02/07
IN-PATIENT NEUROLOGY AND NEUROSURGERY/ RECOVERY
THE STRONG HEARTED, STRONG MINDED GROUP PROPOSED
TO
JILLISSA
CHICAGO
MOORMAN,
IN-PATIENT
SHSM
GROUP
•
6965
CEDAR
OF
NEUROLOGY. RFP
THE
CEO
#11-238197
TOWER
RAPIDS,
IA,
RD
SW,
52404
TABLE OF CONTENTS 1. INTRODUCTION
2. QUALIFICATIONS
3. SCOPE OF PROJECT
4. SUBMITTAL INFORMATION
5. PROPOSED TIMELINE
6. PROPOSED BUDGET
SHSM GROUP
SHSM
02/07
GROUP
WHY CHOOSE US? WHAT CAN WE DO FOR YOU? WHAT DO WE OFFER?
INTRODUCTION THE
SHSM
Illinois
GROUP
with
knowledge GROUP the
in
prides
detail itself
process
15
both
offers
specific
Every
its
over
is
a
a
years
makes
a
every
and
complete
firm
based
experience. residential
experience,
in
With
Chicago, well-rounded
design,
capable
THE
of
SHSM
catering
within
modern,
each
and
project's
design,
which
adaptable
is
why
design,
individual
SHSM
modifying
requirements.
WHO IS THE SHSM GROUP? #1 #4
DESIGN
FIRM
IN
COMMERCIAL
CHICAGO
DESIGN
IN
THE
MIDWEST RANKED
IN
TOP
COMMERCIAL 2018, AS
2019,
SEEN
DIGEST',
IN
5
NATIONWIDE
PROJECTS
2016,
2020 'ARCHITECTURAL
'DWELL',
CELEBRITY
AND
'VOGUE'
DESIGN
PROFESSIONALS COLLABORATED KNOWLES HIT
GROUP
AND
SINGERS
CHILD'
SHSM
to
project.
difference
clear-cut,
design
design
one-of-a-kind of
to
of
commercial
needs
in
renowned
WITH
KELLY
OF
BEYONCE ROWLAND,
'DESTINY'S
SHSM
02/07
GROUP
QUALIFICATIONS THE
SHSM
reach
GROUP
around
Presbyterian Center Patient
the
Pavilion
in
and
functionality
Wendy,
the
firm
around
the
world.
Healthcare
is
to
and
detail
requirements,
Our
design
all
team in
we
professional,
Founded
and
needs, to
a
to
Eisenberg
by
firm
high
along
priority with
our
Retina
Hill
in
Hospital
Germany.
innovation
Siobhan,
and
all
specializes
in
Design, incredible
THE
results.
SHSM
implementing
clients'
visions
proper in
applications.
SUCCESSFUL
WORKS
GROUP
Carolina,
spaces
for
ON
PAGE
a
Health
emphasizes Ashlyn,
with
Novant
Cherry
create
VIEW
SHSM
North
Residential
replicate
precise
in
extraordinary the
expertise
include
that
2007
personalities
able
and
in
firm
Illinois,
is
and
Jefferson
created
Design,
clients'
are
Renovation
product
functionality
our
projects
Waldkliniken
Chicago,
well-known
experience
Brazil,
and
have
Hospitality
and
in
and
users.
of
recent
Inpatient
Jersey,
its
to
scope
Clinic
Based
with
Catering
beautiful,
a
for
Design,
collaborating
Attention
New
GROUP
large
Center
Ophthalmology
SHSM
code
a
world.
Medical
THE
GROUP.
has
5.
PREVIOUS
PAST PROJECTS WALDKLINKEN EISENBERG, GERMANY
NOVANT HEALTH PRESBYTERIAN MEDICAL CENTER INPATIENT, CHARLOTTE, NORTH CAROLINA
SHSM
GROUP
PAST PROJECTS JEFFERSON CHERRY HILL HOSPITAL PATIENT PAVILION, NEW JERSEY
RETINA CENTER OPHTHALMOLOGY CLINIC, PORTO ALEGRE, BRAZIL
SHSM
GROUP
SHSM
02/07
GROUP
SCOPE OF PROJECT
NEW BUILD SCOPE OF SERVICES A.
PROGRAM
A. CONCEPTUAL
DESIGN
B. CONCEPTUAL
PROGRAM
C. SPACE B.
DEVELOPMENT
DESIGN
ADJACENCIES
DEVELOPMENT
A. INITIAL
DRAWINGS
B. PRELIMINARY C.
SELECTIONS
DOCUMENTATION
A. FINAL
DRAWING
B. FINAL
FFE
SET
SPECIFICATIONS
CONSTRUCTION
ADMINISTRATION
SPACE PLANNING
D.
CONSTRUCTION
FFE
SHSM
GROUP
SHSM
02/07
GROUP
SUBMITTAL INFORMATION PROPOSALS
MUST
BE
NEUROLOGY,
BY
LABELED
SHSM
FAILURE
'THE TO
DO
THE
SO
JANUARY
06
JANUARY
20,
SUBMITTED 9TH
OF
GROUP WILL
2022
JILLISSA
FEBRUARY,
MOORMAN,
2022
AT
9:15
CEO
AM.
VIA
OF
CHICAGO
CLASS
IN-PATIENT
PRESENTATION
RFP'
RESULT
,2022
TO
IN
NO
FURTHER
REQUEST
FINAL
CONSIDERATION.
