

8'8"X16'8"

8'8" WIDE PASSAGE

W18

W3

LVL - 196'-5" 4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING

ELEVATION C

JANITOR CLOSET

LANDSCAPED COURT 1 SD2

W18

CARDS ROOM 15'4"X26'8" W18

W3

FALSE CEILING

W31

FALSE CEILING

CW8

B114

13'-6" SERVICE ENTRY

4'8" WIDE SERVICE PASSAGE

D3

13'

STORE 14'0"X15'4"

D6

W23

DECK

SHALLOW WATER BODY 26'8"X26'8" D7

DW8

W21

STEAM

3' 1'-6"

W18

D6

ENTRY

W20

D5

3' 1'-6"

KITCHEN SIZE TO BE EVALUATED BY CONSULTANTS

D8

8'10½" WIDE WALKWAY TO RESTAURANT

DW2

W3 LVL - 211'-9"

4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING

11" THK RCC SLOPED ROOF SLAB

CW9

14'-4" ht COMPOUND WALL

16'0" WIDE PASSAGE

DW1

W3

3' GLASS RAILING TO DETAIL

STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER KERALA TILES

8'-9"

CW6

CW4 W9

8'-9"

10'-6" CW6

12'-6"

CW5

CW5

2"X6" WOODEN RAFTERS CUT OUT ONWOODEN LOUVERS TO DETAIL SLOPED ROOF

15'-9"

W12

12'-6"

WATERBODY

LVL - 7'-8"

RCC FLAT ROOF EXPOSED SIDE - THERMOTILE WOODEN LOUVERS TO DETAIL W38 UNDERSIDE -PAINT FINISH

W12

DUCT

1'-6" 7'-2"

W12

D4

AREA FOR INDOOR GAMES 26'8" x 47'6"

W10

DECK

LVL- -118'-11"

1'-8"

1'-2"

ELEVATION B

ENTRY

TC

FC

W10

SDW1

TC

UP

D6

D

SDW1

309'-5"

Screen/ Partition wall

W8

W5

MD

W29

LVL- 100'-0"

W14

W13

W25

LVL- 127'-4"

B

BB

AV ROOM 26'8"X7'1"

METAL LOUVERS TO DETAIL

W39

LVL - 0'-0"

4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL

SQUASH COURT BELOW 26'8"X 32'6"

W15

BB

DW4

W39

D6

LVL- (-32'0")

14'4" COMPOUND WALL

KK

LOBBY

MINI THEATRE 26'8" X 39'11"

PAINT FINISH

35'-8"

LIFT 6'0" X 5'0"

W6

W39

LVL- 148'-0"

MONIER TILES

SDW2

LVL- 138'-0"

LVL- 96'-6" W39

LVL- (-16'8")

15'-9"

ELECTRICAL SHAFT

KK

10'-6"

D1

8'-9"

D5

V4

RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH UNDERSIDE CANTILEVER - KERALA TILES

CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES

WOODEN LOUVERS TO DETAIL

RAILING 3' TO DETAIL CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES

W5

12'-6"

D5

GENTS TOILET 18'2"X10'8"

Z

V3

3'-4"

8'-8"

8'-4"

8'-4"

LVL - 0'-0"

1'-4"

8'-8"

5'-4"

2'

4'-8"

9"

5'-4"

1'-2"

14'-9"

19'-5" RCC SLOPED ROOF

16'-10"

3'-4"

EXPOSED SIDE - MONIER TILES 309'-5" UNDERSIDE - PAINT FINISH

DW3

16'-2"

PB1

PB1

8'-8"

9'-11"

11'-7"

2"X6" WOODEN RAFTERS

5'-6"

4'-11"

9" 1'-2"

8'-2"

QQ°

R

5'-8" 1'-8" 3'-4"

7'-10"

T

PAINT FINISH LVL - 147'-4"

1'-2"

4'-8"

7'-8"

1'-4"

11'

9'

3'-4"

8'-8"

8'

W16

SEATING LOUNGER

8'-9"

10'-6"

SEATING

DECK

LANDSCAPE AREA

JANITOR CLOSET

SD2

D5

GENTS SALON

CHILDREN'S PLAY AREA 45'0" X 25'0"

MASSAGE ROOM 26'1"X12'9"

Storage

Storage

CW11

CW11

8'

3' 1'-6"

NEIGHBORING PROPERTY

8'-8"

GG

HH LVL - 0'-0"

3'-4"

YY

Y

PB1

SL. NO.

REVISIONS

DATE

SL. NO.

REVISIONS

DATE

CLIENT

DRAWING STATUS

MR.RAJEEV AGRAWAL

EXICUTION

PROJECT

WALL ELEVATIONS

REVISION NO.

PROPOSE VILLA DEVELOPMENT-RAIPUR

DRAWN BY

DRAWING TITLE DATE

DWG. NO.

30-11-2021

--

G

GG

H HH

J

JJ

K

KK

KK°

LL M°

1/8"=1'

MM°

NN°

P

PP

A

30-11-2021SL. NO.

W34

ISMB 200

ISMB 200

7'-8"

V

DW6

4'-8"

B121

1'-8"

1'-2" 7'-10"

W3

3'-4"

1'-2"

5'-8"

B109

B104

GYM

9'-8"

AA B BB DATE SL. NO.

REVISIONS

8'-2"

7" THK SLAB

5'-6"

9'-11"

4'-11"

6"x8" MS PERGOLA AT 7'-11" BEAM BOTTOM / B69 RCC ROOF SLAB BOTTOM

12'-4"

B83

B95

SD2

DW5

W9

MONIER TILES

W18

PB98

5'-4"

1'-8"

8'-4"

PB40

3'-4"

PB37

8'-8"

8'-4" 149'-1"

E

EE

PB98

8'-4"

1'-4"

8'-8"

5'-4"

2'

3'-4"

16'-2"

4'-8"

C CC REVISIONS

D

DD DATE

CLIENT

LVL - 0'-0"

16'-10"

19'-5"

9"

M° LL 1'-2"

14'-9"

14'-9"

5'-4"

4'-8"

5'-4"

8'-8"

2'

FF

G

GG

H HH

J

JJ

K

8'-4"

KK

KK°

KK° KK

K JJ

W12

W12

10'-6" 35'-8" 13'-6"

8'-8"

W12

3'-4"

W12

J HH H GG G FF

8'-4"

W12

F EE

11" THK RCC SLOPED ROOF SLAB

5'-4"

FALSE CEILING

1'-2"

9'-8"

B38

W13

E

3'

27'-10"

DD

W14

D

CC C

W15

BB

B34

B27

MD

W14

B AA

A

LVL- 127'-4"

S6 S5 S4 S3

WALL ELEVATIONS

REVISION NO.

DATE

30-11-2021

STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER KERALA TILES

FALSE CEILING

10" THK GRADE SLAB

PB105

DRAWN BY

19'-5"

16'-10"

--

DWG. NO.

PB5

PB106

DEALT BY

3'-4"

--

16'-2"

PB105

8'-8"

PB1

9'-11"

11'-7"

9"

5'-6"

4'-11"

SCALE

NORTH

CODE

DOUBLE HEIGHT SQUASH COURT

6'5" WIDE PASSAGE

PB105

1'-2"

DRAWING TITLE

EXICUTION

9" PT SLAB

1/8"=1'

Q° QQ° KK KK° L° LL M° MM° N° NN° P PP THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.

SECTION ZZ ISMB 200

ISMB 200

MONIER 6"x8" MS PERGOLA AT TILES BEAM BOTTOM / RCC ROOF SLAB BOTTOM

W3

8" THK SLAB B138

16" CINDER FILLING

GYM B71

8" THK SLAB

15'-10" ht COMPOUND WALL

B123

B129

4" THK RANDOM RUBBLE CW12 SADARAHALLI STONE CLADDING

W3

DW6 16" CINDER FILLING

15'-9"

8'-4"

B40

4" THK RIBBED SADARAHALLI STONE CLADDING TO DETAIL

SB22

SB23

1'-8"

19'-5"

DRAWING STATUS

PROPOSE VILLA DEVELOPMENT-RAIPUR

6"x8" MS PERGOLA AT BEAM BOTTOM / RCC ROOF SLAB BOTTOM

CW11

FALSE CEILING

B110

8" THK SLAB

B50

B44

B84

B96

B105

CW10

CW2

W21

DW5

CW2

DD

MASSAGE ROOM

WATERBODY

3' 1'-6"

LVL- 148'-0" PAINT FINISH

CB3 SB23

FALSE CEILING

Z

14'4" ht COMPOUND WALL PT SLAB EXPOSED SIDE - THERMOTILE UNDERSIDE -2"X6" WOOD LOUVRES

D11

F

PROJECT

CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES

B151

YY

LVL - 148'-0" CB3

11" THK RCC SLOPED ROOF SLAB

1'-4" B43

W11

MM°

MR.RAJEEV AGRAWAL

18" TO 10" PT SLAB

Y

309'-5"

WATERBODY

9"

5'-4"

XX

UNDERSIDE - PAINT FINISH

4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING

W18

D7

LVL - 44'-0"

SB26

6" THK RCC SLOPED ROOF SLAB

1'-2"

4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING

GENT'S TOILET

TT T SS° S° RR° R QQ° Q° PP P NN°

2''X6" WOODEN RAFTERS RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH

THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.

RCC SLOPED ROOF VEXPOSED VV- MONIER TILESX SIDE

STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER - KERALA TILES

8"x8" MS FRAME

9"

LADIES TOILET

UU U

3'

UU

RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH

W7

4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING

W3

SD2

1'-2"

U

TT

STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE CANTILEVER KERALA TILES

18" TO 10" PT SLAB

LVL - 0'-0"

11'

VV

SS°

9" PT SLAB

FALSE CEILING W6 V4

PT SLAB EXPOSED SIDE - THERMOTILE UNDERSIDE -PAINT FINISH

13'

RR°

CUT OUT ON SLOPED ROOF

MONIER TILES

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE. W34 W34

SCALE

NORTH

CODE

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.

DEALT BY

--

FF

DOUBLE HEIGHT INDOOR BADMINTON COURT

KEYPLAN GROUND FLOOR PLAN

1'-6"

30-11-2021SL. NO.

A

REVISIONS

7'-2"

REVISIONS

9'

27'-10"

8'-9"

SL. NO.

F

W24

W34

7" THK SLAB

B148

XX X

B

12'-6"

FF

EE

SECTION FF

LVL - 0'-0"

A

EE

E

18" TO 10" PT SLAB

V3

4" THK RIBBED SADARAHALLI STONE CLADDING

LANDSCAPE

DD

DD

4" THK RANDOM RUBBLE SADARAHALLI STONE CLADDING

LVL - 0'-0"

12'

D

D V5

CB3

15'-10" ht COMPOUND WALL

C

LVL - 0'-0"

CW11

CC V6

1'-4"

CW13

CW13

6

5

4

ELEVATION D

CW12

13'-6"

LANDSCAPED COURT 20'0"X17'8"

13'

LADIES SALON

D4

3

2

1

C

CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER LVL -TILES 0'-0" UNDERSIDE - KERALA TILES 4" THK RANDOM RUBBLE 6"x8" MS PERGOLA AT BEAM BOTTOM / CLADDING SADARAHALLI STONE RCC ROOF SLAB BOTTOM

15'-9"

13'-6" CW10

D5

GENTS

CW11

CW12

CW11

10'-6"13'

MASSAGE ROOM 25'0"X9'0"

D9

D5

8'-9"

CHANGING ROOM 5'0"X5'0"

G - WC 6'6"X3'8"

D5

12'-6"

STEAM ROOM 6'6"X5'0"

RECEPTION

WAITING

L - WC 6'6"X3'8" LADIES

MASSAGE ROOM 26'1"X12'9"

N

D5

3' 35'-8" 1'-6"

D8

STEAM ROOM 6'6"X5'0"

D9 D5

CW11

15'-9"

CHANGING ROOM 5'0"X5'0"

MASSAGE ROOM 25'0"X9'0" CW10

Z

AC / PHE DUCT 4'0" X 2'6"

BB

2''X6" WOODEN RAFTERS RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES V1UNDERSIDE - PAINT FINISH V2

PAINT FINISH LVL - 11'-10"

STEAM

W20

B

PT SLAB EXPOSED SIDE - THERMOTILEW24 UNDERSIDE -PAINT FINISH

W24

PAINT FINISH LVL - 0'-0"

W17

W20

V7

35'-8"

D5

SD2

AA V8

DUCT

W18

LANDSCAPED COURT 1 8'8"X16'8"

A 12'-6"

W18

LANDSCAPED COURT 2 8'8"X16'8"

LOUNGER

7'-2"

LIBRARY / BUSINESS CENTER 43'4"X43'4"

JACUZZI 18'0"X12'0"

STEPS LADIES TOILET 30'8"X26'8"

1'-6"

8'8" WIDE PASSAGE

SHALLOW WATERBODY 26'8"X26'8"

DUCT

CAFETERIA/GAMING 49'0"X26'8" W11

MASSAGE ROOM

RESTAURANT

PB50

PB1

PB101

PB1

PB1

PB101

WATERBODY

PB1

PB1

PB1

12'

SERVICE ENTRY/EXIT

51 7'-2128

77 6'-3128 77 150'-3128

51 16'-2128

51 52'-2128

77 28'-9128

45'

77 46'-9128

18'

45'

77 46'-9128

45'

77 6'-3128

77 4'-0128 77 10'-9128

77 28'-9128

51 25'-2128

77 28'-9128

EXIT

51 104'-10256

79'-7205 256

77 805'-0128

PB1

A

01

+1'6" LVL +0'0" LVL

+0'0" LVL

ENTRANCE PORCH

PB1

12

SECTION AA

13

14

14

15

QQ°

112" 06 05 04

ELEVATION B

1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE

A

01

PB1

+0'0" LVL

PB1

+0'0" LVL

S6 S5 S4 S3 S2 S1

16

T

3" 4

SS° S°

112"

13

14

15

16

65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1'1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE

112"

BRICK MASONRY AS PER STRUCTURE

TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT

03

04

05

PB1

27'-10205 256

36'

112"

51 26'-1256

METAL LOUVERS TO DETAIL

HIGHLIGHT WALL

YY

WALL A ( HIGHLIGHT ) WALL B

COVE LINE

65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE BRICK MASONRY AS PER STRUCTURE

UP

PLAN

N

Z

VERANDAH 8'0" X 16'8'' KOTA STONE FLOORING

D4

3" 4

BOTTEGA CALIZA

596 X 596

WALL D

BOTTEGA CALIZA

596 X 596

53

FLOORING

VERESE CENERE

600 X 1200

71

COVE LINE

HIGHLIGHT WALL

TYPICAL DETAIL C - SECTION THROUGH NICHE

KEY PLAN - FIRST FLOOR

65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1'1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE

BEDROOM 3 TOILET (DAUGHTER'S) 8'0"X11'0"

N

DETAIL A- COVE LIGHT

WALL A

KEY PLAN - FIRST FLOOR BEDROOM 4 TOILET (GUEST'S) 12'11"X5'3"

FLOORING TILE BOTTEGA ACERO

DETAIL A- COVE LIGHT

1'

2'-6" POINT START

2'-10"

3'

2'-10"

4"

1'-2" 1'-9"

1'-4" 1'-8"

1'-10"

ENTRY

3' 1' 3' 2'

2'-10"

1'-9"

3'

2'-6" START POINT

7'-8"

1'

START POINT

2'-6"

1'-6"

3'

6'-6"

3'-6" 2'-3"

1'-6"

1'-812

2'-10"

7'-8"

1'

2'-10"

2'-5"

1'-4"

TOP OF THE WASH BASIN NOT MORE THAN THAT

HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN

3'-6"

START POINT

1'

1' 6'-6"

7'-8"

4"

4"

6" SUNKEN 4"

2'

HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN

SHOWER CUBICLE AS PER DETAIL

2'-5"

2'

MIXER AS PER VENDOR

WALL HUNG WC AS PER VENDOR SPECIFICATION 1 2" DROP

12" SUNKEN

FLOORING TO BE FINISHED IN 600mm X 1200mm VERESE CANERE TILES AS PER SPECIFICATION

1'-4"

6" THK L SHAPE- LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE VANITY COUNTER

FIRST FLOOR FFL

B

7'-8"

START POINT

LINTEL LVL

START POINT

VENTILATOR AS PER ARCHITECTURE DETAIL

2'

1'

COURIAN TOP

WALL B, C, D

FIRST FLOOR FFL

12" SUNKEN

WALL TO BE FINISHED IN (596MM X 596 MM) BOTEGA CALIZA AS PER SPECIFICATION

START POINT

5"

2'

6" THK LEDGE WALL

BOTTEGA CALIZA TILES

VANITY COUNTER AS PER VENDOR SPECIFICATION WALL HUNG WC AS PER VENDOR SPECIFICATION

FIRST FLOOR FFL

12" SUNKEN

SUNKEN SLAB AS PER STRUCTURE

LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT

HIGHLIGHT WALL - LINE PEKIN BOTTEGA ACERO - Horizontal

NICHE TO BE FINISHED IN 6MM CORIAN

1/4"

GYPSUM BOARD

DETAIL B - LEDGE WALL

3'

SHOWER HEAD AS PER VENDOR

WALL-D

WALL-C

TYPICAL DETAIL C SECTION THROUGH NICHE

\\team-b\D\PC10_E Drive_190202\Team B_Project Files\ONGOING PROJECTS\SIDHARTH BHATIA\REFERENCE\BOTTEGA ACERO.jpg

5"

2'

PLASTER

4"

97

PLASTER

WASH BASIN AS PER VENDOR SPECIFICATION

3'-812

53

1'

123

2'

7'-8"

AREA (Sqft)

DOVER MODERN LINE 316 X 900 ARENA(Horizontl- Beige)

MIRROR AS PER SPECIFICATION

RCC SLAB & BEAM AS PER STRUCTURAL DRAWING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL START POINT START POINT

2'

2'

TILE SIZE (MM)

DOVER MODERN LINE 316 X 900 ARENA(Horizontl- Beige)

(HIGHLIGHT)

20MM

TILE TYPE

WALL A

WALL B

NICHE TO BE FINISHED IN 6MM CORIAN

\\team-b\D\PC10_E Drive_190202\Team B_Project Files\ONGOING PROJECTS\SIDHARTH BHATIA\REFERENCE\BOTTEGA CALIZA.jpg

6" SUNKEN

LINTEL LVL

2'X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL

COURIAN TOP

GYPSUM BOARD

6'-6"

2'-10" START POINT

1 2" DROP

1'-4" 1'-4"

3'-9"

APPLICATION

6" THK LEDGE WALL

LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT

3'-6" 7'-8"

4" WALL-D

1 2" DROP

4'-10"

4" WALL-D

4'-10"

START POINT

TOP OF THE WASH BASIN NOT MORE THAN THAT

2'-10"

B

12" SUNKEN

LINTEL LVL

START POINT

SHOWER CUBICLE AS PER DETAIL

WALL-B

4"

VENTILATOR AS PER ARCHITECTURE DETAIL

START POINT START POINT

SUNKEN SLAB AS PER STRUCTURE

SHOWER CUBICLE AS PER SPECIFICATION

1 2" DROP

WALL D & C TO BE FINISHED IN 596 MM X 596 MM BOTEGA CALIZA

1/4"

83 89 87

4'

6" SUNKEN 4"

HIGHLIGHT WALL TO BE FINISHED IN (316MM X 900MM) DOVER MODERN LINE ARENA TILES AS PER SPECIFICATION

WALL-A

FLOORING TO BE FINISHED IN 600 MM X 1200 MM VERESE CENERE

4'

PLAN : BEDROOM - 4 (GUEST ROOM) TOILET (FLOORING)

4" 4"

99

596 X 596 596 X 596 596 X 596

12'-9"

START POINT

2'

1'-4" START POINT

SUNKEN SLAB AS PER STRUCTURE

4"

87

596 X 596

BOTTEGA CALIZA BOTTEGA CALIZA BOTTEGA ACERO

DETAIL AT B

ELECTRICAL ROOM 10'10" X 7'4"

FLOORING TO BE FINISHED IN BOTTEGA ACERO 596 MM X 596 MM TILES AS PER SPECIFICATION

WALL-D

AREA (Sqft)

LINE PEKIN BOTTEGA ACERO( Horizontal) 450 X 1200 BOTTEGA CALIZA

WALL C WALL D FLOORING

03

KEY

TILE SIZE (MM)

START POINT START POINT

PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

FLOORING TO BE FINISHED IN 600mm X 1200mm VERESE CANERE TILES AS PER SPECIFICATION

12" SUNKEN

6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE VANITY COUNTER

2'-914

WALL C

TILE TYPE

4"

START POINT

MATCH TO THE VANITY COUNTER TOP

3'-6"

2'-10"

APPLICATION

12'-11"

4'

1 2" DROP

HIGHLIGHT WALL A & B TO BE FINISHED IN 316 MM X 900 MM DOVER MODERN LINE ARENA

WALL-C

WASH BASIN AS PER VENDOR SPECIFICATION

WALL-C

PLAN - BEDROOM 3 (DAUGHTER'S) - FLOORING

06

51 43'-2128

5

START POINT

(HIGHLIGHT)

05

CLUBHOUSE BANQUET ENTRANCE STEPS DETAIL

MAIN ENTRANCE

5"

DETAIL B - LEDGE WALL

WALL A AND WALL B (HIGHLIGHT WALL) WALL C AND WALL D DOVER MODERN LINE ARENA - Horizontal - Beige Colour BOTTEGA CALIZA

FLOORING

VERESE CENERE

BRICK MASONRY AS PER STRUCTURE

D2

DETAIL AT A

A

A

02

SECTION AA

2 4

SERVICE ENTRY/EXIT

PART PLAN- GROUND FLOOR-BANQUET ENTRANCE STAIRCASE AND RAMP DETAIL AT B

3

01

DETAIL AT B

DETAIL AT A

01

27'-10205 256

3

4 2

N

65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1/2" FROM FINISHED SURFACE OF RISER 1' THK PLASTER RISER-20MM THK POLISHED FINISH KOTA STONE BRICK MASONRY AS PER STRUCTURE

36'

5

SECTION CC

SECTION AA

A

START POINT

B

51 26'-1256

TREAD - RIVER FINISH KOTA 15 STONE (5OMM THICK)

W5

B

LVL - 179'-9"

FIRST FLOOR FFL

START POINT START POINT

MIRROR AS PER SPECIFICATION TOP OF THE 6" THICK LEDGE WALL TO BE IN LINE WITH TOP OF WASHBASIN COUNTER

1'-11"

10'-914

SS°

BRICK MASONRY AS PER STRUCTURE

TREAD - 1'7 1/2" KOTA STONE RISER - 6" KOTA STONE

02

B

MD

DETAIL AT A

03 02 01

TREAD - 1'7 1/2" KOTA STONE RISER - 6" KOTA STONE

VERANDAH 10'8"X 16'0" KOTA STONE

RR°

RR°

65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1'1/2" FROM KOTA SURFACE OF RISER

RISER- RIVER FINISH KOTA STONE 16 TREAD - RIVER FINISH KOTA STONE (65MM THICK)

15

SS° S°

R

03

RISER- POLISHED CEMENT

U TT

16

6"

11

13

6"

12

PB1

A

10

11

PB1

UU

PB104

10

A

SDW1

6 5 4 3 2 1

2'

1'

02

2'

20MM

03

SHOWER CUBICLE AS PER SPECIFICATION

WALL DADOING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES

WALL-C

START POINT

2'6"

+1'6" LVL

MAIN ENTRANCE

START POINT

MATCH TO THE VANITY COUNTER TOP

04

D2

6"

05

1'-11"

FLOORING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA ACERO TILES

7'-10"

C-C

TREAD - 1'6" KOTA STONE RISER - 6" EXPOSED CEMENT

D2

FIRST FLOOR FFL

4"

WALL D TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES

2'

A VERANDAH +3'0" LVL

B

04

PAINT FINISH LVL - 11'-10"

SLOPE OF THE RAMP IS 1:8 LENGTH OF THE RAMP IS 24" RIVER FINISH KOTA STONE (65MM THICK)

DECK

+3'0" LVL

B

6"

06

05

6"

+3'0" LVL

06

6"

VERANDAH

65 MM THK RIVER FINISHED KOTA STONE AS TREAD TO PROJECT 1 1/2" FROM FINISHED SURFACE OF RISER RISER-20MM THK POLISHED FINISH KOTA STONE

DECK

+3'0" LVL

Z

DECK 27'0"X66'0" KOTA STONE

START POINT

DOUBLE HEIGHT BANQUET HALL 37'0"X48'8" ITALIAN MARBLE FLOORING

MD

1 2" DROP

LVL - 16'-8"

SDW1

V

MD

RCC SLAB & BEAM AS PER STRUCTURAL DRAWING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

START POINT

C-C

2'9"X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL

WALL-B

2'

CB5

B208

DUCT-1

1 2" DROP

UP INV.B219

START POINT

2'-512" 1 2" DROP

START POINT START POINT

6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER

3'-11"

WALL-D

3'-10"

7'-8"

Z

YY

2'X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL

PLAN : BEDROOM - 4 (GUEST ROOM) TOILET

12" SUNKEN

WALL-A

A

3'

START POINT

Y

5"

WALL DADOING TO BE FINISHED IN 596 MM X 596 MM BOTEGA CALIZA

DUCT-4

3'

2'

START POINT

FLOORING TILE DOVER ACERO - Raw Finish

RCC SLAB & BEAM AS PER STRUCTURAL DRAWING 4"

START POINT START POINT

FLOORING TO BE FINISHED IN 600 MM X 1200 MM VERESE CENERE

1 2" DROP

WALL-C

6" SUNKEN

LINTEL LVL

WALL HUNG WC AS PER VENDOR SPECIFICATION SHOWER CUBICLE AS PER SPECIFICATION

START POINT

XX

C-C

4'-7"

WALL A, B & C OTHER WALLS - DOVER ARENA

START POINT

X

2"

C-C

WALL-B

ELEVATION B

VV

HIGHLIGHT WALL TO BE FINISHED IN 316 MM X 900 MM DOVER MODERN LINE ARENA

2"

START POINT

START POINT

V

2'

START POINT START POINT

4'

START POINT

UU

2'

START POINT

U

START POINT

TT

X VV INV.B209

LINTEL LVL

HIGHLIGHT WALL TO BE FINISHED IN 450 MM X 1200 MM LINE PEKIN BOTTEGA ACERO TILES

T

2'

WALL-B

START POINT

WALL-A

SS°

2'

C-C

WALL D HIGHLIGHT WALL - VERTEX IVORY - vertical

- REVISION MADE: THE SHOWERE CUBICLE POSITION IS SHIFTED - HATCHED THE FLOOR TILE FOR FLOOR DROP - LEDGE WALL ADJUSTED

6" THK L SHAPE- LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE VANITY COUNTER VANITY COUNTER AS PER VENDOR SPECIFICATION

WALL-A

12" SUNKEN

W4

2'

WASH BASIN AS PER VENDOR SPECIFICATION FLOORING TO BE FINISHED IN BOTTEGA ACERO 596 MM X 596 MM TILES AS PER SPECIFICATION SUNKEN SLAB AS PER STRUCTURE SPOUT AS PER VENDOR

WALL-A

TOP OF THE WASH BASIN NOT MORE THAN THAT

+0'0" LVL TREAD 1'6" KOTA STONE RISER 6" EXPOSED CEMENT

XX

TOP OF THE 6" THICK LEDGE WALL TO BE IN LINE WITH TOP OF WASHBASIN COUNTER

: HIGHLIGHT WALL

12'-11"

A

START POINT

PLAN - BEDROOM 3 (DAUGHTER'S) - FLOORING

PEDESTRIAN RAMP

128 SQ.FT

START POINT

Y

06 05 04 03 02 01

1'

