WORK PORTFOLIO
2013 - 2017
CHOW SIEW MOON
OVERVIEW ARCHITECTURE
NORTHPOINT CITY MIXED DEVELOPMENT, SINGAPORE
1
CITY GATE MIXED DEVELOPMENT, SINGAPORE
2
JTC SPACE AT JALAN PESAWAT, SINGAPORE
3
INTERIOR & FURNITURE DESIGN
3 BEDROOM CONDOMINIUM AT THE LIGHT RESIDENCE, KOTA KINABALU
FURNITURE DESIGN
4
5
ARCHITECTURE
PROJECT INFORMATION “ Located in the heart of Yishun, Northpoint City will be a new Icon of Yishun, offering seamless connectivity and desirable lifestyle to the residents of Yishun. The development offers over 500 commercial units, an integrated public community centre (the first of its kind) and transportation service under one roof, in addition to the residential towers above. “
Project Type | Mixed Development comprises of 3-storey commercial podium (with basements), community club and bus interchange, and 10-storey residential development above (990 units) Land size
| 41,000 sqm
GFA
| 80,000sqm
Construction Cost Timeline
| SGD 600 million (RM 1.8 Billion)
| Q2 2013 - 2019
NORTHPOINT CITY MIXED DEVELOPMENT, SINGAPORE RESPONSIBILITIES - Worked closely with Senior Architect and Associate for Schematic Design process
documents, and subsequent amendments working with the Technical team
- Worked with Client and Consultants on Design Development Phase on design matters and technical requirements, reporting to Associate and Director
- Liaison with Authority Department Officers via emails and meetings to resolve authority requirement issues
- Worked in a team in documentation of Tender and - Preparation of DC (Development Tender Addendum Drawings and Documents. Control), BP (Building Plan) submission drawings and
- Coordination with Consultants, Contractors and Client’s Project Manager during Construction Phase to resolve design and technical issues - Attend Site Meetings, review Shop Drawings, Materials submissions and RFI, reporting to Associate. Assist in EOT evaluation.
View from road across the main entrance
Conceptual Diagram Inspired by the lush greenery on undulating grounds found on the existing Yishun Town Garden, the project extends the greenery onto the façade of the podium, creating a ‘green necklace’ that magnifies the effect of the garden to the entire development, and culminating onto the Level 3 roof garden above the retail mall.
a&A to BlocK 925
EXISTING NORTHPOINT SHOPPING CENTRE
TOWN PLAZA
NORTHPOINT CITY MIXED DEVELOPMENT (MAIN DEVELOPMENT)
mrt station site Plan
EXISTING TOWN GARDEN
TEMPORARY BUS INTERCHANGE
A1 A2 8000
A3 8000
A4 8000
A5 8000
1
2
3
8400
4
8400
5
8400
6
8400
7
8400
8
8400
9
8400
10
8400
11
8000
12
8000
13
8000
14
8000
15
8000
17 A6
16 8000 8000
16000
18 8000
19
20
8000
A7
LANDSCAPE AREA AT 1ST STOREY
8000
BUILDING
AB
LINE ABOVE
A9
37
8000
38
8000
39
8000
40
8000
8000
N BRID PR OP GE ABOV E PEDE OS ED ST RIA SIGNA N CR LISED OSSIN G
PEDE STRIA
T 4 GR A D I E N
RESID ENTIA 8.67 L AREA m²
R S A NI W DP & T A RY
H R /D S TAN R WI TH H O SE D BY
T I EN AD GR 1: 14 P M RA
FL11 20.61
A C (L ( 3 0 0 XO B B Y ) 800)
ST10 11.67 -1 m²
ACMV
FCC 10.65 m²
4m TH
A28
HR
MANA 10.34 GER R. m²
ADMI N OFFIC 33.24 E1 m²
OROU
C ON C O U R S E 3180.1 4 m²
8000
GH FA
RAM
RE
SERV 7.41 ER R. m²
PSO 16.88 2 m²
A30
LOAD ING/U NLOA DING
8000
H R /D S TAN R WI TH H O SE D BY
m² 14.24
FAD
TECH 11.02 R. m²
HR
STOR 6.54 E m² FIRST 7.59 AID m²
A32 8000 8000
/UNLOADIN G
GRADIENT
ABOV E
22.14
1:15
BUIL DING
m²
LINE
ABOV
E
COVE FAD
FL9 m² PL12 6.06 m²
3.97
7.59 ING
m²
R.
RED
WALK
ACMV
FEMA LE 26.15 TOILET m²
UP
ST8 14.16 m²
LTA
FOOD 24.88 STAL L m²
( STA M V (9 0 0 X IR C A SE ) 13 5 0 )
WA Y
E LV RI S ER
LTA
T EL RI S ER
20.26 M ET ER RI S I NG ER
FOOD 18.81 STAL L m² LTA
ALIGHTING BAY
L T A S H OP 22.31 m²
SEE BUS INTERCHANGE PACKAGE
HR
E ABOV
LINE BUIL DING
HR/DR W I TH STA N D B Y H OS E
PL 3 6.63 m²
FFL 8.70 m²
MV ( ST AI R CAS E) ( 9 0 0 X1 3 5 0 )
BI N T RU C K L AY B A Y
EL V C LO SE T
FL 3
MV ( ST AI R CAS E) ( 9 0 0 X1 3 5 0 )
FA D
11.66 m²
UP
H R / D R W I TH STA N D B Y H OS E
FL 4
FFL 8.78 m²
PEDESTRIAN CROSSING
ABOVE
ST3- 1
RE S I D E N TI A L A R E A 14.37 m² ACM V
ST 15 23.91 m²
VOI D
PL 5 6.46 m² BUILDING LINE
01-1 93 S H OP 9.26 m²
BI N P OI N T
01-1 95 S H OP 10.21 m²
PL 7 6.46 m² BI C Y C LE L OTS ( D OU B L E T I E R ) 11 R A C K S
BUILDING LINE
RE S I D E N TI A L A R E A A C M V 14.41 m² H R / D R W I TH
FA D FA D
FA D
01-1 94 S H OP 10.13 m²
BI
STA N D B Y H OS E
BI R C M AK E U P W AT E R T A N K
EA D
EA D
PL 9 6.80 m²
FAD
ID
UP
MV ( ST AI R CAS E) F RO M 2 ND FLO O R
ST5 -1 11.37 m²
BI
ACMV
22.51 UP
m²
ST6
ST 15.09 30 m²
FI R E SHUTTER
GE N S E T 39.68 m²
FEA
E OU RS BL IC 3m PU
20.41 FFL m²
ST 17
m²
FL 6
TO GAR WN DEN
CONC
COVE
HR /D S TAN R WI TH H O D BY SE
3.6m
VO MV ( ST AI R CAS E) ( 9 0 0 X1 3 5 0 )
UP
H R / D R W I TH STA N D B Y H OS E
FFL 8.22 m²
RE D
EL V
UP
RE S I D E N TI A L A R E A 9.87 m²
BI C Y C LE L OTS ( D OU B L E T I E R ) 38 R A C K S
BU I L D I NG L I N E A B OV E
E0 WD/G 2 A/35 01
BI
BU I L D I NG L I N E A B OV E
BU I L D I NG L I N E A B OV E
H R / D R W I TH STA N D B Y H OS E
FEA & ESS SERVICE ROAD
RAMP GRADIENT 1:20
10100
ACCE SSWA Y
ST 29 12.63 m²
EA D
BI
3.6m COVERED WALKWAY
BU I L D I NG L I N E A B OV E
FFL 107. 570
17.01 FL7
MV ( ST A I RC ASE ) F RO M 2 ND S T O RE Y
11.27 m² ST4 -1
UP
FL 5
FFL 8.80 m²
HR/DR W I TH STA N D B Y H OS E
ABOVE
ST 16
6.31 PL10 m²
FAD
SERV ICE HR/DR W I TH STA N D B Y H OS E ACM V ACM V ACM V
BI
ST25- 1 FFL 108. 150
WALK WA
Y
ST2- 1 19.59 m²
C OR R I D OR 49.49 m²
ST2 5
UP
ST 25 A
FFL FFL110. 108.100 100
MV ( ST AI R CAS E) F RO M 2 ND FLO O R
K ED
2746.6 7 m²
FFL 108. 100 ST2 4- 1
VOI D
BU I L D I NG L I N E A B OV E
1040.0 0 m²
SUBS 195.0 TATION 2 m²
FFL 110. 000
3.0m 2.0 PLABUILDIN NTIN G SET G STR BAC BOU NDA K LIN IP RY E LINE
ST2 4
1 m²
4HR FIRE FIRE RATIN SHUT TER G
VOID (BAS CARP EMEN BELO ARK T W)
CSR 54.09 m² FFL 108. 250
SP R I N K L E R P U M P 25.59 m²
SP R I N K L E R P U M P 31.60 m² FFL 108. 250
C OR R I D OR 41.38 m²
01-1 70 CL I N I C 44.44 m² SED
ST 24 A- 1
S I N GP OS T PARKI NG
HR
HR
SS L 6.67 m²
ST25 A- 1
UP
46.24 m²
K FD
ST 2 4 A
HR/DR HR/DR W I TH STA N D B Y 1.86 m² H OS E
VOI D
4m WIDE
W
UP H R / D R W I TH STA N D B Y H OS E RWDP
ELE C
VOI D
EL V
HR
FFL 108. 100 GA S
490 6
UP
FL 1
119.3
ESC (1 6, 17) FR OM B 1 T O L 1
VOI D
BI
3.6m COVERED WALKWAY
UP
UP
FFL 17.87 m² 28.01 m² ST1- 1 FFL 108. 100
UP M B ( L O BBY) ( 6 0 0 X8 0 0 ) AC ( L O B BY) ( 6 0 0 X8 0 0 ) MV ( ST AI R CAS E) ( 1 0 0 0 X1 3 5 0 )
WA T E R T A N K & P U MP R . ( F U L L HE I GH T CH A I N L I NK F EN C E )
TOI L E T A B OV E
ACMV
44.28 m² UP
PL 1 C OR R I D OR 6.17 m² 20.65 m²
PR OP PA VIL OSED LION
BI HR
SE CU RI T Y / FI R E SHUTTER
ACMV
VOI D
01-1 71 CL I N I C 80.57 m²
1200
PL 23
PL 24 ACMV
ACMV
1250
FA
KI T CHE N
m²
FL8
ST 31
CORRIDOR
MDF 15.24 m² FFL 108. 250
1364 PL 25
VOI D (MI DLANDI NG B E L OW )
FFL 108. 100
01-1 72 REST AUR ANT 65.08 m²
PL30
21.79
ST7 ACMV
FFL 20.87 m²
5.82 PL11m²
4 MOTORCYCLE LOTS
FFL 108. 100 LI F T L OB B Y
TEL
FFL 108. 100
HR / DR W I TH S TAN H O D BY SE
02
ID
ST 23.39 31 m²
HR
KI T CHE N
KI T CHE N
SS L 3.39 m²
KI T CHE N
VO
FFL 108. 100
01-1 67 L OW S E A T I N G R E S T A U R A N T 68.24 m²
2400
m²
FIRE SHUT TER
01-1 68/ 169 REST AUR ANT 84.70 m²
W
ST18
MV (S (9 0 0 XTA I R C A S 13 5 0 ) E )
UP
S TO RA 13.72 GE
FOOD 17.64 STAL L m²
AHU 30.70 1 m²
LIFT LOBB 8.87 m² Y
ELV
FOOD 22.38 STAL L LTA m²
HR
HR
ELEC
4.40 UP m² RECE PTION
FFL 108. 100
LTA
HR
COMM UNITY MAIN CENT LOBB RE Y
COMM 01-20 UNITY 1 164.2 CENT 4 m² RE
SE CU RI T Y / FI R E SHUTTER
FFL 108. 100
01
m²
LOUN GE
01-1 65 S H OP 39.04 m²
SE AT ING
KI T CHE N
RESID ENTIA UP 21.67 L AREA m² S TO RA 13.11 GE
HR/DR W I TH STA N D B Y H OS E
01-1 73/ 174 REST AUR ANT 230.2 1 m²
BUILDING LINE ABOVE
VOID ST 14
CUST OMER
RAMP GRADIENT 1:20
SE AT ING
01-1 01 S H OP 249.1 0 m²
m²
FOOD 18.16 STAL L m²
L T A S H OP 21.67 m²
BOU NDA RY LINE 3.0 GRE EN BUF 5.0 RO FER AD BUF LINE FER LINE
MALE 24.08 TOILET m²
ELE RI S C ER
HR
H R/ D W I TH R S TAN H OS DB Y E
EAD/ FAD
HC 5.32 m²
H R /D S TAN R WI TH H O SE D BY
A TM 5. 07 m²
HR
CORR 20.78 IDOR m²
HR
FFL 108. 100
4.832
E11
A31 8000
A33 & LOADING
UP
FIRE ENGINE ACCESS WAY
BOUNDARY LINE
FROM CARPARK
HR
3.0m GREEN BUFFER LINE
9
8000
INGR RETA ESS/E IL NGRE SS
HR
RAMP UP
UP UP
FFL 108. 100 VOID
MET ER I N G R I SER H R / D R
L T A S H OP 20.12 m²
CORRIDOR
E7
1:12
UP
FFL 11.58 m²
1250
SE AT ING
3.6m COVERED WALKWAY
8000
CARP ARK&
BI
PL13 5.82 m²
L T A S H OP 20.57 m²
3000 01-1 03 S H OP 147.1 6 m²
E10
ADMI N OFFIC MANA GER 29.81 R. m² E 2
BAY
HR/DR
L T A S H OP 21.32 m²
C OR R I D OR
01-1 76 REST AUR ANT KI T CHE N KI T CHE N 26.79 m² 01-1 75 REST AUR ANT 124.1 9 m²
E S C A L A T OR 27.63 m²
MAIN ENTRANCE
BOAR DING
L T A S H OP 18.32 m²
01-1 64 S H OP 45.10 m²
SED
01-1 02 S H OP 309.6 9 m²
FROM
GRAD IENT
PSO 21.17 1 m²
01-1 66 S H OP 24.11 m²
01-1 77/ 178 REST AUR ANT 73.05 m²
SE AT ING
ESC ( 28, 29 ) TO 2N D S T OR E Y
HR/DR W I TH STA N D B Y H OS E
K FD
P UP
A29
HR
01-1 04 L OW S H OP 20.10 m²
E
A27
1600 0
STAF F 31.94 TOILET m²
ESC ( 18, 19 ) TO 2N D S T OR E Y
S K Y L I GH T A B OV E
KAG
A26
ELE C R I SER
01-1 62 S H OP 41.61 m²
01-1 79 S H OP 39.25 m²
FFL 108. 100
PAC
A25 8000
SECU SHUT RITY TER
E S C A L A T OR 15.60 m²
AZA
8000 E
UP
LTA FOO STA LL 16.4 D 5 m² STA LL LTA FOO 16.6 D 3 m² STA LL STA LL
ABOV
A ( LO C ( 4 0 0 X BB Y) 800)
ABOV E
LINE
m²
FFL
PL14 6.17 m²
M V (L ( 6 0 0 XO BBY) 800)
BI
m²
FOO 17.0 D 0 m²
CORRIDOR
LTA
FOO 17.8 D 0 m²
LTA
6.34
A24
FFL 11.60 m²
HR
01-1 80 S H OP 34.55 m²
2400
TOW N PL
A22
M V( S T (1 0 0 0 A I R C A S E X1250 ) )
STAF F LOUN GE ROOM / BRIEF ING 99.02 m²
BUIL DING
ST9
01-1 61 S H OP 40.48 m²
01-1 63 S H OP 41.04 m²
FL 16 / E VAC
K ED
8000
A23
H R /D S TAN R WI TH H O SE D BY
R HR/ D
MV (L (6 0 0 x OB B Y ) 800) A C (L (3 0 0 x OB B Y ) 800)
H R /D S TAN R WI TH H O SE D BY
8000
R A M P 1:1
A C (L ( 3 0 0 X O B B Y) 800)
M V (L ( 6 0 0 X O B B Y) 800)
(S T A M V E) (6 0 I R C A S 0X 8 0 0)
CORRIDOR 9.63 m²
1250
CART
CORR 8.82 IDOR m²
2000
( STA M V (1 0 0 0 IR C A SE ) x1250 )
TEL
HR
HR
VOI D AT R I U M 3
1250
E5.5 E6 E6.8
8000
FFL 108. 100
VOID
SEE
A21 8000
8000
QUE UIN G LINE
UP
24.39 ST 13 m²
NURS
01-1 82 S H OP 40.41 m²
KI T CHE N
ACM V OPE N I N G
K FD
8000
A20 8000
m²
FFL
HR
L T A S H OP 18.49 m²
01-1 60 S H OP 38.00 m²
SL A B L I NE A B OV E
01-1 83 S H OP 36.43 m²
FFL 108. 100
ST 23 24.70 m²
E8
8000
2400
KI T CHE N
01-1 06 S H OP 32.72 m²
E5
TEL
FFL 12.66 m² FFL 108. 400
8000
CORR 105.4 IDOR 9 m²
8000 3000
01-1 07 S H OP 49.76 m²
7850
VOI D AT R I U M 4
ELE C T
E9
m²
28.02
HR
01-1 58 S H OP 44.09 m²
01-1 84 S H OP 37.84 m²
01-1 81 S H OP 40.41 m²
01-1 05 REST AUR ANT 23.26 m²
A D VE R T I S EM EN T
EL V
8000
HR
QUE UIN G LINE
BI
PL16 12.24 m² PL17
FL10
KI T CHE N
01-1 57 S H OP 41.04 m² 01-1 59 S H OP 80.77 m²
01-1 85 S H OP 42.92 m²
01-1 19 L OW S E A T I N G R E S T A U R A N T 48.07 m²
SEATING
01-1 08 S H OP 50.19 m²
C OR R I D OR
KI T CHE N
6000
3000
220 0
SEATING
01-1 09 S H OP 50.19 m²
FFL 108. 100
VOI D A B OV E 01-1 11 L OW S H OP 23.46 m² FFL 108. 100
GRADIENT 1:25
TEL
24.01
E0 WD/G 3 A/35 01
W I TH STA N D B Y H OS E
HR
7.5m ROAD BUFFER LINE
6.255
ST 19A-1
m²
ATM
TAXI OPY ABO ST AN VE D
RE
FFL 108. 100
01-1 55 01-1 54 REST AUR ANT REST AUR ANT 30.78 m² 30.82 m²
KI T CHE N
2400
CORRIDOR
4000
4000
SLAB LINE ABOVE
E1 E4
01-1 10 REST AUR ANT 105.9 4 m²
RAMP GR A D I E N T 1 : 2 5
4130 87.593
01-02 REST. NEW SHOP 01-01
A
E T OFFIC TICKE m² 14.25
42.48 ATM
A18 8000
CAN
GH FA
EL V
CORRIDOR
0 150
01-1 16 S H OP 27.94 m²
VOI D
01-1 20 L OW S E A T I N G R E S T A U R A N T 48.07 m²
E1.7 E2 E2.8
01-1 15 S H OP 28.87 m²
E3
784
01-1 14 S H OP 28.87 m²
01-1 56 REST AUR ANT 49.15 m²
01-1 86 S H OP 42.99 m²
KI T CHE N
FFL 108. 400
EN
ST 19-1
ACMV
VOI D
RAMP GR A D I E N T 1 : 2 5
VOI D A B OV E FFL 108. 400 2800
A16 8000
IN
TEL
01-1 18 REST AUR ANT 31.31 m²
3770 SL A B L I NE A B OV E
A15 8000
7.97 m²
SL A B L I NE A B OV E KI T CHE N
VOI D A B OV E AT R I U M 5
7116
8000
01-49 REST. 8000 8000
01-1 88 S H OP 28.78 m²
01-1 17 S H OP 29.25 m²
FFL 108. 100
8000 8000
CORRIDOR
RAMP 1:25 GRADIENT
BOUNDARY LINE
5616
KI T CHE N 01-1 23 REST AUR ANT 23.99 m²
01-1 24 S H OP 24.88 m²
C OR R I D OR
01-1 87 S H OP 31.41 m²
KI T CHE N
FFL 108. 400
01-03 REST. 01-05
01-1 25 S H OP 24.88 m²
FFL 108. 100
01-1 13 REST AUR ANT 148.1 1 m²
FFL 108. 100
KI T CHE N
REST.
01-06
36
8000
A14
HR
E S C A L A T OR 38.32 m²
150 0
01-1 22 REST AUR ANT 24.88 m²
7850
8000
01-48 SHOP
RAMP GR A D I E N T 1 : 2 5
FFL 108. 400
01-1 12 L OW S E A T I N G R E S T A U R A N T 96.12 m²
REST.
01-08 REST.
