Personal Information Name Birth Date Nationality Gender Marital Status Military Status Address
Language Skills
Sherif Khaled Abdelkhaliq 30/03/1994 Arabic English Frensh Egyptian Mother language Advanced level Basic level Male Single Exempted 96 Abou Bakr El-Sedeek, AZ Zaytoun Al Qebleyah, El-Zaytoun, Cairo, Egypt
Work Experience 002-01002566146 sherifkhaled.abdelkhaliq@hotmail.com https://eg.linkedin.com/in/sherif-khaled-abdelkhaliq
www.behance.net/sherifkhaled www.facebook.com/SherifKhaled.Abdelkhaliq
Software Skills Autodesk Revit Dynamo BIM Formit Pro Insight 360 Autodesk 3Ds Max Corona Renderer Autodesk AutoCAD McNeel Rhinoceros Grasshopper Adobe Photoshop Adobe Indesign Adobe Illustrator Lumion 3D Flow Design
Technical Skills Concept Generation Space Planning Facade Design Digital Programming BIM Management Researching
Employee at T.H.E ARCHITECTS, PLANNERS & CIVIL ENGINEERS INC. AASTMT Architectural Engineering & Environmental Design
09/2016 - Present 09/2018 - Present
Trainee at Engineering Consultants Group S.A. - UTW10 Engineering Consultants Group S.A. Al-Moez For Construction Engineering Consultants Group S.A. - UTW6 Nasr General Contracting Co Hassan Mohammed Allam The Arab Contractors (Osman Ahmed Osman & Co.)
06/2018 - 08/2018 06/2016 - 08/2016 06/2015 - 08/2015 07/2014 - 09/2014 06/2014 - 08/2014 06/2013 - 08/2013
Education Higher Technological Institute - 10th of Ramadan City Period GPA Graduation Project Rajac Language Schools
Bachelor’s Degree - Architectural Engineering 2011 - 2016 3.12 A -ExcellentKindergarten - Primary - Secondary - Tertiary
Volunteer Experience Engineering Consultants Group S.A. - UTW8
Teaching Coordinator
1
INDEX PROJECT DESIGN
2
DOCUMENT PREP.
BIM
FREEHAND
3
PROJECT DESIGN 4
Graduation Healthcare Hospitality Commercial Cultural Landscape Educational
5
Graduation
CAC Wellness Center Cairo Airport City Core
6
SCOPE OF WORK • Project Dissertation • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Structure System, Facade Design, Site Planning, Landscape Design, Fire Egress Planning, Interior Design) • 3D Modeling • BIModeling • Visualization and Post Production • Presentation
7
8
Structure System Analysis
Parcels Zoning Stacking Diagram
9
10
11
12
13
Healthcare
Shifa Oncology Hospital Phase III Luxor SCOPE OF WORK • Data Aquirement (Site, Context, Build-
14
ing Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Structure System, Facade Design, Site Planning, Landscape Design, Fire Egress Planning, Interior Design) • Design Development (Detailed Design, Architectural Detailing, Inter-disciplinary Coordination, Tendering, IFT & IFC Preparation, Life Safety planning and development) • QTO/MTO • Project Stakeholders Coordination (Contractor, Owner and Consultants) • 3D Modeling • BIModeling • BIM Coordination • Visualization and Post Production • Presentation
15
16
17
Healthcare
Sohag Pediatric Hospital Sohag SCOPE OF WORK • Pre-Design Report • Data Aquirement (Site, Context, Build-
18
ing Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Structure System, Facade Design, Site Planning, Landscape Design, Fire Egress Planning, Interior Design) • Design Development (Detailed Design, Architectural Detailing, Inter-disciplinary Coordination, Tendering, IFT & IFC Preparation, Life Safety planning and development) • QTO/MTO • 3D Modeling • BIModeling • BIM Coordination • Presentation
19
20
21
Healthcare
Moqattam Hospital Moqattam
22
SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Structure System, Facade Design, Site Planning, Landscape Design, Fire Egress Planning, Interior Design) • 3D Modeling • BIModeling • Visualization and Post Production • Presentation
23
24
25
Hospitality 5 Stars Hotel Qatar
26
SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Facade Design) • 3D Modeling • Presentation
Hospitality
AJG Parking - Serv. Appt. Qatar SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Block and Stack, Facade Design) • 3D Modeling • Visualization and Post Production • Presentation
27
Hospitality
AJG Parking - Serv. Appt. Qatar
28
SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Block and Stack, Facade Design) • 3D Modeling • Visualization and Post Production • Presentation
Hospitality
Reviera Resort Hotel North Coast, Egypt SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Block and Stack, Massing, Site Planning, Landscape Design) • 3D Modeling • Visualization and Post Production • Presentation
29
Commercial
Reviera Shopping Mall North Coast, Egypt
30
SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Block and Stack, Massing, Computational Facade Design, Site Planning, Landscape Design) • 3D Modeling • Visualization and Post Production • Presentation
Commercial
Arabia Shopping Mall New Cairo, Egypt SCOPE OF WORK • Conceptual Design (Facade Design) • 3D Modeling • Presentation
31
Cultural
Islamic Cairo Museum Badr City
32
SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Structure System, Facade Design, Site Planning, Landscape Design, Fire Egress Planning, Interior Design) • 3D Modeling • BIModeling • Visualization and Post Production • Presentation
33
34
35
Cultural
El-Heiz Water Education Center Bahariyya Oasis 1
36
1st Place Winner
SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Structure System, Environmental Design, Site Planning, Landscape Design, Interior Design) • Environmental Analysis • 3D Modeling • BIModeling • QTO/MTO • Cost Estimation • Visualization and Post Production • Presentation
37
38
39
Landscape
Al-Azhar School Sheikh Zayed City, Egypt SCOPE OF WORK • Data Aquirement (Site, Context, Space Program, Guidelines and references, Precedents, etc...) • Landscape Design (Hardscape, Softscape) • 3D Modeling • Rendering and Post Production • Presentation
40
Landscape
Reviera Resort North Coast, Egypt SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Residential/Commercial/Hospitality Design, Structure System, Site Planning, Landscape Design) • 3D Modeling • BIModeling • QTO/MTO • Visualization and Post Production • Presentation
41
Educational
Moringa R&D Center Bahariyya Oasis
42
SCOPE OF WORK • Data Aquirement (Site, Context, Building Function and Typology, Space Program, Guidelines and references, Precedents, etc...) • Conceptual Design (Space Planning, Structure System, Environmental Design, Site Planning, Landscape Design, Interior Design) • Environmental Analysis • 3D Modeling • BIModeling • Visualization and Post Production • Presentation
43
44
45
Parametricism 46
47
BIM 48
Shifaa Oncology Hospital Phase III
Sohag Pediatric Hospital
USA NYC Residential Building
49
BIM
Shifaa Oncology Hospital Phase III SCOPE OF BIM WORK • 3D Modeling • 2D/3D Content Creation • Quality Management (QA/QC) • Data Automation (Dynamo) • Detailed Drawings (IFT & IFC) • Drawing Package • QTO/MTO • Inter-Disciplinary Coordination (ARC, STR, MEP)
50
51
+110.75 S.S.L .
+106.65 F.F.L .
+108.84 F.F.L .
+102.65 F.F.L .
+104.73 F.F.L .
52 +98.65 F.F.L .
+100.73 F.F.L .
+95.00 F.F.L .
+96.83 F.F.L .
+90.24 F.F.L .
