PUBLIC Living Pedestrian Bridge Cairo, Egypt 2020-2021
Data Acquirement, Conceptual Design, 3D Modeling, CAD / AAD, BIModeling, Post Production, Presentation
• 1st Place Entry - Rifat Chadirji Prize 2020 | Tamayouz Excellence Award • Winner - Innovation of the Year 2021 | The Big 5 - Egypt Impact Awards • Multiple publications on local and international platforms
22
TEAM+
Project Design
33
44
TEAM+
Project Design
55
66
TEAM+
STRUCTURAL SYSTEM
Project Design
77
AIRPORT Jazan King Abdullah International Airport Jazan, Saudi Arabia 2020-2021
Passenger Terminal Building (PTB)
8
Design Review, Design Development, 3D Modeling, CAD / AAD, BIModeling / Data Automation, Architectural Detailing, Project Documentation
Project Design
9
10
Project Design
11
12
Project Design
13
14
Project Design
15
AIRPORT Jazan King Abdullah International Airport Jazan, Saudi Arabia 2020-2021
Mosque and Annex building
16
Design Review, Design Development, 3D Modeling, CAD / AAD, BIModeling / Data Automation, Architectural Detailing, Project Documentation
AIRPORT Jazan King Abdullah International Airport Jazan, Saudi Arabia 2020-2021
Design Review, Design Development, 3D Modeling, CAD / AAD, BIModeling / Data Automation, Architectural Detailing, Project Documentation
Air Traffic Control Tower (ATC)
Project Design
17
CULTURAL Vilnius Concert Hall Vilnius, Lithuania 2020
18 18
TEAM+
Data Acquirement, Conceptual Design, 3D Modeling, BIModeling, Post Production, Project Documentation
Project Design
19 19
20 20
TEAM+
Project Design
21 21
22 22
TEAM+
Project Design
23 23
CULTURAL El-Heiz Water Education Center Bahariya Oasis, Egypt 2015
Data Acquirement, Conceptual Design, Design Development, Environmental Analysis, 3D Modeling, BIModeling, QTO/MTO, Visualization and Post Production, Project Documentation
• 1st Place Entry - RISE Design Competition | AUC • Winner - ‘Environment-Friendly Educational and Research Facilities’ category | Egypt Supreme Council of Culture - State Award 2020 • Shortlisted - Aga Khan Award for Architecture 2019
24 24
TEAM+
Project Design
25 25
26 26
TEAM+
Project Design
27 27
28 28
TEAM+
Project Design
29 29
HEALTHCARE Shefaa El Orman Oncology Hospital Phase II Luxor, Egypt 2017
30
Pre-Design Report, Data Acquirement, Conceptual Design, Design Development, 3D Modeling, BIModeling / Data Automation, QTO/ MTO, Visualization and Post Production, Project Documentation
Project Design
31
32
Project Design
33
34
Project Design
35
+110.75 S.S.L .
+106.65 F.F.L .
+108.84 F.F.L .
+102.65 F.F.L .
+104.73 F.F.L .
36 +98.65 F.F.L .
+100.73 F.F.L .
+95.00 F.F.L .
+96.83 F.F.L .
+90.24 F.F.L .