6'-6" 2'

DECK

+3'0" LVL

W1

FIRST FLOOR FFL

WASH BASIN AS PER VENDOR SPECIFICATION

WALL-C

2'-3"

1 2" DROP

VANITY COUNTER AS PER VENDOR SPECIFICATION

TREAD - RIVER FINISH KOTA STONE (65MM THICK)

W4

SDW1

7'-8"

WALL-D

SDW1

DOVER ACERO (Raw finish) 596 X 596

START POINT

WALL DADOING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES

7'-10"

C-C

W5

FLOORING

5"

DETAIL B - LEDGE WALL

START POINT

RISER- 20MM THK POLISHED FINISH KOTA STONE

06 05 04 03 02 01

YY

MIRROR AS PER SPECIFICATION

5"

LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT

DETAIL A- COVE LIGHT

START POINT

C

SLOPE - 1:8

FLOORING TO BE FINISHED IN 596 MM X 596 MM BOTTEGA ACERO TILES

3'-11"

12" SUNKEN SLAB

WALL D

SCALE

1/8"=1'

START POINT

C

DUCT-1

1 2" DROP

--

GYPSUM BOARD

98 SQ.FT 121 SQ.FT

DUCT-4 4" START POINT START POINT

1 2" DROP

SUNKEN SLAB AS PER STRUCTURE

DEALT BY

FILLING

6" THK LEDGE WALL

112 SQ.FT 113 SQ.FT

450 X 900

WALL-B

Z

SHOWER CUBICLE AS PER SPECIFICATION

WALL-B

E:\New folder\2182-Rama Raipur Villas_Image 10_Restaurent-01.jpg

1 2" DROP

3'-10"

E:\New folder\2182-Rama Raipur Villas_Image 09_Massage_room-04.jpg

W25

C-C

12" SUNKEN SLAB

NORTHWALL-C

AREA

316 X 900 316 X 900 316 X 900

VERTEX IVORY

START POINT

17

TILE SIZE (MM)

DOVER ARENA DOVER ARENA

WALL D (HIGHLIGHT WALL)

START POINT

16

12" SUNKEN

HIGHLIGHT WALL TO BE FINISHED IN LINE PEKIN BOTTEGA ACERO 450MM X 1200MM TILES AS PER SPECIFICATION SHOWER CUBICLE AS PER DETAIL MIXER AS PER VENDOR

3'-11"

START POINT

15

START POINT

START POINT

14

START POINT START POINT

START POINT

13

RUNA NERO

WALL B TO BE FINISHED IN 596 MM X 596 MM BOTTEGA CALIZA TILES

START POINT

12

LINTEL LVL

DRAWN BY

KEY PLAN - THIRD FLOOR MASTER SUITE - BATH 11'0" X 11'9" (SURESH)

HIGHLIGHT WALL -C & D

RCC SLAB & BEAM AS PER STRUCTURAL DRAWING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

WALL HUNG WC AS PER VENDOR SPECIFICATION

C-C

BATH TUB

LEDGE WALL TO BE IN LVL WITH TOP OF VANITY COUNTER

WALL A & B:

ENDLESS BIANCO ( 600 X 1200 MM)

HIGHLIGHT WALL TO BE FINISHED IN 450 MM X 1200 MM LINE PEKIN BOTTEGA ACERO TILES 6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER

112 112

C-C

TILE TYPE DOVER ARENA

WALL B WALL C

2'-5"

HIGHLIGHT WALL

2'

5"

FLOORING TO BE FINISHED IN 596mm X 596mm DOVER ACERO TILES AS PER SPECIFICATION

FINISHED TOP SURFACE OF LEDGE WALL TO BE MATCHED WITH TILE LINE

: COVE LINE

2'9"X1' NICHE TO FINISHED IN BOTTEGA CALIZA TILE AS PER DETAIL

WALL-A

SLOPE OF THE RAMP IS 1:8 LENGTH OF THE RAMP IS 24" RIVER FINISH KOTA STONE (5OMM THICK)

APPLICATION

HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN

COVE LINE

DETAIL B- COVE LIGHT

3'

MIXER AS PER VENDOR

--

HIGHLIGHT WALL TO BE FINISHED IN 450MMX 900MM VERTEX IVORY TILES

CODE

WALL A

80

START POINT

DRAWING PLAN -THIS MASTER SUITEIS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.

ENDLESS GRIGIO ( 600 X 1200 MM)

GYPSUM BOARD LED STRIP LIGHT FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT

512

KEY PLAN - FIRST FLOOR

600 X 1200

START POINT START POINT

HH

3'

WASH BASIN AS PER VENDOR SPECIFICATION

5'-11"

FIRST FLOOR FFL

DWG. NO.

WALL - C

START POINT

ENDLESS GRIGIO

BEDROOM 2 TOILET (SIDHARTH'S) 7'5"X11'5 12"

THROUGH NICHE

2'-10"

(HIGHLIGHT)

FLOORING

65

600 X1200 94 600 X1200 73 EACH STRIP-600 X 5) 600 X1200 114 EACH STRIP-600 X 5)

TOP OF THE WASH BASIN NOT MORE THAN THAT

RUNA NERO

AREA(Sqft)

600 X1200

DATE

4"

(HIGHLIGHT)

WALL D

TILE SIZE (MM)

DRAWING TITLE

30-11-2021

GG

SPOUT AS PER VENDOR

WALL DADOING TO BE FINISHED IN 316 MM X 900 MM DOVER ARENA TILES

WALL ELEVATIONS

4"

FF

VANITY COUNTER AS PER VENDOR SPECIFICATION

C-C

2"

1'

REVISION NO.

4"

EE

HIGHLIGHT WALL TO BE FINISHED IN 450MMX 900MM VERTEX IVORY TILES AS PER SPECIFICATION

1'

EXICUTION

PROJECT

PROPOSE VILLA DEVELOPMENT-RAIPUR

SHOWER CUBICLE DD AS PER DETAIL

START POINT

DRAWING STATUS

MR.RAJEEV AGRAWAL

2' X 2" TILE STRIPS

12" SUNKEN SLAB

WALL DADOING TO BE FINISHED IN 316 MM X 900 MM DOVER ARENA TILES

SHOWER HEAD AS PER VENDOR KEY PLAN 614

1'

3'-112

SHOWER CUBICLE AS PER SPECIFICATION FLOORING TO BE FINISHED IN 596 MM X 596 MM DOVER ACERO TILES

4"

START POINT POINT START

2'-3"

CLIENT

KK°

A START POINT POINT START

3'

19'-5" WALL - D

LINTEL LEVEL

START POINT

KK

HH

WALL-B

4"

6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER

1 2" DROP

K

B

4"

14'-9"

JJ

POINT START

GG

RCC SLAB & BEAM AS PER STRUCTURAL DRAWING

WALL - B

5'-4"

J

1'-4"

5'-612

4'-8"

H HH

FF

SUNKEN SLAB AS PER STRUCTURE

3"

2'-10"

GG

WALL HUNG WC AS PER VENDOR SPECIFICATION FLOORING TO BE FINISHED IN 596 MM X 596 MM DOVER ACERO TILES

1 2" DROP

LINTEL LVL

VENTILATOR V6 AS PER ARCHITECTURE DETAIL

1' SUNKEN

G

MATCH TO THE VANITY COUNTER TOP

ENDLESS BIANCO ENDLESS BIANCO RUNA NERO

WALL - B

4'

1' 6"

5'-4"

2'

1' SUNKEN

FFD WALL

2'-512"

TILE TYPE

WALL A

2'-014"

1'-6"

8'-8"

1'-2"

DETAIL A- HIGHLIGHT WALL TILING PLAN : BEDROOM-2 ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWINGTOILET(SIDHARTH'S) IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE. TYPICAL DETAIL C - SECTION FLOORING TILE WALL B WALL C

2'-3"

START POINT

2'-10"

1'-4"

8'-4"

F

9"

6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER ZZ

12" SUNKEN SLAB

5'11"X1' NICHE TO FINISHED IN DOVER ARENA TILE AS PER DETAIL

WALL - A

5'-1"

DATE

EE

1'-4"

POINT START

START POINT

EE

PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

5'-5"

WATERBODY PB1

4"

BB

VANITY COUNTER AS PER VENDOR SPECIFICATION

3"

WALL-A

DUCT-1

RESTAURANT PB1

2'

4"

WASH BASIN AS PER VENDOR SPECIFICATION

2'-3"

C-C

2'

ENTRANCE PORCH

MAIN ENTRANCE

SPOUT AS PER VENDOR

PLAN - MASTER SUITE

CW5

2'-5"

8'-4" 149'-1"

FLOORING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS GRIGIO TILES SUNKEN SLAB AS PER STRUCTURE

E

CW4 CW5

START POINT

3'-6"

8'-8"

CW3

2'

1/4"

APPLICATION

FIRST FLOOR FFL

VANITY COUNTER AS PER VENDOR SPECIFICATION

WALL - C

1'-9"

1'

NICHE TO BE FINISHED IN 6MM CORIAN

20MM

A

CW2

1'

3'-414

B55

CB4

W21

1'-812

HT OF THE VANITY COUNTER WILL DIFFER ACCORDING TO THE WASH BASIN DESIGN

6'-6" 3'-6"

3'-4"

2'-3"

REVISIONS PLASTER

2"

4"

WALL - D

2'-10"

7'-8"

SL. NO.

3'0"X1'0" NICHE TO FINISHED IN ENDLESS BIANCO TILE AS PER DETAIL

DW5

SPOUT AS PER VENDOR HIGHLIGHT WALLS A TO BE FINISHED IN (600MM X1200MM)RUNA NERO TILES AS PER SPECIFICATION

DD

TILE CENTER LINE

1 2" DROP

8'-4"

1'-8"

D

2'

3'-712 3'-614

(600MM X1200MM)RUNA NERO TILES AS REVISIONS DATE PER SPECIFICATION

WALL-C

3'-9"

WALL-B

3'-712

WALL-D START POINT

HIGHLIGHT WALLS A TO BE FINISHED IN

30-11-2021SL. NO.

5'-4"

C C CC WALL

START POINT

REVISIONS

E:\New folder\2182-Rama Raipur Villas_Image 03-club_swiming_pool-02.jpg

WASH BASIN AS PER VENDOR SPECIFICATION

C-C

MIRROR AS PER SPECIFICATION VENTILATOR AS PER SPECIFICATION MIXER AS PER VENDOR

10"

HIGHLIGHT WALL TO BE FINISHED IN 450MMX 900MM VERTEX IVORY TILES 6'-412

SHOWER CUBICLE AS PER DETAIL

POINT START START POINT

5'-614

BATH TUB AS PER SPECIFICATION

3'-9"

TOP OF THE WASH BASIN NOT MORE THAN THAT

1'-4"

1 2" DROP

512 3'

3'-614

7'-8"

7'-314

WALL-D START POINT

START POINT

12'

11'-512

9'-8"

BB

4"

MIXER AS PER VENDOR WASH BASIN AS PER VENDOR SPECIFICATION VANITY COUNTER AS PER VENDOR SPECIFICATION

2"

SL. NO.

E:\New folder\2182-Rama Raipur Villas_Image 08_Drop off-01.jpg

E:\New folder\2182-Rama Raipur Villas_Image 06_Club Waterbody-01.jpg

8" THK SLAB

LINTEL LVL

WALL DADOING TO BE FINISHED IN 316 MM X 900 MM DOVER ARENA TILES FLOORING TO BE FINISHED IN 596 MM X 596 MM DOVER ACERO TILES

114"

16" CINDER FILLING 8" THK SLAB

B74

6"

WALL HUNG WC AS PER VENDOR SPECIFICATION

WALL DADOING TO BE FINISHED IN (316MM X 900MM) DOVER ARENA TILES AS PER SPECIFICATION

START POINT

START POINT

1' SUNKEN

N

PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

4"

SHOWER CUBICLE AS PER SPECIFICATION

START POINT

4'-6"

1 2" DROP

6"x8" MS PERGOLA AT BEAM BOTTOM / RCC ROOF SLAB BOTTOM 8"x8" MS FRAME

MONIER TILES

W2

MIRROR AS PER SPECIFICATION

1' SUNKEN

B

SDW2

SHOWER CUBICLE AS PER DETAIL

GROUND FLOOR FFL

AA

2'-514" as per site C-C START POINT

1 2" DROP

6'-314

3'-5"

2'-3"

WALL-B

1'-6" 7'-2" 11'-512

8'-9"

10'-6"

12'-6"

35'-8" 13'

13'-6"

15'-9"

6"

SHOWER HEAD AS PER VENDOR

EQ

PB47

3'

DOOR D4 AS PER SPECIFICATION FLOORING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS GRIGIO TILES

6'-314

RCC SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - PAINT FINISH UNDERSIDE CANTILEVER - KERALA TILES

CANTILEVER STEEL SLOPED ROOF EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES

W36

4"

START POINT

SHOWER CUBICLE AS PER SPECIFICATION

A

5'11"X1' NICHE TO FINISHED IN DOVER ARENA TILE AS PER DETAIL 6" THK LEDGE WALL TO BE IN LEVEL WITH THE TOP OF THE COUNTER

POINT START START POINT

27'-10"

2'

1 2" DROP

DUCT-1

POINT START START POINT

2'

KK°

START POINT

START POINT

CENTRE-LINE FOR TILING PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

B

4"

EQ

START POINT

KK

WALL - A

8" THK SLAB

5"

SECTION HH

SUNKEN SLAB AS PER STRUCTURE

K

WALL B CENTER LINE

HEALTH SPA

1'-2"

FLOORING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS GRIGIO TILES

JJ B

4"