53
BIM
Shifaa Oncology Hospital Phase III SCOPE OF BIM WORK • 3D Modeling • 2D/3D Content Creation • Quality Management (QA/QC) • Data Automation (Dynamo) • Detailed Drawings (IFT & IFC) • Drawing Package • QTO/MTO • Inter-Disciplinary Coordination (ARC, STR, MEP) R0
11
12
13
14
15
16
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand 7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
Concerte Cover
2 cm Water Proofing
25 cm R.C Slab False Ceiling
0.93
25 cm R.C Slab False Ceiling
3.90 2.80
9.25 2.20
1.10
1.10
4.00
1.60 2.65
2ND
3.63
Recovery
2.65
6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
0.98
+101.50
+97.50
2cm Interlock 2cm Cement Mortar 6cm Clean Sand C.slap fill
1.45 0.95
1.45 0.65 2.20 3.00 3.65
4.60
3.70
2cm Conductive Viny 6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab
2.20 2.70
2.43 2.20
3.65
0.70
4.20 2.20
1.60
2.20
+92.50
+92.50
Chamber
LGR
1.98
2.18 Hallway
+86.50
5.63
1.25
Meeting Room
2cm Cement Mortar 6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
Cooking Hall 3.65
6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
2.20
2cm Porcelain Tiles 2cm Cement Mortar
3.40
Electrical
2.20
Mechanical
5.63
Mechanical
2.20
2cm Ceramic Tiles 2cm Cement Mortar 6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
+92.50 F.F.L
3.43
3.43
2.23
1.88 Mechanical
3.75
6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
5.63
5.63
6.00
2cm Ceramic Tiles 2cm Cement Mortar
+97.50 F.F.L
0.93
0.95
0.93
2.33
2.43
2.43 3.65
3.70
3.00
2.20
Sterile Storage
UGR
+91.50
Mechanical
BAS
Lobby
Soiled Receive 6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab
3.65
3.70
2.20
3.65
Material Management Non Medical Waste
0.98
1.63
0.93
2.43
0.98
0.93
0.95
1.55
Non Medical Waste 3.70
3.65
0.70
+92.20
2cm Ceramic Tiles 6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab
1.60
2.20
2.20
2cm Interlock 2cm Cement Mortar 6cm Clean Sand C.slap fill
2.20
Staff Entrance
3.65
3.70
+92.50
0.88
0.93
0.98 2.33
2.43 1.45
2.43
0.98
0.98
0.93 2.03 2.60
LGR
Staff Entrance
+101.50 F.F.L
Trauma
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
15.00
3.63
2cm Conductive Viny
2.65
2.35 2.20
2.65
Supplies Store
2.00
+97.50
1.28 1.43
0.98
3.63
Resuscitation 2.65
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.63
0.98 Hallway
2cm Conductive Viny
2.20
Triage Bay 2.40
2.35
Lobby
1.43
1.23
1.28
3.63
1.23
1.28
1.43
2.40
2.35
Waiting Area
+105.50 F.F.L
4.00
Equip./Processing Stock 2cm Conductive Viny
Hallway
2.20
+105.50
32.77
1.43 3.63
Dep. Head
Preparation
0.98
2.65
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
+109.50 F.F.L
4.00
0.98
2cm Conductive Viny
3.63
3.63 2.65 2.75 0.93
0.98
Sterilized Dumb-waiter
1.63
0.93 2.70
2.00
2.70
2.65
+101.50
2.65
3.00
2.70
2.28 0.98
0.93
2.65
Duct
0.98
Clean Utility 2.65
3RD
0.95 0.88
0.63
0.93
1.35
0.98
0.93 2.70
0.93
+105.50
Preparation
2 cm Water Proofing 25 cm R.C Slab False Ceiling
Terrace
OR Entrance
Sterile Stock
2.70
2.70
2.70
2.28
2.65
2.20 0.93
0.98
2.65 2.70 0.93
0.98 2.65
0.98
Consult. Room
2cm Porcelain Tiles
6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
2.65
2.65
2.28
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
2.65
3.63
Dep. Head
2cm Conductive Viny
Consult. Room
2.65
2.40 0.98
0.93
+109.50
2.70
2.65
2.70
3.63
0.98
0.93
0.98 3.63 2.65
2.28
0.98
1.35
1.43
0.98 0.93
0.98
0.37 0.98
1.23
1.28
1.35
3.63
2.40
2.35
2.28 1.23 2.40
Duct
3.63
0.93
0.98
0.42 0.93
3.63
2.70
2.28
2.65 3.63
Hallway
7cm Sloped Concrete 6 cm Thermal Insulation
1ST
2.20
2cm Porcelain Tiles 2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
Waiting Area 2.40
2.40
2.35
2.20
?