Project Design
37
HEALTHCARE Shefaa El Orman Pediatric Hospital New Sohag, Egypt 2018
38
Pre-Design Report, Data Acquirement, Conceptual Design, Design Development, 3D Modeling, BIModeling / Data Automation, QTO/ MTO, Visualization and Post Production, Project Documentation
Project Design
39
40
8.90
CW1 CW2
m2 area unit
CW4
+124.60 U.Roof.S.S.L +123.40
+123.40
+123.40 +122.80
+122.90
+121.40 Roof.S.S.L
W2
W2
W2
W2
W2
W1
W1
Paint
Paint
3.90
W2
8.00
W2
Paint
+117.50 5th.F.F.L
Paint
2.40
2.40
W2
1.60
1.60
W1
Paint CW5
W2
W2
Louvers
W2
W2
W2
W2
W1
Perforated Screen
4.00
W2
W1
Perforated Screen
Louvers
+113.50 4th.F.F.L
2.80
W2
1.35
W1
1.60
1.60
1.60
W1
W2
W2
W2
W2
1.35
4.00 4.00
16.90
W6
W6
W6
6
7
8
9
10
11
12
13
W6
15
16
17
18
19
2 cm Water Proofing
25 cm R.C Slab False Ceiling
Concerte Cover
48.80
1.60
BEDROOM F-1 S-4 W-1 C-1
2.00
22
23
25 cm R.C Slab False Ceiling
ﺔﺔ ﺍﻟﻌﻣﺭﺍﻧﻳﻳ
+121.40 S.S.L
Eleva
3.90 2.80
4
+117.50 REVISION: F.F.L 2
Mearaj C Tel: (202
9.25 2.65 2.20
4.00 1.10 1.03
0.93
1.00
+105.50
4.00
32.77
3.63
2.65
+101.50
Trauma 2.70
+97.50
2cm Interlock 2cm Cement Mortar 6cm Clean Sand C.slap fill
1.45 0.95
1.45 0.65
2.20 2.70
2.20 3.00 3.65
Lobby
4.60
2cm Conductive Viny 6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab
3.70
3.65
+97.50 F.F.L
0.93
0.95 2.33
UGR
+92.50
Chamber
15.00
2.65
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
2.43
0.70 2.20
1.60
1.98 2cm Cement Mortar 6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
Cooking Hall 3.65
5.63
1.25 2.20
+101.50 F.F.L
0.93
0.98 3.63
2cm Conductive Viny
2.18
2.23 3.40 2.20
+105.50 F.F.L
0.98
2ND
Recovery
6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
-
SOHAG PED
4.00
1.60
Preparation
0.98
2.65
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
+109.50 F.F.L
122 Mohi El-Din Abu El-E
3.43 5.63
Hallway
+86.50
+113.50 F.F.L
*TEL:+2(02)37602490
2.70
0.98
2cm Conductive Viny
3.63
3.63 1.43 3.63 2.20 1.28 1.43 2.35 2.20 0.93 4.20 2.20
2.20
+92.50
Meeting Room
3
SHEET NO.:
ARCHITECTS, PLANNERS AND
Equip./Processing Stock 2cm Conductive Viny
Hallway
2.43
2.43 3.65
3.00
3.70
Sterile Storage
3.43 6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
2
4.00
1.60
1.60 2.40 1.60 1.10 0.95 0.88 2.65 2.75 0.98
0.93 2.70
2.65 0.98
1.63
0.93
0.98 2cm Porcelain Tiles 2cm Cement Mortar
41 1
0
2 cm Water Proofing 25 cm R.C Slab False Ceiling
Soiled Receive 6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab
2.20
Electrical
DATE
CLIENT NAME:
3RD
Supplies Store
2.00
+97.50
0.93
0.98
3.63
Resuscitation 2.65
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.63
0.98
1.43 Hallway
2cm Conductive Viny
3.65
3.70
3.65
2.20 Mechanical
CREAM MARVEL MARBLE
10cm Mozico skirting
Terrace
Dep. Head 2.70
Sterilized Dumb-waiter
1.63
0.93 2.70
2.00
2.70
2.65
+101.50
2.65
3.00
2.70
2.28 0.98
0.93
2.65
Duct
0.98
Clean Utility 2.65
Preparation
2.20
Triage Bay
0.93
0.95
1.55 2.20
Mechanical
4
MECHANICAL, ELECTRI
7cm Sloped Concrete 6 cm Thermal Insulation
2.65
2.70
0.63
0.93
1.35
0.98
0.93 2.70
0.93
+105.50
2.43 6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
