Our brochure showing some of the projects Tunnel Form Construction crews have completed on 4 continents over the past 10 years+. Over 13,000 units built to date with this fast track method of construction that allows upto 500m2 (5000ft2) of concrete to be casted daily per team. What does ths mean? Just how fast is the system? Well examples would be
- 10 luxury villas of 300m2 over two floors can be completed in... 1 month.
- A 12 floor luxury apartment block of 48 apartments of 150m2 each can be completed in... 1 month.
- a 120 room boutique hotel with 35 m2 rooms built over six floors can be completed in...1 month
There is simply no quicker way to build fast economical concrete structures