Figure 138: South side of the site, used as the assembly ground (Source: Author)
The site is having staff parking and natural microclimatic conditions. These are the existing image of the site the building soon be demolished.
Advertisement
7.8 Traffic study
Figure 139: Illustration representing traffic movement around the site (Source: Author)
LTR
HTR
Figure representing the traffic movement of the site having low traffic road (L.T.R) and heavy traffic road (H.T.R). This flow of traffic is observed earlier by visiting the site.