BRIDESBURG
Restructuring an industrial neighborhood’s relationship with water
East West Connection
Waterfronts to City
Park and Watershed Connection
VISION OBJECTIVES
1
Absorb and repurpose vacant land
2
Increase access to open space
3
Reduce impervious surfaces
4
Leverage waterfront investments
5
Facilitate alternative transit connections
6
Create desirable neighborhoods
Juanita Park
BRIDESBURG Frankford Creek
IA
PORT RICHMOND
N VA
YL
PE
S NN
W NE
EY
S ER
J
0
0.25
0.5
1
Miles
IA
Philadelphia Port Authority
N VA
YL
PE
S NN
W NE
EY
S ER
J
0
0.25
0.5
1
Miles
IA
N VA
YL
PE
S NN
W NE
EY
J
S ER
IA
N VA
YL
PE
S NN
W NE
EY
S ER
J
0
0.25
0.5
1
Miles
IA
N VA
YL
PE
S NN
W NE
EY
S ER
J
0
0.25
0.5
1
Miles
IA
N VA
YL
PE
S NN
W NE
EY
S ER
J
0
0.25
0.5
1
Miles
IA
N VA
YL
PE
S NN
W NE
EY
S ER
J
0
0.25
0.5
1
Miles
CONNECTIVE
PERFORMATIVE
CATALYTIC
SEY
JER
NEW
SYL
VAN I
A
Bridesburg
PEN N
Nort
r
rrido
t Co heas
NEW JER SEY
A
VAN I
SYL
PEN N
Nort t Co heas rrido r
NEW JER SEY
A
VAN I
SYL
PEN N
NEW JER SEY
A
VAN I
SYL
PEN N
NEW JER SEY
A
VAN I
SYL
PEN N
Rohm & Haas
SEY
JER
NEW
PEN N
SYL
VAN I
A
Coke Industries
Flood Plains
SEY
JER
NEW
PEN N
SYL
VAN I
A
50% of Bridesburg lies within the 100year flood plain.
Topography
SEY
JER
NEW
PEN N
SYL
VAN I
A
Bridesburg’s topography ranges from a high of 18 feet above sea level to sea level along the shoreline.
Impervious Surfaces
SEY
JER
NEW
PEN N
SYL
VAN I
A
There are approximately 160 acres of impervious surfaces.
CONNECTIVE
PERFORMATIVE
CATALYTIC
SEY
IA JER
LVA N NSY PEN
NEW
1
Extend the street grid to create a continuous waterfront neighborhood
SEY
IA JER
LVA N NSY PEN
NEW
2
Extend Delaware Avenue to establish a continuous waterfront parkway
SEY
IA JER
LVA N NSY PEN
NEW
3
A waterfront park is developed along parkway and the water’s edge
SEY
IA JER
LVA N NSY PEN
NEW
4
Anchor the neighborhood with industry in balance with the performative system
SEY
IA JER
LVA N NSY PEN
NEW
5
New residential and commercial development fills in
Restored Marshes
Levee
Flood Channel & Retention Pond
Green Streets Esplanade & Marina
Riparian Edge
Industrial Edge
D
Marina & Flood Channel
C
Esplanade B
A
Natural Edge
A
NATURAL EDGE
NATURAL EDGE
Delaware Avenue
NATURAL EDGE
Levee Trail
NATURAL EDGE
high flood level
Riparian and Wildlife Edge
NATURAL EDGE
riparian zone
B
ESPLANADE
ESPLANADE
ALLテ右
ESPLANADE
4% slope
Social Levee
ESPLANADE
Terraced Edge
ESPLANADE
Orthodox Street
ESPLANADE
C
MARINA & FLOOD CHANNEL
Retention Pond
MARINA & FLOOD CHANNEL
Retention Pond
MARINA & FLOOD CHANNEL
high flood level
swale/drywell when not flooded
Buckius Street
MARINA & FLOOD CHANNEL
D
INDUSTRIAL EDGE
Riparian Edge
Green Street
Levee Fishing Pier
Restored Marshes
CASE STUDY: Rohm & Haas Site
INDUSTRIAL EDGE
52 acres of impervious area
$21,385.40/fiscal year
Bridesburg Elementary School
CASE STUDY: Rohm & Haas Site
INDUSTRIAL EDGE
33 greened acres
potential savings: $11,818.23/fiscal year
Bridesburg Elementary School
CASE STUDY: Honeywell Resin & Chemicals
INDUSTRIAL EDGE 33 acres of impervious area
CASE STUDY: Honeywell Resin & Chemicals
INDUSTRIAL EDGE
purchase 10 acres worth of stormwater credits
CONNECTIVE Absorb and repurpose vacant land Increase access to open space Reduce impervious surfaces Leverage waterfront investments Facilitate alternative transit connections Create desirable neighborhoods
PERFORMATIVE
CATALYTIC
NEW JER SEY
A
VAN I
SYL
PEN N
130 acres of waterfront park 53 acres of new development 96% vacancy is absorbed