5.63
2cm Ceramic Tiles 2cm Cement Mortar
CERAMIC TILES 25X60cm
Drawin
4TH
OR Entrance
1.88 Mechanical
CERAMIC TILES 25X35cm
3
WORK
5TH
0.98
0.93
0.98 2.65
+109.50
3.75
6cm Clean Sand 10cm C Slab 2cm Isolation 15cm C Slab fill
DESCRIPTION PAINT ON PLASTER
2
1−4−2018
LGR
2cm Ceramic Tiles 2cm Cement Mortar
MOSAICO SORNAGA TILES
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
Sterile Stock
2.70
2.70
2.28
2.65
2.20 0.93
0.98
2.65 2.70 0.93 2.70
2.65
0.98
Consult. Room
2cm Porcelain Tiles
6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
2.65
0.98
Consult. Room
2.65
3.63 2.65
2.28
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
Material Management Non Medical Waste
3.70
3.65
0.70
Non Medical Waste
1.60
2.20
2.20
0.88
0.93
0.98 2.33
2.43 1.45
2.43 2.20
+92.20
2cm Ceramic Tiles 6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab
7 8
17−5−2017
2.70
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.60
Bedroom 2cm Porcelain Tiles
3.63
0.93
0.98
0.42 0.93
2.70
Hydrotherapy
Dep. Head
2cm Conductive Viny
2.40
2.35
Lobby
FAIR FACE CONCRETE
0.93 0.05 0.98
0.98 3.63
+113.50
2.65
3.63
2.75
2.71
Bedroom
3.63 2.65
2.28
0.98
1.35
0.98 0.93
0.98
1.43
2.65
2.70
2cm Porcelain Tiles 2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.23
1.28
3.63
1.23 2.40
2.35
Waiting Area
CONDUCTIVE VINYL
6
1 6 2 2
1.00
0.88
0.92
0.93
0.93 0.93
1.33 0.98 0.70
3.63
Occupat. Therapy
0.37 0.98
1.23
1.28
1.35
3.63
2.40
2.35
2.28 1.23
Hallway 2.40
Duct
3.63
2.40
2.40
2.35
2.20
1.28
1.43 2.20
2cm Porcelain Tiles 2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
Waiting Area
HPL−HDF FLOORING
5
1
1ST
1.23 3.63
File Store
?
3.63
0.93
0.98
0.42 0.93
3.63
2.70
2.65
2.28 1.23
2.40
3.63
2.70
2.65
2.20
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
CERAMIC TILES 30X30cm
GRANITE GONDOLA TILES
SOHAG P
7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
2.65
1.60
Terrace Terrace
Nurse Head Lobby
Equip. Store
PORCELAIN TILES 60X60c
4
MINISTRY & URB
+92.50 L.Ground.F.F.L
21
DESCRIPTION
2
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
0.50 2.70
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.60
2.35 2.28
2.00
3.63
Recovery
1.23
1.28
1.43
2.35 0.98
0.93
2.40
3.63
1.43
6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
2cm Porcelain Tiles
2.40
+97.50
0.98
0.98 3.65
3.70
1.60
CW21
CLIENT NAME:
+91.50
5.63
86.35
ROF
P. W.C
2cm Porcelain Tiles
2.20
2.65
3.63
3.63
Hallway
2.20
3.63 1.23
1.28
1.23
0.93
1.28
1.33 0.70
2.70
2.35
1.60
0.98 PACS
2.65
2.20
3.63
1.43
0.98 2.65
3.63
1.43 2.20
Nurse Station
Staff Entrance
2cm Interlock 2cm Cement Mortar 6cm Clean Sand C.slap fill
6.00
1.60
CW20
ﺎﻝ
+117.50
Mechanical
BAS
1.60
22.25
DRAWING TITLE:
1.10
2.70
2.65 3.63
Lounge
1.28 0.07 1.28
1.43
1.28
1.63
Gait Training
0.15
V. W.C
2.20
0.70 1.60
3.63 0.93
0.98
+101.48
2.40
2.35
2.20
Hallway
3.63
3.63
1.43
1.23 2.40
2.20
2.70
2.20
Recovery
0.98
0.93 2.70
3.63 2.20
3.63
Store
2.65
2.70
+113.50
0.50 2.65
1.23
1.28
1.43 3.63
2.35 0.93
1.43
0.93 2.70
0.93 2.03 2.60
LGR
+92.50
10.60
37.20
CW19
NO.