KI T CHE N
01-1 26 REST AUR ANT 133.9 9 m²
FFL 108. 100
SEATING
01-1 21 REST AUR ANT 33.28 m²
FFL 108. 100 ESC (5 , 6, 7) F R OM B A S E M E N T 1
C OR R I D OR
2400
KI T CHE N
C
01-04 SHOP
01-26 SHOP
01-25 SHOP
01-24 SHOP 01-09 SHOP
KI T CHE N
01-1 32 REST AUR ANT 67.43 m²
2884
PEDESTRIAN CONCOURSE
8000
01-47 REST.
01-33 SHOP
272°55`13" 36.002
01-32 SHOP 01-31 SHOP
BOUNDARY LINE
FCC SEC
01-30 SHOP 01-27 SHOP
01-23 SHOP
01-22 SHOP
01-21 SHOP
SERVICE LOBBY
01-20 SHOP
LOBBY
EVENTS AREA 01-10 SHOP
SHOP 01-11 SHOP
KI T CHE N
01-1 31 S H OP 40.76 m²
KI T CHE N
FFL 108. 400
8400
01-12 SHOP
01-13 REST.
01-1 30 S H OP 40.76 m²
HR
01-07 REST.
SWITCH ROOM
NEW BIN CENTRE NEW ST
NEW LACTATION (M/V ) wash area
NEW FEMALE TOILET (M/V)
NEW PANTRY
NEW MALE TOILET (M/V)
01-17 SHOP
01-18 SHOP
01-19 REST.
NEW FAMILY TOILETNEW (M/V)HCP (M/V )
09 10
18
01
3000MM WIDE GREEN BUFFER LINE
01-16 SHOP
NEW ESCALATOR
2000MM WIDE PLANTING VERGE
01-15 REST.
01-29 01-28 SHOP SHOP
12
26
62.296
01
13
BOUNDARY LINE/ROAD RESERVE LINE
94.961tot
5.632
01-14 REST.
01-1 29 REST AUR ANT 77.02 m²
FFL 108. 100
SEATING
3000MM BUILDING SETBACK LINE
01-43/44 8000 SHOP 01-45 REST.8000 8000
01-46 SHOP
NEW FEMALE TOILET (M/V)
4 8100
41.478
3
35.911
8100
2 8100
1 3925
2°55`39"
27.033
BOUNDARY LINE
3.6m COVERED WALKWAY
RAMP GRADIENT 1:15
BOUNDARY LINE
55.341 272°55`45"
8000
01-41 SHOP
8000
01-42 SHOP 4.9 sqm (52 sqft)
FFL 107.00
EVENTS AREA 01-35/36 SHOP NEW MALE TOILET (M/V)
NEW PANTRY (M/V) NEW LACTATION (M/V)
01-34 SHOP
NEW HCP (M/V)
4.304 24°01 `18"
04
2.0 PLANTING STRIP 3.0 BUILDING SETBACK LINE
8000 8000
01-40 REST.
01-39 REST. 01-37/38 SHOP
6 4800
5.4
4.332 `40" 71°00
3300
27.040
5
2° 44`02"
LINE
8100
BOUNDARY 2°53`345" 20.986
01
SEA T I N G
7200
11 4500
10 8100
9
48.906
5000MM BUILDING SETBACK LINE
3000MM WIDE GREEN BUFFER LINE
BOUNDARY LINE/ROAD RESERVE LINE
8100
8
92°54`31"
8100 8100
7
5000
BICYCLE LOTS (DOUBLE TIER) 25 RACKS
35
8000
8000
NT
KI T CHE N
01-1 33 REST AUR ANT 33.91 m²
OP E N T O S K Y
6.4m WIDE LINKWAY FROM NP3
01-1 53 REST AUR ANT 36.85 m²
FFL 108. 100
SL A B L I NE A B OV E
ESC ( 8, 9) TO 2 N D S T OR E Y FFL 108. 100
C OR R I D OR 2423.1 1 m²
KI T CHE N
B
01-18 9 to 01- 192 SOU T H A T R I U M ( L OW S H OP ) 440.7 2 m²
01-1 35 REST AUR ANT 37.48 m²
E S C A L A T OR 17.99 m²
KI T CHE N
KI T CHE N
VOI D A B OV E AT R I U M 7
2400
01-1 34 L OW S H OP 8.02 m²
S K Y L I GH T A B OV E
KI T CHE N
D
PO W D ER
RAMP GRADIENT 1:16
3000MM WIDE GREEN BUFFER LINE
5000MM BUILDING SETBACK LINE 28.316
34
8000
A19
OROU
UP
ATM
R. AVM m² 16.17
4m TH
m²
ST11 15.71 -1 m²
DI E
PED EST CRO RIAN SSIN G
FFL HR / DR S TAN WI TH H O D BY SE
2 GR A
HR
01-1 52 REST AUR ANT 65.78 m²
4000
FL12 ACMV
1 :1
FFL 108. 100
FFL 108. 100
HR
FROM E BASEMENT 1
2000
RAMP GRADIENT 1:19.5
RAMP GRADIENT 1:12
7100 9.950
PL 26
EEN F CANT STAF 64.55 m²
C OR R I D OR
01-1 36 REST AUR ANT 37.48 m²
E S C A L A T OR 20.96 m²
L KITCH HALA NON-
14.08
EL V
EN
MP
L STAL FOOD LTA 30.00 m² LL D STA FOO 5 m² LTA 25.9
01-1 51 REST AUR ANT 60.36 m²
SL A B L I NE A B OV E
6.94 m² PL18
RA
2400
01-1 27 L OW S E A T I N G R E S T A U R A N T 38.84 m²
G
01-1 41 S H OP 127.5 7 m²
EN L KITCH HALA m² 37.68
) D OW VOI BEL G ILIN
SITE BOUNDARY LINE / ROAD RESERVE LINE 6.22
33
8000
A13
UP
VOI D AT R I U M 6
RAMP GR A D I E N T 1 : 2 5
FFL 108. 400
FFL 108. 400
EXT'G ESCALATOR
32
8000
0
BOUNDARY LINE/ROAD RESERVE LINE
FFL 108. 400
SE AT ING FFL 108. 400
J
01-1 40 S H OP 92.68 m²
VOI D PL2 7
FAD
KI T CHE N 01-1 28 REST AUR ANT 103.3 9 m²
1800
BI
2 AHU m² 15.41
T R A V E L A T OR 66.52 m²
(CE
600
EXT'G ESCALATOR
KI T CHE N FFL 108. 100
UP
CORRIDOR
2700
51.220
BOUNDARY LINE/ROAD RESERVE LINE
LIFT CAR
01-1 37 REST AUR ANT 96.64 m²
45.25 m²
9.86 m² FL1 5 / EV AC FFL 108. 400
FL 14
ACMV
ELE C T
DOR RRI
CHI L D
FFL 108. 100
ST22- 1
UP
ST22 A- 1
HR/DR W I TH STA N D B Y H OS E
FFL 108. 400
CO
FE M A L E T OI L E T 56.66 m²
0 01-15 NT AURA REST 8 m² 129.3
KITCH
CS
01-1 39 S H OP 10.60 m²
ESC (26, 27) FRO M BA S E M E N T 1
220 0
9600
182°01`46"
8000
2.473
NEW
CORRIDOR 37.18 m²
8000 Qb
Qa
12000
179°23`12"
FIRE LIFT
C OR R I D OR 57.84 m²
ST2 2
SL 2
FFL 108. 100 FFL
01-1 38 S H OP 56.42 m²
3 RD ST O RE Y LIFT AB O V E
ST O R E
WN
SHU
FFL 108. 100
TOI L E T A B OV E
ST RO L L E R
HC 5.51 m²
TY
R.
NEW
NEW EVACUATION LIFT (EXTG LIFT)
EXTG ELECT
RA M P GR AD I E NT 1 :8 . 3
ST 22 A
01-1 47 S H OP 82.81 m²
URI SEC
RFS
EXT'G SHOP 01-13 (MAYBANK) 79 sqm (850 sqft)
1620
SL 1
VOI D (C EI L I N G B E L OW )
R TTE
01-1 48 S H OP 29.08 m²
R.
ESS
PIPE DUCT
31
8000
A17 CAN
OPY DR OP ABO OF F VE
RFS
NEW STAIRCASE
30
8000
8000 -1
0
FFL 108. 400
FFL 108. 400
MA L E T OI L E T 45.07 m² CHI L D
ST RO L L E R
H R / D R W I TH STA N D B Y H OS E
FRO M BA S E M E N T 2
ST20A
SL
01-14 2 to 01- 146 ANC HOR 987.1 4 m²
JA N I TOR 6.91 m²
FEE D I N G R O OM 6.39 m²
ACMV
2000
VOI D (C EI L I N G B E L OW )
ST34- 1 FFL 108. 150
K ED
BE N C H
KI T CHE N
F
29
8000
8000
ST20 UP UP
1929
SL 3
01-1 96 FCC 27.22 m²
01-1 49 S H OP 88.20 m²
HR
WN
C OM MO N C OM MO N OFFI C E
FFL 108. 400
1
m²
400
NEW STAIRCASE
FFL 108. 400
36.19 UP
ST12 15.69 -1 m²
WN
2 VOI D ( C EI LI N G B ELO W)
ST20FFL
PL20 5.93 m²
40.29 m²
UP
GR A D I EN T 1:25
EL V
ELE C T
HR
FL13
CORR 44.02 IDOR m²
KED
ST20A
WN
0 150 TEL
MV
OUT Y
K ED
K ED
FA M I LY R O OM 20.46 m²
42.47 m²
ST3 4
ELE C T
UP
C OR R I D OR 22.27 m²
AC
WALK WA
900
NEW LOADING/ UNLOADING
28
8000
A12
1500
AD
FFL 108. 200 ST34 A- 1 ST 34 A UP FFL 108. 150
RE D
R H R/D H BY T WI S TAND H OSE
EXT'G LOADING/ UNLOADING
3RD
EY STOR
RAMP GR A D I E N T 1:8. 3
FFL
H
27
8000
A11
COVE
FFL 108. 150
CHR
ST21 A- 1
UP
AY
UP
TEL
ST2 1
ST21- 1
0 400
BENCH
EXT'G LOADING/ UNLOADING
/ TO
01-1 97 RCC 38.90 m²
ALKW
CS
FROM BAS FRO EME M NT
E
FFL 108. 100
DW
RE VE
TEL
RAMP 1:1 0
2800
K
26
8000
8000
3.6m
BI
m²
m² UP
M ) FRO 1 (3,4 NT TRV EME BAS
12
RAMP 1:12 NT
EXT'G LIFT
FIRE LIFT
m CO
EL V
FFL 108.40
M
L LINKWAY 3.6m WIDE FROM NP3 EXT'G
3.6
OV
AB
EY
39.83 m² FFL 108. 200
ST 21 A
P
N
OF
STOR
ND CO
HR
FFL 107. 950
UP
Q
EXT'G PL/HL
LINE
SE
GRADIE
8100
3 2 1
EXT'G PL/HL
FFL 107. 390
FFL 107. 660
FFL 107. 680
FFL 107. 435
UP
R
EXISTING ESCALATOR
25
8000
8000
8000
RAMP GRADIENT 1:26.80
FFL 107. 270
RAMP GRADIENT 1:16
8000
12000
Ja
La
Ma
3650
EJ
ES
PROPOSED HIGH Ra COVERED LINKWAY 3800
1500
Ka
NTIAL RESIDE M L3 FRO FFL 107. 320 EGRESS
1500
0. 89
ST33 6.37
AC
IAL DENT L3 RESI ESFFLS107.TO 370 INGR
RAMP 1:14 DIENT GRA
S
fh96 7 5
24
8000
A10
8000
U
T
23
8000
5
8000
8000
GRADIENT
8000
RAMP 1:25
V
22
8000
A8 W
21
BLO CK 9 2
8000
8000
BOU NDA 3.0 GRE RY LINE AA EN BUF / ROA D RES 5.0 RO FER ERV LINE AD BUF E LINE FER LINE
SI GN A L I SE D P E D E ST R I A N CR OS S I N G
fh96 6 8
3000MM WIDE GREEN BUFFER LINE
fh9 66 3
2000MM WIDE PLANTING VERGE
BOUNDARY LINE/ROAD RESERVE LINE
ENTRANCE CANOPY LINE ABOVE
ES
ER
EQ
EP
EL
EK
7900
7900
EJ
EN
7900
7900
EH
EM
7900
6.235
3.531
8000
8000
EF
7900
EG
7900
7900
EE
2700
4700
ED
5200
EC
7850
3550
EB
105.828
BUS STOP BUS INTERCHANGE INGRESS / EGRESS 1 (LEFT-IN-LEFT-OUT)
5000
EA
fh9 66 9
BUS INTERCHANGE INGRESS/EGRESS 2 (FULL SIGNALISED JUNCTION)
E01 WD/GA/3501
2.
3.
3A
3B
.4
4A
4B
5.
5A
5B
6.
6A
6B
7.
7A
7B
8.
SLAB BELOW
SEE POB PACKAGE
1.
LEGEND B.
B. UP
B3 B9
B8
B7
B6
B5
B4
B1 B2
UP
A. A.
ST 28
FA
PROPOSED PLATFORM ESCAPE DOOR
FFL +107 . 90 FFL +108 . 50
FLOOR MAT
AA
BB
9.32 m² LIFT LOBBY PL 17 FFL +108 . 50
UP
15.78 m²
ESC (20,21) FROM BASEMENT 2
FFL +108 . 50 SECURITY SHUTTER
UP
BUS - ANCILLARY
COMMERCIAL - SUBSTATION
BUS - CONCOURSE/CORRIDOR
CC - ANCILLARY
BUS - SHOPS/F&B
CC - CORRIDOR
COMMERCIAL - ANCHOR
COMMUNITY CENTRE
COMMERCIAL - ANCILLARY
SGFA - ENTRANCE
COMMERCIAL - CLINIC
SGFA - COVERED WALKWAY
2. Pending M&E confirmation.
COMMERCIAL - CORRIDOR
RESIDENTIAL
COMMERCIAL - RESTAURANT
EXCLUDED AREA
FFL +108 . 50
UP
ST 32
AA
Note: 1. Please be informed that this set of preliminary plans are revised based on the request by the Client [FCL (AM)]. The preliminary plans are subject to all technical and authorities' requirements & compliance and final confirmation from the Client [FCL(D&P)].
1:12
SED
UP
KED
BA
1:12
FFL +107 . 90
AB
AB
COMMERCIAL - SHOPS COMMERCIAL - SCISSOR STAIRCASE
N
VERSION 36 1ST STOREY SCALE 1:500
1st Storey Plan
21 JUNE 2017 VOID
A1 A2
RET AREAS AIN ED TO BE GO OR M 9 OD AKE
8000
A3 8000
A4
BLK
8000
A5 8000
1
2
3
8400
4
8400
5
8400
6
8400
7
8400
8
8400
9
8400
10
11
16400
12
8000
13
14
16000
8000
15
16
17
A6
8000 8000
16000
18
8000
19 8000
A7
8000
SLAB LINE
ABOVE
25
8000
22 8000
TER RACE
Y BO UNDAR TE
8000
N SEAT 39.03 ING m² 02
02-1 08 S H OP 23.20 m²
02-1 24 S H OP 24.09 m²
02-1 07 S H OP 23.20 m²
02-1 06 S H OP 23.17 m²
02-1 05 S H OP 24.09 m²
(PLA NTER
A31 E LINE
D BUF
FER
BUF FER
PL 12
ACMV H
HR /D W I TH R S TAN D BY
14.59
FFL O SE 11.49 m²
ACTI VITY 32.58 ROOM 03 m² m²
COR 907.9 RIDOR 7 m²
(PLA NTER
OPE
N TO
SET G STR BACK IP
SKY)
OPE
N SEAT 16.07 ING m² 01
BOUND ARY LINE 3.0 GR EEN BUF 5.0 RO FER AD BUF LINE FER LINE
UP
ST8
CEILING BELOW
STOR AGE 11.28 03 m²
SEMI NAR 56.10 ROOM 02 m²
HC 5.02 m²
BUS INTERCHANGE BELOW
2400
ST 14
ACTI VITY 36.59 ROOM 02 m²
JANI 2.49 TOR MAL m² E TOIL 22.85 ET m² NATU (WITH RAL FIRE VENT RATE ILAT FEM ED D ALE BELO CEILING AREA 32.43 TOIL ET W) BOAR m² D
2800
HR
ELEC
1
02-1 61 L OW S H OP 68.10 m²
3000
15.28
ST7 14.45 UP m² FFL 11.76 m²
02-1 62 S C H OO L 182.6 3 m²
PL 11 NATU (WITH RALL FIRE Y VENT RATE ILAT D ED AREA BELO CEILING W) BOAR D
CORRIDOR
S K Y L I GH T A B OV E
ELV
S TO RA 6. 52 GE 0 2 m²
CON FERE 83.07NCE ROO m² M
C OR R I D OR
H R / D R W I TH STA N D B Y H OS E
ACTI VITY 42.32 ROOM 01 m²
COR RIDO 107.7 R 9 m²
OFFI 238.2 CE 0 m²
02-1 57 S H OP 47.10 m²
02-1 58 S H OP 27.30 m²
3M BUIL 2M PLA DING NTIN
FUNC TION 320.1 ROO 8 m² M 2
STOR AGE 22.56 04 m²
8000
3M BUIL 2M DING PLA NTIN SETBAC G STR K BOU NDA IP RY LINE
SEMI NAR 49.79 ROOM 01 m²
2400
02-1 04 S H OP 30.66 m²
C OR R I D OR
A32 A33
GRE
FUNC 01 TION
8000
EN
NDA RY BOU
INDO OR PREAREA
INDO OR PREAREA
FUNC TION 190.2 ROO 3 m² M 1
02-1 25 S H OP 30.66 m²
2000
8000
D RES ERV
m²
/ ROA
14.52
ROA
ACMV HR /D W I TH R
FFL H OS SETAN D BY 11.46 m²
A30 8000
SKY)
5M
FL10
N TO
3M
P
CEILING BELOW
OPE
MUS IC ROO 21.31 M 01 m²
3157
E S C A L A T OR 30.32 m²
A29 8000
1744
ST33 10.52 m²
COR RIDO R
COR RIDO R
RAMP UP GRADIENT 1:25
G SI
A28
1
OPE
(WIT NATU H FIRE RALL RAT Y VENT ED CEILI ILAT NG ED AREA BOA RD BELO W)
ST 14.50 31 m²
V OI
2000
E8
HC 4.93 m²
MC
1200
1465
(N O OR A I S A LL OW E D )
VOI D
RWDP
VOI D
15.43 m² ST2- 1 FFL 113. 600
7.53 m²
ST2 4
UP
34.51 m² SED
VOI D (C E I L I N G B EL OW )
PL 3
FFL
TANK
2
CHIL LER
PLAN 70.09 T ROO M (CC) m²
17.99 m²
ST4 -1
ACMV
FL 3
UP UP
ST3 -1 ST 15
15.60 m² 1S T S TOR E Y CE I LI N G
UP
1S T S TOR E Y CE I LI N G
PL 5
ACMV
FL 4
HR/DR W I TH STA N D B Y H OS E
1S T S TOR E Y CE I LI N G
R WD P & SA N I TA R Y
VOI D
UP
ACMV
PL 7
FFL 113. 600
FL 5 C OR R I D OR 28.12 m²
C H I L L E R P L A N T R OOM 104.1 7 m²
C OOL I N G T OW E R 86.86 m² FFL 113. 600
15.48 m²
C ON C O U R SE 5.43 m²
FFL 113. 600 UP
ST 29
HR/DR W I TH STA N D B Y H OS E
ST5 -1
FFL 113. 600
ST 15.12 30 m²
15.66 m²
(C EI
V L I NG OI D BEL
m²
ACMV
PL 9
FL 6
1S T S TOR E Y CE I LI N G
(C EI
FFL 113. 100
COO
V OI L I NG D BEL
LING TOW 58.43 ER (CC) m²
OW )
FFL 113. 100 OW )
(C EI
UP
