Bill Flinn future proof cladding

Page 1

SHELTER CLADDING Thinking through the consequences Bill Flinn





5” precast RC column

5” precast RC column with diagonal crossbracing

10” brick column

15” composite column

58 km/hr

100 km/hr

Category 3 158 km/h

Category 4+ 194++ km/hr






Institut Abelard


Institut Abelard





Ecole Chretienne Evangelique de Lauture



The rain screen Timber structure Plywood – racking strength Covering (timber, ferrocement, clissage etc




MANY THANKS Any questions?







z



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.