SUBMITTED BY SIOBHAN GIBBENS
ADOBE RFP SUBMITTAL #01-070901 02/28/2022
TOGETHER, WE CREAT CHANGE
TABLE OF CONTENTS 1. INTRODUCTION 2. QUALIFICATIONS 3. SCOPE OF PROJECT 4. SUBMITTAL INFORMATION 5. PROPOSED TIMELINE 6. PROPOSED BUDGET
OVERVIEW OF THE COMPANY Space 07 is a new-age, modern, and sleek commercial design firm with 2022 being its 10th official year in business. With great knowledge in commercial, hospitality, and residential design, Space 07 is confident in conforming to the needs of each individual project, creating a sense of belonging in every space provided. Focusing on both functionality and new, innovative, application techniques, Space 07 is able to completely modernize any project, no matter the scale, providing its clients with results they could have only wished for. Current projects at Space 07 include, but are not limited to: an in-patient neurology and neurosurgery healthcare facility, a residential reconstruction, and a residential parade home.
SUBMITTED BY SIOBHAN GIBBENS
THE PROJECT The Adobe Commercial Office Project consists of remodeling an existing 16th-floor office space in Atlanta, Georgia, into a fresher, sleeker, more functional, and modern office headquarters for Adobe. This facility will serve as a multi-functioning space, providing an area for training, sales & marketing, meeting with clients, and other necessary tasks. Adobe's current headquarters resides in San Jose, California, meaning the new space must be both completed project-wise and finished material-wise to the highest standards.
OUR QUALIFICATIONS
SUBMITTED BY SIOBHAN GIBBENS
With Space 07 having great knowledge in both commercial and residential design, the company prides itself in performing to the best of its ability on every project, no matter the scale, Creating detailed, personable, and ultramodern design is what makes all the difference between Space 07 and other interior design firms, and it truly shows throughout the company's work portfolio. Space 07 revolves around state-of-the-art design and will settle for no less than exemplary, for that is not only upsetting for the clients, but shameful to the interior design industry. Excited for the future of contemporary styles, Space 07 is an active participant in designing functional, large-scale spaces that present various services to their occupants, while providing an otherworldly experience.
ACCOMPLISHMENTS - OVER 15 FEATURED PROJECT IN 'ARCHITECTURAL DIGEST' - AWARDED '2022 BEST OF HOUZZ' FOR THE 6TH YEAR IN A ROW - FIXR TOP INFLUENCER 2021 - LUXE INTERIORS & DESIGN 'GOLD LIST' 2018, 2019, 2022
SEE PAST PROJECTS ON THE NEXT PAGE.
PREVIOUS PROJECTS
THE HOME DEPOT HEADQUARTERS
2455 PACES FERRY RD SE, ATLANTA, GA 30339
THE SALESFORCE TOWER 415 MISSION ST, SAN FRANCISCO, CA 94105
PREVIOUS PROJECTS
THE SANCTUARY HOUSE
AMAGANSETT MODULAR HOUSE
PALO ALTO, CALIFORNIA, USA
AMAGANSETT, NEW YORK, USA
SCOPE OF PROJECT: RECEPTION EQUIPMENT ROOM PRESENTATION AREA
SUBMITTED BY SIOBHAN GIBBENS
REMODEL OF EXISTING INTERIOR OFFICE SPACE
TRAINING SPACE MULTI-SIZED CONFERENCE ROOMS CAFE WORKROOMS OFFICES
SCOPE OF SERVICES: PROGRAM DEVELOPMENT: 1. PRELIMINARY CLIENT PRESENTATION 2. SPACIAL ALLOCATIONS 3. CONCEPTUAL DESIGN ELEMENTS DESIGN DEVELOPMENT: 1. PRELIMINARY DRAWINGS 2. FFE SELECTIONS 3. ARCHITECTURAL CHANGES CONSTRUCTION DOCUMENTATION: 1. FINAL CONSTRUCTION SET 2. SPECIFIC FFE BINDER
SUBMITTAL INFORMATION
SUBMITTED BY SIOBHAN GIBBENS
FEB. 23, 2022 REQUEST FOR PROPOSAL ISSUED FEB. 25, 2022 FINAL DAY FOR PROJECT QUESTIONS FEB. 28, 2022 PROPOSALS DUE BY 9:15 AM FEB. 28, 2022 EVALUATIONS BEGIN MAR. 1, 2022
EVALUATIONS END
MAR. 1, 2022
INTERVIEWS BEGIN
MAR. 5, 2022
INTERVIEWS END
MAR. 8, 2022
SELECTED CANDIDATE NOTIFIED
PROJECT COMMENCEMENT: MARCH 9, 2022
PROPOSED TIMELINE
SUBMITTED BY SIOBHAN GIBBENS
TO BE COMPLETED ON OR BY
PROJECT START DATE
MARCH 9, 2022
ANALYSIS OF LOCATION
MARCH 10, 2022
BUDGET ESTABLISHED
MARCH 12, 2022
PRELIMINARY DESIGN PHASE
MARCH 19, 2022
PRELIMINARY FFE SELECTIONS
MARCH 26, 2022
DESIGN DEVELOPMENT PHASE
APRIL 16, 2022
FINALIZED FFE SELECTIONS
APRIL 21, 2022
DOCUMENTATION
APRIL 28, 2022
MOVE-IN: MAY 9, 2022
PROPOSED BUDGET
SUBMITTED BY SIOBHAN GIBBENS
DESIGN .4M FURNISHINGS .75M FINISHES .3M CONSTRUCTION .65M TOTAL COST 2.1M
SUBMITTED BY SIOBHAN GIBBENS
THANK YOU FOR YOUR CONSIDERATION