1S T ST OR EY C E I L I N G
1S T ST OR EY C E I L I N G
15.63 1S T S TOR E Y CE I LI N G
FFL 11.75 m² ACMV
ST6
FFL 113. 500
C OR R I D OR 20.50 m²
1
MAKFFL 113. 100 EU 28.74 P TANK m²
162.2 4 m² FFL 113. 100
FL7 HR / DR S TAN WI D BY TH HO SE
FFL 113. 700
8000
FFL 113. 500
HR/DR
8
LANDSCAPE AREA
HR/DR W I TH STA N D B Y H OS E
OW )
FFL 113. 150
FL 1
FFL 10.23 m²
MV( LO B B Y) VOI D (600X 800) A C (LO B B Y) (300X 800)
V OI L I NG D BEL
PL 10
FFL 113. 600
ST2 5 38.74 m² ST 25 A
FFL 113. 600 UP UP
MV (STA I R C A SE) (1000X 1350)
VOI D (C E I L I N G B EL OW )
TANK
EL
SUBS 193.8 TATI ON 8 m² FFL 115. 700
VOID (CEIL BELO ING W)
GA S ELE C T
FFL 113. 600
PL 1
STOR AGE 7.52 01 m² (C EI
D
TEL 4.82 m²
JA N I TOR 2.66 m²
FE M A L E T OI L E T 76.00 m²
1500
ST 2 4 A
ST1- 1
7
MUS IC/KA RAO 53.63 KE ROO m² M
1500
PUBL
EL V
6
C PA N
PL30
HR / DR S TAN WI TH H O D BY SE
FL8
3M
PL2 3
MA L E T OI L E T 50.56 m²
PL2 4
PL2 5
FFL 113. 600
3000
N U R S I N G R O OM 13.89 m²
W
m²
ST18
CAT WA LK
V L I NG OI D BEL
OW )
3.0m 2.0 PLABUILDI NTINGNG SET BOUND STR BACK IP LINE ARY LINE
02-1 60 M I N I - A N C H OR 575.5 1 m²
5 HR
ESC (28, 29) F R OM 1 S T S T OR E Y FFL 113. 600
19.17 m²
E9
1800
W
1000
4
VOI D E S C A L A T OR 20.67 m²
8000
3000 TEL
11
SED
14.96 m² M&E 56.11 m²
10 9
LI F T L OB B Y FFL 113. 600
CEILING BELOW
UP
ST 23
FFL 113. 600
3
02-10 1 to 02- 103 R E S T A U R A N T ( F OOD C OU R T ) 743.4 6 m²
HR
FFL 113. 600
D
ER SWIT 13.94 CH ROOM m²
CEILING BELOW
2000
FL 16 / E VAC
V OI
CON D SUM
V OI
CORRIDOR
ACM V OPE N I N G
HR/DR W I TH STA N D B Y H OS E
UP
02-1 59 S H OP 137.4 3 m²
12
RY LINE
A LE 27.77 T OI L E T m²
HC m²
PA N TRY 14.68 m²
BELO W)
BOU NDA
F EM
4. 77
LE T 32.21 OI L ET m²
RATE VOID D CEIL ING
02-1 64 S C H OO L 112.1 6 m²
CORRIDOR
TEL
RAMP GRADIENT 1:25
E7
SKY
HR
MA
(FIRE
A27
UP
EL V
FFL 113. 500
8000
02-1 22 S H OP 23.20 m²
FFL 113. 600
2
E6
87.593
A26 16000
FUNC 02 TION
02-1 63 S C H OO L 129.4 7 m²
K
8000
TO SKY)
HR
FFL 16.68 m²
8000
OPEN
2400
02-1 56 S H OP 54.60 m²
3000
FFL 113. 600
VOI D AT R I U M 4
SPI N K L ER
A
TER
ROO M m² 02
W
02-1 09 S H OP 23.41 m²
ELE C T
FFL 113. 600 ATM
8000
02-1 21 S H OP 23.20 m²
02-1 23 S H OP 23.17 m²
FFL 113. 600
FFL 113. 600
02-1 10 S H OP 23.41 m²
3000
E4 E5
E5.5
4130
02-1 19/ 120 S H OP 46.83 m² FFL 113. 300
FFL 113. 600
2250 RAMP GRADIENT 1:25
KI T CHE N
VOI D
10.88
KI T CHE N
VOI D AT R I U M 3 CORRIDOR
E2.8 E3
RAMP GRADIENT 1:15
7850 3770
02-1 14 REST AUR ANT 52.26 m² FFL 113. 000
ROO M m² 03 MU SIC
UP UP
ST10 15.61 -1 m²
HR
FFL 1 13 . 4 77 RA M P GRA D I E N T 1 : 2 5
FFL 113. 253
FFL 113. 000
FFL 113. 477 02-1 11/ 112 S H OP 45.87 m²
FFL 8.37 m²
HR /D W I TH R S TAN H O D BY SE
FL9
C OR R I D OR
FFL 113. 600
FFL 113. 000 SED
02-1 13 S H OP 35.68 m²
PL 14
VOID
02-1 55 L OW S E A T I N G R E S T A U R A N T 80.67 m²
02-1 26/ 127 L OW S E A T I N G R E S T A U R A N T 130.2 1 m²
2400
7116 784 7850
02-1 16 S H OP 35.74 m²
15.45 FL11
CHIL DREN 02-20 CENT 1 ACTI FOR RE FACI VITIE CHIL LITIE PRO S/ENRICHD S GRA 420.5 MMES MENT 7 m²
VOID
02-1 65 S C H OO L 129.4 7 m²
ESC (18, 19) F R OM 1 S T S T OR E Y
KI T CHE N
FFL 1 13 . 3 56 02-1 17/ 118 S H OP 45.88 m²
FFL 113. 000
HC 4.95 m²
ALE 23.70 TOIL ET m²
A25
UP
02-1 52 S C H OO L 37.78 m²
02-1 32/ 133 L OW S E A T I N G R E S T A U R A N T 130.0 6 m²
KI T CHE N
FFL 113. 600
RA M P GRA D I E N T 1 : 2 5
FFL 113. 000
ET
FEM
REY STO 3RD B LINE SLA
A24 8000 (PLAN
02-1 66 S C H OO L 197.7 2 m²
CORRIDOR
KI T CHE N
KI T CHE N
2400
8000
MU SIC
CATW 12.75 ALK m²
2400
C OR R I D OR
HR
E1.7
02-1 53 S H OP 37.43 m²
VOI D AT R I U M 5
FFL 112. 950
m²
G
BOU NDA RY LINE 2M PLA NTIN 3M BUIL G DING STRIP SET BAC
A23
m²
ST 13
FFL 113. 600
FFL 113. 000 FFL 113. 300
CORRIDOR
E2
02-1 54 S H OP 20.62 m²
2400
C OR R I D OR
DRO P
KI T CHE N
27.06
JANI 2.50 TOR m²
BELO
02-1 34 S H OP 35.72 m²
E LINE
A22
IC CON COU RSE
02-1 35 S H OP 36.21 m²
FER
D RES ERV
SITE
2400
FFL 113. 600
02-1 28/ 129 L OW S E A T I N G R E S T A U R A N T DRO P 132.8 2 m² FFL 113. 000 FFL 113. 300
FFL 1 13 . 0 20
HEN & KITC MS Y ROO 7 m² 89.4 MAL E 23.63 TOIL
CORRIDOR
02-1 36 S H OP 38.12 m²
D BUF
BUF FER
ST9
CORRIDOR
02-1 37 S H OP 41.07 m²
FFL 113. 300
FFL 1 13 . 3 56
E1 5616 2884
02-1 51 S H OP 38.46 m²
HR
02-1 50 S H OP 47.20 m²
EXISTIN
8000 CORRIDOR
CORRIDOR
2400
2400 02-1 49 S H OP 36.36 m²
2400
RAMP GRADIENT 1:25
BOUNDARY LINE
8000
02-44 REST. 8000
272°55`13"
VOID
36.002
02-52/53/54 8000 REST.
2600 WIDE CORRIDOR
02-1 47/ 148 S H OP 75.67 m²
02-1 38 S H OP 100.5 1 m²
RA M P GRA D I E N T 1 : 2 5
FFL 112. 950
PL 16
INAR
S T OR A GE 0 7 8.53 m²
C OR R I D OR
ROA
EN
/ ROA
8000
PL 17
CUL
PIT LIFT M3RD FRO REY STO
RE CENT TYLE LIFES 75.54 m²
GRE
A21 8000
01
ACMV
PL 13
02-1 30/ 131 L OW S E A T I N G R E S T A U R A N T 132.5 9 m²
FFL 112. 950
02-03 SHOP
02-1 68 S H OP 35.55 m²
E0 WD/ 3 GA/35
ACTI VITY 36.68 ROOM 04 m²
T EL C LO S ET
TEL
02-1 67 S C H OO L 105.2 9 m²
S K Y L I GH T A B OV E
FFL 113. 000
FFL 113. 000
RECE 11.17 PTION m²
ID OR
05 AGE m² 06 STOR 10.85 AGE STOR m² 15.52
IO C STUD MUSI E & 7 m² DANC 137.3
FFL 113. 100
FFL 113. 600
& FIRE TY URI TTER SEC SHU
E)
UP
ST11 15.47 -1 m²
2400
02-1 39 S H OP 100.5 1 m²
FFL 113. 000
FFL 113. 000 02-1 15 L OW S E A T I N G R E S T A U R A N T 46.61 m²
02-04/05 SHOP
SEATIN
KI T CHE N
KI T CHE N
FFL
HR
CORR
FFL 113. 100
RA M P U P GR A D I E N T 1 : 2 5 02-1 69 S H OP 30.48 m²
02-1 71 L OW S E A T I N G R E S T A U R A N T 40.30 m² VOI D AT R I U M 7
02-1 70 L OW S E A T I N G R E S T A U R A N T 40.28 m²
2100
1852
8400
E0 WD/ 2 GA/35
01
CAT WA LK
E10.3 E10.1 E10
02-06 REST.
02-1 83/ 184 S C H OO L 121.3 9 m² 02-1 81/ 182 S C H OO L 210.3 1 m²
FFL 113. 100
5M 3M
NDA RY
8000
VOID
HR
FFL 113. 600
VOI D
HR
C
FFL 113. 100
HR/DR W I TH STA N D B Y H OS E
FFL 113. 215
E S C A L A T OR 20.56 m²
02-1 46 S H OP 46.73 m²
FFL 1 13 . 0 20
FL12
HR
FFL 113. 600
C OR R I D OR
C OR R I D OR 2123.5 1 m²
02-1 40 S H OP 87.04 m²
M (L O V AC (L BB Y ) SPR OB BY ) ELE / M C (S T AI V R CA S
INDO OR PLAY 46.58 GRO UND m²
FL 14 02-1 72 S H OP 10.52 m²
E S C A L A T OR 27.91 m²
PL18
/D R H R / DR W I TH S TAN H O D BY SE
FFL 113. 100
FFL 113. 197
FFL 113. 600
8000
BOUNDARY LINE
FFL 113. 215
02-1 74 S H OP 72.07 m²
2400
B
02-07 REST.
HR
02-1 73 S H OP 84.46 m²
C OR R I D OR
VOI D AT R I U M 6
FFL 112. 950 2400
OP E N T O S K Y
BUILDING LINE ABOVE
BU I L D I NG L I N E A B OV E BU I L D I NG L I N E A B OV E
3.0m GREEN BUFFER LINE E10.7
BOUNDARY LINE
10100
7.5m ROAD BUFFER LINE
AHU
02-09/10/11 SHOP
FE M A L E T OI L E T 58.39 m²
PL 26
PL2 7
KI T CHE N
2900
8000
02-28 REST.
2500
3000
BOUNDARY LINE 55.341 3000MM BUILDING SETBACK LINE
FFL 113. 000
BUIL DI NG LI NE AB OV E
VOID
HC 5.51 m²
SL 2
FFL 113. 000
FFL 112. 950
6.255
02-12 SHOP
40 8000
A20
FFL 113. 100 HR
ELECT
BOU
A19 8000
HR
ELV
2400
D
02-27 REST.
ACMV
1620
8000
FFL 113. 100
FFL 113. 100
2400 FAD
FFL 113. 600
RA M P GRA D I E N T 1 : 2 5
FFL 113. 000
8000
02-01/02 SHOP
INFOR COUNTER
02-25 SHOP 02-26 SHOP
02-24 SHOP
02-22 SHOP
EL V
SITE
A18
02-18 CSFS 6 300.0 0 m²
02-1 85 CH I L D CA R E (C S F S ) 500.0 0 m²
FFL 113. 600
02-1 79/ 180 S C H OO L 236.7 1 m²
VOI D
FL1 5 / EV AC
FFL 113. 250
FFL 112. 950
E
02-08 REST.
TOI L E T A B OV E
02-1 44 S H OP 62.20 m²
02-1 43 S H OP 55.72 m²
UP
FFL H R / D R W I TH STA N D B Y H OS E
02-1 41 L OW S E A T I N G R E S T A U R A N T 84.61 m²
2.7m WIDE LINKWAY FROM NP3
4.832
02-13 SHOP
KITC HEN
FFL 113. 100
02-17 5 to 02- 178 ANC HOR 1090.5 8 m²
HR
F
02-23 SHOP
SERVICE LOBBY
02-21 SHOP
NEW HCPNEW FAMILY TOILET (M/V) (M/V )
ELEC
02-20 SHOP VOID
02-17 REST.
02-16 REST.
ST 22 A
UP
02-43 REST.8000
02-45 SHOP
02-46 SHOP
02-47 SHOP 02-48 SHOP 02-49 SHOP 02-50/51 SHOP
02-30 SHOP 02-29 SHOP 26
13
12
NEW MALE TOILET (M/V) BIN
NEW FEMALE TOILET (M/V) HD
02-19 SHOP
HD
NEW PANTRY (M/V)
02-18 SHOP
NEW LACTATION (M/V)
19
18
01
27
3000MM WIDE GREEN BUFFER LINE 19
02-1 45 S H OP 47.55 m²
VOI D (C E I L I N G B EL OW )
272°55`45"
8000
02-42 REST.8000
EXT'G FEMALE (M/V) NEW PANTRY (M/V )
02-40 SHOP
02-41 8000 SHOP VOID
BIN
NEW LACTATION (M/V )
EXT'G MALE (M/V)
02-34 SHOP 02-35 SHOP 02-36 SHOP 02-32 SHOP 02-33 SHOP
02-31 SHOP
3100 WIDE CORRIDOR
35.911
14
01
62.296 10
A17 8000
R UP
FFL FFL 113. 600
02-1 42 S H OP FFL 113. 000 25.30 m²
4
41.478
8100
3 8100
2 8100 BOUNDARY LINE/ROAD RESERVE LINE
18
39 8000
A16 8000
SHOWE
ST20
FFL 113. 600
CORRIDOR
2.0 PLANTING STRIP 3.0 BUILDING SETBACK LINE
8000 8000
02-39 SHOP
02-38 SHOP
02-37 SHOP
5000MM BUILDING SETBACK LINE
TEL
FFL 113. 000
H
1 94.961tot
5.632
02-15 REST.
2500
CHR
EXISTING ESCALATOR
02-14 REST.
38 8000
A15
R
ST20 40.74 A m²
SL
FFL 113. 600 ES C (8 , 9 ) F ROM ESC ( 10, 11 ) TO 1S T S TOR E Y 3R D S T OR E Y
2.5m WIDE LINKWAY FROM NP3
3925
2°55`39"
BOUNDARY LINE
37 8000
8000
SHOWE
E)
VOID
3 RD ST O RE Y LIFT AB O V E
SL 1
HR
27.033
28.316
36 8000
A14 8000
KED
DP
1500
12 7200
11 4500
10 8100
9
3000MM WIDE GREEN BUFFER LINE
BOUNDARY LINE/ROAD RESERVE LINE
48.906
8100
8
92°54`31"
8100
7 8100
4.304 24°01 `18"
DING BUIL
LINE
VE ABO
6.22
9
E11
SITE BOUNDARY LINE / ROAD RESERVE LINE
3000MM WIDE GREEN BUFFER LINE
5000
ES
EP
7850
ER
5200
EQ
2700
EN
7900
EM
7900
EL
7900
7900
EK
7900
EJ
7900
EH
7900
EF
ED
8000
EE
8000
7900
EC
EB
EA
4700
EG
6.235
3.531
BOUNDARY LINE/ROAD RESERVE LINE
3550
LEGEND
ENTRANCE CANOPY
105.828
9.950
RW
FA M I LY R O OM 24.52 m²
SL 3
1200
BOUNDARY LINE/ROAD RESERVE LINE
35 8000
VOID
UP
JA N I TOR 3.38 m²
0 150
ELE C T
6 4800
5.4
4.332 0`40" 71°0
3300
27.040
5
2° 44`02"
8100
20.986
AHU
DR
SSL 5.94 m²
FFL 113. 600
BOUNDARY LINE
LOBBY
EXISTING ESCALATOR
H R/
M (L O V AC (LO BB Y ) V BB Y ) OI D (S T AI M V R CA S
ST12 15.42 -1 m²
2000
2000
2°53`345"
LIFT CAR
34 8000
1500
51.220
BOUNDARY LINE/ROAD RESERVE LINE 3000MM WIDE GREEN BUFFER LINE 5000MM BUILDING SETBACK LINE
NEW
VOID CEIL BELOING W
HR /D S TAN R WI TH H O D BY SE
Y
m²
K ED
ELE C T
TEL TEL
FFL 113. 600
ST 21 A
ST2 2
FROM NP3
G
I T AR
FFL
9.15
VOID
1200
182°01`46"
8000
2.473
FIRE LIFT
2000
8000
179°23`12"
ST2 1
HR/DR W I TH STA N D B Y H OS E
N
J
FL13
PL20
ST3 4
EL V
ST A I R C A S E 10.20 m² UP
M 2.4m WIDE LINKWAY
K
S AN
UP
SSL 3.94 m²
SL A B L I NE A B OV E
SS L 4.09 m²
2400
EXT'G LIFT
FIRE LIFT
33 8000
A11
MA L E T OI L E T 49.04 m²
47.00 m²
NEW
NEW EVACUATION LIFT (EXTG LIFT)
AD
FFL 113. 600 SS L 3.74 m²
ST 34 A
UP
FFL 113. 600 2550
VOI D (C E I L I N G B EL OW )
MDF 21.98 m²
P
EXT'G
32 8000
A12
34.20 m²
Q
EXT'G PL/HL
31 8000
8000
UP
K FD
39.04 m²
EXT'G PL/HL
30 8000
8000
C A N OP Y B E L OW
NEW CORRIDOR
NEW STAIRCASE
SS L 4.09 m²
1500
LK WA CAT
R
L
29 8000
A10
VOID CEIL BELOING W
R WD
Ra
ES
VE E ABO B LIN SLA
1500
VOI D (C E I L I N G B EL OW )
EXISTING ESCALATOR EXISTING ESCALATOR
28 8000
8000
8000 3800
S
AHU
27 8000
8000
AB
VOI D (C E I L I N G B EL OW )
3650
12000
26 8000
A13
8000 Qa
12000
9600
25 8000
8000
Qb
T
Ma
La
Ka
Ja
EJ
2700
24 8000
A9
AC
U
7100
23
8000
A8 8000
16000
V
21
8000
8000 BOUND ARY 3.0 GR LINE AA / RO EEN AD RES BUF 5.0 RO FER ERV LINE AD BUF E LIN E FER LINE
W
20
E01 WD/GA/3501
Note: 1. Please be informed that this set of preliminary plans are revised based on the request by the Client [FCL (AM)]. The preliminary plans are subject to all technical and authorities' requirements & compliance and final confirmation from the Client [FCL(D&P)].