C

WALL HUNG WC AS PER VENDOR SPECIFICATION

W2

LINTEL LVL

PB1

PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

J

B132

LANDSCAPED COURT

WALL DADOING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS BIANCO TILES

H HH

3'-734

START POINT

8" THK SLAB

7'-514

WATERBODY

GG

W37

CENTER LINE

FILLING

WALL-A

G START POINT START POINT

POINT START

WALL DADOING TO BE FINISHED IN 600 MM X 1200 MM ENDLESS BIANCO TILES MIRROR AS PER SPECIFICATION VANITY COUNTER AS PER VENDOR SPECIFICATION WASH BASIN AS PER VENDOR SPECIFICATION SHOWER CUBICLE AS PER DETAIL 6" THK FULL HEIGHT SKIN WALL

W36

3'-314

1' SUNKEN 16" WALL CINDER A 8" THK SLAB B132

PLAN : BEDROOM-2 TOILET(SIDHARTH'S) CW11

FF

POINT START

GROUND FLOOR FFL

3'0"X1'0" NICHE TO FINISHED IN ENDLESS BIANCO TILE AS PER DETAIL

B142

F

START POINT

4'

SHOWER HEAD AS PER VENDOR 4" THK RANDOM RUBBLE HIGHLIGHT WALLS A TO BE FINISHED IN CLADDING (600MMSADARAHALLI X1200MM)RUNASTONE NERO TILES AS PER SPECIFICATION

B153

EE

START POINT

1 2" DROP

RCC SLOPED ROOF BIANCO TILES EXPOSED SIDE -WASH MONIER TILES BASIN AS PER UNDERSIDE - PAINT FINISH VENDOR SPECIFICATION RAILING GLASS VANITY TO COUNTER AS PER VENDOR SPECIFICATION DETAIL CANTILEVER SHOWER CUBICLE AS PER STEEL SLOPED ROOF SPECIFICATION EXPOSED SIDE - MONIER TILES UNDERSIDE - KERALA TILES IN FLOORING TO BE FINISHED 600 MM X 1200 MM ENDLESS 6"x8" MS PERGOLA AT BEAM BOTTOM / GRIGIO TILES RCC ROOF SLAB BOTTOM

WALL-C

14'-4" ht COMPOUND WALL

3' 1'-6"

E

PROVISION OF COVE LIGHTING IN THE FALSE CEILING AS PER DETAIL

START POINT

START POINT

C-C

DD

START POINT

600 MM X 1200 MM ENDLESS

C-C

START POINT

D START POINT

ZZ RCC SLAB & BEAM AS PER STRUCTURAL DRAWING

POINT START

PT SLAB WALL HUNG AS PER VENDOR EXPOSED SIDEWC - THERMOTILE SPECIFICATION UNDERSIDE -PAINT FINISH 2"X6" WOODEN RAFTERS WALL DADOING TO BE FINISHED IN

C-C 5'-314

2'

CC

4"

START POINT

C:\Users\Shantanu\Desktop\5.jpg

C

LINTEL LVL

START POINT

C:\Users\Shantanu\Desktop\3.jpg

BB

START POINT

C:\Users\Shantanu\Desktop\2.jpg

C:\Users\Shantanu\Desktop\1.jpg

B

6"

AA 6" THK FULL HEIGHT SKIN WALL

START POINT

A

WALL-A

4"

7'-514

POINT START START POINT

SECTION GG

R

YY

QQ°

SL. NO.

REVISIONS

KEY

PART PLAN- GROUND FLOOR-ENTRANCE STAIRCASE

30-11-2021SL. NO.

REVISIONS

DATE

SL. NO.

REVISIONS

CLUBHOUSE KITCHEN ENTRANCE STEPS DETAIL

PLAN

DATE

CLIENT

MR.RAJEEV AGRAWAL PROJECT

PROPOSE VILLA DEVELOPMENT-RAIPUR

DRAWING STATUS

EXICUTION REVISION NO.

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.

DRAWN BY

DRAWING TITLE

STEPS DETAIL DATE

30-11-2021

DWG. NO.

CODE

--

NORTH

A

Q° CLUBHOUSE MAIN ENTRANCE STEPS DETAIL

PART PLAN- GROUND FLOOR-KITCHEN ENTRANCE STAIRCASE

KEY

PLAN

DEALT BY

--

SCALE

1/8"=1'

THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.

SL. NO.

REVISIONS

30-11-2021SL. NO.

REVISIONS

DATE

SL. NO.

REVISIONS

DATE

CLIENT

SIDHARTH BHATIA PROJECT

RESIDENCE,BANGALORE

DRAWING STATUS

TENDER - ADVANCE COPY REVISION NO.

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.

DRAWN BY

DRAWING TITLE

TOILET DETAILS DATE

21-09-18

DWG. NO.

CODE

--

NORTH

DEALT BY

--

SCALE

1/8"=1'

THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.


TC

EQ

V1 3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

EQ

M

M

L

L K J H

B'

MIDLANDING 1 +7'6" FFL

DUCT

8"

C

1

D2

EQ

9

10

11

E SL OP N AI DR R WA TE

1'-5

RAIN WATER

8"

1'-4

1'-10

5'-9

1'-10

1'-10

1'-10 1'-10

9' WIDE PASSAGE 1'-10 1'-10

1'-10

1'-10

1'-10

2537.5 SQ.FT

TO BE CONFIRMED BY THE ARCHITECT

VITRIFIED TILES- AS PER SELECTION

538.64 SQ.FT

VITRIFIED TILES- AS PER SELECTION

538.64 SQ.FT

1588.23 SQ.FT

ENGINEERED WOODEN FLOORING

1588.23 SQ.FT

RIVER FINISH KOTA

1399.5 SQ.FT

RIVER FINISH KOTA

1399.5 SQ.FT

RIVER FINISH KOTA

1399.5 SQ.FT

TILES AS PER SPECIFICATION (KITCHEN AND STORE- ENDLESS BEIGE 2'X2' TOILET TILES AS PER SELECTION)

461.5 SQ.FT

TILES AS PER SPECIFICATION (KITCHEN AND STORE- ENDLESS BEIGE 2'X2' TOILET TILES AS PER SELECTION)

461.5 SQ.FT

TILES AS PER SPECIFICATION (KITCHEN AND STORE- ENDLESS BEIGE 2'X2' TOILET TILES AS PER SELECTION)

461.5 SQ.FT

CHINESE MOSAIC

1065 SQ.FT

CHINESE MOSAIC

1065 SQ.FT

CHINESE MOSAIC

1065 SQ.FT

FIRST FLOOR - FLOORING FINISHES

TERRACE FLOOR - FLOORING FINISHES

TC

V4

B

(MASTER BEDROOM)

12'10"X9'4"

FC

FC

TC

12'10"X9'4"

TC

TC

TC

FC

FC

LEGEND RIVER FINISH KOTA 22.5" x 22.5"

NOTE: FLOORING AT THE LANDSCAPE AREA CAN FOLLOW THE LANDSCAPE CONSULTANT'S FLOORING PATTERN WITH RIVER FINISH KOTA

888 SQ.FT

FIRST FLOOR - FLOORING FINISHES

W1 W3 SW1 SW2 DW1 DW2 CW1 CW2

OPENABLE WINDOW + CORNER FIXED WINDOW

CW3 CW4 CW5 CW6

OPENABLE WINDOW + CORNER FIXED WINDOW

2+3+0 1+0+0

7'-0"

1+0+0

0'-0"

7'-6"

0+0+1

SD1 SLIDING DOOR SD2 SLIDING DOOR SD3 SLIDING DOOR SD4 SLIDING DOOR SFD1 SLIDING FOLDING DOOR

VARIES

8'-0"

8'-0"

0'-0"

7+6+0

8'-0"

1+1+0

DECK

8'-8"

BEDROOM 2

7'-0"

8'-0"

0'-0"

8'-0"

0+1+0

DINING

9'-4"

8'-0"

0'-0"

8'-0"

1+0+0

PUJA ROOM

9'-0"

8'-0"

0'-0"

8'-0"

1+0+0

8'-0"

0'-0"

8'-0"

1+0+0

OPENABLE WINDOW

MASTER BEDROOM

FIXED WINDOW

STAIRCASE

SLIDING WINDOW

KITCHEN

SLIDING WINDOW

RIVER FINISH KOTA 22.5" x 22.5"

888 SQ.FT

8" HT BUND WALL

UP

5'5"X8'0"

D3

TOILET

UP

UP

DB access

DUCT

GUEST BEDROOM 16'X14'0"

TC D3

TOILET -1 8'6" X 8'0"

MIDLANDING 1 UP

DB access

DUCT

TERRACE 15'7"X14'0"

PASSAGE BELOW

15'0"X6'9"

LANDSCAPE GARDEN

WALK IN CLOSET 8'0"X11'4"

HEAD ROOM 5'0" x 8'0"

41 42 43 44 45

LIFT 5'2"X5'2"

4' WIDE PASSAGE

33

32

31 30

29 28 27 26 25

24 23

OHT 8'2"X8'0"

DUCT

ELECTRICAL SHAFT

DB access

DUCT CHAJJA PROJECTION ABOVE

8" HT BUND WALL

D3

3' HT RAILING 8" HT BUND WALL

TERRACE 24'6" X 29'8"

D3 D2

TC

D2

TC

TC

SD1

BEDROOM 2 15'0"X18'0"

SD3

TOILET

(PARENTS BEDROOM)

40

D6

V1

(BEDROOM -2)

TC

LIVING 15'8"X18'0"

36 37 38 39

15'0"X6'9"

CW4 CW2

TOILET -1 8'6" X 8'0"

34 35

TERRACE 15'7"X14'0"

WALK IN CLOSET

(BEDROOM -2)

DN MID LANDING 2

DUCT

DW2

D3

V6

D3

ELECTRICAL SHAFT

PASSAGE BELOW

15'0"X6'9"

V2

WALK IN CLOSET

W3

WALK IN CLOSET - 1 5'11" X 8'0"

TOILET

(BEDROOM-2)

DW2

D3

LIFT 5'2"X5'2"

DN

W3

DUCT

V1

TOILET

(BEDROOM-2)

V2 V6

D3

WALK IN CLOSET - 1 5'11" X 8'0"

ELECTRICAL SHAFT

V1

D3

D2

MIDLANDING 1

(GUEST BEDROOM)

9'0"X8'0"

ELECTRICAL SHAFT

DB access

CUT-OUT IN SLAB ABOVE

DECK 9'0"X14'0"

CHAJJA PROJECTION ABOVE

D2 D3

LIFT 5'2"X5'2"

DN

W3

3' HT RAILING

TERRACE 29'5" X 12'1"

TERRACE BELOW FAMILY AREA 14'10"X15'0"

TERRACE 15'8"X15'8"

TC D2

TC DUCT

TC

D2

TC

W1

MASTER BEDROOM 20'9"X18'0"

D2

TC

TC

SD1

BEDROOM 2 15'0"X18'0"

SD3

W1

MASTER BEDROOM 20'9"X18'0"

(PARENTS BEDROOM)

D3

8'0"X11'4"

V5

DECK 9'8"x18'0"

TC

DECK 9'8"x18'0"

TC

SLOPE DOWN

D3

3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

TC

D2

PARENT'S BEDROOM 16'6"X16'0"

F

D3

TC

E

3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

D3

CW6

TC

TC

WALK IN CLOSET

D3

TC

(MASTER BEDROOM)

TOILET

12'10"X9'4"

(MASTER BEDROOM)

(MASTER BEDROOM)

TC

WALK IN CLOSET (MASTER BEDROOM)

12'10"X9'4"

TC

12'10"X9'4"

CV1

TC

CW5

D3

TOILET

TC

12'10"X9'4"

MD

PARKING 21'7"X26'5"

CW1

CW6

TC

DUCT

UP

INFORMAL LIVING 15'0"X9'4"

A'

TC

CW1

CV1

TC

SD1

ENTRANCE VERANDAH 15'0"X5'0"

12" X 12" TERRACOTTA TILES ON EXTERIOR SIDE OF SLOPING ROOF

DECK 17'2"X6'0"

UP

LANDSCAPE GARDEN UP

TC

LEGEND

D

TC

TC

TC

TC

TC

TC

TC

TC

TC

TC

MAIN ENTRY

PARKING ENTRY

FIRST FLOOR- UNDERSIDE ROOF FINISH - ROCK CANYON

FIRST FLOOR- UNDERSIDE ROOF FINISH - IPE WOOD

ROCK CANYON PAINT 8463

TERRACE FLOOR- ROOF FINISH

PAINT FINISH

GROUND FLOOR- UNDERSIDE ROOF FINISH

WOODEN CLADDING

FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL

12'10"X9'4"

TC

FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL

FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL

FIRST FLOOR - ROOF UNDERSIDE FINISHES

TERRACE FLOOR - ROOF FINISHES

C

G'

ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)

TILES AS PER SELECTION

TERRACOTTA TILES - 12" X 12"

GROUND FLOOR - ROOF UNDERSIDE FINISHES

(MASTER BEDROOM)

UNDERSIDE ROOF FINISHES

ROOF PROJECTION ABOVE

B SKYLIGHT TO DETAIL SANDSTONE CLADDING

RAI

DRA

IN SLO

E WA TE IN RA

TC

V4 LVL 37'-11"

LVL 28'-3"

11'

SD3

CW1

D4

SERVANT'S TOILET 4'6"X6'6"

PUJA 9'0"X3'10"

LVL 16'-5"

CW6

13

14

15

16

1

2

3

4

5

6

7

8"

E'

9

10

11

A

TC

12

13

14

15

LVL -16'-5"

SD4

FAMILY ROOM

FIXED WINDOW + SLIDING DOOR

FAMILY ROOM

5'-6"

3'-0"

2'-6"

23'6"

2'-0"

3'-6"

5'-6"

8'-0"

8'-0"

0+1+0

CW7

1

V1 V2 V3 V4 V5 V6 V7 CV1

MIDLANDING-1 BEAM BOTTOM

4'-6"

10'-0"

8'-0"

2'-6"

1+0+0

8'-0"

0+1+0

8'-0"

0+1+0

8'-0"

0+1+0

15'-0" - (7'-0" + 8'-0")

5'-6" + 8'-0"

2'-6" + 0'-0"

FIXED WINDOW + SLIDING DOOR + FIXED WINDOW

TERRACE

14'-0"-(3'-6"+ 7'-0"+ 3'-6")

