Shengke Lim Portfolio 24'

Page 1

SELECTED WORKS ACADEMIC + CV

23’ | BA Arch Academic Selected Work |

PORTFOLIO ‘23 | SHENGKE



SHENGKE LIM shengke.lim@gmail.com +44 07732754560

0402, No 24. Lane 54, Zhong Zheng Road, New Taipei City, Taipei 231

Website: https://skystudioarchitecture. cargo.site/

I am a Part I Architectural Assistant wanting to tell a unique story for every project. Passionate about quality and expression and eager to explore how architecture can dynamically adapt to meet the evolving needs of our rapidly changing world.

EDUCATION.

Architecture : University of Dundee, Scotland | 2021-2024 Graduated (Spring 2024) The university course provides conceptual and technical drawing projects, form a small villa scale up to urban scale. Exploring in-depth the building form and lighting qualities to wider social environment context.

Urban Planning and Architecture : Newcastle University, England | 2018-2020 Learning from urban planning principle and architectural knowledge, the course introduces multidisciplinary view through urban planning perspective, thinking of overall built environment as a whole.

Secondary School : Australian International School Singapore AISS 2012-2018

EXPERIENCE.

Ongoing University Ambassador Short Film Making / Video Editor Produce creative content for School in video and photography format, past work includes city introduction vlog, landmark photography series, as well as event photography around different society events around campus.

Freelance Interior Photographer 2020-2021 Videography and Interior Design Photography, the job includes album editing with InDesign and premier pro software, work includes website content publishing and several design project with cinematography showcasing.

Freelance CG Interior | Architectural Render Artist 2019-ongoing Professional Render for Interior Design using blender, this includes detailed furniture and material rendering that provides clients visual demonstration of design quality. The most recent work includes the design of the retail shop front and producing render and construction drawings for the client.

UoD Dundee Malaysian Society Treasurer (DUMAS) 2021-2022 Society treasurer, the task includes different event organization and fund raising to generate income for society.

UoD Architecture Course Year 1 Leader 2021-2022 Student representative gathers student feedback and academic meetings with course leaders.

Cluster & Associates Architectural Assistant / 2019-2020 Professional work experience includes multiple competition entries, ranging from educational, hotel buildings, and interior design projects, task includes all processes from concept to construction detail, as well as scheduling and monitoring for on-site activities of an interior construction projects.

Taipei Veterans General Hospital Laboratory Assistant 2019-2019 My work experience includes being a laboratory assistant who performs infectious drug medical trials.

Newcastle Taiwanese Society Treasurer 2018-2019 Newcastle University Architectural Sudent REP 2018-2019 Strive Leader Australian International School Singapore 2017-2018

SKILLS.

Communication: English IB-HL, Chinese Native. Duolingo IB diploma. Extensive in Computer Software: Word, Excel, Powerpoint. AutoCAD. Sketchup. Rhino 3D. Blender. Vray. Lumion. Adobe Suite. Photography: Camera and Video cam Operation. Premiere Pro Editing Art: Drawing in all Medium, Water Colour, Pencil, Oil Paint, Acrylic. Music: Violin, Piano, Guitar, Orchestra Violinist.

REFERENCES.

Academic : Richard Dundas. Lecturer & Year Leader. University of Dundee | rdundas001@dundee.ac.uk Professional : LiChun Chang. Principle Architect. Cluster Architect Associates. | +886 0965075333| lichun chang | mchang@cluster-int.com


Street View Render

Creative Instrument Studio Academic Project The creative instrument workshop is located in St. Andrew, Gregory Place. In a c cluster of the residential housing areas, the site has a south-facing view towards at Ancient Monument of St Andrews Cathedral, where the site is located northeast on the cliff of East Scores and Kirkhill, accessible by Gregory place and west by Gregory Lane. St. Regulus Cottage is accessible by three main roadworks of St. Andrew, (Collage on the right).


Building Plan - Hand Drawn | Photoshop

Strategy Diagram

Kitchen Space GF

Bedroom 2F - Model


Street View Render

Mathew Art School Elevation Academic Project The project aims to provide a solution to the existing building facade by rethinking the connection between function and form, between the exterior and interior of the space. The architectural idea develops from a framing view of the River Tay, bringing light in through the void and most importantly, allowing visual interaction between different floors to happen, becoming a catalyst for exchanged ideas from different subject areas happening in the building.


Stu

dio

Stu

dio

Pain

ting

Ga

ce

ic G

xG

alle

ry S

pac

e

alle

ry An

ima

Fas

Spa

y

dio

am

ce

ller

Stu Cer

Spa

hio

nx

Jew

Tex

elle

tile

Ga

tio

nG

alle

ry

ry G

ller

y

alle

ry

Technical axonometric diagram of different studio spaces and construction component


Studio WorkSpace

Cs

Cs

Cs

Cs

Studio WorkSpace

Painting Gallery

Studio WorkSpace

Cs

Cs

Cs

Cs

VOID Open to Below

DRIVEN VOID

3rd Floor

T5 LED Timber Side Panel

Landing

Display Area

23

22

21

20

19

18

17

16

15

14

13

9

12

11

10

8

Display Area

Landing

View Towards River

Possible Full High Glass for Fire Compartmentation

7

6

Display Area

5

Sitting Area Reading Space/ Work Space

4

Cs 3 Book Shelf

Studio WorkSpace Cs

Ceramic Gallery Display Area

Cs

Cs

Cs

Cs

Cs

Cs

Read Area

Cs

Studio WorkSpace Frosted Glass

Studio WorkSpace

Cs

Transparent Display Wall/ Lighten from space behind

Cs

Sitting Area

2nd Floor

Private Reading Space

Private Reading Space 8

Storage Display Above @2200mm

Cs Door flush with Stairs Panel

7

6

Cs

Cs

Cs

Display

Display

Bookshelf

Studio WorkSpace

A Cs Social Space

Book Shelf

Flexible Textile Display

Book Shelf

Flexible Textile Display

Landing

Cs

Textile Display Shelf

1st Floor

Jewellery Gallery

Window For Ventilation /Diffuse Light Display Area

Display Area

Jewellery Gallery

Animation Gallery

Parking Area

Walkway

Sitting Area

Green Space

Display Area

Window For Ventilation /Diffuse Light

Display Area

Display Area

Display Area

Window For Ventilation /Diffuse Light

Sitting Area

Studio WorkSpace

A

Fashion Gallery Flexible Textile Display

Cs Cs

Cs

Flexible Textile Display

Cs Cs

Flexible Textile Display

2

Read Area

Studio Interior Stairs

4

3

1

Window Display to Street

Read Area

5

Display Area

Ground Floor N

Scale 1:50

Floor Plan Level 0


Studio Space View Towards Fashion Gallery Space

Ceramic Gallery Space View towards Tay River


Rev.

Description

Key Plan:

Project:

N Status:

Design Stage 2 Drawn by: Shengke, Pri

Reviewed by: Shengke

Drawn Date: 2022-12-10 Project No: 22-01-03 Sheet Titles:

Original drawing is @ A3 Sheet Number:

Revision:

00

AA Section View Through Voids

Longitudinal Section AA’


Interior Ceramic Gallery View


Loch View of the Visitor Center

RSPB Center Lochwinnoch Academic Project The project is located within the natural reserve at Lochwinnoch, where the new building would accommodate RSPB offices, a tourism center, a cafe restaurant, workshops, and an observatory tower, The design concept focuses on the quality of light and circulation experience throughout the space. A generous entrance and a viewpoint straight through the building frame the view of the lake. Staff office and restaurant are strategically decided by a path. The depth of the path allows the build-up of layers and hierarchy of space, as well as allowing natural daylight to penetrate deep spaces. Offering a whole new experience for visitors and users while minimizing the visual impact of the v in the natural landscape.


7

9

6

3

8

3

1

1

2

Site Plan with Context

EDU Space | Classroom skylight | Dining Area | Entrance | Section showing lighting qualities

Exterior Form | EDU Space Lighting Test | Dining Area | Hall Way Lighting | 1:50 Sectional Model to test lighting


Design Strategy Diagram

Plan according to trees/ boundry Maximise opportunity for view at North side.

Rotate building for maximum / different view angle.

Movement Insert Path between seperation point. Soft boundry that split the building into three different zone.

ROOF FORMS Allow low sun to enter during Winter shaded during summer times.

The building plan facing North, with Entrance from the south, featuring multiple path and entrance. (See Booklet) | Ground Floor Plan in Context 1:100

Structural Timber Columns and Load bearing masonry walls for improved thermal mass.