BUS - ANCILLARY
EXCLUDED AREA
BUS - CONCOURSE/CORRIDOR COMMERCIAL - ANCHOR COMMERCIAL - ANCILLARY COMMERCIAL - CORRIDOR
2. Pending M&E confirmation.
COMMERCIAL - RESTAURANT COMMERCIAL - SHOPS COMMERCIAL SCHOOL COMMERCIAL - SCISSOR STAIRCASE COMMERCIAL - SUBSTATION CC - ANCILLARY CC - CORRIDOR COMMUNITY CENTRE CHILDREN CSFS CSFS RESIDENTIAL
N
VERSION 36 2ND STOREY SCALE 1:500
2nd Storey Plan 21 JUNE 2017
A1 8000
A2 A3
8000
A4
8000
A5
8000
2
3 8400
5
8400
6
8400
7
8400
8
8400
9
8400
10
11
16400
8000
17 A6
8000 8000
18 8000 8000
19
8000
20
8000
A7
21
8000
23
8000
8000
25
8000
8000
P U P 1: 10
75
75
CAR
PAR K
FILT RAT ION CAB SPACE PLA NT ANA POO L
FE NCE
8000
FL 8/ AL
D A BOVER
118.725 FL
SERV LIFTICE
FAD
PL2 7
PL 26
DR
00 )
(600 x10
HR/
1850
9800 4700
A21
8000
01
8000
A22
A23
12
MV FL 118.675
AC BBY)
FE NCE
LIFT LOBB Y
FILTRA TION SPA PUMP POOL SPACE
STAIR CASE MV
8000
FE NCE
5250
10900
4
FE NCE
RW
RA M P
3800
( LO
FENCE
FL 10/ AL
(600 x30DP 00 )
D A BOVER
118.725 FL
PL 10/ AL
M/V
11- 1
FIRE LIFT FIG HTING FL LOBB Y 118.675 D A BOVER UP 1 : 10
75
FENCE
75
FL
A24
8000
13
C OR R I D OR 11.70 m²
A25
8000
FL 118.675
75
A26
PL 10A / AL
10- 1
LIF T LOB B Y M/V FL 11 8.6 75
REC YC L I N G BI N
FENCE
FA M I LY R O OM 16.09 m²
16000
BU L K BI N
SPA TANKPOOL ABOVE
REFUSE CHAMBER
1M WI
UP P E R P A R T OF E S C A L A T OR B E L OW
PL 118.60
DRIVEWAY M/V
E S C A L A T OR 22.61 m²
PLAN
TER
REC YC L I N G BI N
S K Y L I GH T
(800
MV
HR/
FIRE FIGHTING LIFT LOBBY FL 118.675 M/V
PL 3A/ AL
FIRE F LIFT IGHTING LOBB FL 118.75 Y M/V
0 X 6DR 00 )
PL 3/ AL
CA B A NA P O O L BA L A NCI NG TA NK AB O V E
RE F USE CHAMBE R
UP 1 : 10
HR/ A BO VED R
DRIVEWAY
FL 118.60
PL 118.60 8
R ECYC L BIN I NG
8000
BUL K BIN
BALAN DIP CINGPOOLTANK 01 ABOVE
2700
5616
LIFT (PL 22)
BALAN ABOVECING SANI TAR RWDP
VOID (LOWER PART OF STAIRCASE)
(100 0x 25 5 0)
(400
E1.7
(800
FIRE LIFT F IGHTING LOBB FL 118.75 Y M/V
(1 00
150
E2
(LAND PUMP SCAPE SPACE REFLE CTIVE
Y&
HR/
PL/ (P LAL 15)
2884
FE NCE
POOL)
FL/ (FL AL 15)
D
TA I CH I PL A Z A
SEE RESIDENTIAL PACKAGE
DRIVEWAY
LINE OF TANK
3350
260 0
UP N/V
C
CARPARKS
COOLING TOWER
RA M P
0 X 6DR 00 )
AC X 60
0)
BUL K BIN
MV X 60
0)
R ECYC BIN
RE F USE CHAMBE R
UP 1 : 10
HR/ D A BO VE R
STAIRMV (125 0x CASE
FRO GRAN STORM 1ST D STAIR EY/LA STOR CASE NDSC EY TO APE 4TH DECK
17 0 0)
150
FL 118.60
7116
E2.8
BOUND ARY LINE 3.0 GR EEN BUF 5.0 RO FER AD BUF LINE FER LINE
L I NG
FL 118.90
FL 118.75
PL 118.60
LANDS IRRIGA CAP E TANKTION (2M X 2M)
FE NCE
PUMP SPACE
FE NCE
UP
CARPARKS
DOME W ATERTSTICE ANK-1
03-38 CSFS
CARPARKS
CARPARKS
7850
FE NCE
low wall
LA P P O O L BA L A NCI NG TA NK AB O V E
R ECYC L BIN I NG
15 0
7850
RA M P
FILTRA TION ROOM PLANT DIP P OOL
- 01
H A BO VER
BU L K BI N
CARPARKS
RE F USE CHAMBE R
FL 11 8.6 75
GRAND STAIRCASE FROM 1ST STOREY TO 4TH STOREY/LANDSCAPE DECK
75
HR /D R ABO VE AC
(30 0X 80 0)
P L/ AL (P L 21)
FENCE
FIRE FIG HT IN G LIF T LOB B Y N/V FL 11 8.6 75
S TA I RCA S E S TO RE Y S HE LT E R 4-1
AC
(30 0X 80 0)
FL 11 8.6 75
P L/ AL (P L 20)
M/V
HR /D R
FIRE FIG HT IN G LIF T LOB B Y N/V FL 11 8.6 75
FL/ AL (FL 20)
MV
(S TA I RCA SE ) (90 0X 130 0)
CONSUMER LV SWITCHROOM 2
AC
(40 0X 40 0)
PLANTER
SAN ITA RY (90 0x 235 0)
VOI D
MV (ST AIR (900 x CA S E ) 12 50 )
FL 118.60
P L 19/ AL
low wall
VO RWDP (850 x 17 25 )
HR A BOVE
MV
(800 X
BUL K BIN
60 0)
(400 XAC 60 0)
FL 118.75
R ECYC L BIN I NG
MV (S TA I RCA SE ) (10 00 X1 35 0)
FE N CE HR /D R ABO VE
PLANTER
DR
EXIT
S TA I RCA S E S TO RE Y S HE LT E R 5-1
FL 11 8.6 75
RWD P
(16 50 x2 40 0)
PLANTER
HR/
6
CARPARKS
RWD P (16 50 x2 40 0)
1.0 M H IGH RC P A RA P E T WA LL FL/ AL (FL 21)
FL 1 18. 60
COOLING TOWER
M/V
UP 1 : 10
E X IT
HR /D R ABO VE
MV
(S TA I RCA SE ) (90 0X 130 0)
M/V
HR /D R
RA M P
RA M P UP 1 : 1 0
S TA I RCA S E S TO RE Y S HE LT E R 3-1
FL 11 8.6 75
RA MP U P 1 :1 0
RA MP U P 1 :1 0
75
FL 1 18. 60
E X IT
AC
(30 0X 80 0)
P L/ AL (P L 2)
FE N CE
M/V
HR /D R
FIRE FIG HT IN G LIF T LOB B Y FL 11 8.6 75 N/V
FL 1 9/ AL
RWD P ( 1 6 7 5 X2 4 0 0 )
FILTRATION PUMP SPACE LAP & DIP POOL
E10
FIRE FIG HT IN G LIF T LOB B Y N/V FL 11 8.6 75
EXIT
FL/ AL (FL 2)
(100
STAIRCA 0X6 00) STORE FL 118.90 Y SE M/VSHELTER
75
75
1.0 M H IGH RC P A RA P E T WA LL
75
PL 4/ AL FL 4/ AL (100 0X 8 00)
RWDP
HR /D R
RWD P (16 50 x2 40 0)
FL 1 18. 60
HR /D R ABO VE
M/V
FIRE LIFT F IGHTING LOBB FL 118.65 Y M/V
15 0
FL 118.60
RA MP U P 1 :1 0
FL 118.675
EXIT
DRIVEWAY
DRIVEWAY
PL 118.60 FL 1 18. 60
E X IT
S TA I RCA S E S TO RE Y S HE LT E R 2-1
FE N CE
CO OLI
BUL K BIN
FL 118.675 FL 118.80 MV
DRIVEWAY
MV
DR AB OV E MV
(LOB B Y ) (600 X 80 0)
VOID
MV (S TA IR CA SE ) (1 0 0 0 X 1 3 5 0 )
AC
(LOB B Y ) (300 X 80 0)
E9
FL 18/ AL
(S TA I RCA SE ) (90 0X 130 0)
CARPARKS
PAR K
low wall
CARPARKS
TE L AB OV E
STAIRCASE STOREY SHELTER 1-1 M/V
STAIRCASE STOREY SHELTER
8000
DOSMETIC WATER TRANSFER TANK / PUMP SPACE
CAR
low wall
PL 18/ AL
FIRE FIGHTING LIFT LOBBY FL 118.675 M/V
E8
RE FU S E CHA MB E R
BU L K BI N
RE FU S E CHA MB E R
CHAIN LINK FENCE
8000
REC YC L I N G BI N
P L/ AL (FL 2 1A ) REC YC L I N G BI N
low wall
PL UNG E P O O L BA L A NCI NG T A NK AB O V E
AY
NG ID 3.0m TOW BEL ER 2.0 PLABUILDI OW FRO M NTINGNG SET BOUND STR BACK IP LINE ARY LINE
LIF T LOB B Y M/V FL 11 8.6 75
CARPARKS
SWIMMING POOL FILTRATION PLANT SPACE
8000
8400
FL 11 8.6 75
RE FU S E CHA MB E R
P L A Y G R OU N D
TEN S I LE LI N E A B O VE
WID E DRI VEW
P L/ AL (P L 2 0A )
CARPARKS
low wall
CHA I N L INK FE NCE
FENCE
7.5m ROAD BUFFER LINE FE N CE
FE N CE
OPEN SPACE
3.0m GREEN BUFFER LINE
10100
BOUNDARY LINE
03-04 REST.
03-05 REST.
FL 11 8.6 75
BU L K BI N
RE FU S E CHA MB E R
ST A I R C A SE T O 4 T H S T OR E Y
LIF T LOB B Y M/V FL 11 8.6 75
FL 11 8.6 75
(SU VOID BST ATI ON )
REC YC L I N G BI N
ST 23 S E D
LIF T LOB B Y M/V FL 11 8.6 75
KED
(100 0X 6 00)
8000
E7
14.13 m²
UP
A
RW SANI DP/ TARY (127 5x16 5 0)
RE CY C LI N G BIN
E6 8000
8000
87.593
F F L FL 16 / E VAC 15.90 m² FFL 118. 600 TW +118.60
TW +118.60
HR/DR
03-06 REST.
PL 118.60 P L/ AL (P L2 -2)
TW +118.60 TW +118.20
B
03-07 SHOP
03-08 SHOP
03-09 SHOP
03-10 SHOP
03-11 SHOP
FL 16/ AL
6.6M
DRIVEWAY
DRIVEWAY HR/DR
FFL 118. 600
FFL 118. 000
RAMP GR A D I E N T 1 : 1 2 TW +117.70 TW +118.60
7
MV (8 00 X60 0 ) (4 00 AC X60 0 )
PL 16/ AL
DI P P OO L -0 2 BA L A NCI NG TA NK AB O V E
CARPARKS
CARPARKS
4T H S T OR E Y L I NK B R I D GE A B OV E
C OR R I D OR 78.28 m²
8000
03-01 SHOP 03-02 SHOP
FFL 118. 000
C
03-03 SHOP
VOID
03-20 SHOP
03-17 SHOP
03-21 SHOP 03-18 SHOP
VOID
VOID
03-12 SHOP
UP 1 : 10 15 0
CARPARKS
TW +119.00
S K Y L I GH T TR EL LI S OPE N TO S K Y A B OV E
HR/ (1 0 00 X6 DR 00)
FFL 118. 600
3770
TW +118.40
FFL 117. 200
D
4.832
6.255
STAIRCA STORE SE Y M/VSHELTER
FL 118.90
FIRE F LIFT IGHTING LOBB FL 118.75 Y M/V
TW +118.60
CARPARKS
SHOP 03-24
SHOP 03-23
03-19 SHOP
03-13 SHOP
03-16 SHOP
SERVICE LOBBY
24
19
18
01
28.316
SHOP 03-22
(ST MV (12 5 0AIRC A SE) x 1 70 0 ) REFUSE CH AMBER
EXIT
FL 118.75
CHAIN LINK FENCE
03-15 SHOP
HD
LOBBY 03-14 SHOP
NEW HCP (M/V)
DRIVEWAY 150
RA MP U P 1 :1 0
3000MM WIDE GREEN BUFFER LINE BS
HD
NEW PANTRY (M/V)
PL 118.60
DI P P OO L -0 3 BA L A NCI NG TA NK AB O V E
M/V
FFL 118. 000
8000
VOID 01
14
25
15
FFL 117. 200
3.0M WIDE LINKWAY FROM NP3 E
4130
03-25 SHOP
BOUNDARY LINE
8000
2 8100
1 62.296 BOUNDARY LINE
DRIVEWAY REFUSE CHAMBER
TW +119.00
F
3925
BOUNDARY LINE/ROAD RESERVE LINE NEW FAMI LY TOILET (M/V)
6.22
9
E11
SITE BOUNDARY LINE / ROAD RESERVE LINE
LEGEND
3000MM WIDE GREEN BUFFER LINE
ES
ER
EQ
EP
EN
EM
EL
EK
EJ
EH
7900
7900
6.235
3.531
BOUNDARY LINE/ROAD RESERVE LINE
7900
EG
7900
8000
EF
7900
8000
EE
7900
7900
7900
ED
2700
4700
EC
5200
3550
EB
7850
EA
105.828
5000
9.950
94.961tot
5.632 HD
NEW MAL E TOILET (M/V)
BOUNDARY LINE/ROAD RESERVE LINE
2°55`39"
27.033
NEW LACTATION (M/V) WD
FE NCE
DOME W ATERTSTICE ANK-2
REC YC L I N G BI N
RE FU S E CHA MB E R
RE FU S E CHA MB E R
TW +118.40
BIN
HD
PUMP SPACE
FE NCE
E3
CARPARKS
BU L K BI N
A32
DRI VEW AY
STAIRMV (125 CASE
9
270 0
LIFT LOBBY M/V FL 11 8.6 75
A31 8000
0)
0)
0x17 0 0)
150
M/V
X 60
MV X 60
FL 118.90
FL 118.75 RA M P
EXIT
(1 00
150
RA MP U P 1 :1 0
FL 118.675
14)
PL/ (P LAL 14)
low wall
FL 118.60
STAIRCASE STOREY SHELTER 1-2 M/V
(FL
REFUSE CHAMBER
CARPARKS
AC
(400
530 0
G
A30
8000
8000 FL/ AL
BU L K BI N
S TAIRCAS STORE E Y SHELTER M/V 9
CARPARKS
ESC (10, 11) M&E F R OM 2 N D S T OR E Y 7.76 m²
BUL K BIN
NEW FEMAL E TOILET (M/V)
A29
8000 BOX
P L 13A / AL
LIF T LOB B Y M/V FL 11 8.6 75
CARPARKS
784
A28
8000 DTH
FL 118.60
FL 11 8.6 75
FFL 118. 600
M& E D og H ouse
8000
A27
LINE BALAN OF CING
CARPARKS low wall
SH OW ER & C H A N GI N G R OOM 11.14 m²
C A N OP Y A B OV E
BOUNDARY LINE
CARPARKS
40 8000
50
HC 5.62 m²
FFL 118. 600
FFL 118. 600
3000MM BUILDING SETBACK LINE
03-348000 SHOP
C OR R I D OR 21.86 m²
CARPARKS
CARPARKS
JA N I TOR 4.51 m²
FFL FL1 5 / EV AC 14.04 m²
8000
272°55`13" 36.002
2400
12
39 8000
A20
8000
3
2700
WTR/ GAS VOID
PL
E0 WD/ 3 GA/35
ST2 2 13.98 m²
23.27 m²
FILTRATION PLANT SPACE MALE TOILET 13.34 m²
03-338000 SHOP
ST 22 A 23.11 m²
FEMALE TOILET 12.56 m²
272°55`45"
FENCE
8000
03-27/28 SHOP
S TAIRCAS STORE Y E M/VSHELTER
200
N/V
WC
800
N/V
2600
2500 2100
GUARD HOUSE
M/V
03-26 SHOP
35.911
A
DEPMOBILE LOY SPA MENT CE
FL 11 8.6 75
03-35 SHOP8000
03-36 SHOP
03-37 SHOP
8100
4 8100
2
B
M/V
E1
4.304 24°01 `18"
BOUNDARY LINE 41.478
1
D
DRIVEWAY
M/V
H
3
5 0)
C
M/V
J
8100
STAIRMV (100 0x C AS 12 MV
H R/ DR
CARPARKS
K
VOID
EXIT
MDF ROOM
55.341
8000
02-32 SHOP
VOID
BIN
03-29 SHOP
27.040
4800
2.0 PLANTING STRIP 3.0 BUILDING SETBACK LINE
8000 8000
BOUNDARY LINE
EXT'G OPEN TERRACE
NEW EXTENDED TERRACE
03-30/31 ENTERTAINMENT
VOID NEW PANTRY (M/V) NEW LACTATION (M/V )
6
2° 44`02"
5.4
low wall
7
20.986
5
BU L K BI N
2°53`345"
4.332 0`40" 71°0
AC L EDG E
200
7200
11 4500
10 8100
9
3000MM WIDE GREEN BUFFER LINE
5000MM BUILDING SETBACK LINE
BOUNDARY LINE/ROAD RESERVE LINE
48.906
8100
8
92°54`31"
8100
L
LOBBY
3300
REC YC L I N G BI N
SPRINKLER TANK & PUMP SPACE
7
M
FL 118.675
RE FU S E CHA MB E R
P
N
LOBBY
1100
3000MM WIDE GREEN BUFFER LINE
8100
Q
PL 9/ AL
LIF T LOB B Y M/V FL 11 8.6 75
850
SPR/ EL
(100 0 EC x9 00 )
38 8000
FE NCE
7100
5000MM BUILDING SETBACK LINE NEW VOID ABOVE
3750 4800
(600 x 10 00 )
(300AC x800)
37 8000
2700
200
NEW VOID ABOVE
CARPARKS
36 8000
FE NCE
9600 51.220
BOUNDARY LINE/ROAD RESERVE LINE
RA M P UP 1 : 1 0
OUT
MV
1300
H A BO VER
FL 118.60
3000
R'S ITO E VIS LAN
R
FE NCE
PAR K
S TAIRCAS STORE E Y M/VSHELTER 8
12000 182°01`46"
8000
2.473
12
CAR
35 8000
A19
8000
6.0M WIDE DRIVEWAY
4800
34 8000
A18
8000
179°23`12"
IN
S NT' IDE RES LANE
33 8000
A17
8000
75
FL 1 18. 60
32 8000
A16
8000 FE NCE
LIFT LO N/V BB Y FL 118.675
75
RA M
1.0 M H IGH RC P A RA P E T WA LL
DRI VEW AY
31 8000
A15
0x12 5 0)
FL 11 8.6 75
S
8000
STAIRMV CASE (100
FL 118.675
30 8000
A14
8000
VO ID
29 8000
A13
RWDP
(600MV x800) (300AC x800)
M/V
PL 8/ AL
VOID
CARPARKS
DR
12- 1
FIRE FI LIFT G HTING FL LOBB Y 118.675 DR A BOVE
12000
3650
(600 x10
00 )
3800
8000
1500
VOI D
TEL
1.0 M H IGH RC P A RA P E T WA LL
T ER
TARY HR/
28 8000
A12
8000
PLAN SANI
S TAIRCAS STORE E Y M/VSHELTER
ES
Ra
ADCARPARKS
27 8000
A11
8000
8000
PUMP SPACE
26 8000
A10
8000
E
Qb
Qa
24
8000
A9
8000
16000
FENCE
8000
22
8000
A8
8000
FENC
DOSMETIC WATER TANK
T
Ma
16
16000
AC 6.6M WIDE DRIVEWAY
Ja
15
8000
CARPARKS
U
La
16000
14
AB
V
EJ
13
BOUND ARY 3.0 GR LINE AA / RO EEN AD RES BUF 5.0 RO FER ERV LINE AD BUF E LIN E FER LINE
W
Ka
12
8400
4
1
E01 WD/GA/3501
Note: 1. Please be informed that this set of preliminary plans are revised based on the request by the Client [FCL (AM)]. The preliminary plans are subject to all technical and authorities' requirements & compliance and final confirmation from the Client [FCL(D&P)].