5'-6" + 8'-0"

2'-6" + 0'-0"

BEDROOM 2

15'8"-(5'-8" + 4'-0" + 6'-0")

5'-6"

2'-6"

8'-0"

0+1+0

LIVING ROOM

15'2"-(4'-4" + 4'-6" + 6'-4")

7'-0"

1'-0"

8'-0"

1+0+0

BEDROOM 1

13'7"-(4'-4" + 4'-0" + 5'-3")

5'-6"

2'-6"

8'-0"

0+1+0

GUEST BEDROOM

13'3"-(4'-4" + 4'-8" + 4'-3")

7'-0" 7'-0"

1'-0" 1'-0"

8'-0" 8'-0"

1+0+0

5'-6"

2'-6"

8'-0"

0+1+0

OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW

PARENT'S BEDROOM 11'10"-(2'-4"+ 3'-4"+ 6'-2") MASTER BEDROOM 10'11"-(2'-4"+ 4'-4"+ 4'-3")

3'-10"

4'-6"

2'-4" 1'-4" 2'-2" 2'-10"

11'-2"

14'-8"

8'-10"

3'-2"

6'-8"

5'-8"

4'-4"

ELEVATION A (WEST SIDE)

16'-5"

7'-10"

99'-4" R

16

Q

P

N

M

L K

J

6'-1"

5'-8"

3'

1'

6'

5'

4'-8"

4'-9"

1'-1"

69'-4"

H

G

F

E

D

C

B

A

1

2

3

4

5

6

7

8"

9

10

11

3'-4"

CW4

8'

4'-3"

12

5'-6"

D5

13

14

15

16

D3

D2

CLOSET

TC

(GUEST BEDROOM)

5'5"X8'0"

D3

SLIDING WINDOW + CORNER FIXED WINDOW

22'-3" - (6'-8" + 3'-10" + 11'-9" )

DINING VARIES

TOP HUNG VENTILATOR

3'-0"

TOILET - BEDROOM 2

TOP HUNG VENTILATOR

HEIGHT

WIDTH

ITEM

SILL HT. LINTEL HT. NO

7'-0"

1'-0"

3'-0"

5'-0"

8'-0"

1+0+0 0+1+0

2'-0"

6'-0"

8'-0"

2'-0"

5'-0"

7'-0"

1+0+0

SERVANT'S ROOM

10'-9"

2'-0"

6'-0"

8'-0"

1+0+0

TOILET(PARENT'S BEDROOM) WALK - IN CLOSET

7'-4"( 2'-0" + 5'4")

2'-0"

6'-0"

8'-0"

1+0+0

2'-0"

6'-0"

8'-0"

0+1+0

2'-0"

6'-0"

8'-0"

1+0+0

2'-0"

6'-0"

8'-0"

0+1+0

POWDER ROOM

TOP HUNG VENTILATOR

TOP HUNG + FIXED VENTILATOR

SERVANT'S TOILET

(BEDROOM 2)

2'-0" 4'-6" (2'-0"+2'-6")

OPENABLE + CORNER FIXED VENTILATOR

TOILET (MASTER BEDROOM)

13'-0" (2'-0" + 4'-0" + 7'0")

MD D1 D2 D3 D4 D5 D6

1+1+0

8'-0"

2'-0" 2'-0"

LOUVRED VENTILATOR OPENABLE + TOP HUNG VENTILATOR FIXED VENTILATOR

DESCRIPTION MAIN DOOR (OPENABLE DOOR + FIXED WINDOW)

WIDTH

INFORMAL LIVING

15' - (4'-4"+10'-8")

DOOR

KITCHEN

DOOR DOOR

8'-0"

3'-6" 3'-0"

0'-0"

8'-0"

4'-0"

VARIES VARIES

SILL HT. LINTEL HT. NO 0'-0"

8'-0"

0'-0"

8'-0" 8'-0" 8'-0"

W1

OPENABLE WINDOW + CORNER FIXED WINDOW

CW3 CW4 CW5 CW6

OPENABLE WINDOW + CORNER FIXED WINDOW

8'-0"

1+0+0

7'-0"

0'-0"

7'-0"

1+0+0

3'-0"

7'-6"

0'-0"

7'-6"

0+0+1

VARIES

8'-0"

LOCATION

W3 SW1 SW2 DW1 DW2 CW1 CW2

2+3+0

8'-0"

0'-0"

2'-9"

TERRACE STAIRCASE

SERVANT'S TOILET

DESCRIPTION

1+0+0

0'-0"

8'-0"

POWDER ROOM

DOOR

DOOR

ITEM

1+0+0

8'-0"

2'-6"

DOOR

SD1 SLIDING DOOR SD2 SLIDING DOOR SD3 SLIDING DOOR SD4 SLIDING DOOR SFD1 SLIDING FOLDING DOOR

1+0+0

HEIGHT

LOCATION

7+6+0

8'-0"

0'-0"

8'-0"

1+1+0

8'-0"

0'-0"

8'-0"

1+0+0

DECK

8'-8"

BEDROOM 2

7'-0"

8'-0"

0'-0"

8'-0"

0+1+0

DINING

9'-4"

8'-0"

0'-0"

8'-0"

1+0+0

PUJA ROOM

9'-0"

8'-0"

0'-0"

8'-0"

1+0+0

OPENABLE WINDOW

WIDTH

MASTER BEDROOM

FIXED WINDOW

FAMILY ROOM

FIXED WINDOW + SLIDING DOOR

FAMILY ROOM

23'6"

2'-0"

KITCHEN

SLIDING WINDOW

SILL HT. LINTEL HT. NO

5'-6"

3'-0"

STAIRCASE

SLIDING WINDOW

HEIGHT

2'-6" 3'-6"

5'-6"

8'-0"

8'-0"

0+1+0

CW7

1

V1 V2 V3 V4 V5 V6 V7 CV1

MIDLANDING-1 BEAM BOTTOM

4'-6"

10'-0"

8'-0"

2'-6"

1+0+0

8'-0"

0+1+0

8'-0"

0+1+0

8'-0"

0+1+0

15'-0" - (7'-0" + 8'-0")

5'-6" + 8'-0"

2'-6" + 0'-0"

FIXED WINDOW + SLIDING DOOR + FIXED WINDOW

TERRACE

14'-0"-(3'-6"+ 7'-0"+ 3'-6")

5'-6" + 8'-0"

2'-6" + 0'-0"

SLIDING WINDOW + CORNER FIXED WINDOW

BEDROOM 2

15'8"-(5'-8" + 4'-0" + 6'-0")

5'-6"

2'-6"

8'-0"

0+1+0

LIVING ROOM

15'2"-(4'-4" + 4'-6" + 6'-4")

7'-0"

1'-0"

8'-0"

1+0+0

BEDROOM 1

13'7"-(4'-4" + 4'-0" + 5'-3")

5'-6"

2'-6"

8'-0"

0+1+0

GUEST BEDROOM

13'3"-(4'-4" + 4'-8" + 4'-3")

7'-0" 7'-0"

1'-0" 1'-0"

8'-0" 8'-0"

1+0+0

5'-6"

2'-6"

8'-0"

0+1+0

OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW OPENABLE WINDOW + CORNER FIXED WINDOW

PARENT'S BEDROOM 11'10"-(2'-4"+ 3'-4"+ 6'-2") MASTER BEDROOM 10'11"-(2'-4"+ 4'-4"+ 4'-3")

ITEM

DESCRIPTION

LOCATION

SLIDING WINDOW + CORNER FIXED WINDOW

22'-3" - (6'-8" + 3'-10" + 11'-9" )

DINING VARIES

TOP HUNG VENTILATOR

3'-0"

TOILET - BEDROOM 2

TOP HUNG VENTILATOR

POWDER ROOM

TOP HUNG VENTILATOR

HEIGHT

WIDTH

SILL HT. LINTEL HT. NO

7'-0"

1'-0"

3'-0"

5'-0"

8'-0"

1+0+0

UP

DB access

DUCT

GUEST BEDROOM 16'X14'0" V2

6'-0"

8'-0"

2'-0"

5'-0"

7'-0"

1+0+0

8'-0"

1+0+0

8'-0"

1+0+0

10'-9"

2'-0"

6'-0"

7'-4"( 2'-0" + 5'4")

2'-0"

6'-0"

2'-0"

6'-0"

8'-0"

0+1+0

2'-0"

6'-0"

8'-0"

1+0+0

2'-0"

6'-0"

8'-0"

0+1+0

TOP HUNG + FIXED VENTILATOR

SERVANT'S TOILET

(BEDROOM 2)

OPENABLE + CORNER FIXED VENTILATOR

TOILET (MASTER BEDROOM)

13'-0" (2'-0" + 4'-0" + 7'0")

(BEDROOM -2)

LVL 15'-3"

LANDSCAPE GARDEN

CW4

D3 TC

LIVING 15'8"X18'0"

WALK IN CLOSET

" GROUT JOINT LVL 14'-3"

LVL 10'-0"

LVL 10'-0"

LVL 10'-0"

3'-2"

5'-6"

15

4'-3"

14

LEGEND

8'

13

3'-4"

12

4'-9"

1'-1"

CW7

4'-8"

9

5'

8"

6'

3'

6

V5

4

6'-1"

3

N

D

TC

16'-5"

A

1

LEGEND

5'-8"

B

6'-8"

4'-4"

C

D

3'-2"

E

8'-10"

F

14'-8"

G

2'-10"

H

2'-2"

J

1'-4"

K L

2'-4"

4'-6"

11'-2"

M

N

1'-3"

Q

TC

REVISIONS

DATE

SL. NO.

REVISIONS

DATE

CLIENT

DRAWING STATUS

MR.RAJEEV AGRAWAL

DRAWN BY

DRAWING TITLE

EXICUTION

PROJECT

DATE

REVISION NO.

PROPOSE VILLA DEVELOPMENT-RAIPUR

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.

--

LANDSCAPE GARDEN UP

TC

3 4

SL. NO.

REVISIONS

30-11-2021SL. NO.

REVISIONS

DATE

SL. NO.

REVISIONS

DATE

1/8"=1'

2"

3 4 OUT

TC

TC

TC

TC

LEGEND

LEGEND ROCK CANYON PAINT 8463 SANDSTONE CLADDING

UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH

ROCK CANYON PAINT 8463

FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL

SANDSTONE CLADDING

FIRST FLOOR - WALL FINISHES

WALL FINISHES CLIENT

DRAWING STATUS

MR.RAJEEV AGRAWAL

FINISHES

REVISION NO.

PROPOSE VILLA DEVELOPMENT-RAIPUR

DRAWN BY

DRAWING TITLE

EXICUTION

PROJECT

THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.

8" IN

COPING DETAIL FOR COMPOUND WALL

GROUND FLOOR - WALL FINISHES

UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH

SCALE

NORTH

CODE

TC

MAIN ENTRY

PARKING ENTRY

FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCH UP MODEL

A KEY PLAN - GROUND FLOOR PLAN

DEALT BY

--

DWG. NO.

30-11-2021

12'10"X9'4"

UP

WOODEN CLADDING

UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH

30-11-2021SL. NO.

(MASTER BEDROOM)

DECK 17'2"X6'0"

B

C

JODHPUR SANDSTONE CLADDING - 6'X2'

FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCHUP MODEL

UNLESS SPECIFIED, ALL THE OTHER WALL SURFACES ARE PLAIN WHITE PAINT FINISH

TC

WALK IN CLOSET

TOILET

12'10"X9'4"

CV1

TC

CW5 SD1

ENTRANCE VERANDAH 15'0"X5'0"

TERRACOTTA TILES - 12" X 12"

A KEY PLAN - GROUND FLOOR PLAN

D3

(MASTER BEDROOM)

MD

PARKING 21'7"X26'5"

MS SECTIONS COATED WITH CHOCOLATE BROWN PAINT FINISH

WOODEN CLADDING

CW6 D3

11'-5"

2'-7"

P

ELEVATION DETAIL FOR JODHPUR SANDSTONE CLADDING

ROCK CANYON PAINT 8463

B

C

JODHPUR SANDSTONE CLADDING - 6'X2'

TERRACOTTA TILES - 12" X 12"

CW1

INFORMAL LIVING 15'0"X9'4"

ELEVATION B (SOUTH SIDE)

7'-10"

2

MS SECTIONS COATED WITH CHOCOLATE BROWN PAINT FINISH

REVISIONS

W1

DECK 9'8"x18'0"

TC

TC

N

D

5'-8"

1'

5

FOR FURTHER CLARITY PLEASE REFER THE 3D SKETCHUP MODEL

SL. NO.