+95.35 Street Level
UGR
Staff Entrance
18.60
1.20
CW18
PROJECT TITLE:
2cm HDF Flooring 2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
Office Area
0.50
0.98
0.93
0.93
0.98
0.98
2.65
Lounge
2cm Conductive Viny
Waiting Area
2.20
3.63 0.93
11.80
3.63 2.70
+97.50
1.20
CW17
10cm Mozico skirting
0.17 0.93 0.93
0.98
0.50
2.65
2.65
2.70
1.60
Waiting Area
Consul. Room
1.00
1.10
Clinical Pharmacy
Chemotherapy cubicles
2.70 2.20
1.03 0.98
0.93
2.80 1.60 1.28
0.98
6cm Clean Sand 2cm Cement Mortar 25cm R.C Slab False Ceiling
1ST
Fluoroscopy
9.60
+86.50 Base.F.F.L
0.93 3.63
0.98
0.93 3.63
2.70
Office Area
+117.50
0.45 2.20
2cm Cement Mortar 6cm Clean Sand 25cm R.C Slab False Ceiling
1.33
1.26 1.28 2.20 2.35
2.20 1.25
Terrace
1.43
1.25
4.00
36.67 4.00
2.65
+101.50
1.20
Concrete Cover
2.70
Office Area
Stress Test Dep.Head
CW15
5.60 3.50
3
2.70
+121.40
2cm Porcelain Tiles
2cm Porcelain Tiles
Lobby
2.20
4.00
25 cm R.C Slab False Ceiling
30 cm shear wall 2 cm Isolation 25cm brick
+86.50 F.F.L
20
2.63
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
Terrace
13.60
4
10cm Mozico skirting
25 cm R.C Slab False Ceiling
1.03 0.98 1.60
1.60
2.70
3.63
+113.50
1.00
10cm Mozico skirting
25 cm R.C Slab False Ceiling
2.00
3.30
14
1.00
0.93
1.03 0.98 1.60
Bedroom
5.00
+92.50 F.F.L
W6
2.80
1.10
1.50
25 cm R.C Slab False Ceiling
2.65
1.60
4.00
4TH
4.00
+97.50 F.F.L
W6
R8'
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand 7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
2.65
3.90
5TH
2ND
5.60
1.20
3
1
2.80
5
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand 7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand 7cm Sloped Concrete 6 cm Thermal Insulation 2 cm Water Proofing
1.50
CW14
WALL : (W)
1.25
4
2 cm Water Proofing
+101.50 F.F.L
W6
3.80
4.30
7.70
3
7cm Sloped Concrete 6 cm Thermal Insulation
+105.50 F.F.L
10.30
CW13
NO.
4.00
W6
11.30
W6
7cm Sloped Concrete 6 cm Thermal Insulation
10cm Mozico skirting
CW12
2
+97.50 U.Ground.F.F.L
ROF
SOHAG PEDIATRIC HOSPITAL
13.60
1.20
1
Stone Coating
1.70
1.70
Stone Coating
R0
2
3RD
1.20
CW11
WALL
13.60
17.40
12.95
14.30
3.25 1.80
4.00 1.20 4.00
W6 CW1
10cm Mozico skirting
+109.50 F.F.L
6.90
CW10
FLOOR
+101.50 1st.F.F.L
Stone Coating
2cm Cement Mortar 2cm Moziko Tiles 6 cm Clean Sand
+113.50 F.F.L
32.55
13.75
FINISHING SCHEDU
+105.50 2nd.F.F.L
+101.40
10cm Mozico skirting
+117.50 F.F.L
12.10
CW9
Cook Tools Store
30 cm shear wall 2 cm Isolation 25cm brick
+86.50 BAS
+92.50 F.F.L
Project Design
33.30 4.00
11.20
CW2 +105.90
+86.50 Base.F.F.L
+121.40 S.S.L
CW8
7.65
ROOM NAME
W2
5.00
1
11.90
LEGEND :
+109.50 3rd.F.F.L
Stone Coating
+92.50 L.Ground.F.F.L
4.75
NO.