Main Viewing Deck | Shop

Kitchen Serving Space | Dining Area


Low exterior profile, outer cladding are with charred timber and zinc roof | South Elevation in context 1:100

RSPB Centre Prepared for

RSPB Lochwinnoch Design

SKYStudio Planning | Architecture | Interior

All reproduction & intellectual property rights reserved © 2022 In association with:

DO NOT SCALE DIMENSIONS FROM DRAWINGS SITE VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION REPORT ALL DISCREPANCIES TO SKYSTUDIO IMMEDIATELY THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTS AND DRAWINGS NOTE: LAYOUTS SUBJECT TO AGREEMENT BY HMP FOR SERVICE RISER POSITIONS AND PLANT ROOM SIZES WSP/CS FOR THE STRUCTURE ARUPFIRE FOR FIRE FIGHTING LIFTS AND MEANS OF ESCAPE.

Outdoor Education space located at the South intergrated in Landscape / Sitting Area design | North Elevation in context 1:100

Wheelchair

COP Metal Wood Effect

Stannah Lift FX Structure Support

Viewing Area Total 17 Sqm with Wheelchair and lift acess for up to two wheelchair space.

Rev.

Description

Key Plan:

Under Stairs Display Storage Translucent Glass on TOP Project:

Status:

Design Stage 2

The Tower are accesible with lift, accomodate up to two wheelchairs and approx 10 guest, with views towards South and North | Tower Plan with roof context 1:100 Drawn by: Shengke

Reviewed by: Shengke

Drawn Date: 2023-04-30 Project No: 23-02-04

Sheet Titles:

Original drawing is @ A3 Sheet Number:

Revision:

00

Cross Section


Entrance | Reception


RSPB Center Lochwinnoch

Academic Project | Partly Group Work - Studio 6 Role : Publication Lead - Publication and graaphics producer

Copper Roof Sheeting Ply Wood Sheeting

Rainwater Downpipe Structure Beam Timber Structure Column

Rigid Insulation

Panels

Structural Steel Roof Deck

Plywood Insulation Panel

Rain Gutter

Rigid Insulation

Recessed Lighting

20mm Interior Ceiling Plywood (Black Matt) Finish

Ventilation Copper Panel

Structure strips/ Strainer 30 x 15 Timber Beam Structure

Steel Bracket Insulation Timber Column

Section Detail Drawing base on project’s precedent Study Ice Fjord Centre by Dorte Mandrup and Kristine Jensen Architect 2014

Interior Floor Finish (Dark Timber) Structure 300 x 600mm Timber Beam Structural Connector

Sand Fill (Prevent Echo & Vibrartion) Rigid Insulation

Concrete Footing

Water Proof Layer

Radiator Gutter

Compact Earth Fill

Thermal Broken Connector Insulation

Natural Land

Water Proof Layer Concrete Footing / Structure IPR Beam

Timber Structure Detail Section


Copper Roof Sheeting

Ply Wood Sheeting

Rainwater Downpipe

Rigid Insulation

Panels

Structure Beam

Plywood Insulation Panel

Timber Structure Column

Rigid Insulation 20mm Interior Ceiling Plywood (Black Matt) Finish Structure strips/ Strainer 30 x 15 Timber Beam Structure

Structural Steel Roof Deck

Rain Gutter

Recessed Lighting

Ventilation

Copper Pane

Steel Bracket

Insulation

Timber Column

Roof Detail Section

RSPB Centre

Copper Roof Sheeting Ply Wood Sheeting

Prepared for

RSPB Lochwinnoch

Rigid Insulation

Panels Plywood Insulation Panel Rigid Insulation 20mm Interior Ceiling Plywood (Black Matt) Finish

Rain Gutter Recessed Lighting

Planning | Architecture | Interior

Interior Ply Wood Finish

Ventilation Copper Panel

Structure strips/ Strainer 30 x 15 Timber Beam Structure

Design

SKYStudio

Structural Steel Roof Deck

All reproduction & intellectual property rights reserved © 2022 In association with:

300 x 600mm Timber Beam Structural Connector Concrete Footing Radiator Gutter

San

Insulation Timber Column

Inte

Stru

Steel Bracket DO NOT SCALE DIMENSIONS FROM DRAWINGS SITE VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION REPORT ALL DISCREPANCIES TO SKYSTUDIO IMMEDIATELY THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT DOCUMENTS AND DRAWINGS NOTE: LAYOUTS SUBJECT TO AGREEMENT BY HMP FOR SERVICE RISER POSITIONS AND PLANT ROOM SIZES WSP/CS FOR THE STRUCTURE ARUPFIRE FOR FIRE FIGHTING LIFTS AND MEANS OF ESCAPE.