SD1

MASTER BEDROOM 20'9"X18'0"

DUCT

UP

99'-4"

7

ELEVATION DETAIL FOR JODHPUR SANDSTONE CLADDING

ROCK CANYON PAINT 8463

8'0"X11'4"

PARENT'S BEDROOM 16'6"X16'0" LVL 0'-0"

LVL 14'-3"

LVL 31'-5"

69'-4"

10

TC

TC

D2 SD4

11

D2

BEDROOM 2 15'0"X18'0"

(PARENTS BEDROOM)

D3

LVL 15'-3"

LVL 14'-7"

16

8'0"X11'4"

D2

TC

SD3

TOILET

(PARENTS BEDROOM)

D3

LVL 11'-5"

SW1

ELEVATION D (EAST SIDE)

V1

WALK IN CLOSET 15'0"X6'9"

LVL 16'-9"

D3

1+0+0

DUCT

TOILET -1 8'6" X 8'0"

D3

DW2

D3

V6

WALK IN CLOSET - 1 5'11" X 8'0"

TERRACE 15'7"X14'0"

PASSAGE BELOW

15'0"X6'9"

CUT-OUT IN SLAB ABOVE

ELECTRICAL SHAFT

TOILET

(BEDROOM-2)

SD2

LVL 30'-11"

SW2

LVL 11'-5"

0+1+0

2'-0"

2'-0"

SERVANT'S ROOM TOILET(PARENT'S BEDROOM) WALK - IN CLOSET

2'-0" 4'-6" (2'-0"+2'-6")

CW3

1+1+0

8'-0"

2'-0"

LOUVRED VENTILATOR OPENABLE + TOP HUNG VENTILATOR FIXED VENTILATOR

LIFT 5'2"X5'2"

DN

MIDLANDING 1 UP

V1

D3

D2

W3

DUCT

TOILET

(GUEST BEDROOM)

9'0"X8'0"

ELECTRICAL SHAFT

DB access

DECK 9'0"X14'0"

FAMILY AREA 14'10"X15'0"

TERRACE 15'8"X15'8"

TC

STORE 5'0"X7'4"

D3

LIFT 5'2"X5'2" UP

10

DW1

D3 D1

DN

POWDER ROOM 4'6"X8'0"

3'-2"

DUCT

3'

LOCATION

TC

BEDROOM 1 14'11"X18'10"

MS

UTILITY YARD 8'0"X10'9"

LVL 66'-1" CW5

LVL 12'-7"

V3

11'-5"

LVL 30'-11"

DESCRIPTION

TC CW3

TC

DB access

DINING 21'9"X15'0"

LVL 45'-1"

SD1 MD

CW2

CW7

LVL 6'-6"

ELEVATION C (NORTH SIDE)

F'

9' WIDE PASSAGE

TC

A

CW7

LVL -16'-5"

SD2

LVL 59'-4"

TC

TC

FC

SW2

TC V7

KITCHEN 20'9"X18'10"

FC

TC

D3

SFD1

" GROUT JOINT

LVL 26'-5"

CW1

LVL 0'-0"

LVL 28'-3"

TC

A

TC

SERVANT'S ROOM 9'4"X6'6"

SW1

LVL 45'-1"

LVL 28'-3"

30'

DW1

DECK 10'0"X14'7"

LANDSCAPE GARDEN LVL 26'-5"

LVL 22'-3"

CV1

A

TC

TC

TC

TC

3'

SL OP DR

AI

N

CHAJJA PROJECTION ABOVE ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

V4

12

SLIDING WINDOW + CORNER FIXED WINDOW

PAINT FINISH

TERRACOTTA TILES - 12" X 12"

DW1

FAMILY AREA 14'10"X15'0"

TERRACE 15'8"X15'8"

TC

STORE 5'0"X7'4"

CLOSET

(GUEST BEDROOM)

R

1+0+0 1+0+0

8'-0" 8'-0"

0'-0"

7'-6"

ROCK CANYON PAINT 8463

WOODEN CLADDING

TC

BEDROOM 1 14'11"X18'10"

MS

9' WIDE PASSAGE

8'-0" 8'-0" 8'-0"

0'-0" 0'-0"

7'-0"

LEGEND

PE

3'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)

ITEM

REAPER BACKING AT REGUALR INTERVALS

DETAIL THROUGH SECTION BB TYPICAL ROOF CLADDING DETAIL

TERRACOTTA TILES - 12" X 12"

LEGEND

LVL 12'-7"

SILL HT. LINTEL HT. NO

ROOF SLAB AS PER STRUCTURAL DETAIL

1"X1/2" SOLID

WOOD BEADING 1" 2 34MM X 25MM THK BATTEN/

PAINT FINISH WOODEN CLADDING

TC

TC

SW2

TC TC

DW1

D3

D3

LIFT 5'2"X5'2"

11'

0'-0" 0'-0" 0'-0"

8'-0" 8'-0"

2'-9" 3'-0"

HEIGHT

EQ

TC CW3

TC

BEDROOM 1 14'11"X18'10"

MS

30'

8'-0" 8'-0" 8'-0"

2'-6"

TERRACE STAIRCASE

WIDTH

1"X1/2" SOLID WOOD BEADING RECESSED BY FROM EDGE OF ROOF

TC

EQ

IPE WOOD WALL CLADDING AS PER APRROVED SPECIFICATIONS

ROCK CANYON PAINT 8463

34MM X 25MM THK BATTEN/ REAPER BACKING AT REGULAR INTERVALS 1"X1/2" SOLID WOOD BEADING

TC

11'

3'-0"

POWDER ROOM

DOOR

SERVANT'S TOILET

LOCATION

EQ

B

LEGEND

IPE WOOD WALL CLADDING AS PER APRROVED SPECIFICATIONS

DETAIL THROUGH SECTION AA REFER PART PLAN

TC

TC

2'

3'-6"

DOOR

DOOR

DESCRIPTION

EQ

EDGE DETAILS FOR IPE WOOD CLADDING AT MASTER BEDROOM SLOPING ROOF

TC

TC

TC

TC CW3

TC

6'

4'-0"

VARIES VARIES

ITEM

EQ

ROOF SLAB AS PER STRUCTURAL DETAIL

SD1

NOTE: FLOORING AT THE LANDSCAPE AREA CAN FOLLOW THE LANDSCAPE CONSULTANT'S FLOORING PATTERN WITH RIVER FINISH KOTA

TC

SW2

TC V7

D1

DN

10

11'

15' - (4'-4"+10'-8")

KITCHEN

SILL HT. LINTEL HT. NO

EQ

PAINT FINISH BASE WHITE-ASIAN PAINTS

DECK 17'2"X6'0"

UTILITY YARD 8'0"X10'9"

D5

POWDER ROOM 4'6"X8'0"

G

30'

INFORMAL LIVING

DOOR DOOR DOOR

HEIGHT

EQ

TC

MAIN ENTRY

GROUND FLOOR - FLOORING FINISHES

TC

TC

TC

TC

D3

DB access

DINING 21'9"X15'0"

V3

11'

MAIN DOOR (OPENABLE DOOR + FIXED WINDOW)

WIDTH

EQ

D4

SERVANT'S TOILET 4'6"X6'6"

SW1

KITCHEN 20'9"X18'10"

2'

MD D1 D2 D3 D4 D5 D6

LOCATION

EQ

SERVANT'S ROOM 9'4"X6'6"

DECK 10'0"X14'7"

PUJA 9'0"X3'10"

PATHWAY

DESCRIPTION

EQ

WALK IN CLOSET

CW2

ITEM

12'10"X9'4"

12'10"X9'4"

B

KOTA FLOORING PATTERNS

LANDSCAPE GARDEN

KOTA COPING

F'

TC

(MASTER BEDROOM)

TOILET

(MASTER BEDROOM)

ROOF PROJECTION ABOVE

PART PLAN (FIRST FLOOR)- BATTENS FRAMEWORK MASTER BEDROOM

CV1

TC

CW5

PARKING ENTRY

FLOORING FINISHES

B'

FC

RA

2537.5 SQ.FT

TO BE CONFIRMED BY THE ARCHITECT

ENGINEERED WOODEN FLOORING

11'

A

9' WIDE PASSAGE

9' WIDE PASSAGE

GROUND FLOOR - FLOORING FINISHES

2537.5 SQ.FT 538.64 SQ.FT 1588.23 SQ.FT

WALK IN CLOSET

12'10"X9'4"

ER

D3

34MM X 25MM THK BATTEN/ REAPER BACKING AT REGULAR INTERVALS

B

WALK IN CLOSET C

TC

B

1'-10

TC

15'0"X6'9"

CW6

N WAT

12'10"X9'4"

LANDSCAPE GARDEN

SD2

FC

D3

TOILET

CV1

D3

A

A

D

TC

(MASTER BEDROOM)

12'10"X9'4"

UP

VITRIFIED TILES- AS PER SELECTION

A

A

PART PLAN (FIRST FLOOR) MASTER BEDROOM

UP

ENGINEERED WOODEN FLOORING

1"X1/2" SOLID WOOD BEADING 34MM X 25MM THK BATTEN/ REAPER BACKING AT REGULAR INTERVALS

TC

WALK IN CLOSET TOILET

(MASTER BEDROOM)

B

MD

1'-10

16

1'-10"

TC

D

C

TOILET

LEGEND

15

1'-10"

TC

TC

LEGEND

14

B

W1

CW6

(MASTER BEDROOM)

ENTRANCE VERANDAH 15'0"X5'0"

TC

13

1'-6

EQ

PARKING 21'7"X26'5"

TC

TC

LEGEND

E

A

A

TC

1'-10

1'-3"

SD1

W1

TC

(MASTER BEDROOM)

TC

SD1

MASTER BEDROOM 20'9"X18'0"

TC

DECK 17'2"X6'0"

MAIN ENTRY

12

F

A

A

TC

TC

CW1

INFORMAL LIVING 15'0"X9'4"

SFD1

EQ

D3

D2

DECK 9'8"x18'0"

TC

DUCT

UP

SD4

SD1

PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL

PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL

SLOPE

IN

B

12'10"X9'4"

11

TC

TC

TC

12'10"X9'4"

10

1'-10"

MASTER BEDROOM 20'9"X18'0"

F E

1'-3"

DRAIN SLOPE

TOILET

(MASTER BEDROOM)

9

1'-10"

H

3" THK BOXING PROJECTION ALL THREE SIDES POLISHED CEMENT FINISH

TC

SLOPE

CC

BEDROOM 2 15'0"X18'0"

SD3

8'0"X11'4"

V5

8"

G

V1

ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)

EQ

7"

(PARENTS BEDROOM)

D3

PARENT'S BEDROOM 16'6"X16'0"

CV1

TC

CW5

MASTER BEDROOM 20'9"X18'0"

EQ

8'0"X11'4"

D2

TC 1'-10

TOILET

(PARENTS BEDROOM)

16

L K

TC

TC

TERRACE 15'7"X14'0"

D3 TC

WALK IN CLOSET

15

TC

1'-10

D2

TC

14

DW2

D3

CW4

LIVING 15'8"X18'0"

TC

WALK IN CLOSET (MASTER BEDROOM)

13

J

TILES AS PER SELECTION

RIVER FINISH KOTA STONE

RAIN WATER DRAIN

D3

12

TC

MASTER BEDROOM 20'9"X18'0"

D3

TC

M

PASSAGE BELOW

15'0"X6'9"

G

WALK IN CLOSET 15'0"X6'9"

CW2

CW6 D3

11

DUCT

TOILET -1 8'6" X 8'0"

D3

V1

TOILET

(BEDROOM-2)

V2 V6

TC

CW1

DUCT

D2

ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)

G

MASTER BEDROOM 20'9"X18'0"

DECK 9'8"x18'0"

TC

SLOPE DOWN

ENTRANCE VERANDAH 15'0"X5'0"

GUEST BEDROOM 16'X14'0"

10

1'-10

WALK IN CLOSET - 1 5'11" X 8'0"

ELECTRICAL SHAFT

DB access

LANDSCAPE GARDEN

W1

LANDSCAPE GARDEN

C'

RIVER FINISH KOTA STONE

BEDROOM 2 15'0"X18'0"

SD3

SD1

1'-10

9' WIDE PASSAGE

DRAIN SLOPE RAIN WATER

V5

MD

PARKING ENTRY

UP

DUCT

9

D3

V1

CUT-OUT IN SLAB ABOVE

DECK 9'0"X14'0"

CC

8"

D2

LIFT 5'2"X5'2"

DN

MIDLANDING 1 UP

9'0"X8'0"

IPE WOOD WALL CLADDING AS PER APRROVED SPECIFICATIONS

1'-10

W3

DUCT

TOILET

(GUEST BEDROOM)

UP

D3

DECK 9'8"x18'0"

A

RAILING TO DETAIL METAL AND WOOD

TERRACE 24'6" X 29'8"

D3

D3

D2

1'-10

1'-1

TC

5'5"X8'0"

FAMILY AREA 14'10"X15'0"

TERRACE 15'8"X15'8"

TC

STORE 5'0"X7'4"

CLOSET

(GUEST BEDROOM)

ELECTRICAL SHAFT

DB access

1'-6"

UP

LOUVRE SCREEN AT FIRST FLOOR LINTEL LEVEL MS PAINTED CHOCOLATE BROWN

TC

UP

DUCT

TC

TC

TC

N

PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL

TERRACE 15'7"X14'0"

DW2

D3

D2

BEDROOM 2 15'0"X18'0"

SD3

8'0"X11'4"

TC

P

D3

LIFT 5'2"X5'2"

10

8" HT BUND WALL

DW1

D3 D1

DN

(PARENTS BEDROOM)

D3

D'

FC ABOVE

RAILING TO DETAIL METAL AND WOOD

D5

POWDER ROOM 4'6"X8'0"

3' HT RAILING

BEDROOM 1 14'11"X18'10"

MS

6"

UTILITY YARD 8'0"X10'9" 1'-10

DUCT V3

TC

(BEDROOM -2)

DUCT

UP

PARKING 21'7"X26'5"

DUCT

TOILET -1 8'6" X 8'0"

D3

ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)

OHT 8'2"X8'0"

ELECTRICAL SHAFT

DB access

D3

TC

R

E'

8'0"X11'4"

LIFT 5'2"X5'2"

4' WIDE PASSAGE

24 23

SD2

TOILET

(PARENTS BEDROOM)

HEAD ROOM 5'0" x 8'0"

41 42 43 44 45

CHAJJA PROJECTION ABOVE

8" HT BUND WALL

D2

INFORMAL LIVING 15'0"X9'4"

FC

WALK IN CLOSET

5'-8"

B

WALK IN CLOSET

40

29 28 27 26 25

D3 TC

PARENT'S BEDROOM 16'6"X16'0"

Q

FC ABOVE

WALK IN CLOSET - 1 5'11" X 8'0"

ELECTRICAL SHAFT

DB access

PASSAGE BELOW

15'0"X6'9" TILES AS PER SELECTION

TC

RAIN WATER DRAIN

31 30

6'

CC TO WALL

2

ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)

TC

32

11'

EQ EQ

3

6'-8"

D

C

36 37 38 39

D6

WALK IN CLOSET

CW7

16'-5"

16'-5"

7

4

TOILET

V6

4'-4"

D

2

1

MAIN ENTRY

6

5

TC

E

34 35

33

DW2

D3

V6

TC

LIVING 15'8"X18'0"

