Internship Portfolio 2018 - 2021

Page 1

ARC H ITEC TU RA L PO RTFO LIO 2018-2021

HREENI T HI S .M CHOOLOFARCHI T ECT UREAND P L ANNI NG S








Mr .Raj ’ spar ent sl i veont hel owes tf l oorwhi chhasi t sownent r ancet o t heout s i deconnect edt oas emi cover edgar denar eawhi chcanbea s pacef ort hem t os i toutdur i ngwar merdays .T hef l oorconnect st ot he ot herf l oor swi t houtavi s ual connectwhi chgi vest hem t hei rpr i vacy.

L owerGr oundF l oorpl an

T he uppergr ound f l oorand upperl evel s ar e connect ed vi s ual l y t hr ougha doubl e hei ghtopenl i vi ng r oom des i gn.T he uppergr ound f l oori ss pl i ti nt ot wol evel swhi chcanbeus eds epar at el yorcanf unct i on asanex t endedcommons pacef orl ar gef ami l ygat her i ngs . T heuppermos tf l oorhasabedr oom wi t habal conyt hatover l ookst he beaut i f ulvi ewst ot heeas tandt hecommonpas s agear eaabovet he openki t chendoubl esasa l i br ar y/r eadi ng nookwhi chover l ookst he doubl ehei ghtl i vi ngar ea.

UpperGr oundF l oorpl an

F i r s tF l oorpl an



PROJECT TITLE:

OOTY RESIDENCE DRAWING TITLE: PLUMBING LAYOUT

NAHANI TRAP (NT) WASTE WATER PIPE RAINWATER PIPE SOIL PIPE DOMESTIC WATER SUPPLY GULLY TRAP

INSPECTION CHAMBER

WASH BASIN

WASHING MACHINE

KITCHEN SINK

0.5% Slope

WATER CLOSET

0.5% Slo

pe

0.5

pe

FIRST FLOOR

Slo

UPPER GROUND FLOOR

%

LOWER GROUND FLOOR

NOTES: 1. ALL DIMENSIONS ARE IN m AND LEVELS ARE IN m UNLESS OTHERWISE SPECIFED


PROJECT TITLE:

OOTY RESIDENCE DRAWING TITLE: ELECTRICAL LAYOUT

SB9

SB9

SB7

SB10

SB10

SB3

SB7

SB3

SB7

2

2

6A POWER OUTLET

F

P

3

R

0 8

7

5

4

2

1

SB6 SB3

9 6 3

SB5

SB13

6

2

2

SB8 SB6

SB8 F

P

3

R

0 7

SB4

9

8

6

5

4

2

1

SB3

3

SB5

SB4

16A POWER OUTLET 6A ONE WAY SWITCH SB16

4

6A TWO WAY SWITCH

SB7

SB7

16A SWITCH SB13

6

2

SB1

SB2

7

6A SWITCH FOR CALLING BELL TUBELIGHT

SB8

2

2

4

6

4

SB11

SB13

2

WALL MOUNTED BRACKET LIGHT BATHROOM MIRROR LIGHT

SB11

3

SB14

SB15

2

SB12

SB12 MD

SB5

2

1 4

SB9

8

2 5

7

8

F

P

SB4

3 6 9

0 R

3

CHANDELIER

SB5

SB9

SB5

SURFACE MOUNTED CEILING LIGHT

SB13

6

SB8

CALLING BELL FIXTURE SB8 2

WASHING MACHINE SB 9

6

R

3

5

8

0

P

2

4

7

F

1

9

6

R

3

5

8

0

P

2

4

7 7

7

SB5

SB7

F

2

SB17

1

SB

SB9

SB5

SB6

2

REFRIDGERATOR

WATER GEYSER

ROOM HEATER

LOWER GROUND FLOOR

UPPER GROUND FLOOR

FIRST FLOOR

NOTES: 1. ALL DIMENSIONS ARE IN m AND LEVELS ARE IN m UNLESS OTHERWISE SPECIFED




NEI GHBOURHOODCONT EXT

Pavedpat hwaysf or wal ki ngaswel l ascycl i ng wi t hs eat i ng

T heAdyarr i ver f r onti sr ei magi nedand des i gnedcons i der i nghow t heAdyarr i ver oncewas ,f ul l ofl i f eandas pacef orpeopl e ofal l ages . T hedes i gnpr obl em wast odes i gnapubl i c s pacef ort henei ghbour hoodofS ai dapet . Pr ogr am wasdevi s edt oaccomodat e pl ayar eas ,gar dens ,pl aygr ound, per f or manceanddi s pl ays pacesal ongwi t h commer ci al act i vi t i ess uchass hoppi ngand eat er i es .

VERF RONT 02ADYARRI

ENT RY2

Opens eat i ngf or caf ewi t hs t age


Pl aygr ound/canbeus ed asamphi t heat r edur i ng event s

ENT RY1

S mal l t empor ar y s hopsf or commer ci al act i vi t y, s t r eets hoppi ng

Peacef ul gar denwi t h T empor ar yar ti ns t al l at i ons s eat i ng canbes etup

ADYARRI VER



T her ei snopl aygr oundf ort hel ocal chi l dr eni nt henei ghbour hood,s opl ayar easandcycl i ngt r acksar ebui l ti nt o t hepr oj ect .T hear eacomesunderCoas t al r egul at i onz oneasi ti sl ocat edont her i verbankss oi ti sdes i gnedas as er i esofopens paceswi t hl evel sandonl yt empor ar ybui l tups paceswhi chcanber emoveddur i ngf l oodi ng s eas on.I tai msatconnect i ngt hepeopl ewi t ht her i verbypr ovi di ngmul t i pl evi ew poi nt saswel l asdi r ect i nt er act i onwi t ht her i ver .


03



PL ANS

GROUNDF L OORPL AN

F I RS TF L OORPL AN

S ECOND

T HI RDF


DF L OORPL AN

F L OORPL AN

F OURT HF L OORPL AN

F I F T HF L OORPL AN






T hes i t ei sl ocat edonAr cotr oadi nVadapal ani .T her e i s l i t t l e gr een cover pr es ent i n t he near by nei ghbour hood.S o,a par khasbeen pr opos ed asa par toft he campuswhi ch nei ghbour hood r es i dent s canenj oyever yday. T he pr opos ed cul t ur als pace wi l lbe a s pace wher e peopl e ofal lagescan ex pl or et hei ri nt er es t sand becomesa s paceofs el fdi s cover yr egar dl es soft hei r s ki l ll eveli nt hei ri nt er es t .T heycan al s oi nt er actwi t h peopl eofs i mi l ari nt er es t s . I ti sas paceofl ei s ur ewher epeopl ecans pendt i meon weekendswi t ht empor ar yi ns t al l at i onsandf es t s . L OCAT I ONMAP

04CULTURALCENTER

S I T EPL AN


AREAPROGRAM


PL ANS

MAS T ERPL AN

PAVI L L ONANDF OODCOURT-GROUNDF L OOR

MUS I C ANDT HEAT REBL OCK GROUNDF L OOR


DANCEANDARTBL OCK-GROUNDF L OOR

F ORMALS PACESBL OCK-GROUNDF L OOR

F ORMALS PACESBL OCKANDDANCEBL OCK-F I RS TF L OOR


S ECT I ONCC’

S ECT I ONDD’



PARKDES I GN

KEYPL AN

PARKDET AI L EDPL AN




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.