SHUO YANG selected works
M.Arch,Assoc.AIA,LEED AP BD+C
Sandstone Panel Sandstone Panel Wood Ceiling Wood Ceiling + 54 FT.
+ 54 FT.
Glazing Railing Glazing Panel Railing Panel
treatment
exam
office
exam
exam
office
exam
+ 90 FT.
+ 90 FT.
conference room
open to below
staff breaking
office
office
+ 86 FT.
+ 86 FT.
+ 26.5 FT. + 26 FT.
workstation
office
+ 30 FT.
Steel Coping Steel Coping Concrete BlockConcrete Block Outdoor WoodOutdoor Flooring Wood Flooring Sandstone Panel Sandstone Panel
+ 26.5 FT.
nurse clinic
+ 30 FT.
Gravel
Gravel
Wings Hinge
Wings Hinge
Grid Ceiling
Grid Ceiling
+ 26 FT.
HVAC Duct w/ HVAC Terminal Duct w/ Terminal
workstation
+ 81.5 FT. ++67.5 FT. 19 FT.
+ 81.5 FT. ++67.5 FT. 19 FT.
Ceiling + 81 FT. + 67 FT.
+ 81 FT. + 67 FT.
+ 16 FT.
+ 16 FT.
Ceiling
Openable Window Openable Window
rehab gym office
Heating Tube Heating Tube Vertical TimberVertical Wings Timber Wings + 75 FT. + 61 FT.
treatment
changing
treatment
changing
treatment
gait analysis
bath
open to below soiled
+ 75 FT. + 61 FT.
Steel Truss
quite room
Stud Wall w/ Insulation Stud Wall w/ Insulation + 72 FT. ++58 11FT. FT.
+ 72 FT. ++58 11FT. FT.
forensic exam
ster
Steel Truss
Wood Panel
Wood Panel
Raised FlooringRaised Flooring
Sandstone Panel Sandstone Panel
reception workstation
clean supply
treatment
sky garden
Wood Ceiling Wood Ceiling + 54 FT. + 16 FT.
+ 54 FT. + 16 FT.
Exterior
Aluminum Frame Aluminum Frame
waiting area
Glazing Railing Glazing Panel Railing Panel Aluminum Frame Aluminum Frame
+ 30 FT.
+ 11 FT.
+ 11 FT.
+ 11 FT.
+ 30 FT.
Outdoor WoodOutdoor Flooring Wood Flooring Aluminum Frame Aluminum Frame
+ 11 FT.
Aluminum Frame Aluminum Frame + 26.5 FT.
Floor Plan
+ 26.5 FT.
Grid Ceiling + 26 FT.
+ 26 FT.
10
7
Glazing Door Glazing Door + 19 FT.
+ 19 FT.
Steel Column Steel Column
8 10
1 1 2
+ 16 FT.
Heating Tube Heating Tube
1
4
i=2%
3
Slope
i=2%
- 14 FT.
Slope
9
space
Diagram 1 2 3
Space
envelope
create balcony,terrace and courtyard to access to nature
4
Detail 01
90 percent of rooms have nature daylight
5 6 7
cantiliver canopy provides shadow for entrance
SS Credit 7.1/9.1/9.2 | IEQ Credit 8.1/8.2 *
+ 16 FT.
5
6
Envelope
double-layer low-E glass buffer the noise, isulate cool air and gain heat in winter / the transparent facade also maximize the south view horizontal louver system provide shading for south vertical timber rotated louvers for west and east shading roof cover integrated with solar panels
EA Credit 2 | IEQ Credit 2/6.1/8.1/8.2 *
air
Grid Ceiling
Double Layer Low-E Double Glass Layer Low-E Glass
- 14 FT.
+ 11 FT.
Steel Truss Dirt Filter
Steel Truss Dirt Filter
Wood Panel
Wood Panel
+ 11 FT.
Energy Strategies
8 passive chilled-beam cooling system 9 radiant heating coiling embed in the flooring 10 natural ventilation by convention and air chimney IEQ Credit 1/7 *
+ 90 FT.
+ 90 FT.
+ 90 FT. Roof
+ 16 FT.
Metal Coping Metal Coping Aluminum Frame Aluminum Frame
Entrance
Opaque Glazing Opaque w/ Insulation Glazing w/ Insulation Louver Connector Louver Connector
* LEED for Healthcare 2009 L6
+ 72 FT.
L5
+ 58 FT.
+ 86 FT.
Aluminum Frame Aluminum Frame
+ 86 FT.
Gravel
Gravel
Rotated Louvers Rotated Louvers Aluminum Frame Aluminum Frame + 11 FT.
L4
+ 16 FT.
+ 86 FT.
+ 11 FT.
+ 11 FT.
+ 11 FT.
Steel Connector Steel Connector Suspended Ceiling Suspended Ceiling
+ 44 FT. + 82 FT.
+ 82 FT.
Aluminum Frame Aluminum Frame L3
+ 30 FT.
L2
+16 FT.
L1
Âą 0 FT.
LG
- 14 FT.
Sunblind Rotated Louver Sunblind Rotated Louver Double Layer Low-E Glass Double Layer Low-E Glass Double Layer Low-E Double Glass Layer Low-E Glass Glazing Door Glazing Door Steel Column Steel Column Aluminum Frame Aluminum Frame
+ 72 FT.
+ 72 FT.
Raised FlooringRaised Flooring
Detail 02 B1
Section
01
- 30 FT.
i=2%
Slope
i=2%
- 14 FT.
Slope
- 14 FT.
Dirt Filter
Dirt Filter
Facade Section
New Student Health Center of USC
Sky Graden + 90 FT.
+ 90 FT.
Metal Coping Metal Coping
Graduate Studio| Spring 2013
Opaque Glazing Opaque w/ Insulation Glazing w/ Insulation Louver Connector Louver Connector + 86 FT.
+ 86 FT.
Gravel
Gravel
C
B
A
Janitor
Family Suite
Security Office
Adiministration Zone
Office
D
Mediation Pavillion
Grieving Room
Bridge
Chapel
MultiSensory MECH
D
Lobby
Living Room
To BMT Parking
DropOff
Recep.
DN. MECH
H.K.
Dining Hall Break Room
Locker Room
Resident Room
Up
Sharing Resident
E
Fine Arts Therapy
Locker Room
Healing Gerden Activity Room
Pool
Sharing Resident
E
Pet Sleep
SPA
Medicine Room
N.S.
STO.
Library
Community Room
Day Room
N.S.
Egress
Private Resident
Floor Plan Level 1
Volume
C
B
Courtyard
A
Balcony
Public Space
Integrated
Diagram
02
Hospice of Western North Carolina at Asheville
Graduate Studio| Fall 2012
Chapel
1 F
2 c 3
d
E
4 5
LOBBY
ENTRY
DN.
IMMERSION THEATER ART STO.
TECH. CONTROL
D a
ART GALLERY STO.
IMMERSION RM 日
IMMERSION RM 水
b
EXIT
Reception Lounge
IMMERSION RM 木
C IMMERSION RM 月
RECEPTION
IMMERSION RM 火
IMMERSION RM 土
PATIO UP
a
- 16’ -0”
B
IMMERSION RM 金
WAITING LOUNGE
STAFF ENTRY
MECH. Bath M
A
HK. OFFICE
b
DIRECTOR
Bath F
PANTRY MECH.
c
d
Floor Plan
West Facade
Immersion Theater
Facade Model
Art Gallery
site
Diagram
03
Duke Foundation of Immersion Art Pavillion
Graduate Studio| Fall 2012
Interior Rendering
Patient Room
Footwall Explorsive
Footwall Mockup
Floor Plan
04
Patient Room Prototype Design and Buil
Graduate Studio| Spring 2012
Section
Footwall Build
Facade Model
Facade Courtyard Section Redering
Floor Plan
Elevation
05
Courtyard Rendering
China Life R&D Center Professional Work| 2009 - 2010