COMMERCIAL - ANCILLARY COMMERCIAL - CORRIDOR COMMERCIAL - SCISSOR STAIRCASE EXCLUDED AREA
2. Pending M&E confirmation.
N
VERSION 36 3RD STOREY SCALE 1:500
3rd Storey Plan
View on 2nd & 3rd Storey Landscape
21 JUNE 2017
E0 WD/ 2 GA/35
01
A33
A1 A2 8000
A3 8000
A4 8000
A5 8000
1
2
3
8400
4
8400
5
8400
6
8400
7
8400
8
8400
9
8400
10
11
16400
12
8000
13
14
16000
15
8000
16
17
18
A6
8000 8000
16000
8000
19
20
8000
A7
21
8000
22
8000
23
8000
24
8000
25
8000
26
8000
27
8000
28
8000
29
8000
30
8000
31
8000
32
8000
33
8000
34
8000
35
8000
36
8000
37
8000
38
8000
39
8000
40
8000
8000
8000
A8 8000
BOUND ARY 3.0 GR LINE AA / RO EEN AD RES BUF 5.0 RO FER ERV LINE AD BUF E LIN E FER LINE
8000
W
A9 8000
A10 8000
A11
AB
8000
16000
V
A12
8000
8000
A13 8000
AC
A14 8000
3101
4579 4617
SLA ABOVB LINE E
6000
RAM
4717
4200 39
6012
UP
48.43 m²
VOI D UP (C EI L I N G B E L OW ) ST2- 1
FE M A L E T OI L E T 47.77 m²
172 173
3650 174 17 8
17 7
15 6
15 7
76
16.51 m² FFL 101. 850
17 6
4200
MV
70
ACMV
71
72
73
74
16 5
16 6
16 7
249
230
78
79
80
E11
9 6.22
ENT 1:16
11 6
11 7
11 8
11 0
10 9
10 8
14 4
14 3
14 2
14 1
14 0
13 9
13 8
13 7
13 6
13 5
13 4
13 3
231
SE
BY
229
232
16
228 233
13 2
11 4
11 9
12 0
12 1
12 2
12 3
12 4
12 5
12 6
12 7
227
216
226
12 8
225
6004
11
219
242
237
224
243
218
236
GRADIENT 1:15
12
11 3
15
11 5
14 5
215
14 6
14
14 7
FFL 101. 150
10 7
10 6
10 5
10 4
10 3
10 2
10 1
10 0
99
98
220
11 1
4200
97
9
11 2
10
SUMP BELOW PIT CARP FOR ARK
223
238
6000
241
HR
4200
4200
240
4200 23 9
FFL 101. 150
81
82
83
EX H A U ST A I R
84
ELE C T C LO SE T EL V
EX H A U ST A I R
87
88
89
90
91
92
94
93
95
96
EARTH FI L L E D
ST4 -1
HR/DR W I TH STA N D B Y H OS E
EX H A U ST A I R
EX H A U ST A I R
86
85
EX H A U ST A I R
EX H A U ST A I R
UP
1.97 m²
FFL EARTH FL 5 FI L L E D FFL 101. 160 7.19 m²
FFL 101. 150
1
EARTH FI L L E D
ST5 -1
HR/DR W I TH STA N D B Y H OS E
UP
1.98 m²
FFL EARTH FL 6 FI L L E D FFL 101. 160 7.20 m²
BK
2
3
7
4
5
8
6
ELE C T
3.30 m²
E0 WD/ 2 GA/35
01
EL V
LEGEND Note: 1. Please be informed that this set of preliminary plans are revised based on the request by the Client [FCL (AM)]. The preliminary plans are subject to all technical and authorities' requirements & compliance and final confirmation from the Client [FCL(D&P)].
E01 WD/GA/3501
ES
ER
EP
EL
EK
7900
6.235
3.531
BOUNDARY LINE/ROAD RESERVE LINE
7900
EJ
EN
7900
7900
EH
EM
7900
8000
EG
EQ
105.828
7900
7900
8000
EF
2700
7900
EE
5200
4700
ED
HO
13
14 8
217
14 9
51
EARTH FI L L E D
UP
1.98 m²
/D R
W I TH FFL S TAN D
FL8 6.57 m²
246 15 0
FFL 101. 150
1:16
BJ 7850
EC
247
130 15 1
0 420
NT
245
POI
GRADIENT
FFL 101. 150
HR/DR W I TH STA N D B Y H OS E
EAR FILLETH D
4200
6000
235
GRADI
52
FFL EARTH FL 4 FI L L E D FFL 101. 160 7.18 m²
UP
BM
HR
248
131 49 50
15 2
FF
33
SU MP PI T F OR C A R PA R K
53
FFL 101. 150
214
129
DRO P-O 1:8.
FFL 101. 150
54
EAR FILLETH D
17 213
4480
TO
5000
3550
EB
18
212
6000
BL
3.0m GREEN BUFFER LINE
10100
4.832
EA
19
16 8
6266
16 4
221
55
FFL 101. 150 LIFT LOBB EART ELV W Y H FILLE D UP PL30 ST7 11.07 6.82 m² m²
20
420 0 16 3
5584
56
77
75
FFL 101. 150
FL 3
FFL 25.78 m² FFL 101. 850
4200
5000
3823
45
420 0
46
6000
16 2
15 9
SITE BOUNDARY LINE / ROAD RESERVE LINE
EXCLUDED AREA
COMMERCIAL - ANCHOR COMMERCIAL - ANCILLARY COMMERCIAL - CORRIDOR COMMERCIAL - CARPARK LIFT COMMERCIAL - RESTAURANT COMMERCIAL - SHOPS
2. Pending M&E confirmation.
COMMERCIAL SCHOOL COMMERCIAL - SCISSOR STAIRCASE
1.
2.
3.
3A
3B
.4
4A
4B
5.
5A
5B
211
3600
16 1
47
15 8
222
57
ST3 -1
VOI D (PL 3)
FFL 101. 150
6000
17 9
15 5
6000
0 420
GREASE TRAP & EJECTOR
FROM YISHUN MRT
6.
6A
6B
209
6000
CHI L D
CS
SED
21
208
48
P UP
GRA DIE NT
BF
7.
207
175 18 0
15 4
6000
1500
RAM
BG
7A
5114
HR
61
58
BH
7B
CAR PARK
210
16 0
SLAB LINE ABOVE
1800
16 9
3000MM WIDE GREEN BUFFER LINE
8.
22 206
B1M
6000
UP
ELV
6000 18 1
BOUND ARY LINE 3.0 GR EEN BUF 5.0 RO FER AD BUF LINE FER LINE
ELECT
GRADIENT 1:16
183 43 44
18 2
15 3
HR
63 62
17 0
24 23
P DOW N FROM
GRA DIEN T 1:8.3
HR
17 1
60
ST25 A- 1
ST25- 1
5.88 ST8 m²
205
RAM
6600
CHI L D
WN
UP HR / DR W I TH S TAN D BY HO SE
EART FILLE H D
EART FILLE H D
234
3000
M ET ER K I OS I NG K
CH ROO M m²
53.39
HT SWIT
2000
P UP TO B1M GRA CAR DIE PAR NT 1:8. K 3
E LV CL O SET
T 1:16
EN
1500
1500
420 0
25
203
4200
204
T 1:16
GR ADI
19 0
GRA DIEN
1500
1800
3000
18 9
244
1534
1470 1200 2400
2000
2000
1720
2555
6000
3969
69
18 8
3.0m 2.0 PLABUILDI NTINGNG SET BOUND STR BACK IP LINE ARY LINE
E9 E10
18 7
SLAB LINE ABOVE
59
HR/DR W I TH STA N D B Y H OS E
8000
18 6
6000
ELE C T
VOI D (C E I L I N G B EL OW )
MA L E T OI L E T 30.71 m²
ST 24 A- 1
7.5m ROAD BUFFER LINE
UP
FL9 6.57 m² EART FFL FILLE H D FFL 101. 160
26
202
18 5
6000
3600
WN
PO W D ER
FL 1
2200
27
200 201
E S C A L A T OR 27.04 m²
UP
6000
GA S
28 199
18 4
MAKE (20.0 UP TANK X 10.0M 2 FOR ) CC
410 1
VOI D (PL 1)
FFL 16.67 m²
FFL 102. 300 ES C TO B 1 MEZZANI NE
FFL 101. 150
6000
HR
FFL 101. 558
FFL 102. 300
1500
197 198
2916
248.8 6 m²
UP
FFL 101. 150
2018
ACMV
19 2
4200
4404
CS
UP
ST1- 1 18.80 m²
2000
1680
1500
W
EL V
E S C A L A T OR 24.62 m²
19 1
40
H AIR
ST O R E
FFL 102. 300
6000
FFL 102. 300
HR
PL 23
5000
64
PL 24
41
29
65
PL 25
TEL
FEE D I N G R O OM 4.55 m²
CA R T
42
FRES
30 196
RC CT
SUMP FOR PIT B TOWER COOLI EL OW WATE MAK NG R TANKE UP
31 195
1:16
GRADIENT
FFL 102. 300
SEATI NG AREA
FFL 102. 300
32
66
ST RO L L E R
S E AT ING
2000
CE I L I N G B E L OW
2400
ESC ( 1 2,13) F RO M BA S EME NT 2
CHI L D
FA M I LY R O OM 14.86 m²
JA N I TOR 4.65 m²
B1- 203 to B 1-2 05 F OOD S T R E E T 64.80 m²
8000
33
194
6307
KI T CHE N
H AIR
34
5500
K FFL 101. 150 PAR 1:16 CAR GRADIENT B1 33 N TO 1:8. NT P DOW DIE GRA RAM
KI T CHE N
B1- 19 4/ 1 95 F OOD S T R E E T 175.6 6 m²
2400
FFL 102. 300
KI T CHE N
68
E7
FFL 102. 300 2000
B1- 14 9 S H OP 203.9 5 m²
CHI L D
HC 4.46 m²
8000
FFL 102. 300
FI R E SE CU RI T Y / FI R E S HU T T E R S H U T T E R FFL 102. 300 LI F T L OB B Y
MI DLANDI NG A B OV E
2000
HR/DR
W I TH VOI D STA N D B Y (C EI L I N G H OS E B E L OW ) ACMV VOI D FFL 102. 300 HR/DR (C EI L I N G W I TH 41.48 m² ST2 4- 1 STA N D B Y B E L OW ) H OS E
B1- 19 6/ 1 97 F OOD S T R E E T 132.5 5 m²
4235
A33
DOM ESTI DOUB C RC TANK LE (24.0 SLAB ABOVWITH X 10.0M E )
37
4200
6261
KI T CHE N
KI T CHE N
HR
B1- 20 1/ 2 02 F OOD S T R E E T 129.2 2 m²
B1- 14 8 S H OP 31.22 m²
VOI D
B1- 19 8 F OOD S T R E E T 62.11 m²
3142
SEATI NG AREA
F OOD S T R E E T C OR R I D OR
67
E5.5
1701
VOI D AT R I U M 2
FFL 102. 606 FFL 102. 300
E8
HR /D W I TH R S TAN H O D BY SE
2.08 m²
B1- 10 1/ 1 02 F A S T F O OD R E S T A U R A N T 151.0 4 m²
KI T CHE N
VOI D
8000
C OR R I D OR
VOI D (C EI L I N G B E L OW )
FFL 102. 300
HR
2000
B1- 19 9 F OOD S T R E E T 133.1 4 m²
KI T CHE N
2500
B1- 10 3/ 1 04 F A S T F O OD R E S T A U R A N T 139.6 0 m² FFL 103. 158 KI T CHE N
SED
ELE C T
HR
240 0
FOOD STREET CORRIDOR
B1- 20 0 F OOD S T R E E T 87.31 m²
KI T CHE N
RAMP GRADIENT 1:12
FFL 103. 176 FFL FL 16 / E VAC 21.86 m²
COR RIDO R
T EL CL O SET
2400
3000
SEATI NG AREA
2400
SEATI NG AREA
B1- 15 0 F OOD S T R E E T 134.7 9 m²
KI T CHE N
KI T CHE N
SE C U R I T Y SHUTTER
HR
FFL 102. 300
C OR R I D OR 778.5 7 m²
HR
2241
2400
B1- 19 0 F OOD S T R E E T M A R K E T S QU A R E 184.2 4 m²
2400
880
B1- 14 3 S H OP 35.45 m²
2000
2000
KI T CHE N
B1- 18 9 F OOD S T R E E T 31.78 m²
SEATI NG AREA
2241
ST R O L L ER
1:12 GRADIENT
13.50 m² ACM V OPE N I N G
T R A V E L A T OR 74.96 m²
8400
B1- 14 2 S H OP 28.42 m²
B1- 14 7 S H OP 23.66 m²
2000
HR
E S C A L A T OR 45.85 m²
UP UP
BOUNDARY LINE
EXISTING ESCALATOR
3000
B1- 14 4 S H OP 35.83 m²
UP
B1-04 SHOP
1000
HR/ WI DR ST T H ANDB HOS Y E
2400
2400
B1- 14 1 S H OP 28.72 m²
B1- 14 5 S H OP 33.82 m²
ESC ( 1,2,3,4) FRO M BA S E MENT 2
FFL 102. 606
FFL 102. 606
HR/DR W I TH STA N D B Y H OS E
CE I L I N G B E L OW
A
1000
8548
B1- 14 0 S H OP 27.11 m²
B1- 14 6 S H OP 32.15 m²
WN
TEL
8000
EL V
COR RIDO R
2544
1:12 GRADIENT
4687
CORRIDOR
B1- 13 9 S H OP 27.11 m²
B1- 18 6 F OOD S T R E E T 65.40 m²
38
193
HC LI F T 3.40 m² FFL 101. 150
B1- 191 to B 1-1 93 F OOD S T R E E T 216.1 8 m²
KI T CHE N
KI T CHE N
B1- 18 8 F OOD S T R E E T 39.26 m²
KI T CHE N
SEATI NG AREA
FRES
35
HR
B1- 18 7 F OOD S T R E E T 71.94 m²
2400
KI T CHE N
KI T CHE N
B1- 18 5 F OOD S T R E E T 32.57 m²
3735.14 sqm
319
E1.7 E2 E2.8 E3 E4 E5
FFL 103. 395
ELE C T
HR
7
2400
KI T CHE N
A32 HR / DR W I TH S TAN H O D BY SE
8000
SUM BELOP PIT W
ELECT
5.44 UP ST9m²
36
FFL 102. 300
B1- 18 4 F OOD S T R E E T 101.9 5 m²
B1- 15 6 F OOD S T R E E T 88.19 m²
B1- 15 2 F OOD S T R E E T 100.6 9 m²
A31 8000
ELV
EART FILLE H D
SLAB LINE ABOVE
KI T CHE N
SEATI NG AREA
KI T CHE N
SEATI NG AREA
FFL 102. 300
VOI D AT R I U M 1
8000
3000
B EN C H
PO W D ER
SL A B L I NE A B OV E
SL A B L I NE A B OV E B1- 10 5 S H OP 51.29 m²
E6
4130
VOID ABOVE ATRIUM 3
5616 2884 7116 784 7850 7850 3770
1: 2 5 GR A DI E N T
FFL 103. 395
4200
KI T CHE N
C OR R I D OR
B1- 15 5 F OOD S T R E E T 64.99 m² F OOD T R U C K
KI T CHE N
B1- 15 3 F OOD S T R E E T 102.8 6 m²
C OR R I D OR
KI T CHE N
F OOD S T R E E T C OR R I D OR
3000
HR
CORRIDOR
E1
8000 8000 8000 8000 8000 8000
B1-19/20 SHOP
B1-18 SHOP
B1-11 SHOP
B1-17 SHOP B1-16 SHOP
B1-12 SHOP B1-13 SHOP
B1- 13 2 S H OP 56.61 m²
FFL 102. 300 FFL 102. 606 HR
ST 23
B
KI T CHE N
SEATI NG AREA
1000
FL10 6.57 m² FFL EART FILLE H D FFL 101. 160
2400
B1- 17 9 F OOD S T R E E T 129.6 6 m²
A30
7489
4200
8000
SPRI NKLE DOUB R RC LE TANK (14.0 SLAB ABOV WITH X 10.0M E )
4200
B1-15 SHOP
B1- 13 1 S H OP 85.59 m²
KI T CHE N
B1- 15 8 S H OP 38.18 m²
B1- 15 1 F OOD S T R E E T 95.27 m²
FFL 102. 606
B1- 13 0 S H OP 56.47 m²
FFL 102. 771
R A M P T O N OR T H P OI N T S H OP P I N G C E N T R E
FFL 103. 852
SLA ABO B LINE VE
8000
SPRI NKLE 45.16 R PUM P m²
6014
3600
B1-14 SHOP
FFL 102. 771
B1- 12 9 S H OP 48.88 m²
15.61 m²
New SSL
B1-05 SHOP
FFL 102. 972
FFL 102. 972 FFL 103. 158 VOI D A B OV E AT R I U M 4 S K Y L I GH T A B OV E
VOI D ( C EI L I NG B EL OW )
HR
B1- 15 9 S H OP 37.19 m²
B1- 18 0 F OOD S T R E E T 115.1 7 m²
A29
SUM BELOP PIT W
T R A V E L A T OR 29.44 m² T R A V E L A T OR 29.44 m²
KI T CHE N
HR
B1- 15 4 F OOD S T R E E T 48.56 m²
2400
B1- 18 2/ 1 83 F OOD S T R E E T 144.9 4 m²
2400
2800
B1- 10 6 S H OP 150.7 2 m²
87.593
B1-23 KIOSK
SERVICE LOBBY B1-07 SHOP
B1-01 REST.
BS
BS
BS
NEW MALE TOILET (M/V)
NEW PANTRY (M/V)
B1- 13 3 S H OP 42.72 m²
7400 FFL 103. 158
FFL 103. 158
FFL 103. 852
B1-02/03 SHOP
62.296 3000MM WIDE GREEN BUFFER LINE
HD
UP
KI T CHE N
FFL 103. 158
B1- 15 7 F OOD S T R E E T 54.03 m²
A28 8000
4200
UP
B1- 18 1 F OOD S T R E E T 100.4 3 m²
KI T CHE N
B1- 16 0 S H OP 39.06 m²
SEATI NG AREA
B1- 13 4 S H OP 38.27 m²
DRO P
8000
BOUNDARY LINE/ROAD RESERVE LINE NEW HCP (A/C)
NEW ESCALATOR
B1-24 KIOSK
94.961tot
5.632 NEW FEMALE TOILET (M/V)
B1-21/22 KIOSK
2°55`39"
HD
B1-56 REST. B1-53 REST.
B1-54 SHOP B1-55 SHOP
3925
27.033
WD
FFL 102. 300
TRV (5,6) TO MEZZ B1 ANIN E
A27
4200
3600
BS
DRO P
B1- 10 7/ 1 08 REST AUR ANT 384.8 7 m²
1450
B1- 17 7/ 1 78 S C H OO L 239.2 6 m²
FFL 102. 300
B1- 16 7 S H OP 44.80 m²
KI T CHE N
SEATI NG
TO 1STC STOREY
VOI D
B1- 16 6 S H OP 32.74 m²
B1- 16 1 S H OP 60.46 m²
E S C A L A T OR 35.11 m²
B1- 13 5 S H OP 38.23 m²
FFL 104. 112
FFL 104. 112
B1- 16 5 S H OP 32.74 m²
B1- 16 3 S H OP 37.83 m²
PR OV I S I ON F OR SA T E L L I T E C ON C I E R GE
SL A B L I NE A B OV E
1 T 1:3 IEN AD GR
B1- 17 6 S H OP 154.6 3 m²
A26 16000
TO
FFL 101. 150
ESC ( 5,6,7) TO 1 ST S TO RE Y FFL 102. 300
HR
FFL 103. 158
FFL 104. 112
2500
E
D
B1- 136 to B 1-1 38 M I N I - A N C H OR 1143.5 2 m²
VOI D
FFL 104. 000
FFL 104. 200
B1- 17 5 S H OP 85.33 m²
HR
3000
ESC ( 2 4,25) F RO M BA S EME NT 2
HR
FFL 104. 000
B1- 17 4 S H OP 39.10 m²
C OR R I D OR
B1- 16 4 S H OP 31.71 m²
B1- 16 2 S H OP 60.46 m²
FFL 102. 300
FFL 104. 112
B1- 17 3 S H OP 33.19 m²
C OR R I D OR
3000
8000
B1-48 SHOP B1-49 SHOP B1-50 REST. 272°55`13"
3000 WIDE CORRIDOR
36.002
B1-28 SHOP
3000 WIDE CORRIDOR
B1-52 REST.
BOUNDARY LINE
B1-25 SHOP
F
B1- 17 2 S H OP 34.48 m²
1:16
NEW LACTATION (A/C)
PLA YG R O U N D
B1 PLAN B1- 17 0/ 1 71 S H OP 148.5 2 m²
NT DIE GRA
BIN
FFL 102. 516
B1- 10 9 S H OP 30.19 m²
GU P PY FI SH PON D 6 0 0 MM D EP TH
B1- 16 9 S H OP 69.50 m²
A25 8000 FROM
EART FILLE H D
FFL 101. 150
2300
T 1:16
NEW FAMILY TOILET (M/V)
FFL 102. 834
B1- 11 0 S H OP 30.19 m² FFL 104. 000
K OI PON D 1 M WA T ER D EP TH
1500
0 420
B1-06 SUPERMARKET
FFL 102. 941
VOI D
FFL 102. 300
TR E E PLA N T ER 1 . 2 M SOI L D EP TH
B1- 16 8 S H OP 50.41 m²
ST R O L L ER
8000
B1-47 REST.
B1-44 KIOSK
B1-43 KIOSK
B1-42 KIOSK
B1-51 REST.
B1-29 SHOP NEW FEMALE (A/C) NEW MALE (A/C)
B1-26 B1-27 SHOP SHOP
HD
BIN
NEW PANTRY (M/V)
NEW LACTATION (A/C)
WD
35.911
M&E
3 8100
2
G
1
8100
EF
FFL 103. 108
FFL 104. 000
2400
CO URT Y A RD ( OP EN TO SK Y) 110.8 3 m²
FFL 104. 200
UP
CORRIDOR
Ra
8000
BOUNDARY LINE 55.341
8000
FFL 104.20
B1-41 KIOSK
B1-39 KIOSK
B1-40 KIOSK
272°55`45"
8000
3000MM BUILDING SETBACK LINE
B1-37 SHOP
B1-38 KIOSK
B1-34 SHOP B1-33 SHOP B1-32 SHOP B1-30 B1-31 SHOP SHOP
5 8100
4
41.478
8100
EXTG RAMP UP G = 1:13.8
EE
FFL 103. 161
EP D M FLO OR I N G PLA YG R O U N D
J
H
2000
FRO M NPSC B2 CAR GRA DIEN PARK T 1:12
R
UP
FFL
UP
DIEN
NEW AHU
BOUNDARY LINE
B1-36 REST.