Hydrotherapy
+113.50 F.F.L
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
Nurse Head Lobby
Equip. Store
1.23
2.40
3.63
3.63
File Store
2.40
+97.50
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.23
0.98 PACS
2.65
2.20
3.63
1.43
0.98 2.65
Nurse Station
2.70
2.65
2.20
2cm Porcelain Tiles
0.42 0.93
0.93
1.33 0.98 0.70
3.63 2.70
2.65 1.60
2.35 2.28
Occupat. Therapy 2cm Porcelain Tiles 2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
4.00
1.60
1.60
0.93 0.05 0.98 2.70
4TH 10cm Mozico skirting
UGR
30 cm shear wall 2 cm Isolation 25cm brick
+86.50 F.F.L
1.60
Bedroom 2cm Porcelain Tiles 2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.00
0.98 3.63
+113.50
2.65
3.63
2.75
2.71
Bedroom
+117.50 F.F.L
1.03
1.60 0.88
0.92
0.93
0.93
0.50
P. W.C
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
5TH
1.60
2.70
7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
+117.50
2cm Porcelain Tiles
2.20
2.70
3.63 3.63
3.63 2.00
3.63
Recovery
1.23
1.28
1.43
0.98
2.35
2.40
3.63
1.43
6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
0.93
0.70
2.70
2.35
1.60
1.23 2.40
+101.48
3.63
1.43 3.63 Recovery
2.20
2.40
2.20
2.70
2.20
3.63
1.23
1.43
0.93
1.43
0.93 2.70
0.93
11.80
3.63 2.70
+97.50
Hallway
2.20
3.63 1.23
1.28
1.23
0.93
1.28
1.33
0.93
0.98
0.50 2.65
2.65
2.70 2.20
1.28
2.20
2.35
3.63 2.35
Hallway
1ST
Fluoroscopy
1.28 0.07 1.28
1.43
1.28
1.63
Gait Training
0.15 2.20
0.70
3.63
1.60
V. W.C
2cm Conductive Viny
Waiting Area
2.20
3.63
4.00
2.65
+101.50
Lounge
2.65
2.70
3.63
Store
2.65
2.20
+113.50
Stress Test Dep.Head
0.98
0.93
0.98
0.50 2.70
3.63 2.65
Lounge
+121.40 S.S.L
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
Terrace Terrace
1.10
3.63 2.65
Office Area
0.17 0.93 0.93 0.50
0.98
0.93 2.70 1.43
Waiting Area
Consul. Room
5.00
+92.50 F.F.L
0.93
0.93
0.98
0.98 2.20 1.33
1.26 1.28 2.20
2.20 2.35
1.25 1.03 0.98 1.60
1.60
Clinical Pharmacy
Chemotherapy cubicles 2.65
1.28
36.67
0.98
2ND
1.10
Terrace
2cm Porcelain Tiles 6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
Lobby
1.00
25 cm R.C Slab False Ceiling
1.43
1.25
4.00
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand 7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
4.00
+97.50 F.F.L
Terrace
2.80
3RD
2.20
4.00
25 cm R.C Slab False Ceiling
10cm Mozico skirting
+101.50 F.F.L
ROF
2.63
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
2 cm Water Proofing
+105.50 F.F.L
0.98
0.93 2.70
3.63
1.60 2.65
0.45 10cm Mozico skirting
2cm Porcelain Tiles
23
10cm Mozico skirting
2cm HDF Flooring 2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
