Plastic Surgeon Case Study ISG Pearce - Rendering Repairs and Stone Tinting

Page 1

IT, SKIP T ’ DON

! T I X FI

on urge000 S c i t Plas 5 141 0 084

Plastic Surgeon Case Study:

ISG Pearce Ltd Client: Sector: Repairs:

ISG Pearce Ltd Construction: Healthcare Rendering and cosmetic repairs, Stone Tinting

Site:

Assessment Building, Gloucestershire Royal Hospital, Gloucester GL1 3NN

The Challenge ISG Pearce is a major construction company operating across the South West and South Wales. Offering 85 years worth of experience, ISG Pearce is now part of the international construction group ISG plc. Having finished the new Assessment Building at Gloucestershire Royal Hospital with render, it was noted that confusion over drawing revisions had led to a feature boarder around the windows being omitted. This was an essential element to ensure that the new structure resembled the old building across the road. Plastic Surgeon was called in to see if its Fine Finishers could add the cosmetic design around all six windows of the new building to make sure this aesthetic detail was included.

The Solution Plastic Surgeon’s suggestion was to create the illusion of a feature which really equated to a “box” around each window in a contrasting colour to the render. Several finishers created some colour match swatches which were presented to the building designer, Christina Gorton, for approval.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Plastic Surgeon Case Study ISG Pearce - Rendering Repairs and Stone Tinting by Simply Marcomms - Issuu