B1-35 SHOP 5000MM BUILDING SETBACK LINE
EXISTING ESCALATOR
7 8100
6 4800 3300
5.4
4.332 0`40" 71°0
(unless otherwise stated) and Engineering Smoke Control System
UPPER PART OF BASEMENT 1
E8 E9
110
2.0 PLANTING STRIP 3.0 BUILDING SETBACK LINE
8000
7200
11 4500
10 8100
9
48.906
8100
3000MM WIDE GREEN BUFFER LINE
8100
8
92°54`31"
E XTG P UB S UBS TATI ON
18
10
EXTG RAMP UP G = 1:8.3
BOUNDARY LINE/ROAD RESERVE LINE
09
01
E6
04
E7
4.304 24°01 `18"
This floor is provided with Sprinklered, Air-conditioning System
27.040
ED
2° 44`02"
BOUNDARY LINE 20.986
01
UP 27R
5000
EXTG RAMP UP G = 1:20
CORRIDOR 1:25 GRADIENT
EJ 12
3000MM WIDE GREEN BUFFER LINE
5000MM BUILDING SETBACK LINE
E10
2°53`345"
K OI PON D 1 M WA T ER D EP TH
2000
RAMP GRADIENT 1:12
2700
E11
B1- 12 1 S H OP 60.26 m²
B1- 11 1 S H OP 69.24 m²
FFL 104. 000
LV SWIT 203.8 CH ROOM 9 m²
LL E R
DO O
3600
EC
B1- 12 2 S H OP 36.24 m²
UP
PLA YG R O U N D
ST R O
A23 8000
A24
KE T
ST105.63 m² -1
4200
EB
FFL 102. 834
B1- 12 3 S H OP 33.03 m²
FFL 102. 300
T
I NG 6. 72 RO O M m²
FFL 101. 800
2529 FFL 102. 300
B1- 12 0 S H OP 52.09 m² FFL 102. 300
HR
FFL 102. 516
FFL 102. 941 B1- 12 4 S H OP 27.23 m²
FFL 104. 200 GR 1:3 AD 1 IEN
N U RS
1:12
A22 8000
8000
HR /D W I TH R S TAN D BY HO SE
P UP
3600
EA
FFL 103. 298
FFL 101. 800
GRA
BOUNDARY LINE
FFL 103. 359
TRAN SFOR 117.5 MER ROO 0 m² M
WI C
FL11 7.23 m² EART FILLE H D
M
0
28.316
FFL 103. 532
FFL 102. 300
B1- 12 5 S H OP 26.55 m²
FFL 103. 298
RO O D I NG m² 4. 30
200
9.950
FFL 103. 698
FFL 102. 852
FFL 103. 108 FFL 103. 161
B1- 12 6 S H OP 29.92 m²
HC m²
FFL 102. 300
ESC ( 2 6,27) TO 1S T ST O RE Y
S K Y L I GH T A B OV E
C H I L L E R R OOM 370.8 6 m²
F EE
ESC FROM MIDLANDING TO L1
BOUNDARY LINE/ROAD RESERVE LINE
B1- 12 7 S H OP 29.90 m²
FFL 102. 467
FFL 102. 852
7396
DR
6.255
FFL 103. 359
B1- 12 8 S H OP 28.04 m²
B1- 11 2 REST AUR ANT 78.99 m²
SEATI NG
4. 99
A21 8000
FROM MEZZ B1 ANIN E
T
RAM
S T A F F R O OM 10.00 m²
T R A V E L A T OR 49.10 m²
RPI
4200
FFL 103. 532
FFL 103. 698 2500
B1- 11 8/ 1 19 S H OP 147.9 7 m² FFL 102. 300
FFL 102. 852 2000
FFL 103. 108
FFL 103. 298 VOI D A B OV E AT R I U M 6
B1- 11 7 S H OP 127.3 5 m²
FFL 102. 467
FFL 102. 852
1: 2 5 GR A DI E N T R A M P T O N OR T H P OI N T S H OP P I N G C E N T R E
B1- 11 6 S H OP 140.1 1 m²
E S C A L A T OR 22.17 m²
FFL 103. 108
FFL 103. 298 FI R E CURTAI N
HR
ENT ADI GR
GRADIENT 1:12
9600 51.220
BOUNDARY LINE/ROAD RESERVE LINE
7100 PL 26 7.84 m²
TRV (1,2) FROM BASEMENT 2
HR
6
FFL 103. 298
FFL 101. 800
4200
B1-10 KIOSK
B1- 11 4 S H OP 55.82 m² FFL 103. 298
FFL 103. 778
5530
RE T A I L R E C Y C L E P OI N T 2000 28.71 m² UP FFL 101. 800
2400
B1-09 KIOSK
PL2 7 8.40 m²
DER P O WA R E A
FFL 102. 300
CORRIDOR
12
DR
HR/DR W I TH STA N D B Y H OS E
B1- 11 5 S H OP 64.05 m²
UP
FFL FL1 5 / EV AC FFL 103. 778
FFL 104. 132
3.0m WIDE LINKWAY FROM NP3
EXISTING TRAVELATOR B1-08 KIOSK
ELEC
VOI D
CS
LIN B EL E OF EJ OW EC TO
2125
J AN I 7. 29 TO R m²
ESC (14,15) TO MIDLANDING
M&E
NEW ACMV SHAFT
WN
HC 5.23 m²
FFL 103. 298
SI G N AG E
45.93 m²
K
EXISTING TRAVELATOR
1
PO W D E R
ST22- 1
1825
01
FIRE AT FLATSHUT TER LEVE L
HR
9
AHU
CS
ET
AC
VH
FFL 101. 800
FE M A L E T OI L E T 58.80 m²
SEA T I NG
B1-46 SHOP
2.5m WIDE LINKWAY FROM NP3
m²
FFL 102. 300
C H I LD
WN
FFL 102. 300
WN ST O R E
TO MEZZ B1 ANIN E
D
VH
CA R T
EART FILLE H D
ST UP 19A-1 6.50 m²
T LE TOILE m² FEMA 59.69
HR
CHI L D
JA N I TOR 5.54 m²
ST22 A- 1
FFL 103. 863
LOBBY
SI G N AG E
FEE D I N G R O OM 3.46 m² N U R S I N G R O OM 6.99 m²
WN
FFL 103. 698
M & E SPACE
HALF AREA: 30 sqm (323 sqft)
VOI D (C EI L I N G B E L OW )
A20 8000
UP
ST 12.6819-1 m²
EART FILLE H D FFL 102. 300
7
5940
CS
A19 8000
E0 WD/ 3 GA/35
5.45 ST11 m² -1 UP
FFL
MAL E 34.61 TOIL
C HI L
RE T A I L B I N C EN T R E 55.69 m²
FFL 102. 300
FAD
1817
8
FL12 6.15 m²
1850 CO RRI DO R
CHI L D
19
L
9
m²
MAIL BOX AREA
2H R FI R E RA T E D R OL L E R S H U T T E R
MA L E T OI L E T 49.55 m² WN
FFL 103. 863
3.0m WIDE LINKWAY FROM NP3
10
10.85 ELV
FFL 101. 800 U P RES IDEN EJEC TIAL TOR PUMP BELO W
ACMV
VOI D (C E I L I N G B EL OW )
8
24
13
FFL 101. 800
B1- 11 3 S H OP 96.34 m²
B1-45 MSHOP
11
FL 14
HR
FFL105.60 1
SL 2 FFL
A18 8000
GRA DIEN T 1:8.3
A9
EART FILLE H D
ELECT
m²
E J E C T OR PUMP B E L OW
301
NEW
SL 1
SL 3
UP
LOBBY
8000
FFL 102. 300
12
RES FFL 101. 800 BIN IDEN TIAL 60.00CENTRE
FFL 101. 800
HR/DR W I TH STA N D B Y H OS E
FFL 102. 300
RET AI L LO A DI NG / UNL OA DI NG
) (3,4 TRV TO REY STO 2 1ST 315
8000
7900
ELE C
2H R FI R E RA T E D R OL L E R S H U T T E R
FFL 101. 800
0
4700
N
UP
EL V
110
3550
P
9.02 m²
ICE LOBBY L IFT
2400
12000 182°01`46"
8000
2.473
Q
TOI L E T A B OV E
1
2067 TEL
SERV
RES FFL 101. 800 REC IDEN TIAL YCLI POIN NG T
3 RD ST O RE Y LIFT AB O V E
8000
RAM P UP
6
FFL 101. 800
1: 1 2 GR A DI E N T
UP 43.40 m² ST21 A- 1
VOI D (C EI L I N G B E L OW )
5
VOID
A8
CHR
4
VOI D (C EI L I N G B E L OW )
R
EXISTING ESCALATOR
TEL
A17
HR
H R /D W I TH R S TAN H O SE D BY
12000
179°23`12" UP
STO TAN RM WAT K BELO ER W
8.78 m²
TEL
ST21- 1
A16 8000
CARP ARK 9.88 SL m²
FFL 101. 800
U P 37R
ELE C
4.68 m²
UP
ST20 11.26 A-1 m²
FFL 101. 800
FFL 101. 800 EL V
ST20 -1 5.66 UP m²
3
ST34- 1 7.65 m² FFL 102. 315
S
HR / DR W I TH S TAN H O D BY SE
CORRIDOR
3650
8000
ES
Qa
Ma
Qb 3800
1500
2
UP
A15 8000
FL13 7.23 m² FFL 101. 810 5.62 EART FFL ST12-1 m²UP FILLE H D EART FILLE H D
6
Ja
ST34 A- 1 9.10 m² UP
.48
La
ID
102
Ka
AD
FFL
VO
STO TAN RM WAT K BELO ER W
37R UP
HR
T
8000
FFL 101. 800
8000
HR
U
BE
RESIDENTIAL
BD
B.
N
UP
BC
FFL +100 . 57 UP
A.
BB
UP
PL 17
VOID
ST 28
FA
AA
ST 32
VERSION 36 BASEMENT 1 SCALE 1:500
UP
BA AB
B9
B8
B7
B6
B5
B4
B1 B2
Basement 1 Plan 21 JUNE 2017
B3
A1 A1
A2 8000
A2
A3
8000
8000
A3
A4
8000
8000
A4 8000
1
2
1
3
2
8400
3
8400
8400
4 4
8400
8400
5 5
8400
8400
6 6
8400
8400
7 8400
8400
8
7
9
8400 8
8400
9
8400
10
11
10
16400
12
11 8000
16400
12
8000
13 13
16000
16000
148000
A5 0
15
16
8000
15
8000
A5
800
14
16000
17 800
0 17 A6 8000
16 8000 8000
16000
18
18
A6
8000 8000
W W
16000
80008000
27
27
8000
8000
A10 8000 8000
A11
A12
8000 8000
3800
3650
8000
TO
12000
12000
8000 8000
2.473
9600
2700
7100
55.341
R A M P GR A D I E N T 1:12
A25
AD I
E NT
1: 1
2
FFL 97.5 50
HR/DR W I TH STA N D B Y H OS E
OUT
MOT ORC YCLE
5000
3600
6471
4200
23
189
181
21
40
20
172
19
FFL 104. 450
206
16 9
17 7
17 6
15 4
15 5
17 5
207
17 4
4200
3823
16 2
16 3
16 4
18
4200
15 7
16 5
16 6
16 7
16
UP
20.37
HR
ST7
226 227
E11
9 6.22
223
14 1
14 0
13 9
13 8
13 7
13 6
13 5
13 4
13 3
13 2
240
51
12 4
12 5
12 6
12 7
12 8
12 9
73
74
75
76
3000MM WIDE GREEN BUFFER LINE 105.828
7900
RAMP 1:25 GRADIENT
B2- 11 6 REST AUR ANT 17.31 m² FFL 97.1 99
4B
10 5
10 4
10 3
10 2
10 1
10 0
.4
3B
1.
2.
3.
3A
B2- 13 6 REST AUR ANT 17.20 m²
81
82
83
84
85
EARTH FI L L E D
ST4 -1
EL EC T C LO SE T
FA D
EA D
EL V
89
90
91
92
93
94
96
95
BG
NO ORA ALLOWED
B2- 12 3 REST AUR ANT 17.31 m²
BF
B2- 12 4 REST AUR ANT 17.31 m²
B2- 12 5 REST AUR ANT 16.88 m²
B2- 12 7 REST AUR ANT 12.55 m²
B2- 12 8 REST AUR ANT 12.75 m²
7900
7900
7900
7900
6.235
3.531
BOUNDARY LINE/ROAD RESERVE LINE
7900
8000
8000
7900
4700
3550
HR/DR WIT H ST ANDBY H OS E
A N C I LLA R Y 13.96 m²
HR
F A A B OV E
2m HIGH SMOKE CURTAIN
ESP T EL
UP
EA D
HR/DR W I TH STA N D B Y H OS E
ACMV
ESC (20,21) TO 1ST STOREY
8000
14
212
13
213
221
11
BICY CLE
214 215
220
10 217
1
EARTH ST5 -1 FI L L E D
2
3
4
5
1300
m²
ST6
1200
ELE C T EL V
E0 WD/ 2 GA/35
VE
HR / DR S TAN WI TH H O D BY SE
4.91
UP
8
6
1162
1300
01
E0 WD/ 2 GA/35
01
FA D
E01 WD/GA/3501
Note: COMMERCIAL - ANCHOR 1. Please be informed that this set of preliminary Note: on the request by the Client COMMERCIAL - ANCILLARY plans are revised based 1. Please beplans informed that this to setallof preliminary plans are [FCL (AM)]. The preliminary are subject COMMERCIAL - ANCILLARY COMMERCIAL - CORRIDOR revised based on the request by the Client [FCL (AM)]. The technical and authorities' requirements & compliance COMMERCIAL - CARPARK LIFT COMMERCIAL - RESTAURANT preliminary plans are subject to all technical and authorities' and final confirmation from the Client [FCL(D&P)].
LEGEND
requirements & compliance and final confirmation from theCOMMERCIAL Client - SHOPS EXCLUDED AREA [FCL(D&P)]. COMMERCIAL - SUPERMARKET 2. Pending M&E confirmation. EXCLUDED AREAN
2. Pending M&E confirmation.
N B. BD
B2- 12 9 REST AUR ANT 12.75 m²
B2- 13 0 REST AUR ANT 12.92 m²
BC A. BB
B2- 13 1 REST AUR ANT 14.62 m² A N C I LLA R Y 14.67 m²
AA
FIRE SHUTTER UP
7
1162
16.07 m² EA D
FFL 104. 460 FFL
EAR FILLETH D
1 410
FFL 104. 450 EA D
EA BO
EAR FILLETH 6.57 D m² FL7
HR
4200
98
EARTH FI L L E D
ACMV
LI N
BE B2- 12 6 REST AUR ANT 13.30 m²
B2- 13 4 REST AUR ANT 16.48 m²
UP
E A R T H ST 28 LI F T L OB B Y PL 17 FI L L E D 4.01 m² 8.25 m² 6.64 m²
ST 32
97
16.06 m²
UP UP
HR/DR W I TH STA N D B Y H OS E
EARTH FFL FL 5 FI L L E D FFL 104. 460 6.90 m²
5599
4200
6000
87
16.25 m²
FL 4 6.88 m²
E01 WD/GA/3501
B2- 12 2 S H OP 17.31 m²
B2- 13 5 REST AUR ANT 16.22 m²
B2- 13 2 REST AUR ANT 22.95 m²
A.
AA
219
236 86
FFL 104. 450
FFL
S LAB
LEGEND
B2- 12 1 S H OP 17.31 m²
N O OR A A L L OW E D
232
55
23 4
80
ST3UP -1 ACMV
EARTH FI L L E D
BJ
BH
B.
B2- 13 3 REST AUR ANT 16.48 m²
4200
99
BK
B2- 11 9 REST AUR ANT 17.31 m²
HR
4A
222
12
10 6
9
10 7
216
10 8
B2- 11 7 REST AUR ANT 17.31 m² FFL 97.1 00 B2- 11 8 REST AUR ANT 17.31 m²
PROPOSED PEDESTRIAN UNDERPASS LINK TO MRT
5.
B2- 13 7 REST AUR ANT 16.88 m²
233
237 10 9
6000
56
11 0
218
57
11 1
235
58
FFL 104. 450
FFL 104. 460
FFL 104. 450
UP
997
ST 27.47 17 m²
BL
ES
ER
EP
7900
EN
EQ
2700
EM
5200
EL
7850
EK
5000
SLAB LINE ABOVE
B2- 13 9 REST AUR ANT 17.31 m²
229 231
79
77 HR/DR W I TH STA N D B Y H OS E
FL 3 7.03 m²
F F L FFL 105. 000
ST 27.47 16 m²
3.0m 2.0 PLABUILDI NTINGNG SET BOUND STR BACK IP LINE ARY LINE
72
H R / D R W I TH STA N D B Y H OS E
ACMV
VE
1000
238
52 53
59
11 2
6000
78
VOI D ( C EI LI N G B ELO W)
BM
EA BO
6000
54 60
11 3
88
FL 3
6.78 m²m² 18.02
VOI D (PL 3)
LI N
239
13 0
65 64 63
11 4
62
0 420
EARTH FI L L E D HR/DR W I TH STA N D B Y H OS E
UP
N O OR A A L L OW E D B2- 14 3 REST AUR ANT 17.31 m²
TO 1STFFL 104. 450 STOR UP EY UP
230 12 3
S LAB
6003
4480
6000 420 0 66
14.33 m² ST2- 1 UP 4.12 m² FFL 24.60 m²
B2- 11 4 REST AUR ANT 57.07 m²
B2- 11 5 REST AUR ANT 17.89 m² FFL 97.3 86
B2- 14 5 REST AUR ANT 17.31 m² FFL 97.1 00
B2- 14 0 S H OP 17.31 m²
13 1
15
14 2
12 2
PARK ING
14 3
211
14 4
12 1
EARTH FFL FL 6 FI L L E D FFL 104. 460 6.90 m²
B2- 14 4 REST AUR ANT 17.31 m²
228
241 48
14 5
12 0
6000
61
E J E C T OR S U M P 45.38 m²
ST25 A- 1 UP
EA R T H F I L L E D
ST2- 1
B2- 14 6 REST AUR ANT 17.31 m² FFL 97.1 99
SITE BOUNDARY LINE / ROAD RESERVE LINE
14 6
11 9
49
7.09 m²
EARTH FI L L E D
E10.1
B2-05 SHOP
SITE BOUNDARY LINE / ROAD RESERVE LINE
14 7
11 8
50
4000
N O OR A A L L OW E D FFL 97.6 00
B2- 14 7 REST AUR ANT 17.31 m² FFL 97.3 86
3.0m BUFFER LINE 7.5mGREEN ROAD BUFFER LINE
14 8
11 7
3.0m 2.0 PLABUILDI NTINGNG SET BOUND STR BACK IP LINE ARY LINE
8000
E10
ST25- 1 UP
4000
B2- 14 9 REST AUR ANT 18.27 m²
B2- 14 8 REST AUR ANT 17.31 m²
11 6
FFL 104. 450
67
1603
2437.5
3969 6080
ESC (12, 13) TO BA S E M E N T 1
ST 24 A- 1 6.78 m²
7.5m ROAD BUFFER LINE
EARTH FI L L E D
ELE C T
3358
EARTH FI L L E D
B2- 15 0-1 51 L OW S H OP 40.53 m²
UP
EARTH FI L L E D
E S C F R OM BA S E M E N T 1
FFL 104. 450
4200
S E D 7.65UP m² 7.13 m² EA R T H F I L L E D
FFL FL 1 22.81 m² 6.95 m²
E9
1. 8 m W A LL B Y T E NA N T , m² NO M E D I A P A N E43.24 L ( 16,D 17 ) TO E S C A L A T OR A B OV E B Y L A ESC N D L OR 1S T S TOR E Y 19.68 m²
ST2 4- 1
EARTH FI L L E D
UP
EARTH FI L L E D
14 9
HR
11 5
6000
HR
71
4000 ST1- 1 3.60 m²
EARTH FI L L E D
A N C I LLA R Y 8.60 m²
GA S
SL A B L I NE A B OV E TOI L E T A B OV E
1445
6600
FFL 98.3 60
FFL 98.0 12 B2- 15 4 REST AUR ANT 38.81 m² FFL 98.0 12
SU M P PU M P B E LO W
9.92 m²
3
3600
FFL 98.4 93
FFL 98.1 57 B2- 15 5 REST AUR ANT 34.12 m² FFL 98.1 57
VOI D (B1 CARPARK R A M P B E L OW )
A N C I LLA R Y 17.85 m²
182
68
FFL 98.3 60
15 0
SI G N AG E
PL 23
EARTH FI L L E D
4404
FFL 98.6 84
TR A V EL L A TOR (1 , 2 ) TO B A S E M E N T 1
FFL 98.4 93
B2- 15 7 B2- 15 6 REST AUR ANT REST AUR ANT 18.98 m² 21.38 m²
HC 4.95 m²
6000
FFL 99.0 20
FFL 98.6 84 B2- 15 8-1 59 REST AUR ANT 41.89 m²
15 1
6000
0 420
JA N I TOR 4.87 m²
J AN I T O R CA R T
42.17 m² ESC ( 14, 15 ) TO MI DLANDI NG PL 23 9.52D m² VOI (C E I L I N G B EL OW )
FIPLR E25S HU T T E R PL 24
B2- 11 3 L OW S E A T I N G VOI R E SD T A U R A N T (C E64.00 I L I N Gm² B EL OW )
70
5 AD RAMP IE NT 1:2 GR
FFL 99.0 20 B2- 16 0 REST AUR ANT 21.73 m²
TEL
69
B2- 16 1 REST AUR ANT 24.49 m² FFL 99.1 55
FFL 97.6 76 B2- 15 2 REST AUR ANT 14.68 m²
PL 24 8.96 m²
MI DLANDI NG 71.11 m²
FFL 105. 200
FFL 97.6 00 FFL 97.8 35 B2- 15 3 REST AUR ANT 13.34 m² FFL 97.8 35
1670
WN
5
857.7 4 m²
HR/DR WIT H ST ANBY H OS E
8000 8000
FFL 99.3 53
N U R S I N G R O OM 7.40 m²
PO W D E R
1:2
AD RAMP IE NT
FFL 99.1 55 SE C U R I T Y SHUTTER 3000
F EE DI NG RO O M
CS
PL 25 9.19 m²
TE L
E S C A L A T OR 36.39 m² ESC (1, 2, 3, 4) TO B A S E M E N T 1
FFL 97.9 91
SL A B L I N E A B OV E
CORRIDOR VOI D A B OV E AT R I U M 1
B2- 16 2 S H OP 40.55 m² FFL 99.3 53
S H OP FRO NT
EARTH FI L L E D
SI G N AG E
GR
FFL 20.66 m²
HR/DR WIT H ST ANBY H OS E
4800 3200
SED 6.05 m²
FFL 97.1 00
5A
224
46
E5.5 E6 E6.8
87.593
E7
EARTH FI L L E D
1148
ACMV
6.56 FL8 m²
47 WN
SL A B L I NE A B OV E
BOUNDARY LINE
B2-07 REST. B2-06 REST.