3" THK BOXING PROJECTION ALL THREE TC SIDES EXPOSED CEMENT PLASTER FINISH

PERGOLA AT GROUND FLOOR LINTEL LEVEL PRECAST EXPOSED CONCRETE FINISH

(BEDROOM -2)

EQ EQ

5'-8"

E

EQ

LANDSCAPE GARDEN

PERGOLA @ FF SLAB LEVEL PRECAST EXPOSED CONCRETE FINISH

UP

5

6

3'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)

SCREEN WALL TO DETAIL MILD STEEL CHOCOLATE BROWN

A 4

7

E SLOP

1

8

(BEDROOM-2)

V2

RIVER FINISH KOTA STONE

2 UP

PARKING ENTRY 3

G'

SANDSTONE CLADDING

3

9

R DRAIN WATE

RIVER FINISH KOTA STONE

V2

CW4 CW2

RAIN

DECK 17'2"X6'0"

10

PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL

E SLOP

CW5 SD1

UP

11

3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

LIFT 5'2"X5'2"

TREADS - 1'0" RISER - 6" WIDTH - 3'10" RCC STAIRCASE TREADPOLISH KOTA RISERTEAKWOOD BACKED BY PLYWOOD

DN

R DRAIN WATE

3" CHAJJA PROJECTION ABOVE ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

MD

FC ABOVE

SCREEN WALL TO DETAIL MILD STEEL CHOCOLATE BROWN

2

FC ABOVE

MARBLE / TERRAZO

ENTRANCE VERANDAH 15'0"X5'0"

EQ D2

CW1

INFORMAL LIVING 15'0"X9'4"

SQUARE INTERLOCKING PAVER BLOCKS

MARBLE / TERRAZO

W3

F

DN MID LANDING 2

TERRACE 15'7"X14'0"

PASSAGE BELOW

15'0"X6'9"

TO BE CONFIRMED BY THE ARCHITECT

15'0"X6'9"

EQ

CC TO WALL

PARKING 21'7"X26'5" CAR PORCH WALL AND CEILING EXPOSED POLISH CEMENT

FAMILY AREA 14'10"X15'0"

RAIN

ROCK CANYON (ASIAN PAINT 8463)

B

EQ

ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)

ENGINEERED WOODEN FLOORING (AMERICAN WALNUT)

D3

G

F

3" THK BOXING PROJECTION ABOVE

PARENT'S BEDROOM 16'6"X16'0"

ODU

12 13 14 15 16 17 18 19 20 21 22

TC

8'-10"

9' WIDE PASSAGE

CC TO WALL

3'-2" 6'-8" 4'-4"

UP

1

E

SL

TERRACE 15'8"X15'8"

TE WA

3" THK BOXING PROJECTION IN GROUND FLOOR

A'

D2 EQ

DUCT

1

G

13' ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)

AIN

RA

MASTER BEDROOM ABOVE

V5

DUCT

TOILET -1 8'6" X 8'0"

V1

TOILET

(BEDROOM-2)

LANDSCAPE GARDEN

DW1

R DR

IN

TC

C

TC

BEDROOM 1 14'11"X18'10"

PE

EQ

2

C

8'0"X11'4"

TILES AS PER SELECTION

W3 D3

DUCT

DUCT

GUEST BEDROOM 16'X14'0"

CUT-OUT IN SLAB ABOVE

WALK IN CLOSET - 1 5'11" X 8'0"

ELECTRICAL SHAFT

DB access

CC TO WALL

(PARENTS BEDROOM)

D3

ODU

O.D.U @ 1'6" FROM FGL SCREEN WALL TO DETAIL MILD STEEL CHOCOLATE BROWN

8'0"X11'4"

ODU

ODU

A

D

C

O.D.U @ 1'6" FROM FGL

TOILET

(PARENTS BEDROOM)

ENGINEERED WOODEN CC TO DOOR D3 FLOORING (AMERICAN WALNUT)

UP

V1

D2

FC

FC

SW2

TC

IN SLO DRA

8'-10"

WALK IN CLOSET

MARBLE / TERRAZO

O.D.U OVER PUJA ROOM ROOF SLAB

TC

CW3

ER N WAT RAI

LIVING 15'8"X18'0"

F E

SKYLIGHT BELLOW

MS

B

G

RC ABOVE

ODU

3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

D2

MIDLANDING 1 UP

9'0"X8'0"

LIFT 5'2"X5'2"

DN

W3

DUCT

TOILET

(GUEST BEDROOM)

15'0"X6'9"

3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

RAIN WATER DRAIN SLOPE

3'-2"

RC ABOVE

D3

D3

SD2

CW4 CW2

TC

5'5"X8'0"

CW3 TC

DB access

DINING 21'9"X15'0"

CW7 CHAJJA PROJECTION ABOVE

D2

CLOSET

(GUEST BEDROOM)

ELECTRICAL SHAFT

DB access

KITCHEN 20'9"X18'10"

SD4

FAMILY AREA 14'10"X15'0"

TERRACE 15'8"X15'8"

TC

STORE 5'0"X7'4"

D3

LIFT 5'2"X5'2" UP

DECK 9'0"X14'0"

TC

D

SD2

LANDSCAPE GARDEN

D3

TERRACE 29'5" X 12'1"

TERRACE BELOW DW1

D3 D1

DN

POWDER ROOM 4'6"X8'0"

DUCT

RIVER FINISH KOTA STONE

B

G

D5

V3

R

TC

SW2

TC V7

30'

EQ

TC

FC

FC

TC

D3

SFD1

UTILITY YARD 8'0"X10'9"

3'-2"

3' HT RAILING

11'

RIVER FINISH KOTA STONE

EQ

MARBLE / TERRAZO

CUT-OUT IN SLAB ABOVE

DECK 9'0"X14'0"

99'-4"

GUEST BEDROOM 16'X14'0"

5'-6" TC

TC

D4

SERVANT'S TOILET 4'6"X6'6"

SW1

PUJA 9'0"X3'10"

1'-10

8" HT BUND WALL

2'

3" THK BOXING PROJECTION ABOVE

1 UP

9'0"X8'0"

TILES AS PER SELECTION

P

N

K SCREEN WALL TO DETAIL MILD STEELJ CHOCOLATE BROWN 3'6" ht COMPOUND WALL H ROCK CANYON (ASIAN PAINT 8463)

FLOOR LEVEL

(GUEST BEDROOM)

D3

D2

PIPED TO VRV UNIT

TOILET

D3

MARBLE / TERRAZO

P

N

C'

2

5'5"X8'0"

ELECTRICAL SHAFT

DB access

4'-3"

TC

TC

TC

TC

SERVANT'S ROOM 9'4"X6'6"

DECK 10'0"X14'7"

LANDSCAPE GARDEN TC

BEDROOM 1 14'11"X18'10"

MS

3'

1

8'

TC

TC CW3

TC

DB access

DINING 21'9"X15'0"

CW7

3'-4"

TC

TC

V4 FC

FC

SW2

TC V7

KITCHEN 20'9"X18'10"

6'

2

F 1'-1"

4'-9"

TC

TC

TC

D3

SFD1 SD4

9' WIDE PASSAGE

3

PUJA 9'0"X3'10"

16

3'

4

15

6'

5

14

2'

6

4'-8"

13

10

RAILING TO DETAIL METAL AND WOOD

14'-8"

7

D

5' TC

OP

PERGOLA @ GF LINTEL LEVEL PRECAST EXPOSED CONCRETE FINISH

ON TERRACE DUCT

CC TO WALL

8

CC TO DOOR

12

9' WIDE PASSAGE

EQ

9' WIDE PASSAGE

CC TO WALL

UP 9

CLOSET

(GUEST BEDROOM)

6'

PERGOLA AT TERRACE FLOOR SLAB LEVEL PRECAST EXPOSED CONCRETE 8" MS FRAME

IRON COUNTER AT 3'6" HT (FL) WM (FRONT LOAD) & DRYER BELOW

STORE 5'0"X7'4" VITRIFIED

LIFT 5'2"X5'2"

3'

1'

3" THK BOXING PROJECTION IN GROUND FLOOR

@ 2'10"HT BLACK GRANITE COUNTER SS SINGLE BOWL SINK

FC ABOVE TILES

TREADS - 1'0" RISER - 6" WIDTH - 3'10" RCC STAIRCASE TREADPOLISH KOTA RISERTEAKWOOD BACKED BY PLYWOOD

EQ

2'-2"

D3

5'-8" TC

Q

D' RIVER FINISH KOTA STONE

D3

1

DN

10

14'-8"

2

11

DRAIN SLOPE

DB access

D1

PIPED TO VRV UNIT ON TERRACE FLOOR LEVEL

FIRST FLOOR SLAB ABOVE

C

3

TILES AS PER SELECTION

DUCT

B

4

POWDER ROOM 4'6"X8'0"

2'-10"

J H

5

D5

V3

6'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)

Q

UTILITY YARD 8'0"X10'9"

CC TO DOOR

10

(BEDROOM -2)

V7

KITCHEN 20'9"X18'10"

VITRIFIED TILES

6'-1"

TC

D3

DINING 21'9"X15'0"

11'-2" 2'-4"

C

1'-4"

L K

R

10'6" ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)

D4

FC ABOVE

MARBLE / TERRAZO

EQ

9

PERGOLA AT GROUND FLOOR LINTEL LEVEL PRECAST EXPOSED CONCRETE

SERVANT'S TOILET 4'6"X6'6"

SW1 FC ABOVE

SD4

MARBLE / TERRAZO

M

7'-10"

VITRIFIED TILES

D

EQ

3'-2"

SERVANT'S ROOM 9'4"X6'6"

V4

THK BOXING N 3"PROJECTION

CW7

8"

RAIN WATER

3'-10"

5'-6"

SPACE FOR GAS CYLINDERS GRANITE TOP PLATFORM TO COVER THE GAS BANK AT 4' HT

SFD1 4'-6"

4'-3"

R

PUJA 9'0"X3'10"

ALL THREE SIDES EXPOSEED CEMENT PLASTER FINISH

7

E 8'

SKYLIGHT ABOVE

P

6

CC TO WALL

RIVER FINISH KOTA STONE

5

EQ

11'-5"

DECK 10'0"X14'7"

LANDSCAPE GARDEN

4

69'-4"

3'-4"

3" THK BOXING PROJECTION ALL THREE SIDES EXPOSED CEMENT PLASTER FINISH

Q

3

F 1'-1"

4'-9"

11' ht COMPOUND WALL ROCK CANYON (ASIAN PAINT 8463)

PRECAST EXPOSED CONCRETE PERGOLA @GROUND FLOOR LINTEL LEVEL

2

CC TO WALL

4'-8"

1

RAIN WATER DRAIN SLOPE

5'

16

3'-10"

6'

15

4'-6"

3'

1'

14

11'-2"

5'-8"

R

13

2'-4"

6'-1"

12

D

E 69'-4" 7'-10"

11

EQ

10

CC TO WALL

9

11'-5"

8"

1'-4"

7

2'-2"

6

2'-10"

5

99'-4"

4

1'-3"

3

TC

D4

SERVANT'S TOILET 4'6"X6'6"

SW1

2

TC

SERVANT'S ROOM 9'4"X6'6"

V4

DECK 10'0"X14'7"

LANDSCAPE GARDEN

1

DATE

30-11-2021

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.

DEALT BY

--

DWG. NO.

--

SCALE

NORTH

CODE

1/8"=1'

THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.

70'X100' W - COMMON AREAS 12" Sunken CB1

AC UNIT

12" Sunken

AC UNIT

B28

B44

B27

CB1

B44

B35

B38

AC UNIT

CC TO WALL

CB4

B45

CW2

COLUMN LINE

B26

B26

COLUMN LINE

LINTEL HEIGHT

B33

AC UNIT

B8

CB40A

COLUMN LINE

COLUMN LINE

B48

CB10A

B6

AC UNIT

B9

B8A

B6A

LINTEL LVL

PRECAST SPIRAL STAIRCASE

KITCHEN

15'7½" x 18'3"

BEDROOM 1

PUJA

17'6" x 17'4½"

7'6" x 7'9"

SD4

CW7

BATHROOM 1 8'9" x 8'3"

SFD1

D2

SFD1

D1

LANDSCAPE

CW2

CW2

4'3" HIGH SCREEN WALL 2nd CLASS TEAK WOOD

GARDEN

LINTEL LVL

COLUMN LINE

SFD1

MD

AC UNIT

AC UNIT

B21A

B20A

COLUMN LINE

CC TO DOOR

B21

B20

AC UNIT

B35A

LINTEL HEIGHT

CC TO WALL

COLUMN LINE

A

A

BEDROOM 2 12" Sunken B38

LINTEL HEIGHT

OPEN BAR COUNTER

CW7

PASSAGE

FOYER

PASSAGE

LIVING ROOM

FOYER

FOYER

ELEVATION - WALL A

D

9

ELEVATION - WALL B

6

ELEVATION - WALL C

3

9

3

9 6" BLIND SPACE

10'9" x 13'0"

2

7

9

2

7

9

P

M

ELEVATION - WALL D

ELEVATION - WALL B

DN 14

P

B34A

6" BLIND SPACE

WALL - A

LINTEL HEIGHT

AC UNIT

AC UNIT

B48

CB40A

PB1

PB8

D

BAR

17'10" x 11'3"

CW7

PB8

7

2 N

2

7

PLAN : DINING AREA

9

KEY PLAN - GROUND FLOOR

15'9" x 8'7"

TREAD - 1'0" RISER - 0'6" WIDTH - 4'6"

PB1

9 ELEVATION - WALL C

WALL - C

M

LIVING AREA-15'8" X 18'0"

VERANDAH

WALL-A

KEY PLAN - GROUND FLOOR

WALL - B CB8A

B2

B26

LINTEL HEIGHT

AC UNIT

COLUMN LINE

CB4

B31

COLUMN LINE

B31

B13

B26

B39

LINTEL HEIGHT

CB45A

CB40A

B48

CB4

C-C

3'-314"