Thermal Broken Connector Insulation

Rig

Wa

Com

Nat

Water Proof Layer Concrete Footing / Structure IPR Beam

Roof Detail Section


Dundee Blackness Regeneration Project Academic Project | Partly Group Work - Studio 3 Role : Team Leader - Graphics Producer and Model Making DBRP is an urban planning-focused project, group of 4 works collaboratively on an urban planning scale to rethink the built community on Blackness Road, located on the Northwest of Dundee University's main campus. Starting from the history of the place, and the function of buildings. The end macro strategies include the provision of high-density residential blocks, revitalizing derelict land as an open campus, and a natural park for communities. The micro strategy includes pedestrianizing part of the Blackness Road, redirecting traffic and pedestrian movement, that connects to the main university campus as an accessible and coherent community.


Technopole Campus Proposal - Personal Work

Macro Strategy - Dundee Personal Work

Technopole Campus Personal Work


D3

D3

D1

D1 D2

D2

D2

D3 D3

D3

C2

D3

C1

C2

D2

B3

C3 B2 D3 D1 B2

B1

C2 C1

D1 D1

D3

D3

URBAN EVOLUTION

0

5

10

15

20

25

50 m

MASTER PLAN Scale 1:1000

A

1. Learning HUB 2. Mix Learning Centre 3. Auditorium

A RESPONSE TO DUNDEE’S FUTURE GENERATION GROWTH 2023 - 2050

B

Over the last three years, Dundee University has experienced a substantial influx of international students and witnessed a surge in research endeavors. Consequently, there arose a necessity for campus expansion. Situated at Blackness in Dundee, this project has been designed to harmonize with the existing environment. It offers nearby accommodation options, contributing to the growing population in the area and enhancing the overall quality of living for local residents.

1. Textile Factory 2. Service | Business 3. Brewery + Beer Garden

C

1. Recreational Ground 2. Cafe | Restaurant 3. Green Space

D

1. Low Density Terrace House 2. Medium Density Housing Block 3. High Density Housing Block

Ariel Master Plan

Group Model 1:1250

Site Model 1:500 Massing Model

Relationship to Surrounding are

Foam | Card | Strings

tested in the Site Model

C3

AA

BB

C1

A2

A2

After Section Scale 1:100

0

5

10

15

20

25

0

5

10

15

20

25

A3 B2 D2 Technopole Campus Group Mode (Base) : Personal Work (Technopole) in different section.

A1

After Section Scale 1:100

50 m

50 m


Technopole Campus Proposal - Personal Work

Section Keygen

Render of Park Area


Residential Housing Project Personal Project | Design Stage Role : Spatial Design and Layout Planning The project is a single occupancy residential housing located in Taipei, the idea of using minimal material and light color palettes to create the living and dining spaces, together with the use of glass, allows certain areas to review themselves partly when the light is turned on. The design of storage spaces against the wall is suited to daily function, proportioned to the most comfortable height and organization based on the user's need.


EDU Space | Classroom skylight | Dining Area | Entrance | Section showing lighting qualities

Exterior Form | EDU Space Lighting Test | Dining Area | Hall Way Lighting | 1:50 Sectional Model to test lighting


Leisure Center Competition Design Project Professional Practice Role : Documenting Design Process | Digital Model Making | Render Work | Publication This project is based on an existing building with the renovation of the interior room to make the building into a hotel, the highlight of the project is the additional roof structure, that extends from the original building volume down to the foyer spaces, in the form of traditional pitched roof of courtyard houses in Taipei. The foyer spaces are open up the public and provide shelter and entrance walkway all the way to the foyer spaces underneath the main structure. Roof-top terraces are part of the proposal to make a restaurant space, providing views of the city under a massive roof. Project are based on professional practice work.


Macro Strategy - Dundee by Shengke


Residential Housing Proposal Professional Practice Role : Digital Model Making and Render Work

The work included spatial rearrangement and planning for interior spaces, by the implication of architectural ideas on a macro scale, allowing the control of teaching different elements, and truly understanding the scale and dimension of interior spaces. Blender software and Rhino are used in the model making and render process to produce the final imagae.

Bathroom | Bedroom Render


Living Room Render

Dining Room | Entrance


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.