SIDE STREAM FILTRATION CASE STUDY
CHILLED WATER (CHW) AND LOW TEMPERATURE HOT WATER (LTHW) SIDE STREAM FILTERS FOR THE WALBROOK BUILDING, CENTRAL LONDON
“
“
The equipment was manufactured to a high quality standard and delivered on time to meet our project schedule. Project Manager
CLIENT
BUILDING LOCATION
SECTOR
The Walbrook Building
City of London
Business Centre
ABOUT THE PROJECT Due to the prestigious nature of this building the main consultants needed to ensure the environmental systems worked perfectly. Therefore as part of the design process Amazon Filters Side Stream systems were specified to protect the Chilled Water (CHW) and Low Temperature Hot Water (LTHW) circuits. For this project a faster than usual system clean-up was required and this high level of performance needed to be maintained for the on-going normal operation. This requirement resulted in a system that needed to be designed for 10 bar operating pressure.
AMAZON FILTERS SIDE STREAM FILTRATION 62 SERIES HOUSINGS 61 SERIES HOUSINGS DRAIN VALVES, PRESSURE GAUGES AUTOVENTS HIGH TEMPERATURE AND LOW TEMPERATURE SUPAGARD FILTER CARTRIDGES
3 3 3 3 3
PROJECT CHALLENGES To achieve the rapid clean up the system needed to be designed for a higher than usual flow rate and the system required operation at this elevated flow rate on an on-going basis. The specially designed system then needed to be delivered in a short period of time.