4.832
EXISTING ESCALATOR
A
FL 16 / E VAC 9.65 m²
ST UP23 2.36 m²
FFL 99.3 53
10100
B2-09 REST.
B2-02 REST. 8000 8000
B2-08 REST.
B
A
VOI D A B OV E AT R I U M 2
TEL
FFL 99.5 51 B2- 16 3 S H OP 67.70 m² FFL 99.5 51
C
B
EL V
FFL 99.3 20 FFL 99.3 53 FFL 99.3 53
FFL 99.1 23
C B2-01 SHOP
242
168
45
E5 3770
8000
8000
4130
CS
WN
13.62 m² ELE C T B2- 10 2 S H OP 38.28 m²
B2- 10 1 S H OP 80.29 m²
FFL 99.5 51
8000
28.316
B2-11 REST.
CHI L D
1: 2 5 GR A DI E N T R A M P T O N OR T H P OI N T S H OP P I N G C E N T R E
1148
HR /D S TAN R WI TH H O D BY SE
FFL 104. 450 FFL EAR FILLETH D
4200
4200
B2-10 REST.
FE M A L E T OI L E T 67.83 m² MA L E T OI L E T 58.42 m²
FFL 99.5 51
LOBB Y FFL 104. 450
PL30 10.98 m²
m²
209 210
15 8
225
15 6
243
15 3
EART ELV W H FILLE D
17
420 0
6000
43
LIFT 208
COMMERCIAL CARPARK
16 1
44
16 0
6269
17 8
244
17 9
420 0
42
1500
203
173
17 0
3600
B2-12 FOOD COURT
SL A B L I NE A B OV E
BOUND ARY LINE 3.0 GR EEN BUF 5.0 RO FER AD BUF LINE FER LINE
2400
ELECT
HR
22
2700
190
39
UP
4200 202
P DOW N TO B1 CARP GRA DIEN T 1:8.3 ARK
205
17 1
15 9
7850
BOUND ARY LINE 3.0 GR EEN BUF 5.0 RO FER AD BUF LINE FER LINE
m²
ST8 201
RAM
41
7850
15.78
ACMV
3650
HR
204
6000
UPPER PART OF BASEMENT 1
FROM YISHUN MRT
EJ
FL9 6.57 m² FFL EAR FILLETH D FFL 104. 460
ACMV
24
200
4200
ELV
3600
6000
3600
37 38
18 8
HR /D S TAN R WI TH H O D BY SE
5616
E1.7 2884 7116 784
E2.8
OP E N B E L OW A T D R OP - OF F
E4
8000
8000
BOUNDARY LINE
E3
8000 8000
36.002
35.911
EJECTOR ROOM
E2
8000 8000
272°55`13"
NEW CAR PARK
8000
NEW MALE TOILET (M/V)
SERVICE LOBBY
NEW AHU
B2-18 SHOP
HD
WD
NEW LACTATION (A/C)
D B2-17 SHOP
D
EH
18 7
5114
FFL 97.5 50
CHI L D
E
B2-15 SHOP
ELEC
BIN
B2- 108 to B 2-1 12 M I N I - A N C H OR 2035.0 0 m²
B2- 103 to B 2-1 07 SUPERM ARKET 3079.8 0 m²
HR
8000
3000MM WIDE GREEN BUFFER LINE
BS
NEW HCP (A/C)
B2-14 REST. LIFT CAR
B2-04 B2-03 8400 SHOP8400 REST.
62.296
NEW PANTRY (M/V)
BS
EXISTING TRAVELATOR NEW
8000
BOUNDARY LINE/ROAD RESERVE LINE BS
B2-16 SHOP
94.961tot
5.632
2°55`39"
NEW FEMALE TOILET (M/V)
25
6000
E1
8000 8000
NEW FAMILY LOT
EARTH INFILLED
8100
4
41.478
8100
3 8100
2 8100
1 3925
27.033
HD
18 6
HR
E8
4.304 24°01 `18"
BS
26
197
199
18 5
18 4
3600
NEW FAMILY TOILET (M/V)
FAD
27
195 196
18 3
0 420
EF
EAD FAD
28
194
3600
198
18 2
3600
E
EXISTING TRAVELATOR
5B
2400
29 192 193
FFL 98.5 50
3000MM WIDE GREEN BUFFER LINE
EG
191
4200
4200
15 2
F
B2-13 MANAGEMENT OFFICE
31 30
18 0
F
32
3600
6000
4200
EE
3600
4200
ELV ² 3m
ED
33
4200
2. 6
EC
34
6000
1558
A33 8000
35
0 420
BOUNDARY LINE
HC LI F T
A32 A338000 8000
FFL 104. 500
W
EB
A31 8000
FAD
36
0 420
G
G
ELECT
m²
ST9
HR
HR
9.950
ESC ( 2 4,25) TO B A SE ME NT 1
S T R U C T U R E D R OP L I N E B E L OW
UP
ACMV
3600
H
ELV
15.81
FFL
4200
FFL 104. 450
A N C I LLA R Y 11.47 m²
J J
NG
BOUNDARY LINE/ROAD RESERVE LINE
A30 800
A31 0 8000
FL10 6.57 m²
6000
K K
ATI
6.255
R
6000
80008000
4.332 0`40" 71°0
5.4
TRV (5,6) FROM BAS EMEN T1
SE
EA
A29 800
A300 8000 8000
D OO
6000
T R A V E L L A T OR
R A I S E D F L OOR S L A B
HR
5
27.040
4800
EARTH INFILLED
6
2° 44`02"
LOBBY
BOUNDARY LINE 20.986
3300
EXT'G PL/HL EXT'G LIFT
2°53`345"
FIRE LIFT
H
6.
ET
EAR FILLETH D
4200
EXT'G PL/HL EXT'G
LINKWAY FROM NP3
6A
W I CK
HR
EARTH FI L L E D
B2- 13 8 REST AUR ANT 17.31 m²
6B
A28 800
A290 8000
A32
5473
HR /D S TAN R WI TH H O D BY SE
80008000
7 8100
L L
B2- 14 1-1 42 S H OP 34.63 m²
7.
A28
HR
450 0
3600
B2- 12 0 S H OP 17.31 m²
7A
A27
16000
8000 P UP TO 1ST STOR GRA EY DIEN T 1:12
FROM
PARK ING
3600
3.0m GREEN BUFFER LINE
7B
A26 A27
TO
4200
NEW AHU
8.
A26
FFL 104. 450
FIRE SHUT TER
FFL 104. 150
2714
RAM
FFL 98.5 50
GR
FFL 104. 450 RAM
S T OR A G E F OR S U P E R M A R K E T
FAD 5.81 m²
FFL FL1 5 / EV AC 20.56 m² 9.74 m²
M M
A25 8000
16000 2160 IN
2040
FFL 98.5 50
A24 8000 8000
TO
OP E N B E L OW
TOI L E T A B OV E
8000
FROM
B1
2290
BOUNDARY LINE
STOP
272°55`45"
3000MM BUILDING SETBACK LINE
FFL 98.5 50
P UP FRO M B1 GRA CAR DIE PAR NT 1:8. K 3
STOP
FFL
BOUNDARY LINE BOUNDARY
8000 8000 8000 8000 8000 8000
NEW FAMILY LOTS
3000MM WIDE GREEN BUFFER LINE
BOUNDARY LINE/ROAD RESERVE LINE
5000MM BUILDING SETBACK LINE
EXISTING ESCALATOR
R A M P GR A D I E N T 1:12
A23
A23 8000
UP
EARTH FI L L E D 19.83 m² ST22- 1 E A R T H UPFFL 98.5 50 FI L L E D
UP
A22 8000
A22
LOAD ING
& UNLO ADIN GRA G@ DIEN LOW T 1:12 ER
2015
FFL 98.5 50 ST22 A- 1 6.85 m²
8000 8000
A24 FROM
1750
2.0PLANTING PLANTING STRIP 2.0 STRIP 3.0BUILDING BUILDING SETBACK 3.0 SETBACKLINE LINE
8000 8000
7200
11 4500
10 8100
9
48.906
8100
8
EARTH FILLED
5000MM BUILDING SETBACK LINE 92°54`31"
1:16
RAM P UP
4200
8100
G=
A21
A21
8000
TO NORTH CITY BASEMP OINT CARPA ENT 1 RK
FFL 97.5 50
2000
51.220
3000MM WIDE GREEN BUFFER LINE
OP ST 1:8.3
8000 8000
HR
211.44 m²
182°01`46"
BOUNDARY LINE/ROAD RESERVE LINE
12
179°23`12"
S UMP P UMP BELOW
A20
A20
4200
G=
NN
STORE
FIRE LIFT
A19 8000
FFL 98.5 50
NEW STORE
NEW
A18 8000
E0 WD/ 3 GA/35 01
E0 WD/ 3 GA/35 01
TO CITYNORTHPO CAR BASEMENINT PARK T1
FL 14 11.77 m²
8000
8000
A17 8000
B1
STOP
UP
SL 3 11.27 m²
40
40 8000
8000
8000
8000 TO SHO NORT HPO BAS PPIN G INT EMEN CENT RE T2
UP
SL 2 11.77 m²
39
398000
8000
A16
A16
A18
HR/DR W I TH STA N D B Y H OS E
38
388000
8000
8000
8000
SL 1 11.78 m²
37
37 8000
8000
A15
A15
EY STOR
HR
PP
1ST
36
36 8000
8000
8000
8000
2.16 m² E A R T H ST21 A- 1 FI L L E D FFL 97.5 50
TO
35
35 8000
8000
A14
A14
A19
34
34 8000
8000
8000
ST21- 1 11.21 m²
FFL 100. 000
33
33 8000
8000
A13 A13
8000
UP
32
800032
8000
8000
8000
6.33 m²
31
800031
8000
A12
8000
A17
EARTH FI L L E D
30
30
8000
8000
A11
8000
8000
RR
LOBBY
NEW EVACUATION LIFT (EXTG LIFT)
29
29
8000
8000
SS
EXTG AHU
28
28
8000
8000
A10
8000
ES
Ra
26
26
8000
8000
8000
8000
80008000 Qb
25
25
8000
8000
8000
AD
AD
Qa
Ma
24
24
8000
8000
1500
La
23
23
8000
8000
A9 A9 8000
8000
HR
Ja
22
22
8000
8000
A8
AC
AC
T T
21
21
8000
8000
A88000 8000
16000
AB
U U
Ka
20
20
8000
A7
AB
V V
EJ
19
19 A7
8000 8000 8000
8000 8000
BOUND ARY LINE AA BOUND 3.0 GR / RO EEN ARY AD RES BUF 3.0 GR 5.0 LIN AA FER ERV LIN EENROADE / RO E LIN BUF BUF AD RES E E 5.0 RO FER FER ERV LINE LIN E AD BUF E LINE FER LINE
+97 .1 00
VERSION 36 BASEMENT 2 SCALE 1:500
K E D A B OV E
BA
S E D A B OV E
AB
21 JUNE 2017
AB
B4
B1 B2
B5
B6
B7
B8
B9
B3
Basement 2 Plan
Basement 1 Mezzanine Plan
View from Main Entrance
Aerial View
View on Town Plaza
View on 1st Storey Pedestrian Walk
View on Residential Entrance facade
Site Photo: Excavation/ Piling
Site Photo: Atrium
Site Photo: Shop Front Mock Up
Site Photo: Retaining Wall for Basement - Soldier Pile
Site Photo: Structural Works
View from Beach Road
CITY GATE MIXED DEVELOPMENT, SINGAPORE Located strategically in the fringe of the Central Downtown Core cityscape where urban renewal and transformation are proceeding to transform the area into an exciting and dynamic district offering a variety of community, commercial, entertainment and lifestyle attractions, the project intention is to be a recognizable landmark that would add value to the urban context, thus becoming a strong icon as part of Singapore’s gateway towards CBD Central Area.
PROJECT INFORMATION Project type | Mixed Development comprises of 5-storey commercial podium (with basements), and 30-storey residential development above with 2 sky terraces Land size
| 7,268.90 sqm
GFA
| 36,344.50 sqm
Est Construction Cost | SGD 300 million Timeline
| Q3 2013 - Q4 2019
RESPONSIBILITIES - Coordination with Consultants, Contractors and Client’s Project Manager during Construction Phase to resolve design and technical issues - Attend Site Meetings and prepare minutes - Review Shop Drawings, Materials submissions and RFI, reporting to Director - Preparation of BP (Building Plan) amendment submission drawings and documents working with Technical team - Liaison with Authority Department Officers via emails and meetings to resolve authority requirement issues
COMMERCIAL GFA ANCILLARY USE
M&E/ TOILET
Location Plan
ARKS EY
TOTAL MAIN BUILDING GFA
STOREY
TOTAL APPROVED COM./RES. GFA (SQM)
CORRIDOR/ LOBBY
KDOWN OF CARPARK COMPUTATION NO. OF LOTS PROVIDED Accessibility Loading/ Unloading
PLANNING DATA
SUMMARY OF GFA BREAKDOWN CALCULATION
BONUS BALCONY GFA BREAKDOWN APPROVED +/STOREY
+/-
TOTAL PROPOSED APPROVED COM./RES. COMMERCIAL GFA (SQM)
GFA (SQM)
UNIT TYPE
STOREY
QUANTUM
DESCRIPTION
A
1 Bedroom
B
2 Bedroom(Dual Key)
C
3 Bedroom(Dual Key)
D
2 Bedroom(Dual Key)
E
2 Bedroom(Dual Key)
F
2 Bedroom(Dual Key)
G
2 Bedroom(Dual Key)
H
1 Bedroom
J
2 Bedroom(Dual Key)
K
2 Bedroom(Dual Key)
16-25 (Total: 1 units)
L
3 Bedroom(Dual Key)
M
2 Bedroom(Dual Key)
26-50 (Total: 138 units)
N
2 Bedroom
P
2 Bedroom
B1
3 Bedroom Penthouse
C1
4 Bedroom Penthouse
E1
4 Bedroom Penthouse
H1
3 Bedroom Penthouse
J1
1 Bedroom Penthouse
L1
4 Bedroom Penthouse
M1
3 Bedroom Penthouse
P1
3 Bedroom Penthouse
51-75 (Total: 42 units)
76-100 (Total: 6 units)
PLOT No.
>100 (Total: 2 unit)
1
REFUSE OUTPUT CALCULATION FOR RESIDENTIAL
APPROVED PROPOSED COMMERCIAL RESIDENTIAL GFA (SQM) GFA (SQM)
Nett Residential Area (NRA) (excluded Balcony & Roof Terrace) (sqm)
NO. OF UNITS
+/-
PROPOSED RESIDENTIAL GFA (SQM)
Balcony (sqm)
Percentage of Balcony/ over Net NRA(%)
DESCRIPTION
2
BOUNDARY LINE
3
Refuse Output (litres/day) 20 per dwelling premises
Concept Diagram
Total no. of units = 311
BOUNDARY LINE
Total = 311x20 = 6220 litres/day
BOUNDARY LINE 2M PLANTING STRIP 3M BUILDING SETBACK LINE
RECEPTION
BOUNDARY LINE / ROAD RESERVE LINE
REMOVE
NO. OF UNITS
RESIDENTIAL GFA
AREA TABULATION FOR RESIDENTIAL UNIT SIZE
Family Lot
UNITS NO.
+/-
PROPOSED
TOTAL NUMBER OF RETAIL UNITS UNITS SIZE (SQM)
COMMERCIAL GFA
BOUNDARY LINE / ROAD RESERVE LINE
SUPER MAKET
RESIDENTIAL GFA
RECEPTION
BOUNDARY LINE / ROAD RESERVE LINE
Site Plan 2
SITE PLAN SCALE
1:500
1
LOCA SCALE
1st Storey Plan
BOUNDARY LINE
BOUNDARY LINE
4
B
B
BOUNDARY LINE
BOUNDARY LINE
4
BOUNDARY LINE
BOUNDARY LINE 2M PLANTING STRIP 3M BUILDING SETBACK LINE
2M PLANTING STRIP 3M BUILDING SETBACK LINE
SHOP SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
RESTAURANT
BAYFRONT VENTURES PTE LTD
SHOP
55 UBI AVENUE 1 #05-16 UBI 55 BUILDING SINGAPORE 408935
RESTAURANT
SHOP
SHOP
SHOP
SHOP
BA
RESTAURANT
RESTAURANT
TEL: (65) 6840 7777 FAX: (65) 6841 7460
SHOP
55 U #05SING
RESTAURANT
TO L1 FR L1
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
3
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
A
PWD
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
STR
KITCHEN
SHOP SHOP
SHOP
SHOP
SHOP
SHOP
I,
TO L1
SHOP
SHOP
SHOP
SHOP
YEO SIEW HAIP
TEL: (65) 6220 0411 FAX: (65) 6224 9929
REG. NO. A1365 NRIC NO. S1619238D
SHOP
SHOP
ARCHITECTS
SHOP
PTE LTD
2, BUKIT MERAH CENTRAL #17-00, SINGAPORE 159835 TEL:6220 0411 FAX:6224 9929
SHOP
SHOP
RESTAURANT
SHOP
SHOP
SHOP
SAA ARCHITECTS PTE LTD
A
Design Architect / Project Architect
SHOP
Structural Engineers
SHOP
WILLIAM NG CONSULTANTS PTE LTD SHOP
I D
I C U
SHOP
SHOP
YEO
REG. NRIC
2
A
Stru
WIL
Mec
2nd EDITION PTE LTD SHOP
SHOP
SHOP
SA
Des
RO
SHOP
Mechanical & Electrical Engineers
SHOP
A) B)
SHOP
RONNIE & KOH CONSULTANTS PTE LTD
RESTAURANT RESTAURANT
SHOP
FR L1
SHOP
I.D. Consultant
SHOP
TO L1
FR L1
TO L1
FR L3
I HAVE SHOWN THIS PLAN TO THE OWNER(S) OF THE LAND, AND HAVE OBTAINED THE CONSENT OF THE SAID OWNER(S) TO SUBMIT THIS PLAN TO THE COMPETENT AUTHORITY UNDER THE PLANNING ACT (CAP 232, 1998Ed).
2
A
FR L1
TO L1
SHOP
SHOP
FR L1
TO L3
SHOP
, HEREBY DECLARE THAT -
I AM NOT THE OWNER OF THE LAND WITHIN THE MEANING OF THE TERM "OWNER" AS DEFINED IN SECTION 2 OF THE PLANNING ACT (CAP 232, 1998Ed); AND
3
PWD
SHOP
YEO SIEW HAIP
A) B)
PWD
SHOP
SHOP
MR DIR
MR. KOH WEE SENG DIRECTOR
I,
2nd
PWD
SHOP
SHOP
FR L1
SHOP
TO L1
SHOP
RESTAURANT KITCHEN
BOUNDARY LINE / ROAD RESERVE LINE
BOUNDARY LINE / ROAD RESERVE LINE
SHOP RESTAURANT
KITCHEN
BOUNDARY LINE / ROAD RESERVE LINE
BOUNDARY LINE / ROAD RESERVE LINE
SHOP
STR
SHOP SHOP
SHOP
FR L1
SHOP
I.D.
SHOP
SHOP
24-HR POB LINK
STALL 8
SERVERY
TO L1
SHOP
STALL 7
RESTAURANT
SERVERY
SHOP
FOODCOURT STALL 1
PROPOSED ERECTION OF 30-STOREY COMMERCIAL MIXED DEVELOPMENT COMPRISING OF 2-STOREY WITH 1 BASEMENT COMMERCIAL PODIUM (TOTAL: 188 UNITS), 3-STOREY PODIUM CARPARK, SUPERMARKET 25-STOREY RESIDENTIAL TOWER (TOTAL: 311 UNITS), WITH SKY TERRACE ON 6TH AND 24TH STOREY, COMMUNAL FACILITIES AND SWIMMING POOL ON LOT 00534W TS 15 AT 371 BEACH ROAD (KALLANG PLANNING AREA)
SERVERY
STALL 9
RESTAURANT
SERVERY
SERVERY
STALL 1
STALL 2
SERVERY STALL 3
SERVERY STALL 4
SERVERY STALL 5
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
RESTAURANT
SERVERY STALL 6
KITCHEN KITCHEN
CENTRALISED WASH AREA
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
SHOP
RESTAURANT
RESTAURANT
C
PR CO CO BA 188 25UN 24T SW 371 (KA
BOUNDARY LINE / ROAD RESERVE LINE
BOUNDARY LINE / ROAD RESERVE LINE
OV 2ND
OVERALL PLANS: BASEMENT 1 PLAN
1
BASEMENT 1 PLAN SCALE
1:200
1
B
1
LAND TENURE:
DIRECTOR IN CHARGE:
D C REF/B P NO.:
DRAWN BY:
YSH
2ND STOREY PLAN SCALE:
SCALE
DATE:
06 Apr 2016
PROJECT NO.
1:200
LAND
PROJECT ARCH:
NKY/SL
DCR
CHECKED BY:
NKY/SL
DRAWING NO.
SCALE
REV.
1
B
DATE
FILEN
FILENAME:
Basement Plan
2nd Storey Plan
Elevation ( Jalan Sultan)
1ST L E v E L - T H E H I G H S T R E E T
Elevation ( Beach Road)
View on Pedestrian Walkway City Gate Shoppes consists of three levels of 188 commercial units that come in sizes to suit your business needs. Own your retail space in this strategically located mall that is surrounded by four key growth areas in Singapore’s city centre. As such, the potential for growth is set to be exponential.
Artist’s Impression
you will have a ready pool of discerning resident customers from the luxurious City Gate Residences. Adding to that will be residents from nearby developments, including new ones planned for Kampong Bugis. Those working in neighbouring office buildings and designer studios will also add to your ever-widening customer base. In addition, the numerous arts schools and venues around will bring to your business a steady stream of youths, as well as a hipster and bohemian clientele who will inject colour, diversity and youthful energy. This will, no doubt, also attract tourists and visitors from the Kampong Glam heritage district who are looking for unique experiences.
THE HIGH STREET City Gate is also just one stop away from the Singapore Sports Hub. Look forward to attracting the large capacity crowds of visitors and thousands of event-goers from the National Stadium, Singapore Indoor Stadium and the various sports venues.
Interior View Artist’s Impression
BEST INvESTMENT, pERFECT OppORTuNITy
View on Commercial Podium Facade
Standard High Perforation: 24% Openings
Custom Perforation: Average 15% Openings
Standard Low Perforation: 6% Openings
Commercial Podium Facade Materiality
2
ELEVATION OF HR/WR & FE @ ST-5
BOUNDARY LINE
SCALE
4
1:50
B
BOUNDARY LINE
BAYFRONT VENTURES PTE LTD 55 UBI AVENUE 1 #05-16 UBI 55 BUILDING SINGAPORE 408935
13M BUILDING SETBACK LINE
TEL: (65) 68 FAX: (65) 68
BOUNDARY LINE / ROAD RESERVE LINE
MR. KOH WEE SENG DIRECTOR UNIT TYPE-2DK1 YEO SIEW HAIP
I,
UNIT TYPE-3DK1
, HEREBY DECLARE THAT -
A)
I AM NOT THE OWNER OF THE LAND WITHIN THE MEANING OF THE TERM "OWNER" DEFINED IN SECTION 2 OF THE PLANNING ACT (CAP 232, 1998Ed); AND
B)
I HAVE SHOWN THIS PLAN TO THE OWNER(S) OF THE LAND, AND HAVE OBTAINED T CONSENT OF THE SAID OWNER(S) TO SUBMIT THIS PLAN TO THE COMPETENT AUT UNDER THE PLANNING ACT (CAP 232, 1998Ed).
UNIT TYPE-A1
YEO SIEW HAIP
TEL: (65) 62 FAX: (65) 6
15M BUILDING SETBACK LINE
A
UNIT TYPE-B1
UNIT TYPE-B2
UNIT TYPE-2DK-3
3
BOUNDARY LINE / ROAD RESERVE LINE
5M BUILDING SETBACK LINE
REG. NO. A1365 NRIC NO. S1619238D
UNIT TYPE-2DK2 UNIT TYPE-2DK8
A
ARCHITECTS
2
PTE LTD
2, BUKIT MERAH CENTRAL #17-00, SINGAPORE 159835 TEL:6220 0411 FAX:6224 9929
SAA ARCHITECTS PTE LTD Design Architect / Project Architect
RONNIE & KOH CONSULTANTS PTE LTD Structural Engineers
WILLIAM NG CONSULTANTS PTE LTD Mechanical & Electrical Engineers
P
2nd EDITION PTE LTD
P
I.D. Consultant UNIT TYPE-2DK5
UNIT TYPE-A2
UNIT TYPE-3DK2
UNIT TYPE-2DK6
UNIT TYPE-2DK7
UNIT TYPE-2DK4
15M BUILDING SETBACK LINE BOUNDARY LINE
PROPOSED ERECTION OF 30-STOREY COMMERCIAL MIXED DEVELOPMENT COMPRISING OF 2-STOREY WITH 1 BASEMENT COMMERCIAL PODIUM (TOTA 188 UNITS), 3-STOREY PODIUM CARPARK 25-STOREY RESIDENTIAL TOWER (TOTA UNITS), WITH SKY TERRACE ON 6TH AND 24TH STOREY, COMMUNAL FACILITIES A SWIMMING POOL ON LOT 00534W TS 1 371 BEACH ROAD (KALLANG PLANNING AREA) BOUNDARY LINE / ROAD RESERVE LINE
1
1
BOUNDARY LINE
8Th, 11th, 14th, 17th, 20th, 23rd, 26th & 29th Storey Plan 8TH, 11TH, 14TH, 17TH, 20TH, 23RD, 26TH & 29TH STOREY PLAN SCALE
4
1:200
2
B
OVERALL PLANS: 8TH, 11TH, 14TH, 17TH, 20TH, 23TH, 26TH & 2 STOREY PLAN
ELEVATION OF HR/WR & FE @ ST-5 SCALE
1:50
B
LAND TENURE:
DIRECTOR IN CHARGE:
D C REF/B P NO.:
DRAWN BY:
NKY/SL
CHECKED BY:
NKY/SL
PROJECT NO.
DRAWING NO.
DATE: FILENAME:
BOUNDARY LINE
BAYFRONT VENTURES PTE LTD
13M BUILDING SETBACK LINE
BOUNDARY LINE / ROAD RESERVE LINE
55 UBI AVENUE 1 #05-16 UBI 55 BUILDING SINGAPORE 408935
TEL: (65) 6840 7777 FAX: (65) 6841 7460
MR. KOH WEE SENG DIRECTOR
UNIT TYPE-2DK1
UNIT TYPE-3DK1
YEO SIEW HAIP
I,
, HEREBY DECLARE THAT -
A)
I AM NOT THE OWNER OF THE LAND WITHIN THE MEANING OF THE TERM "OWNER" AS DEFINED IN SECTION 2 OF THE PLANNING ACT (CAP 232, 1998Ed); AND
B)
I HAVE SHOWN THIS PLAN TO THE OWNER(S) OF THE LAND, AND HAVE OBTAINED THE CONSENT OF THE SAID OWNER(S) TO SUBMIT THIS PLAN TO THE COMPETENT AUTHORITY UNDER THE PLANNING ACT (CAP 232, 1998Ed).
UNIT TYPE-B1
UNIT TYPE-B2
UNIT TYPE-2DK-3
3
BOUNDARY LINE / ROAD RESERVE LINE
UNIT TYPE-2DK2 UNIT TYPE-2DK8
15M BUILDING SETBACK LINE
UNIT TYPE-A1
5M BUILDING SETBACK LINE
A
PROJECT ARCH:
YSH
SCALE:
YEO SIEW HAIP
TEL: (65) 6220 0411 FAX: (65) 6224 9929
REG. NO. A1365 NRIC NO. S1619238D
A 2
ARCHITECTS
PTE LTD
2, BUKIT MERAH CENTRAL #17-00, SINGAPORE 159835 TEL:6220 0411 FAX:6224 9929
SAA ARCHITECTS PTE LTD Design Architect / Project Architect
RONNIE & KOH CONSULTANTS PTE LTD Structural Engineers
WILLIAM NG CONSULTANTS PTE LTD Mechanical & Electrical Engineers
UNIT TYPE-A2
UNIT TYPE-3DK2
2nd EDITION PTE LTD
UNIT TYPE-2DK5
I.D. Consultant
UNIT TYPE-2DK6
UNIT TYPE-2DK7
UNIT TYPE-2DK4
15M BUILDING SETBACK LINE
PROPOSED ERECTION OF 30-STOREY COMMERCIAL MIXED DEVELOPMENT COMPRISING OF 2-STOREY WITH 1 BASEMENT COMMERCIAL PODIUM (TOTAL: 188 UNITS), 3-STOREY PODIUM CARPARK, 25-STOREY RESIDENTIAL TOWER (TOTAL: 311 UNITS), WITH SKY TERRACE ON 6TH AND 24TH STOREY, COMMUNAL FACILITIES AND SWIMMING POOL ON LOT 00534W TS 15 AT 371 BEACH ROAD (KALLANG PLANNING AREA) BOUNDARY LINE / ROAD RESERVE LINE
1
10Th, 13th, 16th, 19th, 22nd, 25th & 28th Storey Plan 1
OVERALL PLANS; 10TH, 13TH, 16TH, 19TH, 22ND, 25TH & 28TH STOREY PLAN
B
10TH, 13TH, 16TH, 19TH, 22ND, 25TH & 28TH STOREY PLAN SCALE
LAND TENURE:
DIRECTOR IN CHARGE:
D C REF/B P NO.:
DRAWN BY:
SCALE:
1:200
YSH
PROJECT NO.
DATE: FILENAME:
View on 6th Storey Recreational Island
Artist’s Impression
View on 6th Storey Pods Artist’s Impression
Artist’s Impression
PROJECT ARCH:
NKY/SL
CHECKED BY:
NKY/SL
DRAWING NO.
REV.
THE GRAND LEvEL ( 6 T H STOREy )
12
7
26
27
6
25
3
1
4
28
14
5
5 10
29
13 11 24
2
30
23
8 9 31 15 17 22
32
16 18
19
20
21
23
Artist’s Impression
LEGEND 1 2 3 4 5 6
The Grand pool The Tropical Deck Spa Cove pool Bar Spa Jets Sun Lounger
7 8 9 10 11 12
Sun Deck Garden Waterfall Splash pool Sandbox playground Water Wall The Residence Room
13 The Dining Terrace
19 Recreation Island
25 pebble Garden
31 Leisure pod
14 Changing Room / Toilet
20 Garden Swing Island
26 Reflexology Garden
32 Botanic Terrace
15 Table Tennis
21 Relaxation Island
27 Outdoor Fitness
16 Hot Stone Grill
22 Horseshoe Bar
28 Reading pod
17 Reflective pool
23 Residential Lobby
29 Social pod
18 picnic Island
24 Chill-out Deck
30 Tranquil pod
ExC AB 6th Storey Plan
THE SKy CLuB ( 24 T H STOREy )
14
13
9
11
10
8
16 5
17
12 15 7 6
1
4
3 2
4
18
4
4
Artist’s Impression
LEGEND 1
Children Sky play Water Terrace 3 Outdoor Gym 2
4
7
5
8
Floral Sanctuary Toilet 6 Fitness Corner
The Sky Gym putting Green 9 Relaxation Deck
10 Meditation Deck 11 yoga Deck 12 zen Garden
13 Sky Gourmet Dining
16 Reflective pool
14 Sky Teppanyaki Grill 15 Moonlight Lounge
17 Observatory Sky pavilion 18 Sky Lounge
24th Storey Plan
View on Residential Towers
Artist’s Impression
Selected Unit Plans
BALCONY BATH AC LEDGE
KITCHENETTE
SH
BEDROOM 1 STUDY LIVING
MASTER BEDROOM
MASTER BEDROOM
DINING
STUDY
BEDROOM 1 UPPER PLATFORM
DINING
LIVING MASTER BEDROOM UPPER PLATFORM
AC LEDGE
SH
BATH
AC LEDGE
KITCHENETTE
BALCONY
2DK1
TYPE A2 1 Bedroom 42 sqm / 452 sqft
A1 2DK8
3DK2
B1
3DK1
2DK1
3DK1
2DK2
A1
2DK2
2DK8
B2
2DK7 2DK6
A2 2DK5
B1
B2
2DK3 2DK4
3DK2
2DK7 2DK6
A2 2DK5
2DK3 2DK4
TYPE B2 2 Bedroom 53 sqm / 570 sqft
BALCONY
TYPE 2DK1
LIVING
2 Bedroom Dual Key 72 sqm / 431 sqft
STUDY
MASTER BEDROOM
MASTER BEDROOM UPPER PLATFORM
SH
AC LEDGE
KITCHENETTE
BATH DINING
BALCONY 2DK1 A1 2DK8
3DK2
B1
STUDY
2DK2
STUDIO
AC LEDGE
B2
2DK7 2DK6
SH
STUDIO BATH
3DK1
FOYER
KITCHENETTE
2DK3
A2 2DK5
2DK4 STUDIO UPPER PLATFORM
FOYER KITCHENETTE
SH
TYPE 2DK5
AC LEDGE
63 sqm / 678 sqft
KITCHENETTE
2 Bedroom Dual Key STUDIO BATH
DINING
SH
BATH
STUDY
STUDIO
LIVING
2DK8
3DK2
B1
2DK1
3DK1
A1
2DK2
STUDY
B2
2DK7 2DK6
AC LEDGE
STUDIO UPPER PLATFORM
BALCONY
MASTER BEDROOM
BALCONY
2DK3
A2 2DK5
2DK4
MASTER BEDROOM UPPER PLATFORM
BALCONY
TYPE 3DK1 3 Bedroom Dual Key 85 sqm / 915 sqft
BALCONY
AC LEDGE
BEDROOM 1 STUDY
MASTER BEDROOM
LIVING STUDIO
STUDY
BEDROOM 1 UPPER PLATFORM
BALCONY
SH DINING
2DK1 A1 2DK8
3DK2
B1
3DK1
2DK7 2DK6
STUDIO BATH SH
2DK2
B2
KITCHENETTE A2 2DK5
STUDIO UPPER PLATFORM
KITCHENETTE
MASTER BATH
AC LEDGE
FOYER
2DK3 2DK4
BALCONY
TYPE CPH3 116 sqm / 1,249 sqft
A/C LEDGE
LIVING MASTER BEDROOM
3 Bedroom Penthouse
DINING
BALCONY
BEDROOM 3 JUNIOR MASTER BEDROOM SH
A/C LEDGE
MASTER BATH
UTILITY UTILITY
DRY KITCHEN
WC
CPH3
WET KITCHEN WM
DB
BATH FOYER
SH
Physical Model: Overall
Physical Model: Residential Tower
Physical Model: Commercial Podium
Site Photo: Piling
Site Photo: Piling / Excavation/ Slab Casting
Site Photo: Opening for Excavation to Basement
Site Photo: Slab Casting
Concept Diagram
Diagramtic Section
Elevation from Proposed Road
JTC SPACE AT JALAN PESAWAT, SINGAPORE The design proposal is an 8-storey high-rise ramp-up development for 3-storey stack up flexible small footprint factories (SFP) for small and medium-sized enterprises (SMEs). Production activities traditionally sprawling extensively on land can now be stacked up and vertically integrated over 2 to 3 storey within the unique factory unit framework. The proposal not only allows industrialists to configure their own space and integrate their processes over multiple floors but also encourages company growth by allowing SMEs to build new capabilities and expand into higher value-added industrial activities.
PROJECT INFORMATION Project type | Competition for Multi-storey Stack up SmallFootprint Factory Land size
| 20,000 sqm
GFA
| 40,000 sqm
Status |Competition held on Q2 2016; Competition Won
RESPONSIBILITIES - Worked in a team to develop massing and planning strategies - Coordination with Consultants pertaining to structural and M&E matters - Worked in a team to prepare 6 A1 presentation boards and Power Point Slides
View from Proposed Road
1st Storey Plan
2nd Storey Plan
3rd Storey Plan
4th Storey Plan
5th Storey Plan
6th Storey Plan
7th Storey Plan
Roof Plan
View from Adjacent Plot
Planning Strategies
Value-Added Strategies
Aerial View showing building facade
Structural Concept
Alternative Proposal
Section
Diagrammatic Section
Floor Plans
Swept Path Study
INTERIOR & FURNITURE DESIGN
Dry Kitchen
INTERIOR DESIGN & BUILD FOR THE LIGHT RESIDENCE The interior concept celebrates clean lines and the owner’s great interest in local timber. Species of ‘Shorea’ , locally named ‘as Selangan Batu’ was selected for its durability and its beautiful yellowish brown hue. The living room is fitted out with timber ‘beams’ at the soffit of the ceiling that extends vertically to create a feature wall, to define the ‘living space’ from the dining space and kitchen in the open-plan apartment. The timber ‘beams’ also serve to conceal wiring works for the downlights and ceiling fan to omit the use of false ceiling in the light of maximising the floor-to-ceiling height. The master bedroom are furnished with integrated bed frame with bedside table and vanity/ study desk, in addition to a full height wardrobe, in order to leverage on the efficiency of the room to suit the client’s lifestyle despite its small size.
PROJECT INFORMATION
RESPONSIBILITIES
Project type |
- Design and oversee work progress
Interior Design & Build for 3 Bedroom Unit at The Light Residence
- Produced Schematic Design by working closely with the owner to understand their preference.
Unit size
| 102 sqm ( 1100 sqft)
Status
| Interior Fitting Out Works
- Completed Interior Construction Drawings as well as images - Liaise with the Contractors and Suppliers for details and materials selection.
Living Room
Living Room
Master Bedroom
Plan (Scale 1:75)
FURNITURE DESIGN The project seeks to produce distinctive furniture pieces using responsibly sourced local timber with local craftmens, catered for small to medium sized residences. Pieces in this first series uses Shorea (Genus) timber that is named ‘Selangan Batu’ locally. This hardwood is very durable and has generally fine and even texture with some interlocking grains. It comes in beautiful yellow to brown hue that is popular with modern homes. The pieces features tesselated surface that adds interest to the pieces and the interior it is in. The tesselated surface demonstrates fine craftmenships as well as textures of natural wood. Apart from that, the tesselated feature also serves to compensates the rather little features found in natural tropical timber.
RESPONSIBILITIES - Furniture design from concept to details, working closely with local craftmens - Contribute to branding concept -Contribute to website content