+97.50 U.Ground.F.F.L
+92.30 Street Level
9.00
CW7
Stone Coating
Louvers
Paint
R8''
4.60
FLOOR : (F)
+105.50 2nd.F.F.L
+101.50 1st.F.F.L
9.75
4.00
W2
W2
1.60
2.80
W2
W2
Stone Coating
1.60
4.00
W2
+109.50 3rd.F.F.L
W2
2.40
W2
m2 area unit
CW5 CW6
CW16
+114.90
1.60
4.00
W1
+114.90
1.90
+113.50 4th.F.F.L
W2
2.40
Paint
Paint
W2
2.40
+117.50 5th.F.F.L
W2
1.60
W2
6.10
3.90
1.60
10.65
2.26
3.30
2.80
3.30
+121.40 Roof.S.S.L
1.90
3.20
+122.80
4.15
2.40
1.20
+124.60 U.Roof.S.S.L
11.60
m2 area unit
CW3
+86.50 F.F.L
RESIDENTIAL ZED - El Sheikh Zayed
El Sheikh Zayed, Egypt 2019-2020
42
Design Review, Design Development, 3D Modeling, BIModeling / Data Automation, QTO/MTO, Architectural Detailing, Project Documentation
Project Design
43
RESIDENTIAL Swan Lake Residence New Cairo, Egypt 2019
44
Design Review, Design Development, 3D Modeling, BIModeling / Data Automation, QTO/MTO, Architectural Detailing, Project Documentation
Project Design
45
URBAN PLANNING Reviera Resort
North Coast, Egypt 2017
46
Data Acquirement, Conceptual Design, Urban Design, Landscape Design, 3D Modeling, CAD / AAD, BIModeling, QTO/MTO, Post Production
Project Design
47
EDUCATIONAL Moringa R&D Center
Bahariya Oasis, Egypt 2015
48
Data Acquirement, Conceptual Design, Environmental Analysis, 3D Modeling, BIModeling, Visualization and Post Production
Project Design
49
t ge me n al M an a
Off ice 2
Ma teri
Off ice 1
Med
ical C
Me an ch ica l
are Q.C
Mec ha
Q.C
nica l
Ope n Terra ce
1
2
in Ma rk Wo ps sho
r La ge ry to ra bo La
La bo
to
ry
Larg e La bora
Storag e
9
Sm tory
M. W.C Pra
all La
8
Re sea
b. 9
Sma ll La b. 8
rch ers ' Lo un g
Lect ur Entra e Hall nce & Foye r e
l Lab .7
7
Ha Small Lab
Le c ture
Large Laboratory 6
.6
Small Lab. 5
5
er Ma Op in The en a Terr ter ac e
2
1
Ha
ll
ry to
.1
Sec reta ry Ge Ma nera na l ge r
Mee tin Room g
F. W.C all
Cafet er Seat ia ing Area
Kitche
n
F. W.C
an ce H
Pe rs Fin onn e an cia l & l
Entra
Sta ff
nce
Lobb y
M. W.C
Entr
M. W.C
Seat ing Ar ea
Secr etary
M.P.U
Lou ng e
F. W.C
Co Ha nfere ll nc Entr e Foy ance er &
E Spa xh. ce 3
R& D Ce Ma nter na ge r
E Spa xh. ce 1
M. W.C
Are
. Exh 2 ce Spa
Ma Co in nfe ren
a
ce
to ry
ra bo La
2
b La all Sm
3
La bo ra
ge
b. La all
Ma Entr in The an a ce ter &F oy
Sm
ry rato bo
r La
ea ter
b. 3 all La Sm
4 tory bora e La Larg
La rge La
Lab. 4
Ma in Th
Small
ting
oratory
Sea
Large Lab
La rg e
50
Labora tory
Smal
F. W.C
yer
ll
Large
Libra ry
Rese ar Office chers' s
10
M W.C.
rge La bo ra
F W . .C
ra to ry
La
Rese arch er Office s' s
11
La rg e
Storag e
Project Design
51
GRADUATION CAC Wellness Center
Cairo Airport City Core, Egypt 2016
Data Acquirement, Conceptual Design, 3D Modeling, BIModeling, Visualization and Post Production
• 1st Place of Class 2016 - Graduation Project | Higher Technological Institute (HTI) • Nominated to represent HTI - Top National Graduation Projects of 2016 | SEA (Society of Egyptian Architects)
52
Project Design
53
54 Structure System Analysis
Parcels Zoning Stacking Diagram
Project Design
55
56
Project Design
57
58
Project Design
59
60
Other
61
62
Other
63
Finishings Automation
USA NYC - Residential Building
64
Other
65
KFMC - PCU / RDC - Project Execution Plan
66
Documentation
67
SEM Center - Pre-Design Report Sports & Exercise Medicine Centre
68
SEM Center - NAC
Overall –Functional Adjacencies Diagram-
Car DropOff/Short term parking
Car DropOff/Short term parking
Future Extension
Administration
FOH
Inpatient Wards
Pharmacy
ICU Outdoor Spaces (Outdoor Gait Training / Analysis)
Allied Health / Physiotherapy / Rehabilitation
Medical Imaging
Surgery Dept.
69
Laboratories
Support Facilities
Loading Dock
Documentation
Media Center
70
Freehand
71
72
Freehand
73