Office Area
1.00
1.10 0.93 2.70
3.63
+113.50
1.00
4TH
7cm Sloped Concrete 6 cm Thermal Insulation
+109.50 F.F.L
Office Area
+117.50
22
Concrete Cover
2.80
1.03 0.98 1.60
Bedroom
2.65
1.60
4.00
+113.50 F.F.L
25 cm R.C Slab False Ceiling
1.50
54
5TH
1.60
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand 7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
3.90
+117.50 F.F.L
1.03 0.98
10cm Mozico skirting
21
2.70
ROF
20
25 cm R.C Slab False Ceiling
+121.40
2.70
+121.40 S.S.L
19
1.00
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
18
10cm Mozico skirting
10cm Mozico skirting
7cm Sloped Concrete 6 cm Thermal Insulation
17
0.93
10
2.70
9
0.98
8
2.65
7
0.93
6
2.70
5
2.80
4
2.70
3
0.93
2
2.70
1
R8'
1.25
R8''
Cook Tools Store
30 cm shear wall 2 cm Isolation 25cm brick
+86.50 BAS
+86.50 F.F.L
8
16
WIDTH HEIGHT SILL
R8'
17
18
19
20
21
22
−−−
2.20
−−−
D3
1.00
2.20
−−−
D4
0.80
2.20
−−−
D5
1.60
2.20
−−−
D6
1.80
2.20
D7
1.80
2.20
−−−
D8
1.00
2.20
−−−
D9
4.00
2.20
−−−
D10
2.00
2.20
−−−
1.90
0.1
0.60
1.90
0.3
5.00
2.20
−−−
D14
3.20
2.20
−−−
D15
2.00
2.20
−−−
D16
2.00
2.20
−−−
D17
2.00
2.20
−−−
0.70
D12
SIZE IN MTS WIDTH
HEIGHT
W1
2.00
1.60
W2
1.20
1.60 0.70
W3
1.00
W4
1.20
W5
1.60
0.70
W6
3.60
1.60
CW1
8.90
11.60
CW2
+123.40
+123.40
+123.40 +122.80
+122.90
+121.40 Roof.S.S.L
W2
W2
W2
W2
W2
W2
W1
Paint
Paint
3.90
W2
W1
8.00
W2
1.60
1.60
1.60
W1
+117.50 5th.F.F.L
Paint
2.40
Paint
W2
Louvers
W2
W2
W2
W2
W2
W1
Perforated Screen
4.00
W2
1.35
W2
1.60
1.60
1.60
W1
W1
Perforated Screen
Louvers
+113.50 4th.F.F.L
W2
W2
33.30
CW8
12.10
32.55
CW9
13.75
6.90
CW10
1.20
13.60
CW11
1.20
CW12
10.30
CW13
1.50
5.60
CW14
1.20
13.60
CW15
1.20
9.60
1.20
18.60
1.20
10.60
37.20
1.60
CW19
22.25
1.60
CW20
86.35
1.60
CW21
48.80
1.60
BEDROOM
WALL
F-1 S-4 W-1 C-1
FINISHING SCHEDU
4.00
1
13.60
4.00
4.00
W6
W6
1.70
1.70
W6
W6
W6
W6
W6
W6
W6
2.00
2.00
3.30
3.80
GRANITE GONDOLA TILES
5
CONDUCTIVE VINYL
6
FAIR FACE CONCRETE
7
MOSAICO
8
SORNAGA TILES
1
DESCRIPTION PAINT ON PLASTER
2
CERAMIC TILES 25X35cm
3
CERAMIC TILES 25X60cm
4
CREAM MARVEL MARBLE
4
+97.50 U.Ground.F.F.L
4.30
HPL−HDF FLOORING
4
NO.
Stone Coating
11.30
W6
Stone Coating
4.00
16.90
1.20
Stone Coating
CERAMIC TILES 30X30cm
3
WALL : (W) +101.50 1st.F.F.L
+101.40
DESCRIPTION
PORCELAIN TILES 60X60c
2
+105.50 2nd.F.F.L
17.40
12.95
14.30
3.25
CW2
4.00
+92.50 L.Ground.F.F.L
5.60 3.50
CW18
+95.35 Street Level
3 2
1−4−2018
WORK
1
17−5−2017
Drawin
NO.
DATE
CLIENT NAME:
5.00
+92.30 Street Level
7.65
CW17
FLOOR
+109.50 3rd.F.F.L
1.80
4.00
11.20
11.90
ROOM NAME
W2
+105.90
CW1
7.70
4.75
NO.