FOR
DAY
PROPOSALS
FOR
ISSUED
QUESTIONS
FEBRUARY
06,
2022
PROPOSAL
SUBMISSIONS
OPEN
FEBRUARY
09,
2022
PROPOSAL
SUBMISSIONS
CLOSE
FEBRUARY
10,
2022
PROPOSAL
EVALUATIONS
BEGIN
FEBRUARY
14,
2022
FORMAL
INTERVIEW
PROCESS
BEGINS
FEBRUARY
21,
2022
FORMAL
INTERVIEW
PROCESS
CONCLUDES
FEBRUARY
28,
MARCH
1,
2022
2022
FINAL
AT
9:15
DECISION
CHOSEN
CANDIDATE
NOTIFIED
PROJECT COMMENCEMENT: MARCH 2, 2022.
SHSM
GROUP
AM
PROPOSED TIMELINE FEBRUARY 9, 2022
MARCH 10, 2022
PROGRAMING + ANALYSIS PHASE
SCHEMATIC DESIGN PHASE
ANALYZE: SITE, EXISTING CONDITIONS,
INITIAL BUDGETING
ARCHITECTURE, BUDGET, PREFERED TIMELINE,
INTRODUCE CONCEPT FOR CLIENT'S
AESTHETIC, AND LIFESTYLE
APPROVAL
FINALIZE DESIGN SCOPE
INITIAL DESIGN DEVELOPMENT
COMPLETE INVENTORY + SURVEYING
DESIGN IDEAS FOR KEY SPACES
-
AUGUST 30, 2022 DOCUMENTATION PHASE FULLY DOCUMENT CLIENT'S APPROVED
MAY 30, 2022 DESIGN DEVELOPMENT PHASE
MATERIALS, FINISHES, FIXTURES, EQUIPMENT,
FULLY DEVELOP ALL SPACES PER CONCEPT
AND FURNITURE FOR PURCHASING AND
SELECTION OF ALL MATERIALS, FINISHES,
BIDDING
FIXTURES, EQUIPMENT, AND FURNITURE
SPECIFICATION BOOKS -FINALIZED DRAWINGS -
FINAL DESIGN PROPOSAL/PRESENTATION -MATERIALS FOR APPROVAL -
NOVEMBER 29, 2022 CONSTRUCTION ADMINISTRATION SUBCONTRACTORS AND QUOTES FINALIZE BUDGET AND VALUE ENGINEERING INITIATE CONSTRUCTION AND PURCHASING INSTALLATION
BUDGET -INFIELD SOLUTIONS -
SHSM
GROUP
MOVE IN DECEMBER 3, 2022
SHSM
02/07
GROUP
PROPOSED BUDGET DESIGN
.08 M
FURNISHINGS .6 M
FINISHES .3 M
CONSTRUCTION 1.25 M SHSM
GROUP
SHSM
02/07
GROUP
BUDGET CONTROL METHODOLOGY SHSM
PROPOSES
AUTHENTICATE ESTIMATES OF
BOTH
TEAM'S
SUPPORT
A
TO
BE
TO
WILL
REVIEW
AND
SCOPE
OR
PROCESSION BEGINS
THE
ONLY
AT
AN
OUR
COST
BUDGET
IS
THE
OF
IMPLEMENTED
THE
IF
LEVEL
STAGE.
BUDGET
TO
EVALUATION
COMPLETED
BE
THERE
OUR
REALISTIC
PRELIMINARY
GUARANTEE ALL
INDEPENDENTLY
SCOPE
ARE
WORKSHOPS WAY
AND
WORK.
THE
QUALITY
TO
AS
A
IN-DEPTH
AGREEMENT
AND
ON
CHANGES.
NEXT
PLANNED
OWNER
IS
IN
SHSM'S 4 KEY ELEMENTS ENSURING PROJECT BUDGET COMPLIANCE
STAGE 1. UTILIZATION
FULL
OF
CONSULTANT
AGREEMENT PROJECT
IS
THAT
EACH
BEING
OBJECTIVE
OF
THE
EXECUTED.
DAY TO
DECISION
PROMOTE
PROJECT
IN
ORDER
THIS WE
MAXIMIZE
PROJECT,
HAVE
COSTS. OF
TO
THE
IT
IS
SHSM
MOST
PLANNING, WHEN
AND
COSTS
CONTROLLED MONITORS PROJECT OUR
AND
THE
MOST
A
WHEN
OVER
EARLY
STAGES
DESIGN
EFFECTIVELY
DEFINED.
SYSTEM
ADHERES
MODEL
THE
OF
PROGRAMMING,
TO
OF
THAT
THE
THROUGHOUT
EACH
ENSURES
ORIGINAL THE
ENTIRE
DEVELOPMENT.
IT
IS
VITAL
TO
AVOID
BACKTRACKING DECISIONS
SHSM
GROUP
AS
BY
POTENTIAL
DEFINING
EARLY
AS
KEY
COSTLY COST
POSSIBLE.
ALL
A
COMPONENTS THE
TO
IS
OF
GOALS.
ANY
PROJECT
THEIR
INFLUENCE
BUDGET. COMMUNICATION ALL
KEPT
SESSIONS,
CONFIRM
DRIFT
OF
ARE
AND
OF
MEMBERS
AND
ENSURING
INVOLVED
PROCESS
COMPLETE
PROJECT
3. APPLICATION TOOLS
DESIGN
INFORMATION
TEAM IN
DAY-TO-
UNDERSTANDING
OF
UNDERSTANDING
ON
THE
PARAMETERS
RESULTING
4. WORK
SHSM
DEVELOPMENT
USING
TEAM
COST
CONTROL
SCHEMATIC
ARE
BUDGET
UNDERSTANDS
DURING
ARCHITECTURAL
THE
AMONG
COST
IN
AND
THE
2. DISTRIBUTION
BUDGET MAXIMIZATION
OUR
TEAM
PARTIES
INFORMED.
WHEN
WARRANTED,
POTENTIAL
DEMINISHED.
SCOPE
THANK YOU FOR YOUR CONSIDERATION.
SHSM GROUP