1 minute read

Danville Airport

Next Article
A Reunion

A Reunion

experience our comeback

PHOTO PROVIDED BY DANVILLE REGIONAL AIRPORT

Quick Hits:

Danville Regional Airport Renovation Project

• The airport’s shorter, crosswind runway is approximately 5000’ in length and is important to support aircraft operations for smaller aircraft when wind conditions do not support the use of the longer primary runway (5900’).

• Recent upgrades including new furniture and hallway renovations with regional tourist venue images.

• Upgrades for pilots. As part of the renovation project, the pilot’s lounge includes new powered recliners.

A new pilot’s shower was also part of the project.

This article is from: