Architecture Portfolio

Page 1

Portfolio

Siavash Habibi Selected Works


Contents

01 02 03 04 05 06

The Arctic Hotel The Kurgi Observation Tower The Abu Dhabi Visitor Center Rey Cement Factory Road & Urban Organization Office Astan Qods Museum

03 12 19 24 28 32


01

The Arctic Hotel The Rovanimei is one of those cities that seems to come straight out of a fairy tale. It is the capital of Finnish lapland, located a few kilometers from the Arctic Circle.The program was set to replace the previuos hotel and build a new one. The new building is designed over the old building to avoid cutting more trees. The site is on the pinnacle of a hill facing trees and a ski resort. The idea comes from a simple box over the footprints of the previuos building, modified for the new one. To use the most out of the view, the box is cutted to add a private terrace for every room. The ground floor is wrapped with a glass wall to capture the sun light in the day and the stars in night.

3


4


5


A

B

C

D

E

F

H

I

J

K

L

M

N

I

J

K

L

M

N

1 2

3 4

Ground Floor Plan

A

B

C

D

E

F

H

1 2

3 4

First Floor Plan 0

5

10

20 6


7


8


9


10


11


02

Kurgi Observation Tower The Kurgi farm is a family farm located in the North Vidzeme Biosphere Reserve near the Latvian-Estonian border. It is home to a unique kind of horse, the Latvian Ardennes. The farm is visited by thousands of tourists every year. The idea of the obsevation tower comes from a paradox. The contradiction of modern life represented by steel and mother nature represented by the fram. The tower is a simple box-shaped structure extended with t terraces in two sides in every floor to add more indication of a every part of the farm. The ground floor works as a serving floor, covered with glass wall with a restaurant inside.

12


2. Using every side to have a full view

1. Basic structure

3.Dividing the square into four parts by adding perpendicular axis

4.Using new sides to add more space for view

5.Extended terraces to make a unique view in every side

13


A

b

c

d

A

e

b

c

d

e

f

g

1

1

2

2

3

3 4

4 5

+18.00

- 0.00

+

6

5 7

Ground Floor Plan

Forth Floor Plan level

0 A

5

b

c

d

e

0

f

1

3 2

5

A

b

c

d

e

f

g

1

1

2

2

3

3

4

4 5

5

+24.00

+6.00

6

6 7

First Floor Plan

Fifth Floor Plan level

A

1

b

c

d

e

f

g

0

1

4 2

5

A

1

1

2

2

3

3

4

4

5

5

b

c

d

e

f

g

5

+12.00

+30.00

6

6

7

7

Second Floor Plan

2

Sixth Floor Plan level

5

0

1

5 2

5

14


15


16


17


18


03

Abu Dhabi Visitor Center The Al Wathba Wetland Reserve is a nature reserve consisting of both natural and manmade bodies of water located 40 km southeast of central Abu Dhabi. The visitor center is like a cutted part of the desert dunes, working as canopy to provide shelter and shadow for the visitors from the sharp and direct sun light of Abu Dhabi. The top roof is designed wider than the lower roof to provide a full shadow. The whole structure is an open two story building in order to help the air flow and a full 360 degree view to the wetlands.

19


Conventional 2 story ceilings

Square Grid

Desert Dunes

Sinuated Ceilings

20


South Elevation

West Elevation 21


22


23


04

Rey Cement Factory • • • • • •

Project: Recreation of Rey cement factory In collaboration with: Vaal Studio Status: Competition-Honorable Mention Year: 2020 Team: Shirin Haddadian,Milad Salehi,Siavash Habibi, Sara Behtash Role: Design team member-Presentation team member

24


‫‪2060‬‬ ‫‪2050‬‬ ‫‪2040‬‬ ‫‪2030‬‬ ‫‪2020‬‬ ‫‪2010‬‬ ‫‪2000‬‬ ‫‪1990‬‬ ‫‪1980‬‬ ‫‪1970‬‬ ‫‪1960‬‬ ‫‪1950‬‬

‫‪2054: WWF Conference in REy‬‬ ‫‪Cement factory‬‬ ‫‪1945: Second World War Ends‬‬

‫‪1950: Nationalization of the Iranian oil industry‬‬

‫‪1953: Iranian coup détat‬‬

‫‪1955: The 300ton furnace starts operating‬‬

‫‪1959: World population reaches 3 billion‬‬

‫‪1979. Islamic Revolution‬‬ ‫‪1980: Iran-Iraq War Begins‬‬

‫‪1983: Closure of Rey Cement Factory‬‬

‫‪1990: Iran Co2 Emission Reaches 100 mt‬‬

‫‪1998: Iran Co2 Emission Reaches 300 mt‬‬

‫‪2002: Iran Co2 Emission Reaches 400 mt‬‬

‫‪2006: Iran Co2 Emission Reaches 500 mt‬‬

‫‪2006: Iran Co2 Emission Reaches 600 mt‬‬

‫‪2016: States Sign Paris Agreement‬‬

‫‪2020: International Ideas‬‬ ‫‪Competition for Adaptive Reuse‬‬ ‫‪and Regeneration of Rey Cement‬‬ ‫‪Factory‬‬

‫‪2029: Tehran is amongst top 10‬‬ ‫‪sustainable cities‬‬

‫‪2036: Rey Cement Factory is the‬‬ ‫‪green heart of the region‬‬

‫‪2047: G20 Summit in Cement‬‬ ‫‪factory‬‬

‫احیای بافت طبیعی منطقه ری‬

‫کاهش چشمگیر تولید زباله‬ ‫برگزاری کنفرانس شهر پایدار‬

‫جذب توریست در ری توسط کارخانه سیمان‬

‫کالس های آموزش زندگی پایدار در ری‬

‫کارخانه سیمان مرکز کشاورزی پایدار و ارگانیک‬

‫خطر از بیخ گوش جنگل های هیرکانی گذشت‬

‫کارخانه سیمان الگوی دیگر کارخانه های آالینده قرار گیرد‬

‫گردهمایی صنایع پایدار در کارخانه سیمان‬

‫کارخانه سیمان کانون رشد و ارتقای فرهنگی منطقه است‬

‫تهران الگوی پایداری در آسیا است‬

‫یوزپلنگ ایرانی دیگر در معرض انقراض نیست‬ ‫اولین جلسه حفظ و پایداری محیط زیست در کارخانه سمان تهران برگزار شد‬

‫روند نزولی آلودگی هوای تهران شگفت انگیز است‬

‫تولید ‪ 20‬درصد برق تهران از طریق مدیریت پسماند‬

‫افزایش تعداد واگن های مترو‬

‫افزایش استفاده شهروندان از دوچرخه‬

‫میانگین مصرف بنزین روزانه ‪ ٨٧‬میلیون لیتر‬ ‫آلودگی‌هوا‌ساالنه‌بر‌مرگ‌‪۳۳‬هزار‌ایرانی‌تاثیر‌می‌گذارد‬

‫ُمد‪ ،‬دومین صنعت آالینده محیط زیست‬

‫ایرانی‌ها‌هر‌سه‌روز‌یک‌بار‌به‌اندازه‌وزن‌برج‌میالد‌زباله‌تولید‌می‌کنند‬

‫آلودگی‌هوا‌ساالنه‌‪‌۲۲۵‬میلیارد‌دالر‌از‌اقتصاد‌جهان‌را‌از‌بین‌می‌برد‬

‫خسارت‌ساالنه‌عدم‌مدیریت‌پسماند‌در‌کشور‌به‌‪‌44‬هزار‌میلیارد‌تومان‌می‌رسد‬

‫هزینه های آلودگی هوا در ایران به طور ساالنه ‪ 20‬میلیارد دالر است که معادل خرید ‪20‬‬ ‫هزار واگن برقی زیرزمینی یا تاسیس ‪ 140‬واحد صنعتی‪ 60 ،‬استادیوم با ظرفیت ‪ 50‬هزار‬ ‫صندلی و ‪ 900‬پارک ‪ 60‬هکتاری است‬

‫سهم منابع ثابت از آلودگی هوای کالنشهرها حدود ‪۱۵‬درصد است‬

‫بیشترین‌آسیب‌را‌کشورهای‌جنوب‌آسیا‌تجربه‌می‌کنند‬

‫هر‌فرد‌به‌طور‌متوسط‌‪‌۷۰۰‬تا‌‪‌۷۵۰‬گرم‌پسماند‌تولید‌می‌کند‬

‫سرانه تولید زباله در شهر تهران بین ‪ 700‬تا یک کیلوگرم است‬

‫ُمد‪ ،‬دومین صنعت آالینده محیط زیست‬

‫نسل آینده جنگلی در شمال نخواهد دید‬ ‫اقتصاد ایران هر سال ‪ ۲.۳‬درصد‬ ‫از تولید ناخالص داخلی خود را به‬ ‫دلیل آلودگی هوا از دست میدهد‬ ‫خسارت ساالنه عدم مدیریت‬ ‫پسماند در کشور به ‪ 44‬هزار‬ ‫میلیارد تومان میرسد‬ ‫در شهر تهران حدود ‪9‬هزار‬ ‫تن زباله توسط شهروندان‬ ‫تولید میشود‬

‫ایرانیها هرسه روز‬ ‫یکباربهاندازه وزن‬ ‫برج میالد زباله‬ ‫تولید میکنند‬

‫آلودگی هوا‬ ‫ناشی از‬ ‫سوختهای‬ ‫فسیلی ضرر‬ ‫اقتصادی را‬ ‫معادل ‪ ۸‬میلیارد‬ ‫دالر در روز به‬ ‫بار میآورد‬ ‫در ایران روزانه‬ ‫بیش از ‪۲۵‬‬ ‫هزار تن زباله‬ ‫در شهرها تولید‬ ‫میگردد‬ ‫هزینه‬ ‫اقتصادی‬ ‫آلودگی‬ ‫هوای‬ ‫تهران‬ ‫بین ‪ ۱۲‬تا‬ ‫‪ ۱۵‬هزار‬ ‫میلیارد‬ ‫تومان‬ ‫است‬

‫‪1943: Tehran Conference‬‬

‫‪25‬‬

‫‪1940‬‬

‫کارخانه سیمان به عنوان دروازه ورود به ری‪ ،‬احیا دروازه رشکان و ایجاد مسیر گردشگری متصل کننده آثار تاریخی‬ ‫بافت ساختمانی‪ ،‬معابر و فضاهای سبز در محدوده کارخانه سیمان‬ ‫محدوده ری باستان‪ ،‬آثار تاریخی ری و موقعیت کارخانه سیمان نسبت به آنها‬

‫‪1941: Anglo-Soviet invasion of Iran‬‬

‫محدوده هسته تاریخی ری‬ ‫چشمه علی‬

‫‪1937: The 200ton furnace starts operating‬‬

‫محدوده ری پیش از اسالم‬ ‫ارگ سلجوقی‬

‫‪1939: Second World War Begins Preparations for the 300ton furnace begins‬‬

‫ﭘﺎﯾﺪار‬ ‫داﯾﻤﻰ‬ ‫ﻓﺼﻠﻰ‬ ‫ﻣﻮﻗﺖ‬ ‫ﻣﻨﺎﺳﺒﺘﻰ‬ ‫ﺗﺨﺼﺼﻰ‬ ‫ﻋﻤﻮﻣﻰ‬ ‫ﺗﻔﺮﯾﺤﻰ‬ ‫ﮔﺮدﺷﮕﺮى‬ ‫ﻓﺮﻫﻨﮕﻰ‬ ‫ﺗﺠﺎرى‬ ‫آﻣﻮزﺷﻰ‬

‫روﯾﺪاد‬

‫‪1933: Inauguration of Rey Cement Factory‬‬

‫ﻣﺮﮐﺰ ﮔﺴﺘﺮش ﮔﻔﺘﻤﺎن ﺗﻮﺳﻌﻪ ﭘﺎﯾﺪار‬ ‫ﺷﻨﺎﺳﺎﯾﻰ‬ ‫ﻣﺴﺘﻨﺪ ﺳﺎزى‬ ‫ﺣﻔﺎﻇﺖ‬ ‫اﺣﯿﺎ‬ ‫ﺑﺎزآﻓﺮﯾﻨﻰ‬ ‫اﺻﺎﻟﺖ‬ ‫ﻫﻮﯾﺖ‬

‫روﯾﮑﺮد‬

‫ﺻﻨﺎﯾﻊ‬

‫‪1930‬‬

‫‪SUSTAINABLE DEVELOPMENT CENTER‬‬

‫ﻣﻮزه‬

‫ﻫﻮا‬ ‫ﺧﺎك‬ ‫آب‬ ‫ﺟﺎﻧﻮران‬ ‫ﮔﯿﺎﻫﺎن‬ ‫رﯾﺰ ﻣﻮﺟﻮدات‬

‫زﯾﺴﺖ ﺑﻮم‬

‫ﺑﺴﺘﺮ‬

‫ﺳﯿﻤﺎن‬

‫‪1927: World population reaches 2 billion‬‬ ‫‪1927: Construction of Rey Cement Factory Begins‬‬

‫ﺻﻨﻌﺖ‬

‫ﻣﻮاد ﺧﺎم‬ ‫ﺗﻮﻟﯿﺪ‬ ‫ﻣﺤﺼﻮل‬ ‫آﻻﯾﻨﺪﮔﻰ‬ ‫ﭘﺴﻤﺎﻧﺪ‬

‫ﻓﺮاﯾﻨﺪ‬

‫‪1920‬‬

‫ﮐﺎر‬ ‫ﻣﺨﺎﻃﺐ‬ ‫ﮔﺬﺷﺘﻪ‬ ‫ﺣﺎل‬ ‫آﯾﻨﺪه‬ ‫ﭘﮋوﻫﺶ‬ ‫ﻧﻤﺎﯾﺶ‬ ‫ﺗﻮﻟﯿﺪ‬ ‫ﻋﺮﺿﻪ‬ ‫ﻣﺴﺘﻨﺪﺳﺎزى‬ ‫ﺟﻬﺎن‬ ‫اﯾﺮان‬ ‫ﺗﻬﺮان‬ ‫رى‬ ‫ﻣﺤﻠﻪ‬ ‫ﺳﺎﯾﺖ‬ ‫ﻣﺪ و ﻟﺒﺎس‬ ‫اﻧﺮژى‬ ‫ﺳﺎﺧﺘﻤﺎن‬ ‫ﻏﺬا و دارو‬ ‫ﺷﻬﺮ‬ ‫ﺣﻤﻞ و ﻧﻘﻞ‬ ‫اﺳﺘﺎرﺗﺎپﻫﺎ‬ ‫داﻧﺶ ﺑﯿﻨﺎنﻫﺎ‬ ‫ﺷﺮﮐﺘﻬﺎى ﻓﻨﺎور‬ ‫ﻫﺎى ﺗﮏﻫﺎ‬ ‫داﻧﺸﮕﺎهﻫﺎ‬

‫ﻓﻌﺎﻟﯿﺖ‬

‫ﮐﺎرﺧﺎﻧﻪ‬

‫‪1914: First World War Begins‬‬

‫ﺧﺎﻧﻪ‬

‫ﻣﺘﺨﺼﺼﯿﻦ‬ ‫ﻧﺨﺒﮕﺎن‬ ‫ﭘﮋوﻫﺸﮕﺮان‬ ‫ﻣﺪﯾﺮان‬ ‫ﺳﺮﻣﺎﯾﻪ ﮔﺬاران‬ ‫ﺧﺎﻧﻮادهﻫﺎ‬ ‫ﺟﻮاﻧﺎن‬ ‫ﮐﻮدﮐﺎن‬ ‫ﺳﺎﻟﻤﻨﺪان‬

‫زﻣﺎن‬

‫‪REY CEMENT FACTORY‬‬

‫ﮐﺎرﺧﺎﻧﻪ ﺳﯿﻤﺎن رى‬

‫رى‬

‫ﻧﻮآورى‬

‫محدوده باستانی رشکان‬

‫دژ رشکان‬

‫دروازه رشکان‬

‫موقعیت کارخانه سیمان‬

‫برج طغرل‬

‫ابن بابویه‬

‫اتصال به پهنه سبز‬

‫اتصال به تهران‬

‫موقعیت ری و جاده ابریشم‬

‫‪1910‬‬

‫‪waste‬‬

‫‪1907: Persian Constitutional Revolution ends with the establishment of a parliament‬‬ ‫‪1908: First commercial Middle-Eastern oilfield established at Masjed Soleyman‬‬

‫‪CO2‬‬

‫‪1900‬‬

‫‪CEMENT‬‬


Sustainable in Food Industry .Exhibition .Research Laboratory .Workshops .Restaurant .Organic Market .Kitchen Ancubator .Start Ups .Office .Auditorium .Observation Tower

Sustainable in Fashion Industry .Exhibition .Research Laboratory .Workshops .CatWalk .Retail .Design Studios .Office .Auditorium

Sustainable in Energy Industry .Exhibition .Research Laboratory .Visualisation Center .Data Center .Assembly Area .Retail .Office .Start Ups

.Sustainable in Digital Industry .Exhibition .Research Laboratory .Retail .Office .Start Ups

Central Hub .Event Space

Sustainable in Construction Industry .Exhibition .Research Laboratory .Visualisation Center .Data Center .Assembly Area .Selling Area .Office .Start Ups

Cement Museum Sustainable City .Exhibition .Research Laboratory .Visualisation Center .Data Center .Assembly Area .Selling Area .Office .Start Ups .Auditorium

Restaurant Forum .Exhibition .Retail .Office .Auditoriums .Forum Hall .Observation Tower

PlayGround

26


27


05

Road & Urban Organization Office • • • • •

Project: Tehran Road & Urban organization head office In collaboration with: Experimental Branch of Architecture [M] Status: Comissioned Year: 2018 Team: Arash Mozafari,Mehrad Alimohammadi,Siavash Habibi,Forogh Sadeghpoor • Role: Design team member

28


‫مومی خود به صورت بلوکهای متصل به هم هستند که نماهای آنها در پیوستگی با هم منظر شهری تهران را شکل دادهاند‪.‬‬

‫‪.4-1‬تـــــــوده گــــــذاری بر اســــاس دستــــــور نقـــــشه‬

‫‪%100‬‬

‫‪%80‬‬

‫‪%45‬‬

‫‪site project border‬‬

‫‪office level | +7‬‬ ‫‪office level | +6‬‬ ‫‪%45‬‬

‫‪office level | +5‬‬ ‫‪office level | +4‬‬

‫‪52m‬‬

‫‪office level | +3‬‬

‫‪%80‬‬

‫د عملکــرد‬

‫‪office level | +2‬‬

‫‪%100‬‬

‫‪public plaza| roof Top lobby‬‬ ‫‪lobby| restaurant| half of a floor‬‬ ‫‪public entry |lobby| level zero‬‬

‫‪%45‬‬

‫‪services level |-1‬‬ ‫‪vip parking |mechanic -2‬‬ ‫‪staff parking |-3‬‬ ‫‪staff parking |-4‬‬

‫‪%80‬‬

‫‪staff parking |-5‬‬ ‫‪%100‬‬

‫‪.4-1‬تـــــــوده گــــــذاری بر اســــاس دستــــــور نقـــــشه‬

‫ِ‬ ‫جنوب‬ ‫قرار گیری ساختمان از شمالِ زمین تا خط ‪ 45‬درصدی زمین‪ ،‬دسترسی به پالزا از سمت‬ ‫ساختمان‬

‫‪office level | +8‬‬

‫سـاختـــــــمان مـــرکزی اداره کــل راه و شهـــــرسازی استـــــان تهـــــــــــران‬

‫‪office level | +7‬‬

‫شاخه تجربی معماری کالنشهر‬

‫]‪EBA[M‬‬

‫‪office level | +6‬‬

‫در انتزاعی ترین حالت می توان روی یکی از صفحات خطوط افقی و روی دیگری خطوط‬ ‫عمودی در نظر گرفت ‪.‬‬

‫‪office level | +5‬‬

‫استـــــان تهـــــــــــران‬ ‫سـاختـــــــمان مـــرکزی اداره کــل راه و شهـــــرسازی‬ ‫‪office level | +4‬‬

‫شاخه تجربی معماری کالنشهر‬

‫]‪EBA[M‬‬

‫‪13‬‬

‫‪%45‬‬

‫‪office level | +3‬‬

‫‪%80‬‬

‫‪amphitheatre | +2‬‬ ‫‪%100‬‬

‫‪public plaza| roof Top lobby +1‬‬ ‫‪lobby| restaurant| half of a floor‬‬ ‫‪public entry |lobby| level zero‬‬ ‫‪%45‬‬

‫‪services level |-1‬‬

‫ایــن خطــوط روی دو وجــه بیرونــی ســاختمان اســتوارند در حالــی کــه دو وجه پنهان ســاختمان‬ ‫یعنــی دیوارهــای مــرزی بــا همســایگان هــم چنــان بــه عنــوان وجــه بــی اهمیــت ســاختمان‬ ‫بــدون برنامــه رهــا شــده انــد ‪.‬‬ ‫بــا امتــداد خطــوط اولیــه نمــا روی ایــن ســطوح‪ ،‬ایــده خطــوط متنافــر بــه حجــم کلــی بنــا بســط‬ ‫داده مــی شــود و ارتبــاط میــان اجـزای ســاختمان بــا یکدیگــر پدیــد مــی آیــد ‪.‬‬

‫سـاختـــــــمان مـــرکزی اداره کــل راه و شهـــــرسازی استـــــان تهـــــــــــران‬

‫‪29‬‬

‫‪vip parking |mechanic-2‬‬

‫شاخه تجربی معماری کالنشهر‬

‫‪staff parking |-3‬‬ ‫‪staff parking |-4‬‬

‫‪%80‬‬

‫‪staff parking |-5‬‬ ‫‪%100‬‬

‫]‪EBA[M‬‬

‫‪17‬‬

‫ِ‬ ‫جنوب‬ ‫قرار گیری ساختمان از شمالِ زمین تا خط ‪ 45‬درصدی زمین‪ ،‬دسترسی به پالزا از سمت‬ ‫ساختمان‬

‫‪11‬‬


‫‪F‬‬

‫‪G‬‬

‫'‪E‬‬

‫نمای شمالی‬ ‫مقیاس ‪1/300‬‬ ‫‪D‬‬

‫‪E‬‬

‫‪C‬‬

‫‪D‬‬

‫‪A‬‬

‫‪B‬‬

‫‪A‬‬

‫‪C‬‬

‫‪B‬‬

‫'‪C‬‬

‫‪3.45‬‬

‫‪10.40‬‬

‫‪2.50‬‬

‫‪6.50‬‬

‫‪F‬‬

‫‪42.30‬‬

‫‪42.30‬‬

‫‪7.00‬‬

‫‪E‬‬

‫‪D‬‬

‫'‪E‬‬

‫‪g‬‬

‫‪6.60‬‬

‫‪5.20‬‬

‫‪5.20‬‬

‫‪6.60‬‬

‫‪7.00‬‬

‫‪6.50‬‬

‫‪2.50‬‬

‫‪10.40‬‬

‫‪3.45‬‬

‫‪39.20‬‬ ‫‪39.20‬‬

‫‪39.20‬‬

‫‪39.20‬‬

‫‪6.80‬‬

‫‪6.80‬‬

‫‪9.00‬‬

‫‪9.00‬‬

‫‪TAXI‬‬

‫سـاختـــــــمان مـــرکزی اداره کــل راه و شهـــــرسازی استـــــان تهـــــــــــران‬

‫‪30‬‬

‫شاخه تجربی معماری کالنشهر‬

‫]‪EBA[M‬‬

‫‪42‬‬

‫سـاختـــــــمان مـــرکزی اداره کــل راه و شهـــــرسازی استـــــان تهـــــــــــران‬

‫شاخه تجربی معماری کالنشهر‬

‫]‪EBA[M‬‬

‫‪41‬‬


‫دید جنوبی‬

‫‪31‬‬

‫سـاختـــــــمان مـــرکزی اداره کــل راه و شهـــــرسازی استـــــان تهـــــــــــران‬

‫شاخه تجربی معماری کالنشهر‬

‫]‪EBA[M‬‬

‫‪47‬‬


06

Astan Qods Museum • • • • • •

Project: Astan Qods Razavi Museum Competition In collaboration with: Experimental Branch of Architecture [M] Status: Competition Year: 2017 Team: Arash Mozafari,Zahra Rahmati,Alale Sarabadani,Siavash Habibi Role: Design team member-Presentaion team member

32


0 0

10

20

33


Roof

1|Coffee Shop

x 0

8.

c'

2|Lobby

w 9

8.

0

8.

b'

3|Security

v 0

8.

0

8.

a'

.0

4|Gift Shop

u

40 0

8.

0

.9

8.

40

t 0

8.

0

8.

y

6|Educational

Vertical access

z

5|Temporary Exhibition s 9

r

0.

0

8.

8

7|Museum of Imam Reza’s seerah

8

8|Administrative Offices

Muqarnas Dome

11

9|Washrooms

.0

11

10

10|Museum of Quran

0

8.

Entrance

9

11|Mechanical

0

8.

8 0

6.

12|Amphitheatre

7 .9

77

0

8.

13|Museum of Astan qods Treasures

Public spaces

6 0

8.

5

14|Museum of Leader Gifts

0

8.

4 0

8.

Water

7

15|Museum of Carpet and textiles

3

4. 2

2'

16|Museum of Razavi Shrine History

4. 0

2

4.

1

17|Museum Archival Storage Showroom Car Access to treasury Vertical access

+1 FLOOR PLAN | +6.00 | SC: 1/600

Void to central yard Main gallery

x 8.0

c' w 8.9

8.0

b'

v 8.0

8.0

a'

.0

u

40

3

8.0 .9

40

8.0

z

t

2

Utility Vertical access Treasury Central yard Water fall Main gallery

8.0

y

8.0

s 0.9

1

Amphitheatre entrance

r

8.0

Treasury Vertical access

11

Main void

.0

11

Main gallery

10

4

8.0

9 8.0

2

Amphitheatre exit

8 6.0

Vertical access

7 .9

77

Treasury

8.0

6 8.0

5

Main void

8.0

Main gallery

4 8.0

3 4.7 4.2

Treasury

4.0

2'

2

1

Water Old shrines

Main gallery

GROUN FLOOR PLAN | 0.00 | SC: 1/400

0

10

20

34


35


36


Thank you for your time


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.