Stone Coating
+97.50 U.Ground.F.F.L
9.00
CW7
FLOOR : (F)
Paint
+101.50 1st.F.F.L
4.60
LEGEND :
Louvers
+105.50 2nd.F.F.L
CW6
4.00
W2
m2 area unit 9.75
Stone Coating
1.35
W2
W1
2.80
Stone Coating
W2
W2
2.40
2.80
W2
W2
1.60
4.00
W2
+109.50 3rd.F.F.L
W2
m2 area unit
CW5
CW16
+114.90
W2
1.60
4.00
W1
+114.90
1.90
+113.50 4th.F.F.L
W2
Paint CW5
1.60
W2
2.40
Paint
2.40
Paint
W2
2.40
+117.50 5th.F.F.L
W2
6.10
3.90
1.60
10.65
2.26
3.30
2.80
3.30
+121.40 Roof.S.S.L
1.90
3.20
+122.80
4.15
2.40
1.20
+124.60 U.Roof.S.S.L
1.00
m2 area unit
CW3 CW4
+124.60 U.Roof.S.S.L
−−−
D13
D11
2.20
1.00
55
1.20
D2
MARK
D1
SCHEDULE OFWIN
23
SIZE IN MTS.
MARK
SCHEDULE OF DOOR
key plan
SOHAG PE
15
14
12 13
11
R0
10
9
7
6
5
4
3
2
W.SC. 01
1
301
R8''
SOHAG PEDIATRIC HOSPITAL
+92.50 L.Ground.F.F.L
ﺔﺔ ﺍﻟﻌﻣﺭﺍﻧﻳﻳ
MINISTRY & URB CLIENT NAME:
PROJECT TITLE:
ﺎﻝ +86.50 Base.F.F.L
+86.50 Base.F.F.L
SOHAG P DRAWING TITLE:
BIM USA NYC Residential Building
56
57
DOCUMENT PREP. 58
Sohag Pediatric Hospital Pre-Design Report
Sports & Exercise Medicine Centre
&HEALTHCARE HOSPITALITY C O M P L E X
Graduation Project Thesis
It takes more than physical well-being to maintain good health. Maintaining balance, developing healthy lifelong habits and making good choices contribute to one's overall well-being and ultimately. It's never too late to begin the journey to better health, and the Wellness Center is here to help you achieve whatever goal you have set for yourself.
Building healthy minds through healthy habits. Graduation Project Wellness Center Project At Cairo Airport City Core By:Sherif Khaled Abdel-Khaliq To:Dr.Ahmed Nabih El-Menshawy Higher Technological Institute
Wellness Center at Cairo Airport City Core
By:Sherif Khaled Abdel-Khaliq
To:Dr.Ahmed Nabih El-Menshawy
SEM Center Pre-Design Report
1
Wellness Center at CAC core Where Healthcare Meets Hospitality Building healthy minds through healthy habits.
BYSherif Khaled / 20110447
TO Dr.Ahmed Nabih El-Menshawy
59
Document Prep.
Sohag Pediatric Hospital Pre-Design Report
60
61
Document Prep.
SEM Center Pre-Design Report
Sports & Exercise Medicine Centre
62
SEM Center - NAC
Overall –Functional Adjacencies Diagram-
Car DropOff/Short term parking
Car DropOff/Short term parking
Media Center Future Extension
Administration
FOH
Inpatient Wards
Pharmacy
ICU Outdoor Spaces (Outdoor Gait Training / Analysis)
Allied Health / Physiotherapy / Rehabilitation
Medical Imaging
Surgery Dept.
63
Laboratories
Support Facilities
Loading Dock
By:Sherif Khaled Abdel-Khaliq
64
To:Dr.Ahmed Nabih El-Menshawy
Document Prep. Graduation Project Thesis
HEALTHCARE &HOSPITALITY C O M P L E X
65
FREEHAND 66
67
68
T
H
A
N
K
Y
O
U