Energy Efficiency Case Study - Laboratory EPBD Compliance

Page 1

Client: Location: Site: Date: Laboratory & North East of England Redcar August 2012 Office Accommodation

Sector: Laboratory EPBD Compliance

Energy Efficiency Case Study

Study to determine what the effect of changing the primary heating fuel from waste heat to natural gas would have on the Energy Performance Certificate rating, and letability of the property portfolio after 2018 Regulation: Provisions in the Energy Act 2011 provide for powers to ensure that from April 2018, it will be unlawful to rent out a residential or business premises that does not reach a minimum energy efficiency standard (the intention is for this to be set at EPC rating ‘E’).

About the project: The facility in question is a site which rents out office, laboratory and pilot plant accommodation to a number of companies. In 2009 EECO2 was commissioned to provide Energy Performance Certificates across the site to comply with EPBD regulations. Understanding the EPC rating amd grid fuel supplied are key to the site’s energy future plans.

Client Requirements: The site does not have an independent gas or electric supply. Electricity and waste-heat steam is supplied by the adjacent power station. The cost of procuring the steam from the power station has nearly doubled within 3 years. The client requested EECO2 to evaluate what the impact on the Energy Performance Certificate ratings would be by changing their primary heating fuel from waste heat to natural gas and by connecting directly to the grid for their electricity supply.

Project Challenges: The original Energy Performance Certificates were issued using SBEM software 3.2b in 2009; the software has since undergone several amendments and upgrades as part of the on-going improvements. The first task was to convert the EPCs to the latest software 4.1d. This led to a fall in the ratings of all of the EPCs across the site due to the software being more accurate. What was unexpected was by how much they fell across some of the buildings. It became evident that the blocks within the main building which contained laboratories that are heated by air ventilation systems were affected the most, with the worst case seeing a block being reduced from a C72 rating to G306 rating.

www.eeco2.co.uk


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Energy Efficiency Case Study - Laboratory EPBD Compliance by Simply Marcomms - Issuu