CB45A

B49

B39

COLUMN LINE

6" BLIND SPACE

WALL - D

N

WALL - B

PASSAGE TO BE PUT ON HOLD AT SITE CB40A

11

WALL - C

G

B48

M

9

N

D2

CB4

FAMILY AREA-14'10" X 15'0"

KEY PLAN - FIRST FLOOR

WALL - A

ELEVATION - WALL D

3'-314"

3'-314"

DETAIL B - COVE LIGHT

PART PLAN- POWDER ROOM (6'10½" x 4'10½")

PASSAGE

DETAIL A - LEDGE WALL

PB1

10

G

7 ELEVATION - WALL C

H

CB21A

CB4

CB4

LINTEL HEIGHT

COLUMN LINE

COLUMN LINE

SD2

N

PASSAGE

WALL - C

G

G

FALSE CEILING OF GYPSUM BOARD (ACOUSTIC QUALITY) FINISHED IN ACRYLIC EMULSION PAINT

PB1

PB1

PB1

CB4

G 7

H

3'-314"

GYPSUM BOARD LED STRIP LIGHT

10

H

CB21A

SD2

PB1

10

ELEVATION - WALL B

B13

G ELEVATION - WALL D

G

PB1

H

H 7

11

10

PLAN : PASSAGE AT CUTOUT AREA

PLAN : PASSAGE AREA FIRST FLOOR

11

PASSAGE PB1

7 ELEVATION - WALL A

7

CB8A

7

ELEVATION - WALL C 9

PB1

B39

10

H

LINTEL HEIGHT

SW2

11

7

B28

COLUMN LINE

WALL - C

7

G

WALL - A AC UNIT

B32

CB45A

ELEVATION - WALL C

H

11

H

LINTEL HEIGHT

CB3

M

11

PASSAGE PASSAGE

CB21A B49

10

7

P

6" BLIND SPACE WALL - A

CB4

B49

ELEVATION - WALL B 7

MD

D2

WALL - B

P

CB4 CB45A

B39

ELEVATION - WALL A

M

ELEVATION - WALL D

6" BLIND SPACE

11

P

WALL - B

9

CB10A

B8 B8A

P

WALL - D

7

M ELEVATION - WALL B

SFD1

SD2

D2

PASSAGE

WALL - D

B8 B8A

11

D2

DW2

FAMILY AREA

CB10A

CB3 B48

9

D2

6" BLIND SPACE

FAMILY AREA

FAMILY AREA CB40A

7

DW2

RAILING TO DETAIL

D2

ELEVATION - WALL A

DW2

SW2

6" THK FINISHED LEDGE WALL

WALL - C

PART PLAN- POWDER ROOM (6'10½" x 4'10½")

CB21A

B49

CC TO WALL

SW2

DW1

ENTRANCE

KEY PLAN - GROUND FLOOR

WALL - D

CB3A B2

B32

UP

WALL - A

WALL - A

WALL - D

CB3A

AC UNIT

ROAD

LAND SCAPE GARDEN

UP

WALL-D

WALL-B

WALL-C

WALL - C

SW2

UP

B

9

DINING AREA - 21'9" X 15'0"

DN

GROUND FLOOR FFL

GROUND FLOOR FFL

C-C

B28

ENTRY

LEATHER FINISHED KOTA FLOORING

DINING

PB7

3

ELEVATION - WALL C

PASSAGE

CC TO DOOR

70'X100' W - GROUND FLOOR

DW1

LIVING ROOM

TREAD - 1'0" RISER - 0'6" WIDTH - 4'1¼"

LEATHER FINISHED KOTA FLOORING

COLUMN LINE

4'3" HIGH SCREEN WALL TO DETAIL 2nd CLASS TEAK WOOD

N

CC TO WALL

3

KEY PLAN - GROUND FLOOR

5'0" x 5'6"

FOYER

15'9" x 10'3"

B33

COLUMN LINE

PLAN : LIVING AREA

FOYER-15'0" X 9'4"

LIFT

CC TO DINING

WALL - C

D

B

5' WIDE PASSAGE

13 12 11 10

16'6" x 23'4½" (DOUBLE FLOOR HEIGHT)

CB4

LIVING ROOM

WALL - B

PLAN : INFORMAL LIVING AREA

M

CC TO WALL

9 PB2

D

PB11

PB1

UP

AC UNIT

B45

LINTEL HEIGHT

B28

PB1

ELEVATION - WALL D

P

ELEVATION - WALL A

FOYER

B 9

PB1

WALL - D

WALL - C

D ELEVATION - WALL D

N

6" BLIND SPACE

G

PB1

PB7

COLUMN LINE

WALL - D

WALL - B

B27

LINTEL HEIGHT

6

LINTEL HEIGHT

DINING

15'9" x 18'0"

COURT YARD

PASSAGE

PB1

PB8

B34

WALL - D

WALL - A

G

PB1

G CC

CC TO WALL

D

WALL - A

12" Sunken

CC TO WALL

DINING

PB1

PB1

ELEVATION - WALL B

9

D

PB1

ELEVATION - WALL A

G 6

PB8

PB1

PB1

RAMP UP

B

PB8

WALL - B

PB1

WALL - B

PB2

9

B

PASSAGE

6'10½" x 4'10½"

PB8

6

D

LIVING ROOM

TOILET

TO BE PUT ON HOLD AT SITE

PB1

KEY PLAN - FIRST FLOOR

PASSAGE AREA FFL- 14'9"X14'

PASSAGE AREA - 13'9"X14'

KEY PLAN - GROUND FLOOR

70'X100' W - FIRST FLOOR POWDER ROOM - 1 (6'10½" x 4'10½") SL. NO.

REVISIONS

30-11-2021SL. NO.

REVISIONS

DATE

SL. NO.

REVISIONS

DATE

CLIENT

MR.RAJEEV AGRAWAL PROJECT

PROPOSE VILLA DEVELOPMENT-RAIPUR

DRAWING STATUS

EXICUTION REVISION NO.

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.

DRAWN BY

DRAWING TITLE

WALL ELEVATIONS DATE

30-11-2021

DWG. NO.

CODE

--

NORTH

DEALT BY

--

SCALE

1/8"=1'

THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.

SL. NO.

REVISIONS

01.12.2018SL. NO.

REVISIONS

DATE

SL. NO.

REVISIONS

DATE

CLIENT

DRAWING STATUS

EXECUTION COPY

POWDER ROOM -1

RESIDENCE, BANGALORE

R4

30-11-2021

PROJECT

REVISION NO.

ALL DIMENSIONS ARE IN FEET AND INCHES. DRAWING IS NOT TO BE SCALED. ANY DEVIATIONS NECESSITATED DURING IMPLEMENTATION AT SITE IS TO BE BROUGHT TO IMMEDIATE NOTICE OF THE ISSUING AUTHORITY & RATIFIED BEFORE IMPLEMENTING ANY CHANGE.

DRAWN BY

DRAWING TITLE

SIDHARTH BHATIA

DATE

DWG. NO.

SBR GD 301.9

--

NORTH

DEALT BY

--

SCALE

1/4"=1'

THIS DRAWING IS COPYRIGHTED. IT IS THE PROPERTY OF khosla ASSOCIATES & IS NOT TO BE REPRODUCED, COPIED OR GIVEN TO A THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT HAS BEEN LOANED.


CAFETERIA



SECTION

ELEVATION

ISOMETRIC VIEW MASTER PLAN


LED CEILING LIGHTS

TOILET TILES

MALE TOILET 3400x2400MM

FEMALE TOILET 3400x2400MM

MALE +4000 TOILET 3400x2400MM

CERA MAKE FLOORING TOILET TILES DIM - 600 X 600 MM COLOUR - WHITE

+4000 +600

FEMALE TOILET 3400x2400MM

PLANE FALSE CEILING

+600

+600

+600

TILE DROP 18 MM THK GRANITE AS A TILE DROP

TILE DROP 18 MM THK GRANITE AS A TILE DROP

INDOOR FLOORING WOODEN TEXTURED VINYL FLOORING

REFRIGERATOR

LED CEILING LIGHTS +4000

SERVENT TOILET

SERVENT TOILET 1900x2000MM

PLANE FALSE CEILING

+4000 1900x2000MM

REFRIGERATOR

+600

+600

GRID FALSE CEILING

KITCHEN 4800x5000MM

KITCHEN 4800x5000MM

+600

+600

TILE DROP 18 MM THK GRANITE AS A TILE DROP

+4000 +3600 LOADING / UNLOADING PLATFORM +600

LOADING / UNLOADING PLATFORM LOADING / UNLOADING PLATFORM +600 +600

TILE DROP 18 MM THK GRANITE AS A TILE DROP

LOADING / UNLOADING PLATFORM +600

+4000 STANDALONE AC

LED CEILING LIGHTS KITCHEN FLOORING QUARRY TILES FLOORING TILES COLOUR - BROWN DIM - 300 X 300 MM

UP TILE DROP 18 MM THK WOOD AS A TILE DROP

ENTRANCE 4000x4000MM +600

FLOORING PLAN

UP ENTRANCE 4000x4000MM +600

FALSE CEILING PLAN


HOUSING DESIGN,PUNE



ROOFING MASTER PLAN

MASTER PLAN

ELEVATION

ELEVATION


3bhk

1bhk floor plate

2bhk

1bhk

2bhk floor plate

pent house

pent house

pent house floor plate

3bhk floor plate


SECTION

SECTION


ARCHAEOLOGICAL RESEARCH CENTRE


MASTER PLAN

ELEVATION

ELEVATION

SECTION

SECTION


ARCHITECTURE COLLAGE DESIGN



+19.0M

S2

22.0 21.0

STUDIO 135 sq.m

COMPUTER ROOM

+17.0M

MINI LIBRARY

TOILET (BOYS)

S2

STUDIO 135 sq.m

TOILET (GIRLS)

STUDIO 135 sq.m

AV ROOM 70 sq.m

COMMON ROOM 135 sq.m AV ROOM 70 sq.m

+14.5M +14.5M

+14.5M

+14.0M AV ROOM 70 sq.m

+14.5M AV ROOM 70 sq.m AV ROOM 70 sq.m

+20.0M AV ROOM 70 sq.m AV ROOM 70 sq.m

+12.0M

EXAM ROOM AV ROOM 70 sq.m ggg

PRINTING SHOP +14.5M

SICK ROOM

+10.00M

STORE ROOM

LIVING ROOM VERANDA 4M X 4M

BED ROOM 4M X 4M

LIVING ROOM VERANDA 4M X 4M

4M X 4M

BED ROOM 4M X 4M

LIVING ROOM VERANDA 4M X 4M

4M X 4M

BED ROOM 4M X 4M

LIVING ROOM

LIVING ROOM VERANDA 4M X 4M

4M X 4M

KITCHEN

4M X 4M

KITCHEN

BED ROOM

KITCHEN

4M X 4M

KITCHEN

KITCHEN

BED ROOM +18.0M

VERANDA 4M X 4M

4M X 4M

4M X 4M

+09.0M

+03.0M +14.0M

+07.0M

+04.0M

LIVING ROOM VERANDA 4M X 4M

LOBBY

BALYCONY 7M X 3M

PASSAGE

TOILET 2.5M X 2.5M

ROOM 1 7M X 5M

PASSAGE

TOILET 2.5M X 2.5M

ROOM 1 7M X 5M

VERANDA 4M X 4M

4M X 4M

4M X 4M

LIVING ROOM VERANDA 4M X 4M

4M X 4M

BED ROOM 4M X 4M

LIVING ROOM VERANDA 4M X 4M

4M X 4M

LIVING ROOM VERANDA 4M X 4M

4M X 4M

+00.0M

+00.0M LOBBY

LOBBY

PASSAGE

TOILET

7M X 3M

LIVING ROOM

BED ROOM

ROOM 1 7M X 5M

2.5M X 2.5M

BALYCONY

4M X 4M

+00.0M

canteen 10M X 9M

kitchen

LOBBY

3.8m x 9m PASSAGE

TOILET 2.5M X 2.5M

4M X 4M

BED ROOM

KITCHEN

4M X 4M

KITCHEN

BED ROOM

KITCHEN

4M X 4M

KITCHEN

KITCHEN

BED ROOM

ROOM 1 7M X 5M

LOBBY

PASSAGE

LOBBY

ROOM 1 7M X 5M

TOILET

LOBBY

ROOM 1 7M X 5M

TOILET

2.5M X 2.5M

ROOM 1 7M X 5M

PASSAGE

PASSAGE

LOBBY

ROOM 1 7M X 5M

TOILET

2.5M X 2.5M

SPORTS GROUND

PASSAGE TOILET

2.5M X 2.5M

2.5M X 2.5M

BALYCONY

BALYCONY

BALYCONY

BALYCONY

7M X 3M

7M X 3M

7M X 3M

7M X 3M

N

SPORTS GROUND +00.0M

+00.0M

SCALE 1:200

+0.00M

MASTER PLAN

FRONT ELEVATION

+00.0M


TECHNICAL DRAWING



RESIDENCE (OWN PROJECT)


UP

TERRACE 19'6" X 4'6"

OFFICE 10'11" X 15'5"

OFFICE TABLE

LIVING ROOM 19'6" X 16'0"

T.V.UNIT

COFEE TABLE

STORAGE

BED SIDE TABLE

TOILET 7'3"X6'0"

DINING ROOM 11'2" X 20'9"

BED SIDE TABLE

WARDROBE

BEDROOM 12'0"X12'0"

LIFT 5'4"X4'7"

UP

SHOWER AREA 4'0"X 4'11"

DINING TABLE

TOILET 8'0"X4'11"

BED SIDE TABLE

PUJA ROOM 7'6"X7'2"

BEDROOM 12'0"X14'9"

T.V.UNIT

STORAGE

STORE 7'7"X7'0"

BED SIDE TABLE

STORAGE

SHOWER AREA 4'0"X 4'11"

TOILET 8'0"X4'11"

DRESSING 7'7"X10'1"

WARDROBE

DRESSING

KITCHEN 11'2"X17'5"

WARDROBE

WASHING MACHINE

UP

UTILITY 9'1"X10'11"

GROUND FLOOR PLAN



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.